1. | Construction of Stone Pitching Parapet Wall around Mine Dump Area behind Siding Region, Balaghat Mine. (Agent Sr DGM/Civil/BGT/18-19/981 Date 07.05.18) | 08-05-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 04:30 PM | Active | View |
2. | PURCHASE OF CONDENSATE TANK WITH ACCESSORIES - 1 NO. FOR EMD PLANT, DONGRI BUZURG MINE (PUR/MOIL/C-4/315 /E-7 /156-M) | 08-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | View |
3. | Purchase of MS Neoprene Rubber Lined Cell Feed Tank with Accessories - 1 No.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-20(MOIL/18-19/ET/52) DT.08/05/2018) | 08-05-2018 | 04-06-2018 | 05-06-2018 | 05-06-2018 | 03:30 PM | Active | View |
4. | Purchase of Polypropelene Pad - 80 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine WE-22(MOIL/18-19/ET/55) DT.08/05/2018 | 08-05-2018 | 31-05-2018 | 01-06-2018 | 01-06-2018 | 03:30 PM | Active | View |
5. | Purchase of Mild Steel Square Bar Cladded with Copper Sheet - 700 Nos.(1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-21(MOIL/18-19/ET/54) DT.08/05/2018) | 08-05-2018 | 31-05-2018 | 01-06-2018 | 01-06-2018 | 03:30 PM | Active | View |
6. | Outsourcing of Industrial Pumping Operation in Underground Vertical Shaft of Munsar Mine (MOIL/18-19/ET/30 ) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 3:30 PM | Active | View |
7. | Washing picking and collection of material from waste reject crude from West side of 6 B at Tirodi Mine (MOIL/18-19/ET/34) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
8. | Conveyor Belt (PUR-MOIL-C-12-20-WE-01) | 08-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
9. | Outsourcing of Industrial Pumping Operation at UG level and OC of Kandri Mine (MOIL/18-19/ET/35 ) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
10. | Underground development work at 450 Level at Kandri Mine (MOIL/18-19/ET/36) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
11. | Underground Sump cleaning of Ukwa Mine i Vertical shaft UG section ii Ch.50 UG Section iii 9500 section and iv Ch.10800 (MOIL/18-19/ET/37) | 08-05-2018 | 08-06-2018 | 08-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
12. | Purchase of Spent Transfer Pump, Model 40 /13QF (Mech.Seal Type) MOC R-55 - 2 Nos. (1 LOT) for EMD Plant, Dongri Buzurg Mine (WE-19(MOIL/18-19/ET/51) DT.08/05/2018) | 08-05-2018 | 07-06-2018 | 07-06-2018 | 08-06-2018 | 03:30 PM | Active | View |
13. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRUM ASSEMBLY OF LHD AND SDL MACHINES-MAKE EIMCO ELECON (PUR/MOIL/C-5/27/E-05/138-M Dt. 07/05/2018) | 07-05-2018 | 13-06-2018 | 13-06-2018 | 13-06-2018 | 03:30 PM | Active | View |
14. | PURCHASE OF STRAIN BAR FOR CHIKLA MINE (TE-641 DT.07052018) | 07-05-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 04:30 PM | Active | View |
15. | Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/279) | 07-05-2018 | 07-05-2018 | 17-05-2018 | 17-05-2018 | 4:30 pm | Active | View |
16. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER (PUR/MOIL/C-5/30/E-04/137-M Dt. 07/05/2018) | 07-05-2018 | 06-06-2018 | 06-06-2018 | 06-06-2018 | 03:30 PM | Active | View |
17. | Laying of 3C x 95Sqmm Cable from Main Vertical Shaft Subsation to 2nd level undergound for feeding supply to LHD(ELECT/MUN/ADGM/18-19/78) | 05-05-2018 | 12-05-2018 | 12-05-2018 | 12-05-2018 | 03:30 PM | Active | View |
18. | Purchase of Drilling Accessories for Electro Hydraulic Crawler Drill Machines at Chikla and Gumgaon Mine.(WE-01 e-tender No.MOIL/18-19/ET-46, Dt.04.05.18) | 04-05-2018 | 12-06-2018 | 12-06-2018 | 13-06-2018 | 03:30 PM | Active | View |
19. | Titanium Anode Plates - 256 Nos. (1 Lot) for EMD Plant Dongri Buzurg Mine (Only Through e-procurement)(WE-5 Dt.04/05/2018 (MOIL/18-19/ET/47)) | 04-05-2018 | 28-05-2018 | 28-05-2018 | 29-05-2018 | 03:30 PM | Active | View |
20. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPIRAL LINER -200 Nos.(PUR/MOIL/C-11/135/E-03/119-M Dt. 03-05-2018) | 04-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | View |
21. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-01/102-M Dt. 04/05/2018 | 04-05-2018 | 30-05-2018 | 30-05-2018 | 30-05-2018 | 03:30 PM | Active | View |
22. | Purchase of Manwinding Steel Wire Rope - 36 MM for Balaghat Mine - 1950 Mtr(WE-2 DT.03.05.2018 (e-Tender No. MOIL/18-19/ET/43) | 03-05-2018 | 28-05-2018 | 28-05-2018 | 29-05-2018 | 03:30 PM | Active | View |
23. | Purchase of Graphite Cathode Plates - 700 Nos. for EMD Plant, Dongri Buzurg Mine (1 Lot) (Only Through e-procurement)(WE-8 Dt.02/05/2018 (MOIL/18-19/ET/38)) | 02-05-2018 | 23-05-2018 | 23-05-2018 | 24-05-2018 | 03:30 PM | Active | View |
24. | Purchase of Zirconium Coil - 18 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-7 Dt.02/05/2018 (MOIL/18-19/ET/41)) | 02-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | View |
25. | Purchase of Lead Cathode Plates - 320 Nos. (1 Lot) for EMD Plant, Dongri Buzurg Mine (Only Through e-procurement)( WE-6 Dt.02/05/2018 (MOIL/18-19/ET/40)) | 02-05-2018 | 24-05-2018 | 24-05-2018 | 25-05-2018 | 03:30 PM | Active | View |
26. | Screening of siding debridge to produce 420 MT ORE on 590 MT Fines at Chikla Mine(TE/CH/agent/ch/mine/18-19/52) | 01-05-2018 | 15-05-2018 | 15-05-2018 | 15-05-2018 | 04:00 PM | Active | View |
27. | Providing and fixing of mosquito net door and vent to b and c type quarter of Munsar mine(MUN/CIVIL/18-19/16 DT. 30.04.2018) | 01-05-2018 | 11-05-2018 | 11-05-2018 | 11-05-2018 | 04:30 pm | Active | View |
28. | Providing and supply of 5core X 25Sqmm Trailing cable - 100Meters(GM/Elect/TE/18-19/325,Dated - 30.04.2018) | 01-05-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | View |
29. | Maintenance and operation of water supply scheme at Ukwa Mine.(16/Civil/UM/18-19/245) | 30-04-2018 | 15-05-2018 | 15-05-2018 | 15-05-2018 | 04:30 pm | Active | View |
30. | Maintenance and cleaning of New Administrative Building at munsar mine(MUN/MINING/18-19/116) | 29-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 03:30 PM | Active | View |
31. | Removing of loose Waste rock at 1850 level Ukwa Mine(16/Mining/UM/18-19/224) | 26-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 04:30 PM | Active | View |
32. | Trench Cutting of OCF stacks at Munsar Mine(MUN/MINING/18-19/115) | 24-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 03:30 PM | Active | View |
33. | Construction of New Building for Syndicate Bank Bharweli Branch at Balaghat Mine.( MOIL/17-18/ET/472) | 20-04-2018 | 21-05-2018 | 21-05-2018 | 21-05-2018 | 03:30 PM | Active | View |
34. | EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE(PUR/MOIL/CH/18-19/01) | 19-04-2018 | 26-04-2018 | 26-04-2018 | 26-04-2018 | 03:30 PM | Active | View |
35. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/40 dtd 17/04/2018) | 19-04-2018 | 30-04-2018 | 30-04-2018 | 30-04-2018 | 04:30 PM | Active | View |
36. | Loading and Unloading of steel section, Cement Bags, Timbers, Lubricants and other spare as well as store materials with stacking at Ukwa Mine stores(UK/Mech/17-18/2656 Dated 15/03/2018) | 19-04-2018 | 30-04-2018 | 30-04-2018 | 30-04-2018 | 04:30 PM | Active | View |
37. | Cleaning of Surface Drain at Ukwa Mine(16/Civil/UM/18-19/164) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | View |
38. | Retiling and roof repair work of camp quarter at Ukwa Mine(16/Civil/UM/18-19/165) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | View |
39. | Repairs to roof slab of camp quarters at Ukwa Mine(16/Civil/UM/18-19/166) | 19-04-2018 | 02-05-2018 | 02-05-2018 | 02-05-2018 | 04:30 PM | Active | View |
40. | Cleaning Desilting and removal of garbage from Dug Open Well through machine manually at Kandri Mine(MOIL/17-18/ET/493) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | View |
41. | Providing and fixing of Paving Block Flooring at front and back side and construction of shed at backside of workshop at Gumgaon Mine(MOIL/17-18/ET/307) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | View |
42. | Annual Repair to Camp Quarters at Beldongri Mine.(MOIL/17-18/ET/293) | 18-04-2018 | 18-05-2018 | 18-05-2018 | 18-05-2018 | 03:30 PM | Active | View |
43. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.9500 to ch.12000 at Ukwa Mine(MOIL/18-19/ET/23) | 17-04-2018 | 22-05-2018 | 22-05-2018 | 22-05-2018 | 03:30 PM | Active | View |
44. | Trench cutting in ore stacks including sample bags carrying at Ukwa Mine(MOIL/18-19/ET/21) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | View |
45. | Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch.4300 to ch.6800 at Ukwa Mine(MOIL/18-19/ET/22) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | View |
46. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/18-19/ET/24) | 17-04-2018 | 17-05-2018 | 17-05-2018 | 17-05-2018 | 03:30 PM | Active | View |
47. | Furniture and Interior Works for Civil Department 2nd Floor MOIL Bhawan Nagpur.(MOIL/18-19/ET/ 25) | 17-04-2018 | 08-05-2018 | 08-05-2018 | 08-05-2018 | 03:30 PM | Active | View |
48. | Picking and collection of material from Magazine Dump South side at Chikla Mine(MOIL/18-19/ET/20) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
49. | Loading of Manganese Ore into trucks for despatches of ore at Ukwa Mine(MOIL/18-19/ET/18) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
50. | Cleaning of ROM recovered from Pit No.2 at Sitapatore Mine(MOIL/18-19/ET/19) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
51. | Providing and fixing of Paving Blocks in park near Old Admin Building at Dongri Buzurg Mine(MOIL/18-19/ET/12) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
52. | Renovation of Sabha Mandap in Syndicate Camp at Dongri Buzurg Mine(MOIL/17-18/ET/441) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
53. | Construction of Store Room for used oil at Dongri Buzurg Mine(MOIL/17-18/ET/286) | 16-04-2018 | 16-05-2018 | 16-05-2018 | 16-05-2018 | 03:30 PM | Active | View |
54. | Purchase of Sand for Sand Stowing Plant at Balaghat Mine(MOIL/18-19/ET/17) | 16-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 03:30 PM | Active | View |
55. | Annual Repair to Camp Quarters at Ukwa Mine.(MOIL/17-18/ET/310) | 16-04-2018 | 23-05-2018 | 23-05-2018 | 23-05-2018 | 03:30 PM | Active | View |
56. | Repairing of OTR Tyres (18.00 X 25 and 24.00 X 35) for Dumpers of 35 T and 60 T at Dongri Buzurg Mine.(MOIL/18-19/ET/13) | 14-04-2018 | 01-05-2018 | 01-05-2018 | 01-05-2018 | 03:30 PM | Active | View |
57. | Outsourcing of Crushing and Screening Plant Operation for Gumgaon Mine for 12 Months(MOIL/18-19/ET/14) | 14-04-2018 | 04-05-2018 | 04-05-2018 | 04-05-2018 | 03:30 PM | Active | View |
58. | Construction/Extension of H.T Panel Room at 33kV Main Substation of Ukwa Mine(MOIL/17-18/ET/491) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | View |
59. | Construction of vehicle parking shed at new workshop near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/490) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | View |
60. | Providing and fixing of Paver Block Flooring for infront of Winder House And Cap Lamp Room near Vertical Shaft at Ukwa Mine(MOIL/17-18/ET/309) | 13-04-2018 | 14-05-2018 | 14-05-2018 | 14-05-2018 | 03:30 PM | Active | View |
61. | Operation and Maintenance works of Electrical Installations of Establishment at Corporate Office, Nagpur(MOIL/18-19/ET/16) | 13-04-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | View |
62. | Construction of Compound Wall at new workshop premises at Ukwa Mine(MOIL/17-18/ET/487) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | View |
63. | Notice Inviting Tender for Drilling of Borehole for Sand Stowing Plant and underground works(Surface to First Level) at near Vertical Shaft Ukwa Mine( MOIL/17-18/ET/486) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | View |
64. | Construction of Sand Stowing Plant Bunker at First Vertical Shaft Ukwa Mine(MOIL/17-18/ET/489) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | View |
65. | Construction of new sample room near Mine Store at Ukwa Mine(MOIL/17-18/ET/492) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | View |
66. | Providing and laying epoxy flooring to Store Building at Gumgaon Mine(MOIL/17-18/ET/283) | 11-04-2018 | 10-05-2018 | 10-05-2018 | 10-05-2018 | 03:30 PM | Active | View |
67. | Annual Plumbing and Sanitary items for Officers and Staff Quarters at Balaghat( Civil/BGT/T.E./2018-19/101) | 06-04-2018 | 12-04-2018 | 12-04-2018 | 12-04-2018 | 04:30 PM | Active | View |
68. | Repairing of approach stone Pitching stair from 6 th Level Pit Top up to Production Shaft Balaghat Mine.(Civil/BGT/T.E./2018-19/99) | 06-04-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 04:30 PM | Active | View |
69. | Cleaning of Inner sides of centralized Air Cooling Duct by robot and sterilization by Ozone generator at MOIL Bhawan, Nagpur.(MOIL/17-18/ET/495) | 06-04-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | View |
70. | PURCHASE OF PULMONARY FUNCTION TESTS MACHINES -3 NOS(PUR-MOIL-C-10-35-E-85 dt.5-4-2018) | 05-04-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | View |
71. | Providing, Supplying, installation and commissioning of DC drive with PLC system for production shaft winder at Balaghat Mine for Enhancement of Skip hoisting capacity(MOIL/17-18/ET/465) | 04-04-2018 | 16-04-2018 | 16-04-2018 | 16-04-2018 | 03:30 PM | Active | View |
72. | RECASTING OF 6 NOS. CONTACT CLAMP OF FERRO MANGANESE PLANT(TE/MOIL/BGT/FMP/ELECT/18-19/08 Date 03.04.18) | 04-04-2018 | 07-05-2018 | 07-05-2018 | 07-05-2018 | 04:30 PM | Active | View |
73. | ANNUAL OPERATION AND MAINTENANCE CONTRACT OF HEMM FOR THE PERIOD OF TWO YEARS AT DONGRI BUZURG MINE(MOIL/17-18/ET/484) | 03-04-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | View |
74. | Providing Furniture and Interior works for proposed chamber of Director (H.R) on first floor of MOIL Bhawan Nagpur.(MOIL/17-18/ET/ 497) | 29-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 03:30 PM | Active | View |
75. | Creation of Facilities under R and D for Production of Manganese Dioxide at Dongri Buzurg Mine(MOIL/18-19/ET/15) | 29-03-2018 | 17-04-2018 | 17-04-2018 | 17-04-2018 | 03:30 PM | Active | View |
76. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STAIN BAR FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-641 DT.27032018) | 27-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 04:30 PM | Active | View |
77. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR CHIKLA MINE AS PER ANNEXURE A ENCLOSED(TE-640 DT.27032018) | 27-03-2018 | 10-04-2018 | 10-04-2018 | 10-04-2018 | 04:30 PM | Active | View |
78. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/126/E-81/1309-M Dt. 27-03-2018) | 27-03-2018 | 18-04-2018 | 18-04-2018 | 18-04-2018 | 03:30 PM | Active | View |
79. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF CONTACT SHOE -1 SET(PUR/MOIL/C-11/144/E-80/1291-M Dt. 27-03-2018) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | View |
80. | Picking and collection of material from contaminated low grade ROM near Western side of Fagni Dump at Dongri Buzurg Mine(MOIL/18-19/ET/10) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | View |
81. | Underground horizontal and vertical development at -200 ft L and -300 ft L at Gumgaon Mine(MOIL/18-19/ET/9) | 27-03-2018 | 27-04-2018 | 27-04-2018 | 27-04-2018 | 03:30 PM | Active | View |
82. | Application of New Austrian tunneling method and Norwegian method of tunneling system for underground drift in Munsar Mine of MOIL limited under RandD with SRCoEM Nagpur(MUN/CIVIL/17-18/89 DT 24.03.2018) | 24-03-2018 | 31-03-2018 | 31-03-2018 | 31-03-2018 | 04:30 PM | Active | View |
83. | Underground development of ore drive at 13.5th Level North Section at Balaghat Mine(MOIL/18-19/ET/05) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | View |
84. | Underground development at 12th Level (South Section) at Balaghat Mine( MOIL/18-19/ET/7) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | View |
85. | Trench cutting in ore stack at Chikla Mine(MOIL/18-19/ET/8) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | View |
86. | Underground development at 13.5th Level South Section at Balaghat Mine(MOIL/18-19/ET/06) | 23-03-2018 | 23-04-2018 | 23-04-2018 | 23-04-2018 | 03:30 PM | Active | View |
87. | PURCHASE OF GODREJ MAKE CHAIR, MODEL - LEOMA - 1 NO. FOR HEAD OFFICE, NAGPUR (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/54/E-83/1354-M DT.22/03/2018) | 22-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 03:30 PM | Active | View |
88. | Loading, Transport and unloading of granulated slag from MEL Chandrapur to Balaghat Mine.(BGT/Mining/Sand Stowing/TE/17-18/8118 Date 18.03.1) | 22-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 04:30 PM | Active | View |
89. | PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-82/1326-M DT.20.03.2018) | 20-03-2018 | 11-04-2018 | 11-04-2018 | 11-04-2018 | 03:30 PM | Active | View |
90. | Picking and collection of material from 5 No. Dump at Sitapatore Mine(MOIL/17-18/ET/02) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | View |
91. | Washing picking and collection of material from west side of D dump waste dump at Tirodi Mine(MOIL/18-19/ET/03) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | View |
92. | Pushing of tubs in underground at Chikla Mine(MOIL/18-19/ET/1) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | View |
93. | Loading unloading and transportation of Hutch by mechanical means from Hutch slim Pond Jigg Drain Jigg Pond and other area of dump to the siding at Balaghat Mine(MOIL/18-19/ET/04) | 20-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 03:30 PM | Active | View |
94. | PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/17-18/625 dtd 17.03.2018) | 19-03-2018 | 28-03-2018 | 28-03-2018 | 28-03-2018 | 04:30 PM | Active | View |
95. | Collecting and loading of fines at Chikla Mine.(TE/CH/Civil/17-18/5363 dated 15/03/2018) | 19-03-2018 | 22-03-2018 | 22-03-2018 | 22-03-2018 | 03:30 PM | Active | View |
96. | Tender for Undertaking Annual maintenance of Air-Conditioners, Aqua Guard Water Purifiers, Water Coolers , Repair and maintenance of Air Coolers of MOIL LIMITED at Nagpur(MOIL/PERS/2017-18/1) | 17-03-2018 | 26-03-2018 | 26-03-2018 | 26-03-2018 | 03:30 PM | Active | View |
97. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF STRATA MONITORING INSTRUMENT MPBX FOR KANDRI MINE AS PER ANNEXURE A ENCLOSED(A-II/KAN/MIN/17-18/669) | 17-03-2018 | 03-04-2018 | 03-04-2018 | 03-04-2018 | 04:30 PM | Active | View |
98. | Purchase of Traction Batteries - 12 Sets (WE-73 DT.13.03.2018(e-Tender No.MOIL/17-18/ET/488)) | 14-03-2018 | 06-04-2018 | 06-04-2018 | 06-04-2018 | 3:30 PM | Active | View |
99. | Purchase of Diamond Drill Accessories (WE-77 DT.14.03.2018 (e-TenderNO.MOIL/17-18/et/494)) | 14-03-2018 | 20-04-2018 | 20-04-2018 | 20-04-2018 | 3:30 PM | Active | View |
100. | Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/17-18/2578) | 10-03-2018 | 22-03-2018 | 22-03-2018 | 22-03-2018 | 04:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2204) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |