निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. PCC to be carried out at -330 Level AT MUNSAR MINE.(7100000782/MUN/2018-19/469) 16-05-2018 25-05-2018 25-05-2018 25-05-2018 04:30 PM Active और देखें
2. Pushing and unloading of ROM and rock tubs in underground and on surface AT MUNSAR MINE.(7100000781/MUN/2018-19/468) 16-05-2018 25-05-2018 25-05-2018 25-05-2018 04:30 PM Active और देखें
3. Design Supply and Installation of mild steel n stainless steel piping work for both steam line and condensate line and Design Supply and Installation of dual laminated composite material trench n overflow bends for spent solution at EMD Plant, Dongri(MOIL 16-05-2018 30-05-2018 30-05-2018 30-05-2018 03:30 PM Active और देखें
4. Short term e-Tender for Purchase of Industrial Power Heater - 90 Nos. and 0-1200 degree C Thermocouple - 18 Nos.(2 Lots) for EMD plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-31 (MOIL/18-19/ET/66) DT.15/05/2018) 15-05-2018 24-05-2018 24-05-2018 25-05-2018 03:30 PM Active और देखें
5. Construction of shed in D type bungalow at Munsar Mine (MUN/CIVIL/18-19/20 DT 13.05.2018) 15-05-2018 15-05-2018 25-05-2018 25-05-2018 04:30 PM Active और देखें
6. Purchase of Temperature Control Panel - 18 Nos.(1 Lot) for EMD plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-30 (MOIL/18-19/ET/65) DT.15/05/2018) 15-05-2018 24-05-2018 24-05-2018 25-05-2018 03:30 PM Active और देखें
7. Construction of Stone Pitching Parapet Wall for Side slope Stability for Newely Diverted Hutch drain at ocf jig section at Balaghat Mine.(Civil/BGT/T.E./2018-19/81) 15-05-2018 21-05-2018 21-05-2018 21-05-2018 04:30 PM Active और देखें
8. PURCHASE OF Sensor Assembly for 1500 KVA, 11KV DG Set for CHIKLA MINE(TE-04 DT.14052018) 15-05-2018 28-05-2018 28-05-2018 28-05-2018 04:30 PM Active और देखें
9. Purchase of Ore-Petrology Microscope and Microscope Camera - 1 No.each (2 Lots) (Only Through e-procurement)(Purchase of Ore-Petrology Microscope and Microscope Camera - 1 No.each (2 Lots) (Only Through e-procurement)(WE-27 (MOIL/18-19/ET/64) DT.14/05/201 14-05-2018 25-06-2018 25-06-2018 26-06-2018 03:30 PM Active और देखें
10. Filling and spreading work at haulage road Munsar Mine (Mining/MUN/18-19/417) 14-05-2018 25-05-2018 25-05-2018 25-05-2018 04:30 PM Active और देखें
11. Cleaning of sand from 170 L and 70 L at Munsar Mine (Mining/MUN/18-19/416) 14-05-2018 14-05-2018 25-05-2018 25-05-2018 04:30 PM Active और देखें
12. Construction of New Vehicle washing pit near workshop premises at Ukwa Mine(16/Civil/UM/18-19/338) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 04:30 PM Active और देखें
13. Concreting work for Chamber Prepration at1850 level Ukwa Mine(16/Mining/UM/18-19/335) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 04:30 PM Active और देखें
14. Providing Polymers Based Lining with acid referactory bricks at EMD Plant at Dongri Buzurg Mine(MOIL/18-19/ET/27) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 03:30 PM Active और देखें
15. Design Supply and Installation of FRVE and HDPE piping work for supply of feed and spent solution and Insulation work including material for steam and condensate pipeline and One Condensate Tank at EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/28) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 03:30 PM Active और देखें
16. Cage Suspension Gear -3sets(C-12-12-WE26-ET-63 D.14-5-2018) 14-05-2018 07-06-2018 07-06-2018 08-06-2018 03:30 PM Active और देखें
17. Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine (AGT/BGT/MECH/IMB/18-19/75 DTD 10.05.2018) 12-05-2018 12-05-2018 25-05-2018 25-05-2018 04:30 PM Active और देखें
18. Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine (MOIL/18-19/ET/48) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active और देखें
19. Underground Vertical Development and allied work at 1750 Level at Ukwa Mine (MOIL/18-19/ET/42) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active और देखें
20. Washing picking and collection of material from West side of D Dump waste dump at Tirodi Mine (MOIL/18-19/ET/44) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active और देखें
21. Picking and collection of material to recover Ferro Grade Ore KD 2272 from Dumps at Kandri Mine (MOIL/18-19/ET/45) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active और देखें
22. Construction of Additions to Third Floor East and WestWings of MOIL Bhavan Nagpur (MOIL/18-19/ET/ 26) 11-05-2018 12-06-2018 12-06-2018 12-06-2018 03:30 PM Active और देखें
23. Laying of 6 G.I. Pipe line -180 mtrs and 4 G.I. Pipe line-180 mtrs in vertical shaft for pumping operation at Kandri Mine (MOIL/18-19/ET/31 ) 11-05-2018 13-06-2018 13-06-2018 13-06-2018 03:30 PM Active और देखें
24. TESTING OF HOT AND EOT CRANRS INSTALLED IN BALAGHAT MINE (BGT/MECH/CRANE-TEST/18-19/1050 ) 11-05-2018 11-05-2018 22-05-2018 22-05-2018 4:00 PM Active और देखें
25. Shifting of 3 phase 3 wire HT Overhead line of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/67) 11-05-2018 11-05-2018 17-05-2018 17-05-2018 04:30 PM Active और देखें
26. PURCHASE OF TRACK ROLLER ASSEMBLY FOR EIMCO ELECON MADE SIDE DUMP LOADER MODEL 625CR, PART NO- 1027C050000005 (PUR/MOIL/BGT/SDL/18-19/73 dtd 09.05.2018) 11-05-2018 11-05-2018 24-05-2018 24-05-2018 04:30 PM Active और देखें
27. Open e-Tender No. WE-09-ET-62 for purchase of PEARL COKE with Transportation (WE-09 e-tender No.MOIL/18-19/ET-62, Dt.11.05.18) 11-05-2018 04-06-2018 04-06-2018 05-06-2018 03:30 PM Active और देखें
28. Purchase of industrial power heaters for cells of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/66) 10-05-2018 16-05-2018 16-05-2018 16-05-2018 4:00 PM Active और देखें
29. Arc Flash Protective wear (PUR-MOIL-C-1-WE-25-ET-61) 10-05-2018 11-06-2018 11-06-2018 12-06-2018 03:30 PM Active और देखें
30. Shifting of 3 phase, 3 wire HT OH line and 11KV outdoor substation at Dongri Buzurg Mine (MOIL/18-19/ET/32 ) 10-05-2018 10-05-2018 08-06-2018 08-06-2018 03:30 PM Active और देखें
31. SUPPLY OF BLACK GITTI FOR CONCRETING AT CHIKLA MINE (TE-03 DT.08052018) 09-05-2018 09-05-2018 15-05-2018 15-05-2018 04:30 PM Active और देखें
32. Purchase of Geological Modelling, Mine Planning and Design Software for Four Modules i.e. Core, Tools, Geology and Surveying (WE-3 Dt.09/05/2018 (e-Tender No.MOIL/18-19/ET/60)) 09-05-2018 12-06-2018 12-06-2018 13-06-2018 03:30 PM Active और देखें
33. Design, Manufacture and Supply Plummer Block of Pinion shaft of Production Shaft winder of Balaghat Mine (BGT/MECH/PS/18-19/ 989) 09-05-2018 24-05-2018 24-05-2018 24-05-2018 4:00 PM Active और देखें
34. Open e-Tender No. WE-24-ET-56 for Purchase of copper bus bar, aluminium bus bar, Z bar and various type copper-aluminium bus with other electrical accessories for new Cell-Bay section at EMD PLANT, DONGRI BUZURG MINE (WE-24 e-tender No.MOIL/18-19/ET-56, D 09-05-2018 09-05-2018 30-05-2018 31-05-2018 03:30 PM Active और देखें
35. TENDER ENQUIRY FOR ANNUAL MAINTENANCE CONTRACT OF COMPUTER, LAPTOPS, PRINTER, UPS AND NETWORKS (SYS/HW MAINTENANCE/2018-19/2) 09-05-2018 30-05-2018 30-05-2018 30-05-2018 3:00 PM Active और देखें
36. Purchase of 550 H.P., 1000 RPM, Laminated Yoke, Shunt Wound, D.C.Motor - 2 Nos. for Double Drum Winder of Balaghat Mine (WE-23 (MOIL/18-19/ET/58) DT.09/05/2018) 09-05-2018 09-05-2018 06-06-2018 07-06-2018 03:30 PM Active और देखें
37. Purchase of Lead Steam Coil - 10 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-18 (MOIL/18-19/ET/59) DT.09/05/2018) 09-05-2018 14-06-2018 14-06-2018 15-06-2018 03:30 PM Active और देखें
38. Purchase of Electrically Operated Travelling Crane - 1 No. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-17 (MOIL/18-19/ET/57) DT.09/05/2018) 09-05-2018 09-05-2018 05-06-2018 06-06-2018 03:30 PM Active और देखें
39. Limited tender for Removal of spillage from the bottom of conveyor belt of 141/2 level Loading station Production Shaft (BGT/ Mech /spillage/18-19/ 456) 08-05-2018 16-05-2018 16-05-2018 16-05-2018 5:50 pm Active और देखें
40. PURCHASE OF SULPHATE TRANSFER PUMP 1 NO. AND CONDENSATE PUMP WITH MOTOR AND BASE FRAME 2 NOS. FOR EMD PLANT DONGRI BUZURG MINE (PUR/MOIL/C-4/78/E-8 /155 -M Dt.07.05.2018) 08-05-2018 08-05-2018 21-05-2018 22-05-2018 03:30 PM Active और देखें
41. Housekeeping inside the house premises of IMB Plant at Balaghat Mine (MOIL/18-19/ET/33) 08-05-2018 22-05-2018 22-05-2018 22-05-2018 03:30 PM Active और देखें
42. Construction of Stone Pitching Parapet Wall around Mine Dump Area behind Siding Region, Balaghat Mine. (Agent Sr DGM/Civil/BGT/18-19/981 Date 07.05.18) 08-05-2018 17-05-2018 17-05-2018 17-05-2018 04:30 PM Active और देखें
43. PURCHASE OF CONDENSATE TANK WITH ACCESSORIES - 1 NO. FOR EMD PLANT, DONGRI BUZURG MINE (PUR/MOIL/C-4/315 /E-7 /156-M) 08-05-2018 21-05-2018 21-05-2018 21-05-2018 03:30 PM Active और देखें
44. Purchase of MS Neoprene Rubber Lined Cell Feed Tank with Accessories - 1 No.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-20(MOIL/18-19/ET/52) DT.08/05/2018) 08-05-2018 04-06-2018 05-06-2018 05-06-2018 03:30 PM Active और देखें
45. Purchase of Polypropelene Pad - 80 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine WE-22(MOIL/18-19/ET/55) DT.08/05/2018 08-05-2018 31-05-2018 01-06-2018 01-06-2018 03:30 PM Active और देखें
46. Purchase of Mild Steel Square Bar Cladded with Copper Sheet - 700 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-21(MOIL/18-19/ET/54) DT.08/05/2018) 08-05-2018 31-05-2018 01-06-2018 01-06-2018 03:30 PM Active और देखें
47. Outsourcing of Industrial Pumping Operation in Underground Vertical Shaft of Munsar Mine (MOIL/18-19/ET/30 ) 08-05-2018 08-06-2018 08-06-2018 08-06-2018 3:30 PM Active और देखें
48. Washing picking and collection of material from waste reject crude from West side of 6 B at Tirodi Mine (MOIL/18-19/ET/34) 08-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active और देखें
49. Conveyor Belt (PUR-MOIL-C-12-20-WE-01) 08-05-2018 07-06-2018 07-06-2018 08-06-2018 03:30 PM Active और देखें
50. Outsourcing of Industrial Pumping Operation at UG level and OC of Kandri Mine (MOIL/18-19/ET/35 ) 08-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active और देखें
51. Underground development work at 450 Level at Kandri Mine (MOIL/18-19/ET/36) 08-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active और देखें
52. Underground Sump cleaning of Ukwa Mine i Vertical shaft UG section ii Ch.50 UG Section iii 9500 section and iv Ch.10800 (MOIL/18-19/ET/37) 08-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active और देखें
53. Purchase of Spent Transfer Pump, Model 40 /13QF (Mech.Seal Type) MOC R-55 - 2 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-19(MOIL/18-19/ET/51) DT.08/05/2018) 08-05-2018 07-06-2018 07-06-2018 08-06-2018 03:30 PM Active और देखें
54. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRUM ASSEMBLY OF LHD AND SDL MACHINES-MAKE EIMCO ELECON (PUR/MOIL/C-5/27/E-05/138-M Dt. 07/05/2018) 07-05-2018 13-06-2018 13-06-2018 13-06-2018 03:30 PM Active और देखें
55. PURCHASE OF STRAIN BAR FOR CHIKLA MINE (TE-641 DT.07052018) 07-05-2018 22-05-2018 22-05-2018 22-05-2018 04:30 PM Active और देखें
56. Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/279) 07-05-2018 07-05-2018 17-05-2018 17-05-2018 4:30 pm Active और देखें
57. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER (PUR/MOIL/C-5/30/E-04/137-M Dt. 07/05/2018) 07-05-2018 06-06-2018 06-06-2018 06-06-2018 03:30 PM Active और देखें
58. Laying of 3C x 95Sqmm Cable from Main Vertical Shaft Subsation to 2nd level undergound for feeding supply to LHD(ELECT/MUN/ADGM/18-19/78) 05-05-2018 12-05-2018 12-05-2018 12-05-2018 03:30 PM Active और देखें
59. Purchase of Drilling Accessories for Electro Hydraulic Crawler Drill Machines at Chikla and Gumgaon Mine.(WE-01 e-tender No.MOIL/18-19/ET-46, Dt.04.05.18) 04-05-2018 12-06-2018 12-06-2018 13-06-2018 03:30 PM Active और देखें
60. Titanium Anode Plates - 256 Nos. (1 Lot) for EMD Plant Dongri Buzurg Mine (Only Through e-procurement)(WE-5 Dt.04/05/2018 (MOIL/18-19/ET/47)) 04-05-2018 28-05-2018 28-05-2018 29-05-2018 03:30 PM Active और देखें
61. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPIRAL LINER -200 Nos.(PUR/MOIL/C-11/135/E-03/119-M Dt. 03-05-2018) 04-05-2018 30-05-2018 30-05-2018 30-05-2018 03:30 PM Active और देखें
62. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-01/102-M Dt. 04/05/2018 04-05-2018 30-05-2018 30-05-2018 30-05-2018 03:30 PM Active और देखें
63. Purchase of Manwinding Steel Wire Rope - 36 MM for Balaghat Mine - 1950 Mtr(WE-2 DT.03.05.2018 (e-Tender No. MOIL/18-19/ET/43) 03-05-2018 28-05-2018 28-05-2018 29-05-2018 03:30 PM Active और देखें
64. Purchase of Graphite Cathode Plates - 700 Nos. for EMD Plant, Dongri Buzurg Mine (1 Lot) (Only Through e-procurement)(WE-8 Dt.02/05/2018 (MOIL/18-19/ET/38)) 02-05-2018 23-05-2018 23-05-2018 24-05-2018 03:30 PM Active और देखें
65. Purchase of Zirconium Coil - 18 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-7 Dt.02/05/2018 (MOIL/18-19/ET/41)) 02-05-2018 24-05-2018 24-05-2018 25-05-2018 03:30 PM Active और देखें
66. Purchase of Lead Cathode Plates - 320 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)( WE-6 Dt.02/05/2018 (MOIL/18-19/ET/40)) 02-05-2018 24-05-2018 24-05-2018 25-05-2018 03:30 PM Active और देखें
67. Screening of siding debridge to produce 420 MT ORE on 590 MT Fines at Chikla Mine(TE/CH/agent/ch/mine/18-19/52) 01-05-2018 15-05-2018 15-05-2018 15-05-2018 04:00 PM Active और देखें
68. Providing and fixing of mosquito net door and vent to b and c type quarter of Munsar mine(MUN/CIVIL/18-19/16 DT. 30.04.2018) 01-05-2018 11-05-2018 11-05-2018 11-05-2018 04:30 pm Active और देखें
69. Providing and supply of 5core X 25Sqmm Trailing cable - 100Meters(GM/Elect/TE/18-19/325,Dated - 30.04.2018) 01-05-2018 21-05-2018 21-05-2018 21-05-2018 03:30 PM Active और देखें
70. Maintenance and operation of water supply scheme at Ukwa Mine.(16/Civil/UM/18-19/245) 30-04-2018 15-05-2018 15-05-2018 15-05-2018 04:30 pm Active और देखें
71. Maintenance and cleaning of New Administrative Building at munsar mine(MUN/MINING/18-19/116) 29-04-2018 02-05-2018 02-05-2018 02-05-2018 03:30 PM Active और देखें
72. Removing of loose Waste rock at 1850 level Ukwa Mine(16/Mining/UM/18-19/224) 26-04-2018 10-05-2018 10-05-2018 10-05-2018 04:30 PM Active और देखें
73. Trench Cutting of OCF stacks at Munsar Mine(MUN/MINING/18-19/115) 24-04-2018 02-05-2018 02-05-2018 02-05-2018 03:30 PM Active और देखें
74. Construction of New Building for Syndicate Bank Bharweli Branch at Balaghat Mine.( MOIL/17-18/ET/472) 20-04-2018 21-05-2018 21-05-2018 21-05-2018 03:30 PM Active और देखें
75. EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE(PUR/MOIL/CH/18-19/01) 19-04-2018 26-04-2018 26-04-2018 26-04-2018 03:30 PM Active और देखें
76. Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/40 dtd 17/04/2018) 19-04-2018 30-04-2018 30-04-2018 30-04-2018 04:30 PM Active और देखें
77. Loading and Unloading of steel section, Cement Bags, Timbers, Lubricants and other spare as well as store materials with stacking at Ukwa Mine stores(UK/Mech/17-18/2656 Dated 15/03/2018) 19-04-2018 30-04-2018 30-04-2018 30-04-2018 04:30 PM Active और देखें
78. Cleaning of Surface Drain at Ukwa Mine(16/Civil/UM/18-19/164) 19-04-2018 02-05-2018 02-05-2018 02-05-2018 04:30 PM Active और देखें
79. Retiling and roof repair work of camp quarter at Ukwa Mine(16/Civil/UM/18-19/165) 19-04-2018 02-05-2018 02-05-2018 02-05-2018 04:30 PM Active और देखें
80. Repairs to roof slab of camp quarters at Ukwa Mine(16/Civil/UM/18-19/166) 19-04-2018 02-05-2018 02-05-2018 02-05-2018 04:30 PM Active और देखें
81. Cleaning Desilting and removal of garbage from Dug Open Well through machine manually at Kandri Mine(MOIL/17-18/ET/493) 18-04-2018 18-05-2018 18-05-2018 18-05-2018 03:30 PM Active और देखें
82. Providing and fixing of Paving Block Flooring at front and back side and construction of shed at backside of workshop at Gumgaon Mine(MOIL/17-18/ET/307) 18-04-2018 18-05-2018 18-05-2018 18-05-2018 03:30 PM Active और देखें
83. Annual Repair to Camp Quarters at Beldongri Mine.(MOIL/17-18/ET/293) 18-04-2018 18-05-2018 18-05-2018 18-05-2018 03:30 PM Active और देखें
84. Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.9500 to ch.12000 at Ukwa Mine(MOIL/18-19/ET/23) 17-04-2018 22-05-2018 22-05-2018 22-05-2018 03:30 PM Active और देखें
85. Trench cutting in ore stacks including sample bags carrying at Ukwa Mine(MOIL/18-19/ET/21) 17-04-2018 17-05-2018 17-05-2018 17-05-2018 03:30 PM Active और देखें
86. Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.4300 to ch.6800 at Ukwa Mine(MOIL/18-19/ET/22) 17-04-2018 17-05-2018 17-05-2018 17-05-2018 03:30 PM Active और देखें
87. Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/18-19/ET/24) 17-04-2018 17-05-2018 17-05-2018 17-05-2018 03:30 PM Active और देखें
88. Furniture and Interior Works for Civil Department 2nd Floor MOIL Bhawan Nagpur.(MOIL/18-19/ET/ 25) 17-04-2018 08-05-2018 08-05-2018 08-05-2018 03:30 PM Active और देखें
89. Picking and collection of material from Magazine Dump South side at Chikla Mine(MOIL/18-19/ET/20) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active और देखें
90. Loading of Manganese Ore into trucks for despatches of ore at Ukwa Mine(MOIL/18-19/ET/18) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active और देखें
91. Cleaning of ROM recovered from Pit No.2 at Sitapatore Mine(MOIL/18-19/ET/19) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active और देखें
92. Providing and fixing of Paving Blocks in park near Old Admin Building at Dongri Buzurg Mine(MOIL/18-19/ET/12) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active और देखें
93. Renovation of Sabha Mandap in Syndicate Camp at Dongri Buzurg Mine(MOIL/17-18/ET/441) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active और देखें
94. Construction of Store Room for used oil at Dongri Buzurg Mine(MOIL/17-18/ET/286) 16-04-2018 16-05-2018 16-05-2018 16-05-2018 03:30 PM Active और देखें
95. Purchase of Sand for Sand Stowing Plant at Balaghat Mine(MOIL/18-19/ET/17) 16-04-2018 07-05-2018 07-05-2018 07-05-2018 03:30 PM Active और देखें
96. Annual Repair to Camp Quarters at Ukwa Mine.(MOIL/17-18/ET/310) 16-04-2018 23-05-2018 23-05-2018 23-05-2018 03:30 PM Active और देखें
97. Repairing of OTR Tyres (18.00 X 25 and 24.00 X 35) for Dumpers of 35 T and 60 T at Dongri Buzurg Mine.(MOIL/18-19/ET/13) 14-04-2018 01-05-2018 01-05-2018 01-05-2018 03:30 PM Active और देखें
98. Outsourcing of Crushing and Screening Plant Operation for Gumgaon Mine for 12 Months(MOIL/18-19/ET/14) 14-04-2018 04-05-2018 04-05-2018 04-05-2018 03:30 PM Active और देखें
99. Construction/Extension of H.T Panel Room at 33kV Main Substation of Ukwa Mine(MOIL/17-18/ET/491) 13-04-2018 14-05-2018 14-05-2018 14-05-2018 03:30 PM Active और देखें
100. Construction of vehicle parking shed at new workshop near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/490) 13-04-2018 14-05-2018 14-05-2018 14-05-2018 03:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें