Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SANDVIK ASIA PVT. LTD MAKE, JUMBO DRILLING MACHINE OPERATING AT BALAGHAT MINE.(PUR/MOIL/C-5/23/E-11/173-M Dt. 18/08/2020) 18-08-2020 07-09-2020 07-09-2020 07-09-2020 03:30 PM Active View
2. Purchase of Fasteners High Tension Bolts, Mild Steel Bolts, Wire Nails, Rose Nails, Teflon Tape ,M seal, Araldite , Holdite etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/20-21/534) 17-08-2020 08-09-2020 08-09-2020 08-09-2020 04:30 PM Active View
3. PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE- ENESTEE ENGINEERING LIMITED, MODEL- E-VF-1016-001 - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE A ENCLOSED).(PUR/MOIL/C-4/239/E-15/193-M DT.17/08/2020) 17-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
4. Procurement and Installation of CCTV Surveillance System at EMD Plant, MOIL Limited, Dongri Buzurg Mine(DB/ELECT/20-21/556) 14-08-2020 04-09-2020 04-09-2020 04-09-2020 04:30 PM Active View
5. Purchase of WATER BONDED PLUGGING MASS- 5 MT(MOIL/20-21/ET-126 dt.14.08.2020) 14-08-2020 08-09-2020 08-09-2020 09-09-2020 03:30 PM Active View
6. Providing,supplying,installation of neutral grounding resistance and monitoring relay on 11/3.3kV transformer at Balaghat Mine(BGT/ELECT/20-21/523) 13-08-2020 03-09-2020 03-09-2020 03-09-2020 04:30 PM Active View
7. providing, supplying and installation of heat shrinkable indoor End termination kits on the 120 sq mm copper XLPE cable.(BGT/ELECT/2020-21/524) 13-08-2020 03-09-2020 03-09-2020 03-09-2020 04:30 PM Active View
8. Amenities material to be provided to SISF At Balaghat, Ukwa, and Tirodi Mines MOIL Limited(PUR/PERS/BGT/AGT/518 date 10.08.2020) 12-08-2020 31-08-2020 31-08-2020 31-08-2020 04:30 PM Active View
9. Daily fuel (High Speed Diesel) filling in HEMMs at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/542) 11-08-2020 20-08-2020 20-08-2020 20-08-2020 04:30 PM Active View
10. Security of Mine hospital at Balaghat(PERS/BGT/LT/20-21/511 date 10.08.2020) 11-08-2020 20-08-2020 20-08-2020 20-08-2020 04:30 PM Active View
11. Construction of Community hall at Puri (Odisha) under CSR(MOIL/20-21/ET/119) 11-08-2020 10-09-2020 10-09-2020 10-09-2020 03:30 PM Active View
12. Tender inviting in single bid system for Proposal for fabrication and installation of Steel Platform and associated works near 2nd Vert)ical Shaft at Chikla mine.(PUR/MOIL/CH/MECH/20-21/06) 10-08-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
13. REPAIRING OF RHS TRACK CHAIN ASSY OF TATAHITACHI 450-1 HYDRAULIC EXCVATOR OF DONGRI BUZURG MINE.(DB/MECH/20-21/JGM(MECH)/525) 06-08-2020 14-08-2020 14-08-2020 14-08-2020 04:30 PM Active View
14. Waterproofing to RCC slab of old B-Type and C-Type Quarters at Dongri Buzurg Mine.(DB/Civil/20-21/526 Date 04/08/2020) 06-08-2020 14-08-2020 14-08-2020 14-08-2020 04:30 PM Active View
15. Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/20-21/ET/92) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
16. Construction of Community hall at village Chakdehi Distt Mandla (MP) under CSR(MOIL/20-21/ET/105) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
17. Construction of additional floor at Saraswati Mandir an educational institute for Deaf-Mute Childerns at Nagpur under CSR(MOIL/20-21/ET/104) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
18. Construction of new water supply scheme at Chikla Mine(MOIL/20-21/ET/93) 05-08-2020 09-09-2020 09-09-2020 09-09-2020 03:30 PM Active View
19. Maintenance of gardens at Administrative Building and Mine Managers Bungalow at Beldongri Mine(MOIL/20-21/ET/98) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
20. Maintenance, watch and ward of various gardens at Munsar Mine(MOIL/20-21/ET/97) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
21. Const of cubical room and HT panel room and certralized CCTV room near Mine store at Chikla Mine(MOIL/20-21/ET/96) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
22. Construction of CC platform and Industrial shed near dry separation unit at Munsar Mine(MOIL/20-21/ET/95) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
23. Annual repairs to camp quarters at Kandri Mine.(MOIL/20-21/ET/94) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
24. Construction Switch room and NGR panel room and 11 kv cable trench of Chikla Mine(MOIL/20-21/ET/91) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
25. ET 90 for Operation and minor maintenance of water supply scheme at MOIL Bhawan CMD Bungalow CMS with A type quarters and West court with guest house Transit house and Bansivilla compound area MOI Nagpur(MOIL/20-21/ET/90) 05-08-2020 04-09-2020 04-09-2020 04-09-2020 03:30 PM Active View
26. BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF LARSEN AND TOUBRO MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/E-05/79-M DT.04.08.2020) 04-08-2020 24-08-2020 24-08-2020 24-08-2020 03:30 PM Active View
27. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL MB -1500.(PUR/MOIL/C-5/70/E-09/168-M Dt. 04/08/2020) 04-08-2020 26-08-2020 26-08-2020 26-08-2020 03:30 PM Active View
28. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR IR MAKE AIR COMPRESSOR MODEL IN-15-7 AND DYER IR24R, D144 INA FOR IMB PLANT BALAGHAT MINE(PUR/MOIL/C-5/65/E-10/169-M Dt. 04/08/2020) 04-08-2020 26-08-2020 26-08-2020 26-08-2020 03:30 PM Active View
29. Complete survey, Estimation of 3D Subsidence parameter and 3D Numerical Modelling of Subsidence parameters at Chikla Mine of MOIL over an area of 150.650 Ha with survey certification by MoEF recommended Instititions(MOIL/20-21/ET/72) 03-08-2020 19-08-2020 19-08-2020 19-08-2020 03:30 PM Active View
30. FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/20-21/1362) 01-08-2020 26-08-2020 26-08-2020 26-08-2020 04:30 PM Active View
31. Design, Manufacture and supply plumber block for pinion Shaft of Production shaft winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/1361) 01-08-2020 26-08-2020 26-08-2020 26-08-2020 04:30 PM Active View
32. Under ground filling and spreading of waste rock at 13.5th level North section at Balaghat Mine(MIN/BGT/AGT/LT/20-21/469 dt 29.07.2020) 31-07-2020 10-08-2020 10-08-2020 10-08-2020 04:30 PM Active View
33. Supply of empty cement bags for muffle blasting at Tirodi Mine.(403 Dated 15.07.2020) 31-07-2020 05-08-2020 05-08-2020 05-08-2020 03:30 PM Active View
34. Cleaning of Sump at 1650 L Underground at Ukwa Mine(AGT/Civil/UK/LT/20-21/443 Date 28.07.2020) 30-07-2020 10-08-2020 10-08-2020 10-08-2020 04:30 PM Active View
35. CLEANING OF DRAIN(AGT/Civil/UK/LT/20-21/442 Date 28.07.2020) 30-07-2020 10-08-2020 10-08-2020 10-08-2020 04:30 PM Active View
36. Installation of retaining wall from steel section for new dump screen installed near new Joplin Jig section at Balaghat Mine(AGENT/BGT/MECH/20-21/ 451) 29-07-2020 18-08-2020 18-08-2020 18-08-2020 04:30 PM Active View
37. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES.(PUR/MOIL/C-5/46/E-12/174-M Dt. 29/07/2020) 29-07-2020 19-08-2020 19-08-2020 19-08-2020 03:30 PM Active View
38. PURCHASE OF PEOPLELINK EXTENSION MICROPHONE(PUR/MOIL/C-4/138/E-13/176-M DT.28.07.2020) 28-07-2020 14-08-2020 14-08-2020 14-08-2020 03:30 PM Active View
39. Tender For 10 Mbps Wired Wireless Internet Broadband Line 1 1 at Ukwa Mine(BG/SYSTEM/Network/2020-21/433) 23-07-2020 07-08-2020 07-08-2020 07-08-2020 03:30 PM Active View
40. Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine through outsourcing for the period of one year(MOIL/20-21/ET/74) 23-07-2020 24-08-2020 24-08-2020 24-08-2020 03:30 PM Active View
41. WEBSITE SNGLE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS-2020-22- FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AN AIR LEG MACHINES- HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-08/169-M Dt. 23/07/2020) 23-07-2020 05-08-2020 05-08-2020 05-08-2020 03:30 PM Active View
42. Purchase of Strata Monitoring Instrument MPBX for Chikla Mine(TE-04 DT.21072020) 21-07-2020 11-08-2020 11-08-2020 11-08-2020 04:30 PM Active View
43. PURCHASE OF SPARES FOR SIGNALLING SYSTEM OF 150HP WINDER FOR KANDRI MINE(PUR/KD/ELECT/20-21/) 21-07-2020 28-07-2020 28-07-2020 28-07-2020 04:30 PM Active View
44. OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DUMPERS AND TIPPERS ONLY REGISTERED CONTRACTORS WHO DOING THIS TYPE OF SIMILAR WORK SINCE ATLEAST FROM LAST YEAR(MOIL/HO/MECH/2020/56 DT 23.05.2020) 20-07-2020 25-07-2020 25-07-2020 25-07-2020 03:30 PM Active View
45. Designing and printing of Annual Report 2019-20 (Deluxe Version in English, Hindi and Marathi)(MOIL/20-21/ET/99) 20-07-2020 10-08-2020 10-08-2020 10-08-2020 03:30 PM Active View
46. OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DOZER AND EXCAVATOR(MOIL/HO/MECH/2020/57 DT. 23.05.2020) 19-07-2020 25-07-2020 25-07-2020 25-07-2020 03:30 PM Active View
47. Scanning and Digitization of Company Records(MOIL/20-21/ET/102) 18-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
48. Development of Vendor Invoice Tracking System(MOIL/20-21/ET/100) 18-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
49. Maintenance and operation of water supply scheme at Dongri Buzurg Mine(MOIL/20-21/ET/89) 17-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
50. Construction of RCC sump and laying of pipe line for supply of water to new A type quarters and Medical Administrative building at MOIL Nagpur(MOIL/20-21/ET/103) 17-07-2020 17-08-2020 17-08-2020 17-08-2020 03:30 PM Active View
51. Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all winders at Balaghat mine(AGENT/BGT/MECH/NDT/20-21/395) 16-07-2020 05-08-2020 05-08-2020 05-08-2020 04:30 PM Active View
52. Maintenance repair of HT/LT overhead lines for the three months at Balaghat Mine(BGT/ELECT/20-21/376) 14-07-2020 31-07-2020 31-07-2020 31-07-2020 04:30 PM Active View
53. Repairing of Bucket assembly 5.6 Cu M -- 4 Nos of TATAHitachi 1200-3 Hydraulic Excavator of DB Mine.(DB/MECH/20-21/JGM(MECH)/321) 14-07-2020 21-07-2020 21-07-2020 21-07-2020 04:30 PM Active View
54. Replacement of 6mm thick liner plates at 14.5th Level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WINDER/20-21/374) 13-07-2020 04-08-2020 04-08-2020 04-08-2020 04:30 PM Active View
55. Replacement of liner plates of the transfer chute, bunker and repair of transfer chute/bunker at various location at IMB plant of Balaghat Mine(AGENT/BGT/MECH/IMBP/20-21/ 371) 11-07-2020 28-07-2020 28-07-2020 28-07-2020 04:30 PM Active View
56. Construction of Drain around Service Winze beside I st Vertical Shaft at Munsar Mine(MUN/CIVIL/NIT/20-21/51 DT 08.07.2020) 10-07-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
57. Purchase of Steel Cages - 5 Nos.(2 LOTS.) (Only Through e-procurement)(WE-25(ET-88) DT.10/07/2020) 10-07-2020 03-08-2020 03-08-2020 04-08-2020 03:30 PM Active View
58. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2020-21/354) 07-07-2020 17-07-2020 17-07-2020 17-07-2020 03:30 PM Active View
59. Purchase of PEARL COKE with Transportation - 6900 MT(MOIL/20-21/ET-87 dt.06.07.2020) 06-07-2020 05-08-2020 05-08-2020 06-08-2020 03:30 PM Active View
60. Repairing kachha road at North and South Section mine road at Tirodi Mine.(TRD/CIVIL/2020-21/528 Dated 21.06.2020) 04-07-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
61. Retaining wall for installation of pump shed and foundation for 170HP pump150HP pump north C section at Tirodi Mine.(TRD/CIVIL/2020-21/481 Dated 19.06.2020) 04-07-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
62. New installation of pump foundation and retaining wall for 170HP, 150HP north section at Tirodi Mine.(TRD/CIVIL/2020-21/467 Dated 11.06.2020) 04-07-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
63. Cleaning of septic tank with vacuum cleaning machine at camp/colony area at Tirodi Mine.(TRD/CIVIL/2020-21/527 Dated 21.06.2020) 04-07-2020 08-07-2020 08-07-2020 09-07-2020 03:30 PM Active View
64. Expression of Interest (EoI) for Setting up X- Ray based sorting system(PUR-MOIL-X RAY OCS/ET-85) 01-07-2020 29-09-2020 29-09-2020 29-09-2020 03:30 PM Active View
65. Purchase of Flexible Trailing Copper Conductor Cable(WE-21 DT.01.07.2020 (e-Tender no.MOIL/20-21/ET/86)) 01-07-2020 29-07-2020 29-07-2020 30-07-2020 03:30 PM Active View
66. BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF SIEMENS MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/C-3/13/E-06/80-M DT.29.06.2020) 01-07-2020 15-07-2020 15-07-2020 15-07-2020 03:30 PM Active View
67. Loading transportation and unloading of manganese ore ROM at Beldongri Mine(Bel/Min/20-21/600 Dated 28.06.2020) 30-06-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
68. Tnder inviting in single bid system for Construction of switch and NGR panel room and 11KV cable teach at Chikla mine.(TE/CH/CIVIL/20-21/309) 30-06-2020 09-07-2020 09-07-2020 09-07-2020 03:30 PM Active View
69. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2020-21/315) 29-06-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
70. Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Ukwa Mine(BGT/SYSTEM/AMC/2020-21/317) 29-06-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
71. Cleaning of Underground Sumps and Underground Level Drains under Monsoon Preparatory Works at Munsar Mine(ADGM/Mining/LT/2020-21/46 Date 26.06.2020) 27-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
72. Tender inviting in single bid system for Providing Water by Tanker in Residential Colonies at Chikla mine.(TE-CIVIL20-21-280) 27-06-2020 11-07-2020 11-07-2020 11-07-2020 04:00 PM Active View
73. Cleaning of surface drains and making of earthen bunds for North and south section for Monsoon preparatory works at Tirodi Mine.(TRD/CIVIL/2020-21/524 Dated 20/06/2020) 26-06-2020 30-06-2020 30-06-2020 01-07-2020 03:30 PM Active View
74. Repairing of Track Components of Side Dump Loader no.9 in 12th Level Underground of Balaghat Mine(AGT/BGT/MECH/SDL/20-21/291) 26-06-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
75. Tender for Laying of 6 inch and 4 inch GI pipe line for compressed air in underground at balaghat mine(AGT/BGT/MECH/PIPE/20-21/290) 26-06-2020 15-07-2020 15-07-2020 15-07-2020 04:30 PM Active View
76. Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/20-21/289) 25-06-2020 06-07-2020 06-07-2020 06-07-2020 04:30 PM Active View
77. Purchase of Pneumatic Stopper with Telescopic Air Leg for various Mines - 2 Lots.(Only Through e-procurement)(WE-14(ET-84) DT.25/06/2020) 25-06-2020 15-07-2020 15-07-2020 16-07-2020 03:30 PM Active View
78. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft at Chikla Mine.(TE/CHIKLA/MECH/2020-21/94) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 03:30 PM Active View
79. Operation Maintenance, watch and ward of Solid Waste Management Plant at Munsar Mine(MUN/CIVIL/AGT/NIT/20-21/44 DT.24.06.2020) 24-06-2020 30-06-2020 30-06-2020 30-06-2020 04:30 PM Active View
80. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/20-21/ET-83 dt.24.06.2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
81. Purchase of Cable Bolting Machines for Various Mines - 6 Nos.(1 Lot) (Only Through e-procurement)(WE-18(ET-81) DT.24/06/2020) 24-06-2020 20-07-2020 20-07-2020 21-07-2020 03:30 PM Active View
82. Purchase of Pneumatic Rock Drill Machines and Pusher Leg for various Mines (4 Lots.) (Only Through e-procurement)(WE-19(ET-82) DT.24/06/2020) 24-06-2020 16-07-2020 16-07-2020 17-07-2020 03:30 PM Active View
83. Annual Underground Sand cleaning work at Balaghat Mine(MOIL/20-21/ET/70) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
84. Hiring of machinery for loading, unloading and transportation of Hutch from Hutch settling pond and hutch drain at Ukwa Mine(MOIL/20-21/ET/69) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
85. Loading and unloading of steel section and various material with stacking at NOS Kandri Mine(MOIL/20-21/ET/71) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
86. Handling of Manganese Ore in to Trucks for dispatch by Manual and Mechanized means at Ukwa Mine(MOIL/20-21/ET/68) 19-06-2020 20-07-2020 20-07-2020 20-07-2020 03:30 PM Active View
87. PURCHASE OF HT PANELS VARIOUS TYPES - 7 LOTS (only through e-procurement)(WE-22(ET-78) DT.18/06/2020) 18-06-2020 13-07-2020 13-07-2020 14-07-2020 03:30 PM Active View
88. e Procurement of HDPE Pipes, Bends and Pipe Ends(PUR/MOIL/C-1/199/WE-05/ET/80) 18-06-2020 14-07-2020 14-07-2020 15-07-2020 03:30 PM Active View
89. Providing Installation and testing of Piston type Accumulator with fittings in 150 HP winder(A-III/KAN/20-21/382) 17-06-2020 30-06-2020 30-06-2020 01-07-2020 04:30 PM Active View
90. Purchase of Smart Parking System at MOIL BHAWAN, Nagpur(M.S) - 1 Set.(1 Lot) (Only Through e-procurement)(WE-23(ET-77) DT.17/06/2020) 17-06-2020 07-07-2020 07-07-2020 08-07-2020 03:30 PM Active View
91. Picking and collection of SM Grade SPL 463 and SPL 481 from various dumps of Sitapatore Mine(MOIL/20-21/ET/67) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
92. Production of 25 percent Mn. SM Grade ore BGL-523 from U/G old sub grade mineral reject material at Balaghat Mine(MOIL/20-21/ET/66) 16-06-2020 22-07-2020 22-07-2020 22-07-2020 03:30 PM Active View
93. Picking and collection of manganiferous rock from surface bed reject area at Parsoda Mine(MOIL/20-21/ET/65) 16-06-2020 16-07-2020 16-07-2020 16-07-2020 03:30 PM Active View
94. Repairing of Bucket Assy 5.6 cum 4 nos of TATAHitachi 1200 NO.3 Hyd Excavator operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/236) 15-06-2020 23-06-2020 23-06-2020 23-06-2020 04:30 PM Active View
95. Procurement of 1 no. Elecrically Operated Mono- block pump for IMB Plant at Dongri Buzurg mine(PUR/DB/20-21/ 277) 15-06-2020 10-07-2020 10-07-2020 10-07-2020 04:30 PM Active View
96. Terrace water proofing to RCC slab of old B type quarters 05 blocks at Chikla Mine(MOIL/20-21/ET/47) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
97. Maintenance and Operation of Sewage Treatment Plant at Munsar Mine.(MOIL/20-21/ET/50) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
98. Providing and fixing heat guard (Cool roof) for work shop building of Munsar Mine.(MOIL/20-21/ET/51) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View
99. Construction of Security watch tower (2 nos) for surveillance and strengtheing of internal security at Kandri Mine(MOIL/20-21/ET/52) 15-06-2020 31-07-2020 31-07-2020 31-07-2020 03:30 PM Active View
100. Operation of pumps for drinking water supply at Wahitola, Kaichi and Chargaon camp at Munsar Mine(MOIL/20-21/ET/48) 15-06-2020 27-07-2020 27-07-2020 27-07-2020 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2027) Year Tenders
View (2026) Year Tenders
View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.