Tender-Archive-2017
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Shifting of 33kV Overhead Line for installation of Solar Panels at Balaghat Mine.(MOIL/TE/Elect/2017-18/6341 Date 26.12.2017) | 29-12-2017 | 18-01-2018 | 18-01-2018 | 18-01-2018 | 04:30 PM | Active | View |
2. | Rate Contract for one year for supply of Compressed Oxygen Gas and Diss. Acetylene Gas Cylinders.(WE-206 e-tender No.MOIL/17-18/ET-403, Dt.29.12.17) | 29-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | View |
3. | Picking, collection and cleaning of 20 percent mineralized ore from ROM Mix dump particles at Beldongri Mine(MOIL/17-18/ET/365) | 29-12-2017 | 30-01-2018 | 30-01-2018 | 30-01-2018 | 03:30 PM | Active | View |
4. | Picking and collection of UKL 471 20 percent SM grade of Mn. Ore from Ch.6800 to 9500 at F W dump area at Ukwa Mine (MOIL/17-18/ET/362) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | View |
5. | Picking and collection of material from East side of A dump at Tirodi Mine (MOIL/17-18/ET/364) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | View |
6. | Washing picking and collection of material from off the pit area at Tirodi Mine (MOIL/17-18/ET/363) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | View |
7. | New bay for 2500KVA 33KV/11KV outdoor transformer at 33KV substation at Balaghat Mine(MOIL/17-18/ET/369) | 22-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | View |
8. | Supply of Timber (Only Through e-procurement)(WE-200 DT.22/12/2017, eTENDER NO.MOIL/17-18/ET/388) | 22-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | View |
9. | Drilling of 115 mm dia. holes for Opencast development at Dongri Buzurg Mine(MOIL/17-18/ET/374) | 21-12-2017 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | View |
10. | Cleaning , maintenance, watch and ward and operation pump of Sewage treatment plant Kandri mine(Kan/Civil/NIT/17-18/2813 Date 19/12/2017) | 20-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 04:30 PM | Active | View |
11. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF LIQUID LEVEL LIMITER (MOBRAY CONTROL)(PUR/MOIL/C-11/7/E-54/930-M Dt. 19-12-2017) | 19-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | View |
12. | Construction of Boundary wall by Precast Pre stressed Concrete Panels at Chikla Mine(MOIL/17-18/ET/361) | 18-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | View |
13. | PURCHASE OF PORTABLE MAGAZINE(PUR/MOIL/C-6/214/E-52/900-M DT.16/12/2017) | 16-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | View |
14. | LED street lighting from Mine office to Wahitola camp colony, Munsar Mine(MOIL/17-18/ET/346) | 16-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | View |
15. | Stability Test along with designing and Preparation of drawing and detailed cost Estimation for modification work required Strengthening of Head Gear structure of Vertical Shaft at Kandri Mine(A-III/KAN/17-18/2748) | 16-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 04:30 PM | Active | View |
16. | Construction of Boundary wall at Goverment school Adarsh Vidalaya Munsar under CSR(MOIL/17-18/ET/360) | 15-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | View |
17. | Construction of Classrooms in RNT School Ukwa Under CSR(MOIL/17-18/ET/ 359) | 14-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | View |
18. | Providing, Installing, and Commissioning of Hydraullic power pack with cylinders for Vertical shaft 100 ton Bunker at Ukwa Mine(UK/Mech/17-18/1891 Dated 03/12/2017) | 13-12-2017 | 26-12-2017 | 26-12-2017 | 26-12-2017 | 04:30 pm | Active | View |
19. | Providing and fixing of wooden support (Cleats) for cable laid in underground through vertical shaft at Kandri Mine(MOIL/17-18/ET/349) | 13-12-2017 | 12-01-2018 | 12-01-2018 | 12-01-2018 | 03:30 PM | Active | View |
20. | Monitoring and operation of 33KV substation at Balaghat Mine (MOIL/17-18/ET/347) | 12-12-2017 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | View |
21. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE. (PUR/MOIL/C-5/58/E-41/896-M Dt. 12/12/2017) | 12-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | View |
22. | Monitoring and operation of 33KV substation at Balaghat Mine(MOIL/17-18/ET/347) | 12-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | View |
23. | Hiring of Front End Loader 1 No. and Tipper (10 MT)- 2 Nos. at Dongri Buzurg Mine(MOIL/17-18/ET/355) | 12-12-2017 | 11-01-2018 | 11-01-2018 | 11-01-2018 | 03:30 PM | Active | View |
24. | Collecting and removing of Ash from Boiler house to ash dump area at EMD plant, Dongri Buzurg Mine(MOIL/17-18/ET/350) | 11-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | View |
25. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR WIPRO MAKE HYDRAULIC SYSTEM FOR ASHOK LEYLAND TIPPER.(PUR/MOIL/C-5/23/E-48/835-M Dt. 11/12/2017) | 11-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | View |
26. | Monitoring of Environment Parameters at MOIL Mines Plants AND Sand Lease under Water Act 1974 AND Air Act 1981 and Noise Survey(MOIL/17-18/ET/344) | 11-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | View |
27. | Underground Drivage for Electrical Sub-station at 13.5 Ft. L at Balaghat Mine(MOIL/17-18/ET/354) | 11-12-2017 | 11-01-2018 | 11-01-2018 | 11-01-2018 | 03:30 PM | Active | View |
28. | Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine(AGT/BGT/MECH/IMB/17-18/451 DTD 07.12.2017) | 09-12-2017 | 19-12-2017 | 19-12-2017 | 19-12-2017 | 04:30 PM | Active | View |
29. | Replacement of CT and PT metering unit and associated work for HT Service connection of Kandri Mine( MOIL/17-18/ET/351) | 09-12-2017 | 26-12-2017 | 26-12-2017 | 26-12-2017 | 03:30 PM | Active | View |
30. | Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine(MOIL/17-18/ET/345) | 09-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | View |
31. | Drilling 57mm diameter holes a premining support for installing cable bolt in Mangeneferrous rock in between CH-15 to CH-7 of 12 L North at Balaghat Mine(AGT/BGT/MECH/CB/17-18/450 dtd 07.12.2017) | 08-12-2017 | 14-12-2017 | 14-12-2017 | 14-12-2017 | 04:30 PM | Active | View |
32. | Underground Development at -350 Level at Kandri Mine(MOIL/17-18/ET/353) | 08-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | View |
33. | Consultancy Services for Preparation Of Design, Drawings and Detail Estimate for construction Of Material Handling Systems and Crushing and Screening Plants etc. at Chikla and Kandri Mine(MOIL/17-18/ET/352) | 08-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | View |
34. | Picking and Collection of Mn. Ore from 6 no. Old Dump at SitaPatore Mine(SS/MINE/HO/2017-18/2411) | 07-12-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | View |
35. | Hiring of Architect for rendering Architectural and Design Engineering Services for Proposed Construction of Residences for Directors Sr Executives at West Court Compound , Nagpur(MOIL/17-18/ET/ 341) | 06-12-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | View |
36. | purchase of Video Conferencing solution - 1 No. (4 Lots) (Only Through e-procurement)(WE-201 DT.04/12/2017, eTENDER NO.MOIL/17-18/ET/357) | 04-12-2017 | 02-01-2018 | 02-01-2018 | 02-01-2018 | 03:30 PM | Active | View |
37. | Purchase of Jumbo Bags-12,600 Nos(WE-203 e-tender No.MOIL/17-18/ET-356, Dt.04.12.17) | 04-12-2017 | 05-01-2018 | 05-01-2018 | 05-01-2018 | 03:30 PM | Active | View |
38. | Removal of spillage from the bottom of conveyor belt of 14.5 level Loading station Production Shaft(BGT/MECH/Spillage/17-18/5657) | 02-12-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 5:00 PM | Active | View |
39. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR VIBRATORY CUP MILL.(PUR/MOIL/C-11/44/E-51/873-M Dt. 30-11-2017) | 30-11-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | View |
40. | Maintenance OF Garden at Tirodi Mine( TRD/CIVIL/2017-18/2255) | 28-11-2017 | 05-12-2017 | 05-12-2017 | 05-12-2017 | 03:30 PM | Active | View |
41. | Construction of OCF Shed and office at Dongri Buzurg Mine(MOIL/17-18/ET/274) | 28-11-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | View |
42. | Renovation of sample room at Dongri Buzurg Mine(MOIL/17-18/ET/269) | 28-11-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | View |
43. | Construction of stone masonry for making drain and retaining wall for nallah from railway crossing to IMB plant at Dongri Buzurg Mine(MOIL/17-18/ET/275) | 28-11-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | View |
44. | Construction of Cement Concrete road with retaining wall from administrative building to Pit office at Munsar Mine(MOIL/17-18/ET/271) | 28-11-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | View |
45. | Construction of Shed beside Rest Shelter of Siding of Balaghat Mine(Civil/BGT/T.E./2017-18/5699) | 27-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 04:30 PM | Active | View |
46. | Construction of Panel room 5 nos at Munsar Mine(MOIL/17-18/ET/273) | 27-11-2017 | 27-12-2017 | 27-12-2017 | 27-12-2017 | 03:30 PM | Active | View |
47. | Repair for Camp Residential Quarters of Balaghat Mine(Civil/BGT/T.E./2017-18/5538) | 23-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 04:30 PM | Active | View |
48. | Major repairs/overhauling Leyland Engine AL 411 of JCB loader No 3 operating at Balaghat Mine(AGT/BGT/MECH/LMV/17-18/427 dtd 23.11.2017) | 23-11-2017 | 01-12-2017 | 01-12-2017 | 01-12-2017 | 04:30 PM | Active | View |
49. | Shotcrete work for retaining structure for Mobile Crushing plant at Munsar Mine(CIVIL/MUN/17-18/55 DT. 21.11.2017) | 22-11-2017 | 01-12-2017 | 01-12-2017 | 01-12-2017 | 04:30 PM | Active | View |
50. | Desilting of Silts accumulated around Jack Well towards smoothening water supply at Balaghat(Civil/BGT/T.E./2017-18/5571) | 21-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | View |
51. | Provision of regenerative control system for 4T capacity Battery Locomotive of Balaghat Mine(MOIL/17-18/ET/335) | 21-11-2017 | 30-12-2017 | 30-12-2017 | 30-12-2017 | 03:30 PM | Active | View |
52. | Providing and fixing of Pumping machineries, gs flarring unit,aeration work of STP at Munsar Mine(CIVIL/MUN/17-18/50 DT. 19.11.2017) | 20-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 04:30 PM | Active | View |
53. | Provision of audio communication between employees riding in Cage and Master Banksman at Men winder of Balaghat Mine(MOIL/17-18/ET/334) | 20-11-2017 | 20-12-2017 | 20-12-2017 | 20-12-2017 | 03:30 PM | Active | View |
54. | Pattern making, casting,Machining and dynamic balancing of Pumps Spares for 150 HP Maxflow make Mutti stage Pump (Float) of 8th Level Underground of Balaghat Mine(AGT/BGT/MECH/PUMP/17-18/412 DTD 16.11.2017) | 18-11-2017 | 28-11-2017 | 28-11-2017 | 28-11-2017 | 04:30 PM | Active | View |
55. | Fabrication of drive and Driven gear set for vibratory Assembly at IMB Plant Balaghat Mine(AGT/BGT/MECH/IMB/17-18/411 dtd 16.11.2017) | 18-11-2017 | 28-11-2017 | 28-11-2017 | 28-11-2017 | 04:30 PM | Active | View |
56. | PURCHASE OF MS OFFICE STD.2016 and MS VISUAL STUDIO PROFESSIONAL SOFTWARE | 18-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 3:30 PM | Active | View |
57. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL- MB -1500.( PUR/MOIL/C-5/23/E-49/841-M Dt. 18/11/2017) | 18-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | View |
58. | Supplying, providing, erection, installation and commissioning of L.T. 3 phase, 5 wires LT Overhead line, from Balapur camp to Mine Magazine of Dongri Buzurg Mine(MOIL/17-18/ET/333) | 18-11-2017 | 18-12-2017 | 18-12-2017 | 18-12-2017 | 03:30 PM | Active | View |
59. | Purchase of Track rollers of EIMCO Elecon make SDL At Gumgaon Mine(GUM/17-18 /349 Dt-15.11.2017) | 17-11-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | View |
60. | Repairing of Roof at Existing Post Office Building in Side syndicate bank at Tirodi Mine(TRD/CIVIL /L/2017-18/2218-A) | 17-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 03:30 PM | Active | View |
61. | Collecting Caneen Food Item drinks and carrying it on head load for serving it to Mine employee at Tirodi Mine(TRD/Civil/L/2017-18/2195-B) | 17-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 03:30 PM | Active | View |
62. | PRINTING OF DIARY FOR THE YEAR 2018(WE-106 e-tender No.MOIL/17-18/ET-340, Dt.17.11.17) | 17-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 03:30 PM | Active | View |
63. | Maintenance of Gardens at Ukwa Mine.(16/Civil/UM/17-18/1765) | 17-11-2017 | 02-12-2017 | 02-12-2017 | 02-12-2017 | 04:30 PM | Active | View |
64. | Purchase of Steel Braided Rubber Hose.(WE-50 e-tender No.MOIL/17-18/ET-339, Dt.17.11.17) | 17-11-2017 | 19-12-2017 | 19-12-2017 | 19-12-2017 | 03:30 PM | Active | View |
65. | Muffling for Blasting at 6 A 6 B and 6 C section of North at Tirodi Mine(MOIL/17-18/ET/332) | 16-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | View |
66. | Hiring of Front End Loader and Tipper at Dongri Buzurg Mine(MOIL/17-18/ET/331) | 15-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | View |
67. | Repair of roof slab of old ESR behind Mine Hospital at Chikla Mine.(TE/CH/CIVIL/17-18/3243 dated 06/11/2017) | 15-11-2017 | 28-11-2017 | 28-11-2017 | 28-11-2017 | 03:30 PM | Active | View |
68. | Concreting work for chamber Prepration at 1750 level Ukwa Mine.(16/Mining/UM/17-18/1740) | 15-11-2017 | 02-12-2017 | 02-12-2017 | 02-12-2017 | 04:30 PM | Active | View |
69. | Sinking 14 in Bore Hole with MS Casing of 8 in Dia and associated works at Gumgaon Mine.(MOIL/17-18/ET/328) | 15-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | View |
70. | Construction of 15 No Bath room and Toilets for Residential Quarters at Tirodi Mine(MOIL/17-18/ET/326) | 15-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | View |
71. | Transportation of sand from Bawanthadi River lease to Chikla Mine and Kanhan River lease to Gumgaon Mine(MOIL/17-18/ET/321) | 15-11-2017 | 13-12-2017 | 13-12-2017 | 13-12-2017 | 03:30 PM | Active | View |
72. | Construction of Boundary wall for administrative building premises and along the approach at Sitapatore Mine(MOIL/17-18/ET/327) | 15-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | View |
73. | Renovation and mass renovation works for Awlajhari, Tavejhari and Bodha Pumping Station towards Water Supply Scheme at Balaghat Mine(MOIL/17-18/ET/298) | 14-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | View |
74. | Development and beautification of New Colony Garden, Balaghat Mine.(MOIL/17-18/ET/296) | 14-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | View |
75. | Purchase of PEARL COKE with Transportation - 3360 MT(WE-80 e-tender No.MOIL/17-18/ET-338, Dt.14.11.17) | 14-11-2017 | 05-12-2017 | 05-12-2017 | 05-12-2017 | 03:30 PM | Active | View |
76. | Construction of Medical Administrative Building at Nagpur(MOIL/17-18/ET/ 323) | 14-11-2017 | 14-12-2017 | 14-12-2017 | 14-12-2017 | 03:30 PM | Active | View |
77. | Transportation of sand from Kalaphata Ghat to Kandri, Munsar and Beldongri Mine(MOIL/17-18/ET/329) | 14-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | View |
78. | Supplying Providing Fixing of Electronic Boom barrier at Entry point of Kandri Mines(Agent-MH/TENDER/17-18/2353) | 13-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 04:30 PM | Active | View |
79. | Purchase of Oil and Lubricants - 29 items (Only Through e-procurement)(WE-60 DT.13/11/2017 (MOIL/17-18/ET/336-337) | 13-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | View |
80. | PURCHASE OF STEEL WIRE ROPE-USHA MARTIN MAKE(PUR/MOIL/C-3/23/E-47/781-M DT.10.11.2017) | 10-11-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | View |
81. | Picking and collection of material from contaminated low grade ROM at South West Part-3 of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/325) | 10-11-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | View |
82. | Picking and collection of material from contaminated low grade ROM at South West Part-2 side of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/324) | 10-11-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | View |
83. | Purchase of Cross Bit, 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine.(WE-105 e-tender No.MOIL/17-18/ET-330, Dt.10.11.17) | 10-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | View |
84. | Shifting of 3 phase 3 wire existing 11 KV HT overhead line from CH no 49 MRL 345 CH no 49, MRL 353 CH no 52, MRL 356 to CH no 49,MRL 345 CH no 53, MRL 348-CH no 52, MRL 356 at Dongri Buzurg Mine(MOIL/17-18/ET/313) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | View |
85. | Erection of 11KV HT Overhead line from Chikla B New substation to Gadhaghat Substation (2nd Vertical Shaft) of Chikla Mine(MOIL/17-18/ET/314) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | View |
86. | Erection of new 11KV HT Overhead line from 50-52 substation to south bed mine substation at Tirodi Mine(MOIL/17-18/ET/315) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | View |
87. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3 TON AND 4 TON BATTERY-DIESEL LOCO FROM OVIS EQUIPMENTS PVT. LTD., HYDERABAD(PUR/MOIL/C-5/27/E-08/267-M Dt. 08/11/2017) | 08-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 03:30 PM | Active | View |
88. | Automation of underground Pumping Operation at Chikla Mine(MOIL/17-18/ET/288) | 08-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 03:30 PM | Active | View |
89. | Loading and transportation of Mill tailing from Malajkhand Mine of M/s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/17-18/ET/295) | 08-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | View |
90. | Picking and collection of material from contaminated low grade ROM at South West Part-I of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/319) | 07-11-2017 | 16-11-2017 | 16-11-2017 | 16-11-2017 | 03:30 PM | Active | View |
91. | Picking and collection of material from contaminated low grade ROM at South Part of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/320) | 07-11-2017 | 16-11-2017 | 16-11-2017 | 16-11-2017 | 03:30 PM | Active | View |
92. | Screening sorting and stacking of jigged ferro manganese metal Ferro Manganese Plant Balaghat Mine(BGT/FM/TE/2017-18/338 Date 06.11.2017) | 07-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 04:30 PM | Active | View |
93. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR RD-60 DRILL MACHINE AND RD-395 WATER PUMP(PUR/MOIL/C-5/28/E-10/293-M Dt. 07/11/2017) | 07-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | View |
94. | Sinking of Winzes (Manually) from 70ft Level to 30ft Level at Munsar Mine(MOIL/17-18/ET/301) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | View |
95. | Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/17-18/ET/297) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | View |
96. | Extra excavation in Manganiferous rock at 5th Level (Western side of -470 ft L) of vertical section at Chikla Mine(MOIL/17-18/ET/299) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | View |
97. | PURCHASE OF INDUSTRIAL SAFETY SHOES AND PVC HALF GUM BOOT(PUR/MOIL/C-11/109/E-45/772-M Dt. 06-11-2017) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | View |
98. | PURCHASE OF HYDRATED LIME POWDER-15MT(PUR/MOIL/C-11/34/E-46/774-M Dt. 06-11-2017) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | View |
99. | Annual Rate Contract for supply of Cement Capsules - 430397 Nos.((WE-104 dt.06.11.2017(e-Tender No.MOIL/17-18/ET/322) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | View |
100. | 11KV Overhead line for Chikla B new substation at Chikla Mine(MOIL/17-18/ET/289) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |