Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Lowering of HT XLPE copper conductor cable from production shaft surface to 13.5 level at Balaghat Mine(BGT/Elect/19-20/204) 11-06-2019 05-07-2019 05-07-2019 05-07-2019 04:30 PM Active View
2. PROVIDING AND SUPPLYING OF 7.5KVA 3PHASE DG SET COMPLETE WITH ALL STANDARD ACCESSORIES(ELECT/MUN/ADGM/19-20/208) 10-06-2019 21-06-2019 21-06-2019 21-06-2019 03:30 PM Active View
3. Transportation of underground tubs at Ch 5000 section of Ukwa Mine( 16/Mining/UM/19-20/417) 10-06-2019 24-06-2019 24-06-2019 24-06-2019 04:30 PM Active View
4. Purchase of restricted neutral earthing system for Chikla Mine (PUR/MOIL/CH/01) 08-06-2019 15-06-2019 15-06-2019 15-06-2019 4:30 PM Active View
5. Collection of fines from different sorting areas at Munsar Mine (MUN/MINES/19-20/881 DT 07.06.2019) 08-06-2019 15-06-2019 15-06-2019 15-06-2019 4:30 PM Active View
6. Purchase of restricted neutral earthing system for Chikla Mine (PUR/MOIL/CH/01) 08-06-2019 15-06-2019 15-06-2019 15-06-2019 4:30 PM Active View
7. Major repairs/overhauling Ashok Leyland Engine AL 412TC2/1 of JCB-3 loader operating at Balaghat Mine(AGT/BGT/MECH/JCB/19-20/201) 07-06-2019 10-07-2019 10-07-2019 10-07-2019 04:30 PM Active View
8. Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine (AGT/BGT/MECH/IMB/19-20/202 ) 07-06-2019 10-07-2019 10-07-2019 10-07-2019 4:30 PM Active View
9. Hiring of AC Sedan Etios Cars on monthly basis for MOIL Ltd Nagpur (MOIL/19-20/ET/109) 06-06-2019 05-07-2019 05-07-2019 05-07-2019 3:30 PM Active View
10. RETILING AND ROOF REPAIR INCLUDING LAYING POLYTHENE SHEET OVER ROOF OF CAMP QUATER AT CHIKLA MINE (CH/CIVIL/19-20/825) 05-06-2019 11-06-2019 11-06-2019 11-06-2019 4:30 PM Active View
11. Construction of storm water drain in front of Mine Office and along the boundary wall and road side at Sitapatore Mine. (MOIL/19-20/ET/107 ) 04-06-2019 04-07-2019 04-07-2019 04-07-2019 3:30 PM Active View
12. Drilling of Bore Equipped with pump, pipe and starter panel for drinking water at Parsoda Mine. (MOIL/19-20/ET/103) 04-06-2019 04-07-2019 04-07-2019 04-07-2019 3:30 PM Active View
13. Drilling of 3 No. of Bore along with starter panel and pump for drinking water at various locations at Kandri Mine. (MOIL/19-20/ET/104 ) 04-06-2019 04-07-2019 04-07-2019 04-07-2019 3:30 PM Active View
14. Construction of Canteen Building at Balaghat Mine. (MOIL/19-20/ET/102 ) 04-06-2019 04-07-2019 04-07-2019 04-07-2019 3:30 PM Active View
15. Construction of Exhaust fan house with EVASEE and boundary wall at Balaghat Mine. (MOIL/19-20/ET/101 ) 04-06-2019 04-07-2019 04-07-2019 04-07-2019 3:30 PM Active View
16. Annual repairs to camp quarters at Chikla Mine. (MOIL/19-20/ET/106 ) 04-06-2019 08-07-2019 08-07-2019 08-07-2019 3:30 PM Active View
17. Construction of Water supply scheme at Gumgaon Mine (MOIL/19-20/ET/108 ) 04-06-2019 08-07-2019 08-07-2019 08-07-2019 3:30 PM Active View
18. Supplying and installation of portable M.S. Office for Parsoda Mine (Parsoda/civil/19-20/29 dt 03.06.2019) 04-06-2019 12-06-2019 12-06-2019 12-06-2019 4:30 PM Active View
19. Supplying and installation of portable Toilet and Security Cabin for Parsoda Mine (Parsoda/civil/19-20/30 dt 03.06.2019) 04-06-2019 12-06-2019 12-06-2019 12-06-2019 4:30 PM Active View
20. Construction of RCC Retaining wall and floor for new installed bunker of crushing plant at Chikla Mine (MOIL/19-20/ET/105 ) 04-06-2019 04-07-2019 04-07-2019 04-07-2019 3:30 PM Active View
21. Loading of crude ore into tipper manually from different working sections to jig section of Tirodi Mine (MOIL/19-20/ET/121) 04-06-2019 03-07-2019 03-07-2019 03-07-2019 3:30 PM Active View
22. Transportation of sand from Kanhan River to near Guest House and sand stowing plant at Gumgaon Mine by mechanised means (MOIL/19-20/ET/120) 04-06-2019 03-07-2019 03-07-2019 03-07-2019 3:30 PM Active View
23. Annual underground sand cleaning work at Balaghat Mine (MOIL/19-20/ET/122) 04-06-2019 03-07-2019 03-07-2019 03-07-2019 3:30 PM Active View
24. PURCHASE OF APPLE 21.5 INCH IMAC (DESKTOP) WITH RETINA 4K DISPLAY 3.0GHZ 6-CORE 8TH-GENERATION INTEL CORE I5 PROCESSOR, 1TB ALONG WITH APPLE CARE PROTECTION PLAN FOR IMAC-ONLINE ENROLMENT AND MICROSOFT OFFICE MAC HOME STUDENT 2016 - 1 NO. (PUR/MOIL/C-4/13 04-06-2019 10-07-2019 10-07-2019 10-07-2019 3:30 PM Active View
25. Rejuvenate of well situated near siding by cleaning and deepening at Kandri mine. (Kan/Civil/NIT/19-20/687 dt 28.05.2019) 01-06-2019 04-06-2019 04-06-2019 04-06-2019 4:30 PM Active View
26. Repairing and replacement of damaged domestic water pipeline including fitting of pump to service well for water distribution in chargaon colony at Munsar Mine (MUN/CIVIL/19-20/27 Date 29/05/2019) 01-06-2019 08-06-2019 08-06-2019 08-06-2019 4:30 PM Active View
27. Repairing and replacement of damaged domestic water pipeline including fitting of pump to service well for water distribution in chargaon colony at Munsar Mine (MUN/CIVIL/19-20/27 Date 29/05/2019) 01-06-2019 12-06-2019 12-06-2019 12-06-2019 4:30 PM Active View
28. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Chikla Mine and Dongri Buzurg Mine.(TE/CH/SYSTEM/AMC/2019-20/60) 30-05-2019 08-06-2019 08-06-2019 08-06-2019 04:30 PM Active View
29. TENDER DOCUMENT FOR REPLACEMENT OF IBR BED COIL TUBES 19 20(MOIL/EMD/CH/ASDGM/19-20/59) 30-05-2019 11-06-2019 11-06-2019 12-06-2019 10:30 AM Active View
30. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR(PUR/MOIL/C-5/34/E-18/207-M Dt. 29/05/2019) 29-05-2019 19-06-2019 19-06-2019 19-06-2019 03:30 PM Active View
31. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE.(PUR/MOIL/C-5/44/E-19/208-M Dt. 29/05/2019) 29-05-2019 19-06-2019 19-06-2019 19-06-2019 03:30 PM Active View
32. Purchase of SULPHURIC ACID with Transportation - 275 MT(WE-21 e-tender No.MOIL/19-20/ET-128, Dt.29.05.2019) 29-05-2019 20-06-2019 20-06-2019 21-06-2019 03:30 PM Active View
33. Premium Greaves make Worm Gear box, Model U800 Reduction Ratio70is to1 Right Handling(MOIL/EMD/CH/ASDGM/19-20/56) 29-05-2019 19-06-2019 19-06-2019 20-06-2019 10:30 AM Active View
34. Operation and Maintenance of Electrical works at Corporate Office, Nagpur for a period of one year(MOIL/19-20/ET/123) 29-05-2019 28-06-2019 28-06-2019 28-06-2019 03:30 PM Active View
35. Inclusion of priming system in existing pumping automation system for operation and monitoring of underground pumps at Chikla Mine(MOIL/19-20/ET/124) 29-05-2019 28-06-2019 28-06-2019 28-06-2019 03:30 PM Active View
36. Purchase of IRON ORE with Transportation - 3000 MT(WE-20 e-tender No.MOIL/19-20/ET-126, Dt.27.05.2019) 27-05-2019 19-06-2019 19-06-2019 20-06-2019 03:30 PM Active View
37. Purchse of TCT Drill Rods - 4 Items(WE-14 DT.27.05.2019 (e-Tenderno.MOIL/19-20/ET/127)) 27-05-2019 26-06-2019 26-06-2019 27-06-2019 03:30 PM Active View
38. PURCHASE OF GEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/19-20/185) 25-05-2019 07-06-2019 07-06-2019 07-06-2019 04:30 PM Active View
39. Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East south side part-3(MOIL/19-20/ET/116) 24-05-2019 31-05-2019 31-05-2019 31-05-2019 03:30 PM Active View
40. Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South side part-1(MOIL/19-20/ET/117) 24-05-2019 31-05-2019 31-05-2019 31-05-2019 03:30 PM Active View
41. Picking and collection of low grade contaminated Ore DBL-563 from crushed ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South West part-1(MOIL/19-20/ET/118) 24-05-2019 31-05-2019 31-05-2019 31-05-2019 03:30 PM Active View
42. Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South side part-2(MOIL/19-20/ET/119) 24-05-2019 31-05-2019 31-05-2019 31-05-2019 03:30 PM Active View
43. Purchase of PEARL COKE with Transportation - 7000 MT(WE-10 e-tender No.MOIL/19-20/ET-125, Dt.24.05.2019) 24-05-2019 13-06-2019 13-06-2019 14-06-2019 03:30 PM Active View
44. Hiring of diesel Jeep for Balaghat Mine for a period of one year(MOIL/19-20/ET/36) 24-05-2019 24-06-2019 24-06-2019 24-06-2019 03:30 PM Active View
45. Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/19-20/ET/97) 24-05-2019 24-06-2019 24-06-2019 24-06-2019 03:30 PM Active View
46. Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/19-20/ET/99) 24-05-2019 24-06-2019 24-06-2019 24-06-2019 03:30 PM Active View
47. Shifting and Transport of pebbles accumulated due to Sand Stowing by old open plant at 234 MRL and dropping into the winze No. 2 of the level 193 MRL and Spreading at Beldongri Mine(MOIL/19-20/ET/98) 24-05-2019 01-07-2019 01-07-2019 01-07-2019 03:30 PM Active View
48. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE(Lumpy) AND 250 MT FINES AT CHIKLA MINE(TE-33 Dt.23052019) 23-05-2019 29-05-2019 29-05-2019 29-05-2019 04:30 PM Active View
49. Repairing work at quarter no C-2 Chikla type at Balaghat Mine(CIVIL/BGT/LT/19-20/21 DATE 22.05.2019) 23-05-2019 03-06-2019 03-06-2019 03-06-2019 04:30 PM Active View
50. Repairing of existing drain of IMB plant at Balaghat Mine(CIVI/BGT/LT/19-20/22 DATE 22.05.2019) 23-05-2019 03-06-2019 03-06-2019 03-06-2019 04:30 PM Active View
51. Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/19-20/ET/84) 22-05-2019 21-06-2019 21-06-2019 21-06-2019 03:30 PM Active View
52. Cleaning of accumulated silt from cross cut of different level at Balaghat Mine(MIN/BGT/19-2/LT/816 DATE 17.05.2019) 21-05-2019 29-05-2019 29-05-2019 29-05-2019 04:30 PM Active View
53. Transportation of sand from Kanki ghat to Balaghat Mine(Min/BGT/19-2/LT/841 DATE 20.05.2019) 21-05-2019 29-05-2019 29-05-2019 29-05-2019 04:30 PM Active View
54. Additional excavation in Manganiferous rock for concreting of crosscut, manway and orepass etc. in underground at Munsar Mine(MOIL/19-20/ET/94) 21-05-2019 21-06-2019 21-06-2019 21-06-2019 03:30 PM Active View
55. Picking and collection of material to recover Ferro grade MS-3516 ore from sub-grade mineral reject through jigging at Munsar Mine(MOIL/19-20/ET/93) 21-05-2019 21-06-2019 21-06-2019 21-06-2019 03:30 PM Active View
56. Recovery of Ferro grade TD-4505 and SM grade TDL-439 and TDL-499 from South Magazine Dump at Tirodi Mine(MOIL/19-20/ET/95) 21-05-2019 21-06-2019 21-06-2019 21-06-2019 03:30 PM Active View
57. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPERATION PLANT AT MUNSAR MINE(PUR/MOIL/C-5/23/E-16/117-M Dt. 21-05-2019) 21-05-2019 12-06-2019 12-06-2019 12-06-2019 03:30 PM Active View
58. Lifting of transformer and accessories from transformer floor to the ground and transporting to storage site in FMP, Balaghat(FMP/ELECT/19-20/55) 20-05-2019 31-05-2019 31-05-2019 31-05-2019 04:30 PM Active View
59. PURCHASE OF ATLAS COPCO MAKE BBD 94W ROCK DRILL - 10 NOS. AND ALF 72D PUSHER LEGS - 10 NOS. FOR BALAGHAT MINE(M.P)(AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/115/E-17/178-M DT.20/05/2019) 20-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
60. Hiring of services of Design Engineering Firm for proposed new water supply scheme at Chikla Mine(MOIL/19-20/ET/72) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
61. Maintenance, watch and ward of garden at various places at Munsar Mine.(MOIL/19-20/ET/65) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
62. 1 Providing and fixing concertina coil fencing at 160L n 250L 2 Providing and fixing concertina coil fencing from Siding to Chikla B and 3 Construction of boundary wall in precast, prestressed column and panels along peripherial area of 2nd Ve(MOIL/19-20/ 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
63. Construction of GSR of 2.00 lakh liter capacity for second vertical shaft near Gadhaghat at Chikla Mine(MOIL/19-20/ET/70) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
64. Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Vertical Shaft at Chikla Mine(MOIL/19-20/ET/91) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
65. Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/19-20/ET/90) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
66. Construction of Cement concrete plateform beside existing CC plateform at Kandri Mine.(MOIL/19-20/ET/62) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
67. Providing and laying pipe line from service reservoir of guest house upto second level sand stowing plant at Balaghat Mine(MOIL/19-20/ET/66) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
68. Concreting of shaft cross-cut at -450 L using Precast Slabs at Kandri Mine(MOIL/19-20/ET/92) 20-05-2019 20-06-2019 20-06-2019 20-06-2019 03:30 PM Active View
69. Construction of DAV Public school at village Munsar Distt Nagpur, under CSR(MOIL/19-20/ET/100) 20-05-2019 24-06-2019 24-06-2019 24-06-2019 03:30 PM Active View
70. Repairing of Bucket Assembly TATA Hitachi 450-1 Hyd Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/52) 18-05-2019 06-06-2019 06-06-2019 06-06-2019 04:30 PM Active View
71. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-12/114-M Dt. 17-05-2019) 17-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
72. Removal of waste rock and Manganiferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/19-20/ET/86) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
73. Purchase of sand required for Underground concreting work at Ukwa Mine(MOIL/19-20/ET/87) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
74. Transportation of underground tubs at Ch.5000 section of Ukwa Mine(MOIL/19-20/ET/89) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
75. Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/19-20/ET/88) 17-05-2019 19-06-2019 19-06-2019 19-06-2019 03:30 PM Active View
76. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF NON RETURN VALVES, GATE VALVES AND BUTTERFLY VALVES.(PUR/MOIL/C-11/148/E-13/116-M Dt. 17-05-2019) 17-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
77. Purchase of Traction Battery Chargers for Various Mines - 10 Nos. (5 Lots) (Only Through e-procurement)(WE-19(ET/115) DT.17/05/2019) 17-05-2019 13-06-2019 13-06-2019 14-06-2019 03:30 PM Active View
78. Fabrication of wooden and Iron Clamps for lowering of 120 Sqmm XLPE copper cable from Production shaft surface inset to 13.5L Underground at Balaghat Mine(BGT/TE/Elect/19-20/123) 16-05-2019 04-06-2019 04-06-2019 04-06-2019 04:30 PM Active View
79. Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines - 6 Nos.(4 Lots) with Operation and Maintenance Spares (Only Through e-procurement)(WE-7(ET/113) DT.16/05/2019) 16-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
80. Transporting one no. TATA Hitachi make Excavator (Tata from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer.( DB/MECH/19-20/SDGM(MECH)/ 51) 16-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
81. Designing and printing of Annual Report 2018-19 Deluxe Version in English, Hindi and Marathi, Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/19-20/ET/83) 16-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
82. Purchase of Ventilation Fan Complete for various Mines - 3 Sets.(2 Lots) (Only Through e-procurement)(WE-9(ET/114) DT.16/05/2019) 16-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
83. Purchase of Dry Type Transformers for Various Mines - 6 Nos.(4 Lots) (Only Through e-procurement)(WE-8(ET/112) DT.15/05/2019) 15-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
84. PURCHASE OF TRIMBLE MAKE (S-6 MODEL) TOTAL STATION BATTERY.(PUR/MOIL/C-13/19/E-15/151-M DT.14.05.2019) 15-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
85. Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-14/142-M DT.14/05/2019) 14-05-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
86. Purchase of Motorised Rotary Tub Tippler for Gumgaon Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-16 (ET/110) DT.14/05/2019) 14-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
87. Purchase of Double Deck Circular Motion Vibratory Screen for Munsar Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-17 (ET/111) DT.14/05/2019) 14-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
88. LOADING UNLOADING AND FILLING SPREADING AT -70 LEVEL AND 60 LEVEL OF CHIKLA-B SECTION AT CHIKLA MINE(TE-32 Dt.13052019) 13-05-2019 20-05-2019 20-05-2019 20-05-2019 04:30 PM Active View
89. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR RCC WORK AT CH 1830 OF -470 LEVEL AND CH 1920 OF -370 LEVEL AT CHIKLA MINE(TE-31 Dt.13052019) 13-05-2019 20-05-2019 20-05-2019 20-05-2019 04:30 PM Active View
90. Maintenance, Distribution and Collection of Caplamps for One Month( Elect/BGT/Caplamps/19-20/111) 13-05-2019 24-05-2019 24-05-2019 24-05-2019 04:30 PM Active View
91. Facility Management Services for ERP Data Center(MOIL/19-20/ET/68) 13-05-2019 12-06-2019 12-06-2019 12-06-2019 03:30 PM Active View
92. Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine(16/Mining/UM/19-20/195) 11-05-2019 25-05-2019 25-05-2019 25-05-2019 04:30 PM Active View
93. Recovery of cleaned ore from O/C ROM at Parsoda Mine(MOIL/19-20/ET/85) 10-05-2019 24-05-2019 24-05-2019 24-05-2019 03:30 PM Active View
94. Picking and collection of Ferro grade and SM grade ore TDL-439 TDL-499 and TDL-469 from South Staff Quarter Dump at Tirodi Mine(MOIL/19-20/ET/64) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
95. Recovery of Ferro grade TD-4505 and SM grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine( MOIL/19-20/ET/74) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
96. Hiring of tippers for ore transportation from C and S Plant to siding at Chikla Mine(MOIL/19-20/ET/73) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
97. Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/19-20/ET/49) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
98. Construction of Residential quarters Tirodi Mine.(MOIL/19-20/ET/61) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
99. Providing and installation of Bio toilets at Dongri Buzurg and Chikla Mine.(MOIL/19-20/ET/43) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
100. Annual service maintenance contract for Winder System installed at Various Mine(MOIL/19-20/ET/67) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.