Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Hiring of services of Design Engineering Firm for proposed new water supply scheme at Chikla Mine(MOIL/19-20/ET/72) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
2. Maintenance, watch and ward of garden at various places at Munsar Mine.(MOIL/19-20/ET/65) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
3. 1 Providing and fixing concertina coil fencing at 160L n 250L 2 Providing and fixing concertina coil fencing from Siding to Chikla B and 3 Construction of boundary wall in precast, prestressed column and panels along peripherial area of 2nd Ve(MOIL/19-20/ 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
4. Construction of GSR of 2.00 lakh liter capacity for second vertical shaft near Gadhaghat at Chikla Mine(MOIL/19-20/ET/70) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
5. Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Vertical Shaft at Chikla Mine(MOIL/19-20/ET/91) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
6. Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/19-20/ET/90) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
7. Construction of Cement concrete plateform beside existing CC plateform at Kandri Mine.(MOIL/19-20/ET/62) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
8. Providing and laying pipe line from service reservoir of guest house upto second level sand stowing plant at Balaghat Mine(MOIL/19-20/ET/66) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
9. Concreting of shaft cross-cut at -450 L using Precast Slabs at Kandri Mine(MOIL/19-20/ET/92) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
10. Construction of DAV Public school at village Munsar Distt Nagpur, under CSR(MOIL/19-20/ET/100) 20-05-2019 24-06-2019 24-06-2019 24-06-2019 03:30 PM Active View
11. Repairing of Bucket Assembly TATA Hitachi 450-1 Hyd Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/52) 18-05-2019 06-06-2019 06-06-2019 06-06-2019 04:30 PM Active View
12. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-12/114-M Dt. 17-05-2019) 17-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
13. Removal of waste rock and Manganiferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/19-20/ET/86) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
14. Purchase of sand required for Underground concreting work at Ukwa Mine(MOIL/19-20/ET/87) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
15. Transportation of underground tubs at Ch.5000 section of Ukwa Mine(MOIL/19-20/ET/89) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
16. Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/19-20/ET/88) 17-05-2019 19-06-2019 19-06-2019 19-06-2019 03:30 PM Active View
17. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF NON RETURN VALVES, GATE VALVES AND BUTTERFLY VALVES.(PUR/MOIL/C-11/148/E-13/116-M Dt. 17-05-2019) 17-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
18. Purchase of Traction Battery Chargers for Various Mines - 10 Nos. (5 Lots) (Only Through e-procurement)(WE-19(ET/115) DT.17/05/2019) 17-05-2019 13-06-2019 13-06-2019 14-06-2019 03:30 PM Active View
19. Fabrication of wooden and Iron Clamps for lowering of 120 Sqmm XLPE copper cable from Production shaft surface inset to 13.5L Underground at Balaghat Mine(BGT/TE/Elect/19-20/123) 16-05-2019 04-06-2019 04-06-2019 04-06-2019 04:30 PM Active View
20. Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines - 6 Nos.(4 Lots) with Operation and Maintenance Spares (Only Through e-procurement)(WE-7(ET/113) DT.16/05/2019) 16-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
21. Transporting one no. TATA Hitachi make Excavator (Tata from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer.( DB/MECH/19-20/SDGM(MECH)/ 51) 16-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
22. Designing and printing of Annual Report 2018-19 Deluxe Version in English, Hindi and Marathi, Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/19-20/ET/83) 16-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
23. Purchase of Ventilation Fan Complete for various Mines - 3 Sets.(2 Lots) (Only Through e-procurement)(WE-9(ET/114) DT.16/05/2019) 16-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
24. Purchase of Dry Type Transformers for Various Mines - 6 Nos.(4 Lots) (Only Through e-procurement)(WE-8(ET/112) DT.15/05/2019) 15-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
25. PURCHASE OF TRIMBLE MAKE (S-6 MODEL) TOTAL STATION BATTERY.(PUR/MOIL/C-13/19/E-15/151-M DT.14.05.2019) 15-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
26. Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-14/142-M DT.14/05/2019) 14-05-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
27. Purchase of Motorised Rotary Tub Tippler for Gumgaon Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-16 (ET/110) DT.14/05/2019) 14-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
28. Purchase of Double Deck Circular Motion Vibratory Screen for Munsar Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-17 (ET/111) DT.14/05/2019) 14-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
29. LOADING UNLOADING AND FILLING SPREADING AT -70 LEVEL AND 60 LEVEL OF CHIKLA-B SECTION AT CHIKLA MINE(TE-32 Dt.13052019) 13-05-2019 20-05-2019 20-05-2019 20-05-2019 04:30 PM Active View
30. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR RCC WORK AT CH 1830 OF -470 LEVEL AND CH 1920 OF -370 LEVEL AT CHIKLA MINE(TE-31 Dt.13052019) 13-05-2019 20-05-2019 20-05-2019 20-05-2019 04:30 PM Active View
31. Maintenance, Distribution and Collection of Caplamps for One Month( Elect/BGT/Caplamps/19-20/111) 13-05-2019 24-05-2019 24-05-2019 24-05-2019 04:30 PM Active View
32. Facility Management Services for ERP Data Center(MOIL/19-20/ET/68) 13-05-2019 12-06-2019 12-06-2019 12-06-2019 03:30 PM Active View
33. Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine(16/Mining/UM/19-20/195) 11-05-2019 25-05-2019 25-05-2019 25-05-2019 04:30 PM Active View
34. Recovery of cleaned ore from O/C ROM at Parsoda Mine(MOIL/19-20/ET/85) 10-05-2019 24-05-2019 24-05-2019 24-05-2019 03:30 PM Active View
35. Picking and collection of Ferro grade and SM grade ore TDL-439 TDL-499 and TDL-469 from South Staff Quarter Dump at Tirodi Mine(MOIL/19-20/ET/64) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
36. Recovery of Ferro grade TD-4505 and SM grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine( MOIL/19-20/ET/74) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
37. Hiring of tippers for ore transportation from C and S Plant to siding at Chikla Mine(MOIL/19-20/ET/73) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
38. Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/19-20/ET/49) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
39. Construction of Residential quarters Tirodi Mine.(MOIL/19-20/ET/61) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
40. Providing and installation of Bio toilets at Dongri Buzurg and Chikla Mine.(MOIL/19-20/ET/43) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
41. Annual service maintenance contract for Winder System installed at Various Mine(MOIL/19-20/ET/67) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
42. Annual repairs to camp quarters at Balaghat Mine.(MOIL/19-20/ET/47) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
43. TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-30 Dt.09052019) 09-05-2019 16-05-2019 16-05-2019 16-05-2019 04:30 PM Active View
44. Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/19-20/640) 09-05-2019 28-05-2019 28-05-2019 28-05-2019 04:30 PM Active View
45. Major repairs/overhauling Ashok Leyland Engine AL 412TC2/1 of JCB-3 loader operating at Balaghat Mine(AGT/BGT/MECH/JCB/19-20/641) 09-05-2019 28-05-2019 28-05-2019 28-05-2019 04:30 PM Active View
46. Purchase of SODIUM LAURYL SULPHATE - 5875 KG(WE-6 e-tender No.MOIL/19-20/ET-96, Dt.09.05.2019) 09-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
47. Construction of sewage treatment plant at new colony (Chandmara) at Dongri Buzurg Mine .(MOIL/19-20/ET/44) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
48. Providing furniture and interior works and civil works for laboratory on ground floor and Geology and Survey department at second floor of MOIL BHAWAN Nagpur(MOIL/19-20/ET/48) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
49. Construction of Hostel building for Navin Desai Residential school Panchgaon Distt Nagpur under CSR(MOIL/19-20/ET/45) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
50. Construction of Canteen building at Kandri Mine.(MOIL/19-20/ET/50) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
51. Construction of shed over mobile crusher unit at Munsar Mine.(MOIL/19-20/ET/46) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
52. Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos. operating at Balaghat Mine(AGT/BGT/MECH/SDL/19-20/127) 08-05-2019 17-05-2019 17-05-2019 17-05-2019 04:30 PM Active View
53. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/19-20/127) 08-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
54. Retiling and Reroofing of camp quarters at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) 08-05-2019 18-05-2019 18-05-2019 18-05-2019 04:30 PM Active View
55. Cleaning of storm water drain of surface and underground sump at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) 08-05-2019 18-05-2019 18-05-2019 18-05-2019 04:30 PM Active View
56. Disposal and door to door collection of liquid and dry Garbage at camp qr. Ukwa Mine(16/Civil/UM/19-20/128) 08-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
57. Making of stone pitching wall and Hiring of JCB for road repair work near Ch 10000 and New workshop premises Ukwa Mine(16/Civil/UM/19-20/129) 08-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
58. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-10/105-M Dt. 08-05-2019) 08-05-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
59. Making and Supply of stemming material mud plug used for blasting at Ukwa Mine(MOIL/19-20/ET/60) 07-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
60. Loading and unloading steel sections cement bags and other materials with stacking at Balaghat Mine Store(MOIL/19-20/ET/59) 07-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
61. Skywater Generating System capacity 100 Liters( PUR/MOILDB/18-19/12/36) 07-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
62. Construction of 25000 lit GSR RCC water tank for New sand stowing plant near Ist vertical shaft at Ukwa Mine.(16/Civil/UM/19-20/130) 07-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
63. Repairs to roof of Labor and staff quarter Ukwa ,Gudma and Prem Nagar camp at Ukwa Mine .(16/Civil/UM/19-20/126) 07-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
64. Washing Picking and collection of material from rejected dump West side of D dump at Tirodi Mine(MOIL/19-20/ET/63) 07-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
65. Dustworx Water Additive for Mine Haul Road dust suppression.(PUR/MOIL/DB/2019/119/35) 06-05-2019 15-05-2019 15-05-2019 15-05-2019 04:30 PM Active View
66. Prov. consultancy for producing aggregates manufactured sand from waste rock reject generated at DB Mine((GM(MECH)/TEN/AGGRE/19-20/294) 06-05-2019 31-05-2019 31-05-2019 31-05-2019 04;00 PM Active View
67. Underground development for winze -350 L to -450 L at Kandri Mine(MOIL/19-20/ET/58) 06-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
68. Underground development at 7th and 8th level North section and OTC from 8th to 10th Level at Balaghat Mine(MOIL/19-20/ET/56) 06-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
69. Horizontal and Vertical Development at -70 Level of Chikla Vertical Section at Chikla Mine(MOIL/19-20/ET/57) 06-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
70. Hiring of Equipment for removal of soil without drilling and Blasting at Parsoda Mine.(ASDGM(M)/Min/Par/LT/19-20/07 Date 23.04.19) 04-05-2019 06-05-2019 06-05-2019 06-05-2019 04:30 PM Active View
71. ANNUAL MAINTANCE CONTRACT FOR REPAIRS AND REWIRING OF RESIDENTIAL QUARTERS AND OFFICE BUILDINGS TRD(TRD/ELECT/19-20/7400002346/283) 04-05-2019 11-05-2019 11-05-2019 11-05-2019 03:30 PM Active View
72. Drilling of 01 Bore along with starter panel and pump for Drinking water at Kandri Mine(KAN/CIvil/NIT/19-20/362 Date 01.05.2019) 04-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
73. WEBSITE SINGLE TENDER ENQUIRY FOR PURCHASE OF CAR SKODA OCTAVIA STYLE 1.8TSI (AUTOMATIC TRANSMISSION) PETROL - 1 NO. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/161/E-11/110-M DT.03.05.2019) 03-05-2019 20-05-2019 20-05-2019 20-05-2019 03:30 PM Active View
74. Purchase of Dust Extraction System Complete with All Accessories with Ducting Work for Above Dust Extraction System - 1 Set (2 Lots.) for Munsar Mine(M.S) (Only Through e-procurement)(WE-2 DT.03/05/2019(ET/82)) 03-05-2019 23-05-2019 23-05-2019 24-05-2019 03:30 PM Active View
75. Washing Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/19-20/ET/53) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
76. Cleaning of excess ROM at Beldongri Mine(MOIL/19-20/ET/54) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
77. Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of subgrade mineral reject from ROM at Magazine dump East side section of Chikla Mine(MOIL/19-20/ET/55) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
78. Picking collection and cleaning of 20 parcent Mn. ore from sub-grade mineral reject from underground ROM at Beldongri Mine(MOIL/19-20/ET/71) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
79. Major repairs/overhauling Ashok Leyland Engine H6ETIC3R23 of LT loader operating at Balaghat Mine from authorize service dealer of M/s. Ashok Leyland Ltd( AGT/BGT/MECH/LT/19-20/529) 02-05-2019 06-05-2019 06-05-2019 06-05-2019 04:30 PM Active View
80. PURCHASE OF TRACTION BATTERIES(WE-135 DT.01.05.2019 (e-Tenderno. MOIL/19-20/ET/80) 02-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
81. ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-29 Dt.02.05.2019) 02-05-2019 09-05-2019 09-05-2019 09-05-2019 04:30 PM Active View
82. Making Stair case for outside approch to hospital building first floor to be converted into vocational training centre at Balalghat Mine(BGT/CIVIL/19-20/LT/15 DT. 01.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
83. Collection of garbage and cleaning of drain at Balaghat Mine(BGT/CIVIL/19-20/LT/16 DATE 01.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
84. Making and Supplying of stemming sticks material (Mud plug) used for blasting/fragmentation in underground at various levels at Balaghat mine( Min/BGT/19-20/LT/ 543 Date 02.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
85. Repairing of boundary wall at Mine Manager Bunglow at Balaghat Mine(BGT/CIVIL/19-20/LT/17 DATE 01.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
86. PURCHASE OF WELDING CABLE(WE-145 DT.01.05.2019 (e-Tender no.MOIL/19-20/ET/81) 02-05-2019 30-05-2019 30-05-2019 31-05-2019 03:30 PM Active View
87. Construction of Rest Shelter at Parsoda Mine.(Civil/Parsoda/TE/19-20/12 Date 30.04.2019) 01-05-2019 07-05-2019 07-05-2019 07-05-2019 04:30 PM Active View
88. Construction of Sedimentation Tank to comply as per MPCB Norms at Parsoda Mine.(Civil/Parsoda/TE/19-20/11 Date 30.04.2019) 01-05-2019 07-05-2019 07-05-2019 07-05-2019 04:30 PM Active View
89. PURCHASE OF AMMONIUM NITRATE PRILLED(WE-152 DT.01.05.2019 (e-Tender No.MOIL/19-20/ET/79) 01-05-2019 23-05-2019 23-05-2019 24-05-2019 03:30 PM Active View
90. Design and Detailed engineering, supply, erection, commissioning and testing of rotary kiln including all accessories for Manganese Ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/51) 30-04-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
91. Purchase of PPG CORRUGATED ROOF SHEET(WE-3 e-tender No.MOIL/19-20/ET-78, Dt.30.04.2019) 30-04-2019 17-06-2019 17-06-2019 18-06-2019 03:30 PM Active View
92. Construction of Water tank and Laying RCC Hume Pipe Drain near Crushing Plant area at Chikla mine(TE Civil 424) 29-04-2019 08-05-2019 08-05-2019 08-05-2019 03:30 PM Active View
93. Drilling of Bore Holes through DTh at -170L and -270L underground(7100001400) 29-04-2019 13-05-2019 13-05-2019 13-05-2019 03:30 PM Active View
94. Providing Unskilled Manpower in CS Plant Chikla Mine(7100001392) 29-04-2019 13-05-2019 13-05-2019 13-05-2019 03:30 PM Active View
95. Procurement of Roller/Idler for conveyor Belt of IMB Plant at Dongri Buzurg Mine.(PUR/DB/19-20/18) 29-04-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
96. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-08/49-M Dt. 29-04-2019) 29-04-2019 20-05-2019 20-05-2019 20-05-2019 03:30 PM Active View
97. Drilling of Bore Holes through DTh at -170L and -270L underground(7100001400) 27-04-2019 13-05-2019 13-05-2019 13-05-2019 03:30 PM Active View
98. Purchase of Air Receiver Tank for Various Mines - 4 Nos.(2 Lots.) (2 Nos.each for Kandri Mine(M.S) and Ukwa Mine(M.P)) (Only Through e-procurement)(WE-4 DT.26/04/2019 (ET/76) 26-04-2019 16-05-2019 16-05-2019 17-05-2019 03:30 PM Active View
99. Purchase of High end Laptop(Mobile workstation) - 1 No.(Lot No.1), High Performance VR compatible Computer - 1 No.(Lot No.2) and Laptop - 1 No.(Lot No.3) (Only Through e-procurement)(WE-5 DT.26/04/2019 (ET/77)) 26-04-2019 20-05-2019 20-05-2019 21-05-2019 03:30 PM Active View
100. Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestals Etc.( WE-153 DT25.04.2019(e-TENDER NO. MOIL/19-20/ET/75)) 26-04-2019 30-05-2019 30-05-2019 31-05-2019 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.