निविदाएं

Please click here to see all MOIL tender.

 
External Independent Monitor  Finalised Tenders  MOU Between MOIL & TII
View Previous Tenders (2010-11)  Integrity Pact  
View Previous Tenders (2011-12)  
View Previous Tenders (2012-13) -,Other Previous tenders are available in Tender Archive Contracts finalised on nomination basis (2015-16)
Contracts finalised on nomination basis (2016-17)
 


खोज के लिए शीर्षक दर्ज करें  
खोज के लिए निविदा जारी करने की प्रारंभ दिनांक दर्ज करें      
खोज के लिए निविदा जारी करने की अंतिम तिथि दर्ज करें      

क्रमांकनिविदा शीर्षकनिविदा जारी करने की प्रारंभ दिनांकनिविदा जारी करने की अंतिम तिथिनिविदा जमा करने की अंतिम तिथिनिविदा खुलने की तिथिनिविदा खुलने का समयविवरण देखेफ़ाइल डाउनलोड करें
1Picking and collection of 20 percent Mn. SM Grade ore BGL-564 from subgrade mineral reject of Underground ROM at Balaghat mine(MOIL/19-20/ET/306)19/11/201919/12/201919/12/201919/12/201903:30 PMदेखे
2Picking and collection of UKL -471 20 percent from Footwall subgrade mineral stock from Ch.10000 to Ch.12000 at Ukwa Mine(MOIL/19-20/ET/303)19/11/201919/12/201919/12/201919/12/201903:30 PMदेखे
3Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of sub grade mineral reject from ROM at Magazine sub grade mineral stock area west side section of Chikla Mine(MOIL/19-20/ET/304)19/11/201919/12/201919/12/201919/12/201903:30 PMदेखे
4Cleaning and sorting of ROM recovered from North off the pit plot No.6 at Sitapatore Mine(MOIL/19-20/ET/305)19/11/201919/12/201919/12/201919/12/201903:30 PMदेखे
5Transportation of Coal to Fe. Mn. Plant, Balaghat Mine- 2,600 MT(WE-82 e -Tender No. MOIL/19-20/ET-322 Dt.18.11.19)18/11/201910/12/201910/12/201911/12/201903:30 PMदेखे
6Work for outsourcing meter reading, preparation of deduction list and processing of local tenders of Electrical Dept of Balaghat Mine(BGT/ELECT/19-20/807)19/11/201909/12/201909/12/201909/12/201904:30 PMदेखे
7Purchase of HT VCB Panels for Various Mines - 8 Lots. (Only Through e-procurement)(WE-85(ET-321) DT.16/11/2019)16/11/201909/12/201909/12/201910/12/201903:30 PMदेखे
8Outsourcing of Operation and Maintenance of Crushing and Screening Plant at Gumgaon Mine for the period of 24 Months (Two Years) (MOIL/19-20/ET/281)05/11/201905/12/201905/12/201905/12/20193:30 PMदेखे
9Outsourcing of Industrial Pumping Operation and Maintenance in Underground Vertical Shaft at Munsar Mine for the period of One year (12 Months) (MOIL/19-20/ET/280)02/11/201905/12/201905/12/201905/12/20193:30 PMदेखे
10Outsourcing of Industrial Pumping Operation in Underground Mine at Gumgaon Mine for period of 12(Twelve) Months(MOIL/19-20/ET/278)25/10/201904/12/201904/12/201904/12/201903:30 PMदेखे
11Maintenence, distribution and collection of caplamps at Balaghat Mine(BGT/ELECT/19-20/3694)13/11/201903/12/201903/12/201903/12/201904:30 PMदेखे
12Dismantling of old sheave wheel and installation, Commissioning of new sheave wheel 2800 mm diameter 1 no at Kandri Mine(A-III/KAN/19-20/2672)13/11/201903/12/201903/12/201904/12/201904:30 PMदेखे
13Repairing of Hydraulic Control Valve of Dozer BD155 No 2 operating at Dongri Buzurg Mine(DB/MECH/19-20/JGM(MECH)/562)18/11/201903/12/201903/12/201903/12/201904:30 PMदेखे
14Repairing of Bucket Assembly 5.6 CU M 4 Nos. of TATA Hitachi 1200 No 3 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/JGM(MECH)/561)18/11/201903/12/201903/12/201903/12/201904:30 PMदेखे
15Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at East Side Part-6 of Dongri Buzurg Mine (MOIL/19-20/ET/289)01/11/201902/12/201902/12/201902/12/20193:30 PMदेखे
1 2 3