| S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
|---|---|---|---|---|---|---|---|---|
| 1. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF MOBRAY CONTROL/LIQUID LEVEL LIMITER(PUR/MOIL/C-11/7/E-05/33-M Dt. 09-04-2019) | 09-04-2019 | 01-05-2019 | 01-05-2019 | 01-05-2019 | 03:30 PM | Active | View |
| 2. | Trench cutting in ore stacks for sampling at Munsar Mine(MOIL/19-20/ET/30) | 09-04-2019 | 09-05-2019 | 09-05-2019 | 09-05-2019 | 03:30 PM | Active | View |
| 3. | Cleaning and screening of SM grade small 30.50 percent Mn KDL-545 from sub grade mineral reject of underground at Kandri Mine(MOIL/19-20/ET/31) | 09-04-2019 | 09-05-2019 | 09-05-2019 | 09-05-2019 | 03:30 PM | Active | View |
| 4. | Additional excavation in mangeniferous rock at Ch.69 to Ch.75 at 1750 Level and at Ch.62 to Ch.59 at 1650 Level Ukwa Mine(MOIL/19-20/ET/27) | 09-04-2019 | 09-05-2019 | 09-05-2019 | 09-05-2019 | 03:30 PM | Active | View |
| 5. | Making a foundation of centrifugal pump room near 5.0 lakh GSR of Bhatera water storage at Balaghat Mine(CIVI/BGT/LT/19-20/05 DATE 08.04.2019) | 08-04-2019 | 18-04-2019 | 18-04-2019 | 18-04-2019 | 04:30 PM | Active | View |
| 6. | PURCHASE OF TWO NOS. ABT METER S WITH MODEM FOR OPEN ACCESS FACILITY REQUIRED DRAWAL POINTS AS PER ANNEXURE(BGT/ELECT/TE/18-19/ 12) | 08-04-2019 | 30-04-2019 | 30-04-2019 | 30-04-2019 | 04;00 PM | Active | View |
| 7. | Alteration,Modification and beatification work for Main Entrance Gate and Security check post at Kandri mine.( KAN/CIVIL/NIT/19-20/74 Date 06.04.2019) | 08-04-2019 | 16-04-2019 | 16-04-2019 | 16-04-2019 | 04:30 PM | Active | View |
| 8. | Laying of Paver blocks inside Mine Manager bungalow premises at Kandri mine.(KAN/CIVIL/NIT/19-20/75 Date 06.04.2019) | 08-04-2019 | 16-04-2019 | 16-04-2019 | 16-04-2019 | 04:30 PM | Active | View |
| 9. | Strengthening of security of Railway weigh bridge at Balaghat Mine(CIVI/BGT/LT/19-20/10 DATE 08.04.2019) | 08-04-2019 | 18-04-2019 | 18-04-2019 | 18-04-2019 | 04:30 PM | Active | View |
| 10. | Providing and fixing of coil fencing and painting work to boundary wall of mine manager Bunglow at Balaghat Mine(CIVI/BGT/LT/19-20/03 DATE 08.04.2019) | 08-04-2019 | 18-04-2019 | 18-04-2019 | 18-04-2019 | 04:30 PM | Active | View |
| 11. | Drilling of 57 mm dia drill holes for installing cable bolts in manganeferous rock at 11th L 12th L and 13.5th L at Balaghat Mine(MOIL/19-20/ET/24) | 08-04-2019 | 08-05-2019 | 08-05-2019 | 08-05-2019 | 03:30 PM | Active | View |
| 12. | Trench cutting in ore stacks at Ukwa Mine(MOIL/19-20/ET/23) | 08-04-2019 | 08-05-2019 | 08-05-2019 | 08-05-2019 | 03:30 PM | Active | View |
| 13. | Underground horizontal and vertical development at -200 level between Ch.37 to Ch.45 at Gumgaon Mine(MOIL/19-20/ET/22) | 08-04-2019 | 08-05-2019 | 08-05-2019 | 08-05-2019 | 03:30 PM | Active | View |
| 14. | Purchase of Leaching Vessel with all accessories for E.M.D.Plant Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-144 DT.05/04/2019 (ET/34)) | 05-04-2019 | 29-04-2019 | 29-04-2019 | 30-04-2019 | 03:30 PM | Active | View |
| 15. | Supply of Medicines - 250 items(PUR-MOIL-C-10-35-WE-154-ET-33 DT. 05.04.2019) | 05-04-2019 | 16-05-2019 | 16-05-2019 | 17-05-2019 | 03:30 PM | Active | View |
| 16. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF RUBBER HOSE PIPE TYPE - 3(PUR/MOIL/C-11/117/E-02/10-M Dt. 04-04-2019) | 04-04-2019 | 26-04-2019 | 26-04-2019 | 26-04-2019 | 03:30 PM | Active | View |
| 17. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF FRP MATERIAL-4 ITEMS(PUR/MOIL/C-11/119/E-01/8-M Dt. 04-04-2019) | 04-04-2019 | 26-04-2019 | 26-04-2019 | 26-04-2019 | 03:30 PM | Active | View |
| 18. | Construction of Water supply scheme at Ukwa Mine.(MOIL/19-20/ET/15) | 04-04-2019 | 07-05-2019 | 07-05-2019 | 07-05-2019 | 03:30 PM | Active | View |
| 19. | Purchase of CERAMIC PACKING ROPE -2 Items(WE-149 e-tender No.MOIL/19-20/ET-32, Dt.03.04.2019) | 03-04-2019 | 30-04-2019 | 30-04-2019 | 01-05-2019 | 03:30 PM | Active | View |
| 20. | Maintenance of garden at various places at Chikla Mine.(MOIL/19-20/ET/20) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 21. | Maintenance and operation of pumps for Drinking water supply at Munsar Mine.(MOIL/19-20/ET/21) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 22. | Annual repairs to camp quarters at Kandri Mine(MOIL/19-20/ET/18) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 23. | Interior renovation work for Mine Managers bungalow at Kandri Mine.(MOIL/19-20/ET/17) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 24. | Maintenance and operation of sewage treatment plant at Munsar Mine(MOIL/19-20/ET/19) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 25. | Picking and collection of material DBL-456 and DBL-457 from surplus contaminated low grade ROM at Dongri Buzurg Mine(MOIL/19-20/ET/5) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 26. | Picking and collection of material from contaminated low grade ROM at West Part of the quarry at Dongri Buzurg Mine(MOIL/19-20/ET/4) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 27. | Maintenance of garden at Administrative building and Mine Managers bunglow at Beldongri Mine(MOIL/19-20/ET/16) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 28. | Picking and collection of low grade ore DBL-456 from crushed ROM through mobile crushing and screening plant at Dongri Buzurg Mine(MOIL/19-20/ET/7) | 03-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 29. | Picking and collection of 3rd grade and LGHS ore from diluted ROM at South Pit of Tirodi Mine(MOIL/19-20/ET/9) | 03-04-2019 | 03-05-2019 | 03-05-2019 | 03-05-2019 | 03:30 PM | Active | View |
| 30. | Picking and collection of Ferro grade TD-4505 and SM grade from North Magazine dump at Tirodi Mine(MOIL/19-20/ET/8) | 03-04-2019 | 03-05-2019 | 03-05-2019 | 03-05-2019 | 03:30 PM | Active | View |
| 31. | Washing Picking and collection of material from East side of A dump at Tirodi Mine(MOIL/19-20/ET/10) | 03-04-2019 | 03-05-2019 | 03-05-2019 | 03-05-2019 | 03:30 PM | Active | View |
| 32. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL FERRUL(PUR/MOIL/C-11/32/E-75/1230-M Dt. 02-04-2019) | 02-04-2019 | 24-04-2019 | 24-04-2019 | 24-04-2019 | 03:30 PM | Active | View |
| 33. | Breaking of Metal (plus 25mm to minus 50mm) and other associated works at Ferro Manganese Plant at Balaghat Mine(MOIL/19-20/ET/28) | 02-04-2019 | 01-05-2019 | 01-05-2019 | 01-05-2019 | 03:30 PM | Active | View |
| 34. | Picking and collection of material from contaminated low grade ROM at South West Part-5 of the quarry at Dongri Buzurg Mine(MOIL/19-20/ET/6) | 02-04-2019 | 02-05-2019 | 02-05-2019 | 02-05-2019 | 03:30 PM | Active | View |
| 35. | Providing and fixing of over head water tank for camp colony and old b type and mine canteen at Balaghat Mine(BGT/CIVIL/19-20/01 Date 02.04.2019) | 02-04-2019 | 09-04-2019 | 09-04-2019 | 09-04-2019 | 04:30 PM | Active | View |
| 36. | Underground development at 12th Level North at Balaghat Mine(MOIL/19-20/ET/2) | 01-04-2019 | 01-05-2019 | 01-05-2019 | 01-05-2019 | 03:30 PM | Active | View |
| 37. | Removal of waste rock and and handling the same by mechanized means in Western side of North section at Pit No.6 area at Tirodi Mine(MOIL/19-20/ET/1) | 01-04-2019 | 01-05-2019 | 01-05-2019 | 01-05-2019 | 03:00 PM | Active | View |
| 38. | Underground development at -30 level at Munsar Mine(MOIL/19-20/ET/3) | 01-04-2019 | 01-05-2019 | 01-05-2019 | 01-05-2019 | 03:30 PM | Active | View |
| 39. | Laying of bituminous torchshield on Electrical engineer Bunglow at Balaghat Mine(BGT/CIVIL/18-19/41 DATE 31.03.2019) | 01-04-2019 | 09-04-2019 | 09-04-2019 | 09-04-2019 | 04:30 PM | Active | View |
| 40. | Making a school bus stop shed infront of Hospital building at Balaghat Mine(BGT/CIVIL/18-19/42 DATE 31.03.2019) | 01-04-2019 | 09-04-2019 | 09-04-2019 | 09-04-2019 | 04:30 PM | Active | View |
| 41. | Primary soil investigation of site of OCF jig section at Balaghat Mine(BGT/CIVIL/18-19/43 DATE 28.03.) | 01-04-2019 | 09-04-2019 | 09-04-2019 | 09-04-2019 | 04:30 PM | Active | View |
| 42. | Anti termite treatment to old guest house at Balaghat MineBGT/CIVIL/18-19/39 DATE 31.02.2019) | 01-04-2019 | 09-04-2019 | 09-04-2019 | 09-04-2019 | 04:30 PM | Active | View |
| 43. | Providing and fixing of shed and fencing on clarriflocculator of water treatment plant at Balaghat Mine(BGT/CIVIL/18-19/40 DATE 31.03.219) | 01-04-2019 | 09-04-2019 | 09-04-2019 | 09-04-2019 | 04:30 PM | Active | View |
| 44. | PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/18-19/1874 dt 29.03.19) | 01-04-2019 | 15-04-2019 | 15-04-2019 | 15-04-2019 | 04:30 PM | Active | View |
| 45. | Transportation of sand from Gondegaon Mine of WCL to Kandri, Munsar and Beldongri Mine(MOIL/19-20/ET/26) | 01-04-2019 | 16-04-2019 | 16-04-2019 | 16-04-2019 | 03:30 PM | Active | View |
| 46. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF WATER BONDED PLUGGING MASS(PUR/MOIL/C-11/111/E-74/1227-M Dt. 01-04-2019) | 01-04-2019 | 03-05-2019 | 03-05-2019 | 03-05-2019 | 03:30 PM | Active | View |
| 47. | Construction of Boundary Pillars as per IBM Norms for demarcation of Parsoda Mine Lease of Munsar Mine(MUN/Civil/2018-19/193 Date 29.03.2019) | 30-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 04:30 PM | Active | View |
| 48. | Construction of New Medical Administrative wing at Chikla Mine, Dongri Buzurg Mine, Gumgaom Mine, Kandri Mine, Munsar Mine, Tirodi Mine,Ukwa Mine( MOIL/19-20/ET/14) | 29-03-2019 | 07-05-2019 | 07-05-2019 | 07-05-2019 | 03:30 PM | Active | View |
| 49. | Reparing and construction of A/C office store room roof by old GI sheet to rcc roof at Tirodi Mine(TRD/CIVIL/18-19/5004 , Date-23.03.2019) | 29-03-2019 | 06-04-2019 | 06-04-2019 | 06-04-2019 | 03:30 PM | Active | View |
| 50. | Removal of Garbage,Cleaning of Septic Tank and Drain at Camp area Tirodi Mine.(TRD/CIVIL/2017-18/4043) | 29-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | View |
| 51. | PURCHASE OF BOTTOM SUCTION SUBMERSIBLE PUMP AT BALAGHAT MINE AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/18-19/1837 dtd 28.03.2019) | 29-03-2019 | 11-04-2019 | 11-04-2019 | 11-04-2019 | 04:30 PM | Active | View |
| 52. | Cleaning of septic tank with vacuum cleaning machine at camp/colony area at Tirodi Mine.(TRD/CIVIL/18-19/4049 Dt. 20.03.2019) | 29-03-2019 | 10-04-2019 | 10-04-2019 | 10-04-2019 | 03:30 PM | Active | View |
| 53. | Drilling of 2 Nos boreholes for sand stowing work at Balaghat Mine(MOIL/19-20/ET/13) | 27-03-2019 | 26-04-2019 | 26-04-2019 | 26-04-2019 | 03:30 PM | Active | View |
| 54. | Construction of Collection tank and circulation network for sewage treatment plant at Kandri Mine(MOIL/19-20/ET/11) | 27-03-2019 | 26-04-2019 | 26-04-2019 | 26-04-2019 | 03:30 PM | Active | View |
| 55. | Drilling of borewells along with pumps and pipeline for drinking water supply at Gumgaon Mine.(MOIL/19-20/ET/12) | 27-03-2019 | 26-04-2019 | 26-04-2019 | 26-04-2019 | 03:30 PM | Active | View |
| 56. | Design, Procurement, Supply, Fabrication, Erection, Installation and Commissioning of Material Handling System through Belt Conveyors and storage bunker for transportation of ROM from Vertical Shaft to C and S Plant at Chikla Mine(MOIL/18-19/ET/462) | 26-03-2019 | 25-04-2019 | 25-04-2019 | 25-04-2019 | 03:30 PM | Active | View |
| 57. | Purchase Of 1.5 Mtr Drifter Rod for Crawler Mounted Single Boom Drill Machine Make Eimco Elecon at Chikla Mine(TE-16 DT.24032019) | 25-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 04:30 PM | Active | View |
| 58. | Fabrication of 30 lbs rail crossing 24 inch guage at Balaghat Mine(AGENT/BGT/MECH/18-19/1830 dtd 22.03.2019) | 25-03-2019 | 11-04-2019 | 11-04-2019 | 11-04-2019 | 04:30 PM | Active | View |
| 59. | Inviting applications from the PCS/Firms to conduct Secretarial Audit of MOIL Ltd. for Financial Year 2019-20.(MOIL/CS/SA/2018-19) | 22-03-2019 | 12-04-2019 | 12-04-2019 | 12-04-2019 | 03:00 PM | Active | View |
| 60. | Cleaning of spillage material under and around all the equipments at IMB plant at Balaghat Mine(Agent/Min/BGT/18-19/1824 date 20.03.2019) | 20-03-2019 | 28-03-2019 | 28-03-2019 | 28-03-2019 | 04:30 PM | Active | View |
| 61. | Website Tender Enquiry in Single Bid For Repair of storm water drain at new 80 nos. A-Type quarters premises at lower camp at Chikla Mine(CH/CIVIL/18-19/4825) | 20-03-2019 | 26-03-2019 | 26-03-2019 | 26-03-2019 | 04:30 PM | Active | View |
| 62. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PROVIDING AND FIXING CGI SHEET ROOFING AT MINE HOSPITAL AT CHIKLA MINE(CH/CIVIL/18-19/4826) | 20-03-2019 | 26-03-2019 | 26-03-2019 | 26-03-2019 | 04:30 PM | Active | View |
| 63. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DIFFERENT MODELS OF KIRLOSKAR MAKE PUMP.(PUR/MOIL/C-5/28/E-71/1127-M Dt.20-03-2019) | 20-03-2019 | 10-04-2019 | 10-04-2019 | 10-04-2019 | 03:30 PM | Active | View |
| 64. | Repairing of CK300 Hyd Excavator Arm Cylinder at Dongri Buzurg Mine(DB/MECH/Excavator/18-19/650) | 19-03-2019 | 30-03-2019 | 30-03-2019 | 30-03-2019 | 04:30 PM | Active | View |
| 65. | Removing of spillage from conveyor belt of 14.5 level loading station(BGT/Mech/18-19/1800) | 19-03-2019 | 25-03-2019 | 25-03-2019 | 25-03-2019 | 05:00 PM | Active | View |
| 66. | Engagement of Consultant Transaction Advisor For Due Diligence and advise on Transaction of FACORs Asset(MOIL/FACOR/2018-19) | 18-03-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 03:45 PM | Active | View |
| 67. | Providing and Laying Paver Blocks inside Mine Managers Bungalow Premises at Munsar Mine.(MUN/Civil/2018-19/188 Date 16.03.2019) | 18-03-2019 | 29-03-2019 | 29-03-2019 | 29-03-2019 | 04:30 PM | Active | View |
| 68. | Miscellaneous Civil Works and Painting Works to new A-Type Colony and Parsoda Lease at Munsar Mine.(MUN/Civil/2018-19/189 Date 16.03.2019) | 18-03-2019 | 29-03-2019 | 29-03-2019 | 29-03-2019 | 04:30 PM | Active | View |
| 69. | Leather Boots(PUR-MOIL-C1-26-WE 150-ET-471 DT. 18/03/2019) | 18-03-2019 | 15-04-2019 | 15-04-2019 | 16-04-2019 | 03:30 PM | Active | View |
| 70. | Exterior Painting Works for new and old A, B, C Type Quarters of Officers Colony Munsar Mine(Mun/Civil/2018-19/185 Date 15.03.2019) | 16-03-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 04:30 PM | Active | View |
| 71. | Providing and Laying Epoxy Flooring to Winder House at Munsar Mine(MUN/Civil/2018-19/187 Date 16.03.2019) | 16-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 04:30 PM | Active | View |
| 72. | Cleaning of surplus underground ROM at Munsar Mine(MOIL/18-19/ET/454) | 16-03-2019 | 15-04-2019 | 15-04-2019 | 15-04-2019 | 03:30 PM | Active | View |
| 73. | Loading and unloading of explosive for blasting at Tirodi Mine(MOIL/18-19/ET/456) | 15-03-2019 | 15-04-2019 | 15-04-2019 | 15-04-2019 | 03:30 PM | Active | View |
| 74. | Cleaning and sorting of ROM recovered from Pit No.5 at Sitapatore Mine(MOIL/18-19/ET/457) | 15-03-2019 | 15-04-2019 | 15-04-2019 | 15-04-2019 | 03:30 PM | Active | View |
| 75. | Cleaning and sorting of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/455) | 15-03-2019 | 15-04-2019 | 15-04-2019 | 15-04-2019 | 03:30 PM | Active | View |
| 76. | Design, Procurement, Supply, Fabrication, Erection, Installation and Commissioning of Screening Plant of 30 TPH with surface transport system through Belt Conveyor for processing the ROM hoisted from Vertical Shaft at Kandri Mine(MOIL/18-19/ET/461) | 15-03-2019 | 15-04-2019 | 15-04-2019 | 15-04-2019 | 03:30 PM | Active | View |
| 77. | Purchase of Compressed Oxygen Gas and Diss. Acetylene Gas Cylinders(WE-143 e-tender No.MOIL/18-19/ET-469, Dt.15.03.19) | 15-03-2019 | 09-04-2019 | 09-04-2019 | 10-04-2019 | 03:30 PM | Active | View |
| 78. | Construction of Cement concrete road, drain network with paving and retaining wall at industrial premises of Balaghat Mine(MOIL/18-19/ET/450) | 14-03-2019 | 22-04-2019 | 22-04-2019 | 22-04-2019 | 03:30 PM | Active | View |
| 79. | Purchase of Sliding/Folding type Pit Bottom Buffers with Hydraulic Power Pack and Associated Works at Production Shaft at Balaghat Mine(M.P) - 1 Set.(6 Lots) (Only Through e-procurement)(WE-123 DT.14/03/2019 (ET/468)) | 14-03-2019 | 08-04-2019 | 08-04-2019 | 09-04-2019 | 03:30 PM | Active | View |
| 80. | Loading, Unloading and Filling Spreading of Fan Drift CH-2820 at Chikla Mine(TE-27 Dt.13032019) | 13-03-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 04:30 PM | Active | View |
| 81. | Shifting of accumulated sand from haulage at -70 Level, Vertical Section of Chikla Mine(TE-28 Dt.13032019) | 13-03-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 04:30 PM | Active | View |
| 82. | Hiring of 50 MT Capacity 02 Nos. Mobile Crane with 360 Degree revolving Telescopic extended boom for unloading and assembling of BH 60M Dumper 03 Nos. at Dongri Buzurg Mine(MOIL/18-19/ET/465) | 12-03-2019 | 25-03-2019 | 25-03-2019 | 25-03-2019 | 03:30 PM | Active | View |
| 83. | FILLING AND SPREADING AT -30 FEET, 2ND LEVEL IN UNDERGROUND AT MUNSAR MINE(MIN/MUN/ADGM/18-19/4941) | 12-03-2019 | 20-03-2019 | 20-03-2019 | 20-03-2019 | 03:30 PM | Active | View |
| 84. | CONCRETING OF FAN DRIFT WINZE AT CH-2830 OF CHIKLA MINE(TE-26 Dt.11032019) | 12-03-2019 | 19-03-2019 | 19-03-2019 | 19-03-2019 | 04:30 PM | Active | View |
| 85. | Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/18-19/ET/459) | 12-03-2019 | 12-04-2019 | 12-04-2019 | 12-04-2019 | 03:00 PM | Active | View |
| 86. | Transportation of underground tubs at Ch.10800 section of Ukwa Mine(MOIL/18-19/ET/458) | 12-03-2019 | 16-04-2019 | 16-04-2019 | 16-04-2019 | 03:00 PM | Active | View |
| 87. | ADDITIONAL PILLAR OF RCC AT -270L OF CHIKLA MINE(TE-25 Dt.11032019) | 11-03-2019 | 19-03-2019 | 19-03-2019 | 19-03-2019 | 04:30 PM | Active | View |
| 88. | Conveyor belts(PUR-MOIL-c-12-20-WE-148-ET-467 dt. 11/03/2019) | 11-03-2019 | 04-04-2019 | 04-04-2019 | 05-04-2019 | 03:30 PM | Active | View |
| 89. | PURCHASE OF EXTENSION ROD FOR CTH141F FOR SANDVIK MAKE JUMBO DRILL MACHINE(PUR/MOIL/BGT /18-19/1763 dtd 07.03.2019) | 09-03-2019 | 01-04-2019 | 01-04-2019 | 01-04-2019 | 04:30 PM | Active | View |
| 90. | Drilling of Small Dia Holes 1170 Nos. for production of manganese ore at Sitapatore Mine( SS/CIVIL/2018-19/608) | 08-03-2019 | 15-03-2019 | 15-03-2019 | 15-03-2019 | 03:30 PM | Active | View |
| 91. | Drilling of 57 mm diameter holes a premining support for installation cabelbolt(Mining/BGT/T.E./18-19/31) | 08-03-2019 | 14-03-2019 | 14-03-2019 | 14-03-2019 | 04:30 PM | Active | View |
| 92. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/1764 dtd 07.03.2019) | 08-03-2019 | 19-03-2019 | 19-03-2019 | 19-03-2019 | 04:30 PM | Active | View |
| 93. | Underground concreting and extra excavation at -550 Level at Kandri Mine(MOIL/18-19/ET/453) | 08-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 03:30 PM | Active | View |
| 94. | Supply of black gitti for underground concreting work at Munsar Mine(MOIL/18-19/ET/452) | 08-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 03:30 PM | Active | View |
| 95. | Purchase of Atomic Absorption Spectrophotometer for E.M.D.Plant, Dongri Buzurg Mine(M.S) - 1 No.(1 Lot) (Only Through e-procurement)(WE-147 DT.08/03/2019 (ET/466)) | 08-03-2019 | 15-04-2019 | 15-04-2019 | 16-04-2019 | 03:30 PM | Active | View |
| 96. | Repairing of 2 nos Track Chain of DI 500 -2 Drill Machine operating at Dongri Buzurg Mine.(DB/MECH/DRILL/18-19/640) | 07-03-2019 | 16-03-2019 | 16-03-2019 | 16-03-2019 | 04:30 PM | Active | View |
| 97. | Construction of L.T.Panel Room at Beldongri Mine.(MOIL/18-19/ET/448) | 07-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | View |
| 98. | Construction of gantry for sand dumping yard for under ground sand stowing at Chikla Mine.(MOIL/18-19/ET/449) | 07-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | View |
| 99. | Maintenance of garden at Administrative building, MM bungalow, officers colony and rest House at Gumgaon Mine.(MOIL/18-19/ET/451) | 07-03-2019 | 05-04-2019 | 05-04-2019 | 05-04-2019 | 03:30 PM | Active | View |
| 100. | Construction of Guest House at Munsar Mine(MOIL/18-19/ET/447) | 07-03-2019 | 08-04-2019 | 08-04-2019 | 08-04-2019 | 03:30 PM | Active | View |
| Tenders More Information |
|---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
| View (2027) Year Tenders |
| View (2025) Year Tenders |
| View (2024) Year Tenders |
| View (2023) Year Tenders |
| View (2022) Year Tenders |
| View (2021) Year Tenders |
| View (2020) Year Tenders |
| View (2019) Year Tenders |
| View (2018) Year Tenders |
| View (2017) Year Tenders |
| View (2016) Year Tenders |
| View (2015) Year Tenders |
| View (2014) Year Tenders |
| View (2013) Year Tenders |
| View (2012) Year Tenders |
| View (24) Year Tenders |
| View Full Tender Archive |