Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/237) 28-08-2018 26-09-2018 26-09-2018 26-09-2018 03:30 PM Active View
2. TENDER ENQUIRY FOR PURCHASE OF MECHANICAL C CLASS ITEMS(TE/MOIL/FMP/MECH/18-19/163) 27-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
3. PURCHASE OF ANALYTICAL BALANCE FOR FERRO MANGANESE PLANT, BALAGHAT MINE(PUR/MOIL/C-3/48/E-33/513-M DT.27.08.2018) 27-08-2018 14-09-2018 14-09-2018 14-09-2018 03:30 PM Active View
4. Explosives and Accessories(PUR/MOIL/C-6/214/WE-55 (MOIL/18-19//ET/242)) 25-08-2018 19-09-2018 19-09-2018 21-09-2018 09:30 AM Active View
5. Maintenance and operation of water supply scheme at at MOIL BHAWAN, CMD Bunglow, CMS with A type quarters, West Court with Guest huose, Transit House and Bansivilla area Compound MOIL, Nagpur(MOIL/18-19/ET/218) 25-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
6. Equipping of 11KV Indoor substation at 5th level surface substation of Balaghat Mine(MOIL/18-19/ET/225) 24-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
7. Setting up 54.25 KWp capacity, grid connected, Solar Power Trees at Corporate office MOIL Bhawan, Nagpur(MOIL/18-19/ET/232) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
8. Maintenance and operation of water supply scheme at Ukwa Mine(MOIL/18-19/ET/217) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
9. Maintenance and operation of water supply scheme at Balaghat Mine(MOIL/18-19/ET/216) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
10. Maintenance of Garden at Balaghat Mine(MOIL/18-19/ET/219) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
11. Procurement, installation and commissioning of Special Energy Meters(SEM) at Chikla, Kandri and Gumgaon Mine substation and respective substations of MSEDCL/MSPTCL(MOIL/18-19/ET/238) 24-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
12. Purchase of Sand for Sand Stowing Plant at Kandri, Munsar and Beldongri Mine(MOIL/18-19/ET/235) 24-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
13. Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/236) 24-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
14. Fabrication of Miscellaneous items a. Leather piston Packing for Air Legs b.Leather Cap Lamp Belts c. Rexin First Aid Kit Bag(AGENT/BGT/MECH/MISC/18-19/591 dtd 19.08.2018) 23-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
15. Repairing of Track Components of Side Dump Loader no.6 in 11th Level Underground of Balaghat Mine( AGENT/BGT/MECH/SDL/18-19/616 Dtd 21.08.2018) 23-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
16. PURCHASE OF C CLASS ITEMS -MISCELLANEOUS ITEM FOR KANDRI MINE.(AGT-GR.III/KD/2018-19/1653) 22-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
17. Purchase of Reduction Gear Box-1 No.(1 Lot) for Man Winding Engine of Production Shaft at Balaghat Mine(M.P) (Only Through e-procurement)( WE-84 Dt.21/08/2018 (MOIL/18-19/ET/240)) 21-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
18. Hiring of services for mobile/skid mounted crushing and screening plant with VSI unit for processing dump reject ore/sand pebbles including excavation transportation of raw materials and transportation of product for sand stowing at Balaghat Mine(MOIL/18- 21-08-2018 19-09-2018 19-09-2018 19-09-2018 03:30 PM Active View
19. Blanket Rate Contract for one Year for supply of various types of Paints, Thinner etc( WE-78 DT.21.08.2018 (e-Tender no.MOIL/18-19/ET/241) 21-08-2018 18-09-2018 18-09-2018 19-09-2018 03:30 PM Active View
20. Concreting of X cut between Ch.24 to Ch.30 at 300 Level for stope preparation at Gumgaon Mine(MOIL/18-19/ET/213) 21-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
21. Making and Supply of stemming material Mud plug used for blasting at Gumgaon Mine(MOIL/18-19/ET/214) 21-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
22. Procurement of C class Items for Ferro Manganese Plant(FMP/TE/Elect/18-19/160) 21-08-2018 05-09-2018 05-09-2018 05-09-2018 03:30 PM Active View
23. PURCHASE OF FASTNERS,WIRE NAILS AND ROSE NAILS FOR BALAGHAT MINE(PUR/MOIL/BGT/FASTNER/18-19/607 dtd 20.08.2018) 21-08-2018 11-09-2018 11-09-2018 11-09-2018 04:30 PM Active View
24. PURCHASE OF C CLASS ITEMS GRINDING WHEEL COTTON WASTE and WHITE CHINDI, TORCH CELL, HACKSAW BLADE, NYLON ROPE, MANILA ROPE, TEFLON TAPE and EMERY TAPE FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1640) 21-08-2018 11-09-2018 11-09-2018 11-09-2018 03:30 PM Active View
25. Replacement of Buntons of Holmes Shaft at Balaghat Mine( BGT/MECH/PS/18-19/3358) 20-08-2018 28-08-2018 28-08-2018 28-08-2018 04:00 PM Active View
26. Agrico implements( PUR-MOIl-C-1-196-E-32 dt -20-08-2018) 20-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
27. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES (PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) 20-08-2018 19-09-2018 19-09-2018 19-09-2018 3:30 PM Active View
28. Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos operating at Balaghat Mine(AGT/BGT/MECH/SDL/18-19/590 dtd 19.08.2018) 20-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
29. PURCHASE OF C CLASS ITEMS - PACKING MATERIAL FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1623) 20-08-2018 11-09-2018 11-09-2018 11-09-2018 03:30 PM Active View
30. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES(PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) 20-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
31. EXTENSION OF RETAINING WALL FOR STABILITY OF LOOSE OVERBURDEN AT MOBILE CRUSHER AT MUNSAR MINE.(MUN/CIVIL/18-19/72 DT 17.08.2018) 18-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
32. Underground Development Horizontal and Vertical at 170 Level of Vertical section at Chikla Mine(MOIL/18-19/ET/211) 17-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
33. Removal of accumulated pebbles near sand stowing plants at Chikla Mine( MOIL/18-19/ET/212) 17-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
34. Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/18-19/ET/215) 17-08-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
35. Purchase of Tipper - 5 Nos for Various Mines (1 Lot) (Only Through e-procurement)( WE-71 DT.16/08/2018 (MOIL/18-19/ET/239)) 16-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
36. PURCHASE OF C CLASS ITEMS PIPE FITTING ACCESSORIES FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1562) 13-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
37. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF TENOVA DELKOR MAKE BUTTERFLY VALVE AND ACTUATOR(PUR/MOIL/C-11/129/E-29/481-M Dt. 13-08-2018) 13-08-2018 05-09-2018 05-09-2018 05-09-2018 03:30 PM Active View
38. RCC work at CH-1800 and CH-2665 in -470 Level and -270 Level of Chikla Mine(TE-14 Dt.13082018) 13-08-2018 20-08-2018 20-08-2018 20-08-2018 04:30 PM Active View
39. PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN - 2 SETS (1 SET CONTAINTS - 12 NOS.BLADES) (AS PER ANNEXURE A ENCLOSED).(PUR/MOIL/C-4/148/E-30/484-M Dt.09/08/2018) 10-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
40. Purchase of Electrically Operated Auxiliary Ventilation Fan for Various Mines - 7 Nos. (2 Lots) (Only Through e-procurement)(WE-82 Dt.09/08/2018 (MOIL/18-19/ET/210)) 09-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
41. Manual Removal of Sludge from S.K. Tank at I.M.B. Plant at Balaghat Mine(MOIL/18-19/ET/187) 09-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
42. Raking of Raw Materials and Preparation of Sand beds and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/186) 09-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
43. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-28/472-M Dt. 09-08-2018) 09-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
44. Purchase of Electrical HT/LT Cables (Assorted Size)( WE-56 DT.08.08.2018 (e-TenderNo.MOIL/18-19/ET-209)) 09-08-2018 11-09-2018 11-09-2018 12-09-2018 03:30 PM Active View
45. Overhauling of Pollution Control Unit with Material at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/188) 09-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
46. SUPPLY OF JAW PLATES FOR SAYAJI MAKE CRUSHER 20 X 12(SDGM/CHIKLA/MECH/TE/2018-19, 08/08/2018) 08-08-2018 29-08-2018 29-08-2018 29-08-2018 03:30 PM Active View
47. Purchase of Head Gear Sheave Wheels, 3.6 Mtrs Dia. for Balaghat Mine - 2 Sets.(1 Lot) (Only Through e-procurement)( WE-81 Dt.08/08/2018 (MOIL/18-19/ET/208)) 08-08-2018 10-09-2018 10-09-2018 11-09-2018 03:30 PM Active View
48. Additional excavation in Mangeniferous rock between Ch.24 to Ch.30 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/196) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
49. Underground development at 13.5th Level at Balaghat Mine(MOIL/18-19/ET/195) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
50. Underground development at 11th Level South Section at Balaghat Mine(MOIL/18-19/ET/199) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
51. PURCHASE OF C CLASS ITEMS - WIRE and ROSE NAILS AND FASTENERS FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1486) 06-08-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
52. Handling of spillage ore and fines from various places of IMB plant at Dongri Buzurg Mine(MOIL/18-19/ET/197) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
53. Purchase of Hose Fittings for Rock Drill and Air Leg Machines(WE-68 e-tender No.MOIL/18-19/ET-207, Dt.06.08.18) 06-08-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
54. Procurement of 33kV residual voltage transformer for capacitor bank..(fmp/elect/18-19/147) 04-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
55. Procurement of Industrial man cooler pedestal fan(fmp/elect/18-19/146) 04-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
56. SAPLING AT MINE DUMP AREA AT TIRODI MINE(TRD/CIVIL/2018-19/1065-A) 04-08-2018 11-08-2018 11-08-2018 11-08-2018 03:30 PM Active View
57. Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine and BEML Make Dozer BD-85 and BD-155.(WE-75 e-tender No.MOIL/18-19/ET-206, Dt.03.08.18) 03-08-2018 28-08-2018 28-08-2018 29-08-2018 03:30 PM Active View
58. Underground Concreting work at Chikla Mine(MOIL/18-19/ET/192) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
59. Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/18-19/ET/193) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
60. Removal of waste rock and handling the same by mechanized means from South dump at Tirodi Mine(MOIL/18-19/ET/194) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
61. PURCHASE OF MATHER AND PLATT MAKE BARE PUMP (WITHOUT MOTOR AND ACCESSORIES) - 1 NO. FOR IMB PLANT, BALAGHAT MINE (M.P), AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/78/E-6/459 -M DT.03/08/2018) 03-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
62. Purchase of Transformer - 14 Nos. (10 Lots) (Only Through e-procurement)(WE-72 DT.02/08/2018 (MOIL/18-19/ET/205)) 02-08-2018 03-09-2018 03-09-2018 04-09-2018 03:30 PM Active View
63. Purchase of Cable Bolting Machine for Various Mines - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-70 DT.01/08/2018 (MOIL/18-19/ET/203)) 01-08-2018 04-09-2018 04-09-2018 05-09-2018 03:30 PM Active View
64. Purchase of High Mast Lighting System for Various Mines - 13 Nos. (2 Lots)(WE-73 DT.01/08/2018 (MOIL/18-19/ET/204)) 01-08-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
65. Purchase of Steel Braided Rubber Hose(WE-69 e-tender No.MOIL/18-19/ET-202, Dt.01.08.18) 01-08-2018 06-09-2018 06-09-2018 07-09-2018 03:30 PM Active View
66. PURCHASE OF C CLASS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-12 DT.25072018) 31-07-2018 20-08-2018 20-08-2018 20-08-2018 04:30 PM Active View
67. Underground Horizontal Development at 270 Level of Vertical section at Chikla Mine( MOIL/18-19/ET/189) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
68. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(MOIL/18-19/ET/190) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
69. Washing Picking and collection of material from 6 No. dumps of Sitapatore Mine(MOIL/18-19/ET/191) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
70. Annual repairs to camp quarters Munsar Mine and Construction of pitching of un-course rubble masonry for stability of siding plateform at Kandri Mine(MOIL/18-19/ET/165) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
71. Providing expoxy flooring for old and new workshop building of Balaghat Mine(MOIL/18-19/ET/167) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
72. Providing furniture and interial works for Marketing Department on first floor of MOIL Bhawan Nagpur(MOIL/18-19/ET/170) 30-07-2018 28-08-2018 28-08-2018 28-08-2018 03:30 PM Active View
73. Painting to plant structure of integrated Manganese Beneficiation Plant IMB of Balaghat Mine(MOIL/18-19/ET/166) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
74. Construction of sample room, weight bridge room, metal beam crush barrier along the WBM road at Beldongri Mine and construction of Electric meter room at old Satak mine(MOIL/18-19/ET/163) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
75. Drilling of bore hole with installation of pump at Dongri Buzurg Mine(MOIL/18-19/ET/161) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
76. ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-13 Dt.28072018) 28-07-2018 06-08-2018 06-08-2018 06-08-2018 04:30 PM Active View
77. Manpower towards plantation under Plantation Drive at Munsar Mine.(MUN/CIVIL/18-19/59 Date 27.08.2018) 28-07-2018 04-08-2018 04-08-2018 04-08-2018 04:30 PM Active View
78. Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/878) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
79. Maintenance and operation of water supply scheme at Ukwa Mine (16/Civil/UM/18-19/879) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
80. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine (16/Civil/UM/18-19/880) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
81. Manual Removal of Sludge from S.K. tank (Mining/BGT/T.E./2018-19/298) 26-07-2018 03-08-2018 03-08-2018 03-08-2018 4:30 PM Active View
82. Trameline accessories-7 items (PUR-MOIL-C-12-05-WE-67-ET-200 dt. 26.07.2018) 26-07-2018 20-08-2018 20-08-2018 21-08-2018 3:30 PM Active View
83. Purchase of Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-13 DT.26.07.2018(e-TenderNo. MOIL/18-19//ET/201) 26-07-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
84. Ms Pipes -2 items (PUR-MOIl-C-1-197-We-66-ET-198 dt.25.07.2018) 25-07-2018 16-08-2018 16-08-2018 17-08-2018 3:30 PM Active View
85. BLANKET RUNNING RATE CONTRACT UNDER MVC PROGRAM OF HP FOR SUPPLY OF TONERS/CARTRIDGES FOR HP MAKE PRINTER/ALL IN ONE PRINTER. (PUR-MOIL-C-12-1-E-26 dt. 24/07/2018) 24-07-2018 08-08-2018 08-08-2018 08-08-2018 3:30 PM Active View
86. Procurement of LT Panel for colony substation at Chikla Mine (TE/CH/ELECT/18-19/288) 24-07-2018 13-08-2018 13-08-2018 13-08-2018 4:30 PM Active View
87. REQUIREMENT OF EXTRA EXCAVATION AT -370L FOR RCC SUPPORT AT CHIKLA MINE (TE-11 Dt.23072018) 23-07-2018 30-07-2018 30-07-2018 30-07-2018 4:30 PM Active View
88. Purchase of Traction Battery Chargers - 12 Nos. for various Mines (4 Lots) (Only Through e-procurement) (WE-65 DT.23/07/2018 (MOIL/18-19/ET/185)) 23-07-2018 23-08-2018 23-08-2018 24-08-2018 3:30 PM Active View
89. Procurement of Insulation Tester kit (BGT/TE/Elect./18-19/433) 23-07-2018 20-08-2018 20-08-2018 20-08-2018 4:30 PM Active View
90. Purchase of TCT Drill Rods - 4 Items (WE-12 DT.21.07.2018 (e-TenderNo.MOIL/18-19/ET/184)) 21-07-2018 16-08-2018 16-08-2018 17-08-2018 3:30 PM Active View
91. Construction of store room for Diamond Drill department near Timber yard at Chikla Mine. (TE/CH/CIVIL/18-19/171 date 14/06/2018) 19-07-2018 26-07-2018 26-07-2018 26-07-2018 3:30 PM Active View
92. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES OF ENGINE FOR 1500 KVA DG SET, MAKE STERLING AND WILSON. (PUR/MOIL/C-5/47/E-25/406-M Dt. 19/07/2018) 19-07-2018 10-08-2018 10-08-2018 10-08-2018 3:30 PM Active View
93. Purchase of Rubber Air Hoses (WE-64 DT.19.07.2018(e-Tender No.MOIL/18-19/ET/183)) 19-07-2018 16-08-2018 16-08-2018 17-08-2018 3:30 PM Active View
94. Replacement of Buntons of Production Shaft(BGT/MECH/PS/18-19/ 2652) 18-07-2018 30-07-2018 30-07-2018 30-07-2018 04:00 PM Active View
95. Purchase of Grinding Wheels(WE-63 DT.16.07.2018(E-Tender No.MOIL18-19/ET/182)) 18-07-2018 09-08-2018 09-08-2018 10-08-2018 03:30 PM Active View
96. Maintenance and operation of water supply scheme at Chikla Mine (MOIL/18-19/ET/159) 18-07-2018 23-08-2018 23-08-2018 23-08-2018 3:30 PM Active View
97. Construction of Sand stowing plant with 1 lakh litre capacity RCC water tank and Construction of GI sheet shade at 0 L platform at Vertical shaft of Gumgaon Mine (MOIL/18-19/ET/157 ) 18-07-2018 23-08-2018 23-08-2018 23-08-2018 3:30 PM Active View
98. Construction of cement concrete road at industrial area premises and Construction of road side cement concrete drain at Gumgaon Mine (MOIL/18-19/ET/155 ) 18-07-2018 23-08-2018 23-08-2018 23-08-2018 3:30 PM Active View
99. Providing, supplying of LED Tube fitting(BGT/TE/Elect./18-19/396) 18-07-2018 13-08-2018 13-08-2018 13-08-2018 04:30 PM Active View
100. Design and Detailed engineering, supply, erection, commissioning and testing of rotary kiln including all accessories for Manganese Ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/171) 18-07-2018 17-08-2018 17-08-2018 17-08-2018 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2027) Year Tenders
View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.