1. Removal of Spillage from the bottom of Conveyor belt of 14.5th Level Loading station of Production shaft of Balaghat Mine.(AGT/BGT/MECH/WINDER/20-21/1004) 22-12-2020 30-12-2020 30-12-2020 30-12-2020 04:30 PM Active View
2. Procurement of Electrically operated horizontal submersible pump for Balaghat Mine(PUR/MOIL/BGT/PUMP/20-21/1006) 21-12-2020 08-01-2021 08-01-2021 08-01-2021 04:30 PM Active View
3. Tender enquiry in single bid system for Consultancy for preparation of design, drawing, and detailed estimate for construction of screening plant for handling of pebble near sand stowing plant at Chikla mine(TE-24 DT.17122020) 17-12-2020 26-12-2020 26-12-2020 26-12-2020 03:30 PM Active View
4. Dismantling of Gear train of winding engine and replacement of Main Gear, Intermediate Gear and Pinion Gear of Production Shaft Winder at Balaghat Mine.(AGT/BGT/MECH/WINDER/20-21/975) 15-12-2020 21-12-2020 21-12-2020 21-12-2020 04:30 Pm Active View
5. Purchase of Black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2020-21/3588) 14-12-2020 25-12-2020 25-12-2020 25-12-2020 04:30 PM Active View
6. Production of Aggregates and M-Sand from waste rock generated during development of hang wall portion from CH.25 to CH.42 by contractual means at Dongri Buzurg Mine to make the best out of waste(MOIL/20-21/ET/219) 12-12-2020 11-01-2021 11-01-2021 11-01-2021 03:30 PM Active View
7. Design, Manufacture and supply plumber block-1Set for Intermediate Gear Shaft of Production shaft winder at Balaghat Mine(AGENT/BGT/MECH/20-21/ 964) 11-12-2020 23-12-2020 23-12-2020 23-12-2020 04:30 PM Active View
8. PURCHASE OF CUMMINS DIESEL ENGINES VARIOUS TYPES - 3 NOS.FOR TIRODI MINE(M.P) AND DONGRI BUZURG MINE(M.S) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/139/E-35/372-M DT.08/12/2020) 09-12-2020 01-01-2021 01-01-2021 01-01-2021 03:30 PM Active View
9. Upgradation of small product, size 6 25 mm of CandS plant through dry density separation plant at Chikla Mine by contractual means for the period of 3 years(MOIL/20-21/ET/237) 08-12-2020 08-01-2021 08-01-2021 08-01-2021 03:30 PM Active View
10. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE COMPRESSOR FOR BALAGHAT MINE(PUR/MOIL/C-5/40/E-36/394M,Dt. 08/12/2020) 08-12-2020 30-12-2020 30-12-2020 30-12-2020 03:30 PM Active View
11. Cleaning and screening of Ferro grade 34 Mn Lump ore(KD/MINES/NIIT/2020-21/4389) 05-12-2020 14-12-2020 14-12-2020 14-12-2020 04:30 PM Active View
12. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ROCKDRILL MAKE EXPLORATION DRILL MACHINE(PUR/MOIL/C-5/49/E-34 /370-M,Dt.05/12/2020) 05-12-2020 06-01-2021 06-01-2021 06-01-2021 03:30 PM Active View
13. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 1500 KVA DG SET.(PUR/MOIL/C-5/47/E-14 /184-M,Dt.05/12/2020 05-12-2020 28-12-2020 28-12-2020 28-12-2020 03:30 PM Active View
14. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR PUMP OPERATING AT BALAGHAT MINE(PUR/MOIL/C-5/28/E-32/367M Dt.04.12.2020) 04-12-2020 28-12-2020 28-12-2020 28-12-2020 03:30 PM Active View
15. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MAXFLOW PUMP(PUR/MOIL/C-5/28/E- 33 368-M,Dt.04/12/2020) 04-12-2020 28-12-2020 28-12-2020 28-12-2020 03:30 PM Active View
16. Washing Pump at DB Mine(/AGT-GR.II/DB/2020-21/1134) 03-12-2020 05-01-2021 05-01-2021 05-01-2021 05:00 PM Active View
17. Repairing of Old Holmes shaft skip of 3 MT for refitting work into production shaft winding shaft.(AGT/BGT/MECH/PS SKIP/20-21/2749) 03-12-2020 10-12-2020 10-12-2020 10-12-2020 04:30 PM Active View
18. Purchase of Grinding Wheels(WE-70 dt.01.12.2020 (e-Tender no.MOIL/20-21/ET/227) 02-12-2020 23-12-2020 23-12-2020 24-12-2020 03:30 PM Active View
19. Purchase of Shot Firing Cable(WE-58 dt.01.12.2020 (e-Tender no.MOIL/20-21/ET/233) 02-12-2020 23-12-2020 23-12-2020 24-12-2020 03:30 PM Active View
20. OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KD/Civil/20-21/3542 Dt2.12.2020) 02-12-2020 09-12-2020 09-12-2020 09-12-2020 04:30 PM Active View
21. Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) - 2 Nos. (1 Lot) (Only Through e-procurement)(WE-72 DT.02/12/2020 (ET-239)) 02-12-2020 28-12-2020 28-12-2020 29-12-2020 03:30 PM Active View
22. Outsourcing skilled manpower for electrical maintenance work at sitapatore mine.(MOIL/HO/ELEC/2020/47 DATE 16/06/2020) 01-12-2020 12-12-2020 12-12-2020 12-12-2020 03:30 PM Active View
23. Repairing of Idler Assy-2 nos of Tata Hitachi 450-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1121) 01-12-2020 04-01-2021 04-01-2021 04-01-2021 04:30 PM Active View
24. Purchase of Steel Braided Hose-4 Items.(MOIL/20-21/ET-228 DT.01.12.2020) 01-12-2020 29-12-2020 29-12-2020 30-12-2020 03:30 PM Active View
25. Laying of GI Pipe Line 6 inch and 4 in underground at Chikla Mine(TE-13 DT.30112020) 30-11-2020 12-12-2020 12-12-2020 12-12-2020 03:30 PM Active View
26. CLEANING , SCREENING OF FERRO GRADE KD-4543 FROM SUBGRADE MINERAL REJECT FROM UNDERGROUND AT KANDRI MINE(KAN/MIN/AGT/NIT/20-21/3447 DT 24.11.2020) 27-11-2020 04-12-2020 04-12-2020 04-12-2020 04:30 PM Active View
27. Making and Supplying of Stemming material Mud Plug used for Blasting / fragmentation in U/G at various working levels at Balaghat Mine(MOIL/20-21/ET/217) 27-11-2020 28-12-2020 28-12-2020 28-12-2020 03:30 PM Active View
28. Pushing and unloading of tubs in underground and surface at vertical section and Ch.10800 section of Ukwa Mine(MOIL/20-21/ET/216) 27-11-2020 28-12-2020 28-12-2020 28-12-2020 03:30 PM Active View
29. e-Procurement of Iron Pan and Ore Cleaning Hammer(PUR/MOIL/C-1/196/WE-76/ET/226) 27-11-2020 21-12-2020 21-12-2020 22-12-2020 03:30 PM Active View
30. Tubeless Tyre Size 205 55 R16 10 Nos.(PUR/MOIL/C-13/18/E-31/363-M) 26-11-2020 02-12-2020 02-12-2020 02-12-2020 03:30 PM Active View
31. Purchase of Hose Fittings for Rock Drill and Air Leg Machines.(MOIL/20-21/ET-225 dt.25.11.2020) 25-11-2020 16-12-2020 16-12-2020 17-12-2020 03:30 PM Active View
32. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73/E-29 /352-M Dt. 25/11/2020) 25-11-2020 14-12-2020 14-12-2020 14-12-2020 03:30 PM Active View
33. Purchase of Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-35 dt.24.11.2020 (e-Tender no.MOIL/20-21/ET/224) 24-11-2020 22-12-2020 22-12-2020 23-12-2020 03:30 PM Active View
34. Picking and collection of Ferro Grade and SM Grade ore TD-4505, TDL-439 and TDL-499 from South Staff Quarter dump of Tirodi Mine(MOIL/20-21/ET/214) 24-11-2020 24-12-2020 24-12-2020 24-12-2020 03:30 PM Active View
35. Recovery of Ferro grade TD-4505 and SM Grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine(MOIL/20-21/ET/213) 24-11-2020 24-12-2020 24-12-2020 24-12-2020 03:30 PM Active View
36. Picking and collection of 3rd Grade and LGHS ore from diluted ROM at South Pit North side of Tirodi Mine(MOIL/20-21/ET/215) 24-11-2020 24-12-2020 24-12-2020 24-12-2020 03:30 PM Active View
37. DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/20-21/JGM(MECH)/1075) 23-11-2020 02-12-2020 02-12-2020 02-12-2020 04:30 PM Active View
38. Pushing of tubs from SDL faces at Gumgaon Mine(MOIL/20-21/ET/210) 23-11-2020 23-12-2020 23-12-2020 23-12-2020 03:30 PM Active View
39. Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/20-21/ET/211) 23-11-2020 23-12-2020 23-12-2020 23-12-2020 03:30 PM Active View
40. Sinking of winzes from plus 60 Level to -70 Level at zero deposit of Chikla B section at Chikla Mine(MOIL/20-21/ET/212) 23-11-2020 23-12-2020 23-12-2020 23-12-2020 03:30 PM Active View
41. Purchase of G. I. Core Boxes(WE-67 dt.23.11.2020 (e-Tender no.MOIL/20-21/ET/223) 23-11-2020 18-12-2020 18-12-2020 19-12-2020 03:30 PM Active View
42. e-Procurement of Rubber Tub Buffer(PUR/MOIL/C-12/13/WE-68/ET/222) 21-11-2020 21-12-2020 21-12-2020 22-12-2020 03:30 PM Active View
43. PURCHASE OF DENSITY MEASUREMENT KIT(PUR/MOIL/C-12/23/E-30/356-M DT.20.11.2020) 20-11-2020 09-12-2020 09-12-2020 09-12-2020 03:30 PM Active View
44. Transportation of Sand from Bawanthadi River lease to Chikla Mine(MOIL/20-21/ET/209) 20-11-2020 21-12-2020 21-12-2020 21-12-2020 03:30 PM Active View
45. Removal of waste rock in F W H W and manganiferous rock from Ch-52 to Ch-60 at Dongri Buzurg Mine(MOIL/20-21/ET/218) 20-11-2020 24-12-2020 24-12-2020 24-12-2020 03:30 PM Active View
46. Concreting by using Pre Cast Slabs at Gumgaon Mine(MOIL/20-21/ET/208) 20-11-2020 21-12-2020 21-12-2020 21-12-2020 03:30 PM Active View
47. Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/20-21/ET/207) 20-11-2020 01-12-2020 01-12-2020 01-12-2020 03:30 PM Active View
48. e-Procurement of Butterfly Valves(PUR/MOIL/C-1/202/WE-71/ET/221) 19-11-2020 08-12-2020 08-12-2020 09-12-2020 03:30 PM Active View
49. PURCHASE OF SPARES FOR AUTOMATED DIESEL DISPENSING ASSY MAKE HECTRONIC FOR DONGRI BUZURG MINE(DB/MECH/20-21/MECH/1056) 18-11-2020 08-12-2020 08-12-2020 08-12-2020 04:30 PM Active View
50. CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRIBUZURG MINE(DB/MECH/IMB/20-21/1057) 17-11-2020 21-11-2020 21-11-2020 21-11-2020 04:30 PM Active View
51. Purchase of Motors various types - 32 Lots.(Only Through e-procurement)(WE-41 DT.17/11/2020 (ET/220)) 17-11-2020 09-12-2020 09-12-2020 10-12-2020 03:30 PM Active View
52. Regular clearing of main bunker ore flow in IMB plant at Dongri Buzurg Mine(DB/MECH/IMB/20-21 /1055) 16-11-2020 21-11-2020 21-11-2020 21-11-2020 04:30 PM Active View
53. Repairing of Sprocket Assy of Tata Hitachi 450-2 and Tata Hitachi 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1042) 14-11-2020 28-12-2020 28-12-2020 28-12-2020 04:30 PM Active View
54. Design, Manufacture and supply plumber block-1Set for pinion Shaft of Production shaft winder at Balaghat Mine(AGENT/BGT/MECH/20-21/869) 14-11-2020 23-11-2020 23-11-2020 23-11-2020 04:30 PM Active View
55. Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGT/BGT/MECH/WINDER/20-21/871) 14-11-2020 23-11-2020 23-11-2020 23-11-2020 04:30 PM Active View
56. Repairs to BDC shed and development of surrounding area by excavation and filling at Kandri Mine.(KD/CIVIL/NIT/20-21/3326 DT 13.11.2020) 14-11-2020 20-11-2020 20-11-2020 20-11-2020 04:30 PM Active View
57. Hiring of Diesel Jeep for the period of three months at Balaghat Mine(AGT/BGT/MECH/JEEP/20-21/867) 13-11-2020 20-11-2020 20-11-2020 20-11-2020 04:30 PM Active View
58. Procurement of Ceiling Fans 1200MM for residential Camp, Dongri Buzurg Mine(DB/ELECT/20-21/832 DATED 19.09.2020) 13-11-2020 24-11-2020 24-11-2020 24-11-2020 04:30 PM Active View
59. Tender invited in single bid system for Proposal for the providing, designing, fabrication, installation, and commissioning of Motorized Gate for mine workshop at Chikal Mine(TE/CH/MECH/20-21/14) 13-11-2020 23-11-2020 23-11-2020 23-11-2020 03:30 PM Active View
60. Procurement of 4 Nos Brake Tie rods for Production shaft Winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/ 870) 13-11-2020 04-12-2020 04-12-2020 04-12-2020 04:30 PM Active View
61. Procurement of 3 nos Tie rods for Holmes shaft Skip Winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/860) 12-11-2020 02-12-2020 02-12-2020 02-12-2020 04:30 PM Active View
62. Purchase Of MF Drill Rods 10nos and 57 mm Button Bits 2nos for Cable Bolting Operation through UDM - 601 at Chikla Mine(TE-12 DT.12112020) 12-11-2020 02-12-2020 02-12-2020 02-12-2020 04:30 PM Active View
63. Breaking of Metal and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/20-21/ET/190) 12-11-2020 11-12-2020 11-12-2020 11-12-2020 03:30 PM Active View
64. Procurement of 55Nos. 2V Lead Acid batteries for substation of Balaghat Mine(BGT/ELECT/20-21/849) 11-11-2020 03-12-2020 03-12-2020 03-12-2020 04:30 PM Active View
65. e Procurement of White Metal R. C. Tandem(PUR/MOIL/C-1/192/WE-69/ET/206) 11-11-2020 17-12-2020 17-12-2020 18-12-2020 03:30 PM Active View
66. Providing and Installation of Driver Fatigue Monitoring Systems in Dumpers Operating at Dongri Buzurg Mine 10-11-2020 24-11-2020 24-11-2020 24-11-2020 4:30 pm Active View
67. WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FORKLIFT MAKE VOLTAS FOR DONGRI BUZURG MINE 10-11-2020 01-12-2020 01-12-2020 01-12-2020 4:30 pm Active View
68. Repairing of toilet of Master bed room at Mine Manager Bunglow at Balaghat Mine 10-11-2020 17-11-2020 17-11-2020 17-11-2020 4:30 pm Active View
69. WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HYDRAULIC MOBILE CRANE OPERATING AT DONGRI BUZURG MINE 10-11-2020 24-11-2020 24-11-2020 24-11-2020 4:30 pm Active View
70. Repairing of Bhatera Pipe line at Balaghat Mine(CIVIL/BGT/T.E./2020-21/840 DT. 06.11.2020) 10-11-2020 17-11-2020 17-11-2020 17-11-2020 04:30 PM Active View
71. Loading of Metal (plus25 mm to minus50mm) into trucks at Ferro Manganese Plant, Balaghat Mine(MOIL/20-21/ET/189) 10-11-2020 08-12-2020 08-12-2020 08-12-2020 03:30 PM Active View
72. Fabrication and supply of complete ID FAN BLOWER ASSEMBLY with Motor for Boiler Scrubber at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET-205 dt.10.11.2020) 10-11-2020 03-12-2020 03-12-2020 04-12-2020 03:30 PM Active View
73. Providing 6 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(ADGM/Grp-III/SYS/NW/20-21/1354) 09-11-2020 17-11-2020 17-11-2020 17-11-2020 03:30 PM Active View
74. Repairing of AC of TATA HITACHI 1200-1 AND TATA HITACHI 450-2 AT DONGRI BUZURG MINE(DB/MECH/20-21/JGM(MECH)/986) 09-11-2020 25-11-2020 25-11-2020 25-11-2020 04:30 PM Active View
75. Purchase of Cross Bit 57MM Dia suitable for Cable Bolting Machine.(MOIL/20-21/ET-204 dt.07.11.2020) 07-11-2020 08-12-2020 08-12-2020 09-12-2020 03:30 PM Active View
76. Automation of Pumping Operation at Kandri Mine(MOIL/20-21/ET/188) 07-11-2020 07-12-2020 07-12-2020 07-12-2020 03:30 PM Active View
77. Procurement of 11KV Aluminum Arial Air bunch XLPE Cable of 70Sqmm for EMD Plant, Dongri Buzurg Mine.(DB/ELECT/20-21/1026) 06-11-2020 20-11-2020 20-11-2020 20-11-2020 04:30 PM Active View
78. Purchase of Cable Bolting Accessories For cable Bolting machine.(MOIL/20-21/ET-203) 05-11-2020 26-11-2020 26-11-2020 27-11-2020 03:30 PM Active View
79. Loading Transportation and Unloading of Manganese Ore Rom(Bel/Min/NIT/20-21/1707) 04-11-2020 13-11-2020 13-11-2020 13-11-2020 04:30 PM Active View
80. PROCUREMENT OF 2 NOS. ELECTRICALLY OPERATED MONO BLOCK PUMP FOR 15TH LEVEL UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/20-21/817) 04-11-2020 25-11-2020 25-11-2020 25-11-2020 04:30 PM Active View
81. PURCHASE OF C.S. WHEEL ASSEMBLY WITH COVER FOR 4MT GB CAR IN UNDERGROUND LEVELS AT BALAGHAT MINE(PUR/MOIL/BGT/CS WHEEL /20-21/818) 04-11-2020 25-11-2020 25-11-2020 25-11-2020 04:30 PM Active View
82. PURCHASE OF ELECTRICALLY OPERATED HORIZONTAL SUBMERSIBLE PUMP FOR BALAGHAT MINE(PUR/MOIL/BGT/PUMP/20-21/819) 04-11-2020 25-04-2020 25-11-2020 25-11-2020 04:30 PM Active View
83. Loading Transportation and Unloading of Manganese Ore Rom(Bel/Min/NIT/20-21/1707) 04-11-2020 13-11-2020 13-11-2020 13-11-2020 04:30 PM Active View
84. Engagement of thr Consultant for Implementation of digitization projects for improvement in various processes in the Company(MOIL/20-21/ET/191) 04-11-2020 18-12-2020 18-12-2020 18-12-2020 03:30 PM Active View
85. e-procurement of Tub Coupling Chain and Pins(PUR/MOIL/C-12/6/WE-66/ET/201) 04-11-2020 23-11-2020 23-11-2020 24-11-2020 03:30 PM Active View
86. Automation of Pumping Operation at MOIL Bhawan, CMD Bungalow, CMS and Staff Quarters(MOIL/20-21/ET/187) 04-11-2020 03-12-2020 03-12-2020 03-12-2020 03:30 PM Active View
87. House Keeping Works in Mine office Building ,Mine Manager Bungalow, Rest House in Ukwa Mine(AGT/CIVIL/UK/LT/20-21/803) 03-11-2020 10-11-2020 10-11-2020 10-11-2020 04:00 PM Active View
88. CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/20-21/978) 27-10-2020 04-11-2020 04-11-2020 04-11-2020 04:30 PM Active View
89. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-26/315-M Dt. 27/10/2020) 27-10-2020 18-11-2020 18-11-2020 18-11-2020 03:30 PM Active View
90. Trench cutting in ore stacks at Beldongri Mine(MOIL/20-21/ET/186) 26-10-2020 26-11-2020 26-11-2020 26-11-2020 03:30 PM Active View
91. Pushing and unloading of tubs in Underground and surface at Ch.5000 1850 L of Ukwa Mine(MOIL/20-21/ET/184) 26-10-2020 26-11-2020 26-11-2020 26-11-2020 03:30 PM Active View
92. Removal of accumulated pebbles near sand stowing plants at Chikla Mine(MOIL/20-21/ET/185) 26-10-2020 26-11-2020 26-11-2020 26-11-2020 03:30 PM Active View
93. Underground concreting at -1850 L -1750 L and -1650 L of Ukwa Mine(MOIL/20-21/ET/183) 26-10-2020 26-11-2020 26-11-2020 26-11-2020 03:30 PM Active View
94. CLEANING AND SCREENING OF FERRO GRADE KD-4543 FROM SUBGRADE MINERAL AND REJECT AT KANDRI MINE(KAN/MIN/AGT/NIT/20-21/3121 DT 23.10.2020) 24-10-2020 31-10-2020 31-10-2020 31-10-2020 04:30 PM Active View
95. ERECTION OF 11KV OVERHEAD LINE FROM MINE WORKSHOP TO EMD PLANT(DB/ELECT/20-21/961) 23-10-2020 13-11-2020 13-11-2020 13-11-2020 04:30 PM Active View
96. Picking and collection of material to recover Ferro Grade KD-2272 ore from subgrade mineral rejects at Kandri Mine(MOIL/20-21/ET/182) 23-10-2020 23-11-2020 23-11-2020 23-11-2020 03:30 PM Active View
97. Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of sub grade mineral reject from ROM at 320 L North-West section at Chikla Mine(MOIL/20-21/ET/192) 23-10-2020 23-11-2020 23-11-2020 23-11-2020 03:30 PM Active View
98. Cleaning of surplus underground ROM at Kandri Mine(MOIL/20-21/ET/181) 23-10-2020 23-11-2020 23-11-2020 23-11-2020 03:30 PM Active View
99. Construction of Toilet Block beside Road Weigh Bridge at Munsar Mine(Munsar/Civil/NIT/20-21/154 Date 20.10.2020) 22-10-2020 30-10-2020 30-10-2020 30-10-2020 04:30 PM Active View
100. Making and Supplying of stemming sticks material used for blasting in undergound at working levels at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/761 DT. 21.10.2020) 22-10-2020 02-11-2020 02-11-2020 02-11-2020 04:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.