Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Removal of Spillage material accumulated during hoisting of skip from 15th Level of Production shaft at Balaghat Mine(Mining/BGT/T.E./2018-19/198) 06-06-2018 12-06-2018 12-06-2018 12-06-2018 04:30 PM Active View
2. Installation of Biometric attendance system at Gumgaon Mine(MOIL/18-19/ET/88) 06-06-2018 03-07-2018 03-07-2018 03-07-2018 03:30 PM Active View
3. PURCHASE OF CUMMINS DIESEL ENGINE - 1 NO. SUITABLE FOR BEML MAKE BD155 DOZER OPERATING AT TIRODI MINE (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/139/E-15/260-M DT.05.06.2018) 05-06-2018 20-06-2018 20-06-2018 20-06-2018 03:30 PM Active View
4. Providing and fixing of exterior tiles and paiver blocks for front and backside portion of Agent bungalow Balaghat Mine(Civil/BGT/T.E./2017-19/1527 Date- 31.05.2018) 04-06-2018 11-06-2018 11-06-2018 11-06-2018 04:30 PM Active View
5. Replacement of Old Worn Out Steel Doors and Windows with new steel doors and windows for Camp Quarters at Balaghat Mine.( CIVIL/BGT/T.E./2018-19/172 Date 31.05.2018) 04-06-2018 11-06-2018 11-06-2018 11-06-2018 04:30 pm Active View
6. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR LHD AND SDL MACHINES-MAKE EIMCO ELECON.(PUR/MOIL/C-5/27/E-13/219-M Dt. 04/06/2018) 04-06-2018 27-06-2018 27-06-2018 27-06-2018 03:30 PM Active View
7. Picking and collection of material from crushed ROM DBL 456 at South Part II of the Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/90) 04-06-2018 04-07-2018 04-07-2018 04-07-2018 03:30 PM Active View
8. Picking and sorting of material SM Grade Lump 30 percent Mn ore (KDL-435) and SM Grade 25 percent Mn ore KDL 446 from dumps at Kandri Mine(MOIL/18-19/ET/92) 04-06-2018 04-07-2018 04-07-2018 04-07-2018 03:30 PM Active View
9. Picking and collection of material from crushed ROM DBL 456 at South Part III of the Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/91) 04-06-2018 04-07-2018 04-07-2018 04-07-2018 03:30 PM Active View
10. Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch 6800 to ch 8600 at Ukwa Mine(MOIL/18-19/ET/89) 04-06-2018 04-07-2018 04-07-2018 04-07-2018 03:30 PM Active View
11. Picking and collection of UKL 448 25 PERCENT from F W dumps from Ch 6800 to ch 8600 at Ukwa Mine(MOIL/18-19/ET/89) 04-06-2018 10-07-2018 10-07-2018 10-07-2018 03:30 PM Active View
12. Concreting work for Packwall bracewall at Ch 10800 section of Ukwa Mine(16/Mining/UM/18-19/471) 04-06-2018 18-06-2018 18-06-2018 18-06-2018 04:30 pm Active View
13. PROVIDING, SUPPLYING, INSTALLATION AND COMMISSIONING OF TUB PULLING ARRANGEMENT AT VERTICAL SHAFT PIT TOP OF MUNSAR MINE.(MUN/MECH/18-19/170) 04-06-2018 18-06-2018 18-06-2018 18-06-2018 03:30 pm Active View
14. purchase of 3.5 C x 70 Sq. MM PVC Insulated Single Wire Armoured, Aluminium Conductor Cable of 1100 Volts Grade(WE-35 Dt.02/06/2018(e-Tender no.MOIL/18-19/ET/101)) 02-06-2018 12-06-2018 12-06-2018 13-06-2018 03:30 pm Active View
15. Underground Filling spreading at 270 Level and 370 Level at Chikla Mine(MOIL/18-19/ET/80) 02-06-2018 02-07-2018 02-07-2018 02-07-2018 03:30 pm Active View
16. Annual Underground sand cleaning work at Balaghat Mine(MOIL/18-19/ET/82) 02-06-2018 02-07-2018 02-07-2018 02-07-2018 03:30 pm Active View
17. Loading and unloading of steel section and various materials with stacking at NOS Kandri Mine store(MOIL/18-19/ET/79) 02-06-2018 02-07-2018 02-07-2018 02-07-2018 03:30 pm Active View
18. Making and supply of stemming material Mud Plug for blasting at Ukwa Mine(MOIL/18-19/ET/81) 02-06-2018 02-07-2018 02-07-2018 02-07-2018 03:30 pm Active View
19. Re-tiling and roof repair including Laying polythene sheet over roof of camp quarters at Chikla Mine( TE/CH/CIVIL/18-19/117 date 27/05/2018) 02-06-2018 07-06-2018 07-06-2018 07-06-2018 03:30 pm Active View
20. Sampling of Manganese ore for output (Production) and Despatch (Railing) for all the mines of MOIL Limited(MOIL/18-19/ET/87) 02-06-2018 15-06-2018 15-06-2018 15-06-2018 03:30 pm Active View
21. COMPUTER HARDWARE AMC for Chikla and Dongri Buzurg Mine 2018-19 (COMPREHENSIVE)(TE/CH/SYSTEM/AMC/2018-19/1/128) 01-06-2018 07-06-2018 07-06-2018 07-06-2018 04:00 PM Active View
22. Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/18-19/164 dtd 29.05.2018) 31-05-2018 03-07-2018 03-07-2018 03-07-2018 04:30 PM Active View
23. Repairing of 4 Flow Hydraulic Pump Of Sandvik make Jumbo Drill Machine operating at Balaghat Mine(AGT/BGT/MECH/18-19/165 dtd 31.05.2018) 31-05-2018 07-06-2018 07-06-2018 07-06-2018 04:30 PM Active View
24. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS (i.e.01/04/2018 TO 31/03/2020) FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AND AIR LEG MACHINES HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-11/217-M 31-05-2018 22-06-2018 22-06-2018 22-06-2018 03:30 PM Active View
25. Purchase of Reduction Gear Box - 1 No.(1 Lot) for Man Winding Engine of Production Shaft at Balaghat Mine(M.P) (Only Through e-procurement)(WE-34 DT.30/05/2018, eTENDER NO.MOIL/18-19/ET/86) 30-05-2018 25-06-2018 25-06-2018 26-06-2018 03:30 PM Active View
26. Retilling and Reroofing of country tiles and manglower tiles roof of Residencial quarter at Tirodi Mine(TRD/Civil/A/2018-19/569B Dated 27/05/2018) 30-05-2018 06-06-2018 06-06-2018 06-06-2018 03:30 PM Active View
27. Cleaning of susrface drain and making of Earthen bound Preparation Mansoon south , north section and 7No. Pit to 9 No. pit area at Tirodi Mine(TRD/CIVIL/2018-19/569-C) 30-05-2018 06-06-2018 06-06-2018 06-06-2018 03:30 PM Active View
28. Sand stowing plant operation at Gumgaon Mine(MOIL/18-19/ET/72) 29-05-2018 28-06-2018 28-06-2018 28-06-2018 03:30 PM Active View
29. Drilling of holes for cable bolting and grouting operation at Kandri Mine(MOIL/18-19/ET/73) 29-05-2018 28-06-2018 28-06-2018 28-06-2018 03:30 PM Active View
30. Picking and collection of material from crushed ROM (DBL-456) at South Part of Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/75) 29-05-2018 28-06-2018 28-06-2018 28-06-2018 03:30 PM Active View
31. Winzing from 12th Level to 13.5th Level at Balaghat Mine(MOIL/18-19/ET/74) 29-05-2018 28-06-2018 28-06-2018 28-06-2018 03:30 PM Active View
32. Picking and collection of material (DBL-456 and DBL-457) from surplus contaminated low grade ROM at Dongri Buzurg Mine(MOIL/18-19/ET/77) 29-05-2018 29-06-2018 29-06-2018 29-06-2018 03:30 PM Active View
33. Picking and collection of material from crushed ROM (DBL-456) at South Part-I of the Quarry at Dongri Buzurg Mine(MOIL/18-19/ET/76) 29-05-2018 29-06-2018 29-06-2018 29-06-2018 03:30 PM Active View
34. Picking and collection of material (DBL-456 and DBL-457) from surplus contaminated low grade ROM at Dongri Buzurg Mine(MOIL/18-19/ET/78) 29-05-2018 29-06-2018 29-06-2018 29-06-2018 03:30 PM Active View
35. HIRING OF EXCAVATOR ON HOURLY BASIS AT CHIKLA MINE(TE-05 Dt.26052018) 29-05-2018 02-06-2018 02-06-2018 02-06-2018 04:30 PM Active View
36. Purchase of Kirloskar and Benlec make Carbon brush and carbon brush holder( BGT/TE/Elect./18-19/814) 28-05-2018 20-06-2018 20-06-2018 20-06-2018 04:30 PM Active View
37. Miners Safety Canvas Boots(PUR-MOIL-C-1-186-WE-32-ET-85 dt.28.05.2018) 28-05-2018 19-06-2018 19-06-2018 20-06-2018 03:30 PM Active View
38. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ABB MAKE SF6 HT BREAKER.(PUR/MOIL/C-11/155/E-10/201-M Dt. 25-05-2018) 28-05-2018 29-06-2018 29-06-2018 29-06-2018 03:30 PM Active View
39. HIRING OF HYDRAULIC ROCK BREAKER WITHHYDRAULIC EXCVATOR FOR LGHS PRODUCTION AT DONGRI BUZURG MINE(DB/MECH/PROJECT/18-19/ 115) 28-05-2018 05-06-2018 05-06-2018 05-06-2018 04:30 PM Active View
40. Providing and laying torchshield over mangalore tiled roofing for mine managers Bungalow balaghat Mine(Civil/BGT/T.E./2018-19/141) 28-05-2018 04-06-2018 04-06-2018 04-06-2018 04:30 PM Active View
41. Maintenance and cleaning of New Administrative Building at Munsar Mine( MUN/MINING/18-19/613) 28-05-2018 06-06-2018 06-06-2018 06-06-2018 03:30 PM Active View
42. Trench Cutting at OCF stacks at Munsar Mine(MUN/MINING/18-19/612) 28-05-2018 06-06-2018 06-06-2018 06-06-2018 03:30 PM Active View
43. Providing and applying distempering, painting, of Ground Floor, First Floor and Second Floor and outer Snowcem to MOIL Bhawan, Nagpur(MOIL/18-19/ET/71) 28-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active View
44. Drilling of Borehole, Supply of Submersible Pump with pipeline etc. at the location of High Speed Shaft Gumgaon Mine(MOIL/18-19/ET/83) 28-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active View
45. Procurement of Copper Lugs, double Compression Cable Glands and Tools for Balaghat Mine(BGT/TE/Elect./18-19/98) 25-05-2018 11-06-2018 11-06-2018 11-06-2018 04:30 PM Active View
46. Providing and Supplying of trailing cable for Balaghat Mine(BGT/TE/Elect./18-19/132) 25-05-2018 20-06-2018 20-06-2018 20-06-2018 04:30 PM Active View
47. Providing supplying and installation of CCTV system for the vertical shaft of Ukwa Mine.(Uk/elect/2018-19/435) 25-05-2018 07-06-2018 07-06-2018 07-06-2018 04:30 PM Active View
48. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF NEOPRENE RUBBER CUSHION - 300 Mtrs.(PUR/MOIL/C-11/147/E-09/196-M) 24-05-2018 22-06-2018 22-06-2018 22-06-2018 03:30 PM Active View
49. Rewinding and Repairs of submersible water pumps of Balaghat Mine(BGT/TE/Elect./18-19/96) 23-05-2018 11-06-2018 11-06-2018 11-06-2018 04:30 PM Active View
50. Installation of 1000KVA Transformer for power supply of skip winder at Balaghat Mine(BGT/TE/Elect./18-19/119) 23-05-2018 20-06-2018 20-06-2018 20-06-2018 04:30 PM Active View
51. Open e-Tender No. WE-29, ET-84 for purchase of SCREEN FRAME WITH SCREEN PANEL FOR JIG(WE-29 e-tender No.MOIL/18-19/ET-84, Dt.23.05.18) 23-05-2018 18-07-2018 18-07-2018 19-07-2018 03:30 PM Active View
52. Drilling of Borehole at Awlajhari Pumping Station towards Water supply Scheme at Balaghat Mine.(Civil/ BGT/T.E./2018-19/122) 23-05-2018 29-05-2018 29-05-2018 29-05-2018 04:40 PM Active View
53. Retiling and Reroofing of camp quarters at Kandri mine(Kan/Civil/NIT/18-19/12) 23-05-2018 29-05-2018 29-05-2018 29-05-2018 04:30 PM Active View
54. Cleaning of storm water drain of surface and underground sump at Kandri mine(Kan/Civil/NIT/18-19/11) 22-05-2018 29-05-2018 29-05-2018 29-05-2018 04:30 PM Active View
55. Computer and peripherals (Printers, UPSs and LAN) Annual Maintenance Contract of Chikla and Dongri Buzurg Mine(CH/SYSTEM/AMC/2018-19/1) 21-05-2018 30-05-2018 30-05-2018 30-05-2018 04:00 PM Active View
56. Supplying and Providing of Straight Through Cable Jointing Kit for Balaghat Mine(BGT/TE/Elect/18-19/97) 21-05-2018 07-06-2018 07-06-2018 07-06-2018 04:30 PM Active View
57. Miscellaneous Contract works of Cell Bay, Neutralization and Boiler Section at EMD Plant Dongri Buzurg Mine(MOIL/18-19/ET/50) 21-05-2018 18-06-2018 18-06-2018 18-06-2018 03:30 PM Active View
58. Miscellaneous Contract works of Leaching Section at EMD Plant Dongri Buzurg Mine(MOIL/18-19/ET/49) 21-05-2018 18-06-2018 18-06-2018 18-06-2018 03:30 PM Active View
59. Safety Rubber Ankle Boots(PUR-MOIL-C-1-185-WE-28-Et-70) 19-05-2018 15-06-2018 15-06-2018 18-06-2018 03:30 PM Active View
60. Purchase of Electrical Cable (Size 3.5 C x 50 Sq. mm and 3 C x 6 Sq. mm) - 2 Items( WE-33 DT.18.05.2018(e-Tender No. MOIL/18-19/ET/69)) 18-05-2018 28-05-2018 28-05-2018 29-05-2018 03:30 PM Active View
61. Gum Boots-Rubber and PVC(PUR-MOIl-C-1-187-WE-15-ET-67) 17-05-2018 11-06-2018 11-06-2018 12-06-2018 03:30 PM Active View
62. Open e-Tender No. WE-10-ET-68 for purchase of IRON ORE with Transportation(WE-10 e-tender No.MOIL/18-19/ET-68, Dt.17.05.18) 17-05-2018 19-06-2018 19-06-2018 20-06-2018 03:30 PM Active View
63. PURCHASE OF PUZZOLANA MAKE SPARES OF VIBRATING SCREEN(PUR/MOIL/C-11/135/E-02/108-M Dt. 17-05-2018) 17-05-2018 08-06-2018 08-06-2018 08-06-2018 03:30 PM Active View
64. Repairing and making 170HP and 150HP Pump foundation, pump shed, misc. work North c section at TD01(TRD/Civil/2018-19/407) 16-05-2018 22-05-2018 22-05-2018 22-05-2018 03:30 PM Active View
65. PCC to be carried out at -330 Level AT MUNSAR MINE.(7100000782/MUN/2018-19/469) 16-05-2018 25-05-2018 25-05-2018 25-05-2018 04:30 PM Active View
66. Pushing and unloading of ROM and rock tubs in underground and on surface AT MUNSAR MINE.(7100000781/MUN/2018-19/468) 16-05-2018 25-05-2018 25-05-2018 25-05-2018 04:30 PM Active View
67. Design Supply and Installation of mild steel n stainless steel piping work for both steam line and condensate line and Design Supply and Installation of dual laminated composite material trench n overflow bends for spent solution at EMD Plant, Dongri(MOIL 16-05-2018 30-05-2018 30-05-2018 30-05-2018 03:30 PM Active View
68. Short term e-Tender for Purchase of Industrial Power Heater - 90 Nos. and 0-1200 degree C Thermocouple - 18 Nos.(2 Lots) for EMD plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-31 (MOIL/18-19/ET/66) DT.15/05/2018) 15-05-2018 24-05-2018 24-05-2018 25-05-2018 03:30 PM Active View
69. Construction of shed in D type bungalow at Munsar Mine (MUN/CIVIL/18-19/20 DT 13.05.2018) 15-05-2018 15-05-2018 25-05-2018 25-05-2018 04:30 PM Active View
70. Purchase of Temperature Control Panel - 18 Nos.(1 Lot) for EMD plant, Dongri Buzurg Mine (Only Through e-procurement)(WE-30 (MOIL/18-19/ET/65) DT.15/05/2018) 15-05-2018 24-05-2018 24-05-2018 25-05-2018 03:30 PM Active View
71. Construction of Stone Pitching Parapet Wall for Side slope Stability for Newely Diverted Hutch drain at ocf jig section at Balaghat Mine.(Civil/BGT/T.E./2018-19/81) 15-05-2018 21-05-2018 21-05-2018 21-05-2018 04:30 PM Active View
72. PURCHASE OF Sensor Assembly for 1500 KVA, 11KV DG Set for CHIKLA MINE(TE-04 DT.14052018) 15-05-2018 28-05-2018 28-05-2018 28-05-2018 04:30 PM Active View
73. Purchase of Ore-Petrology Microscope and Microscope Camera - 1 No.each (2 Lots) (Only Through e-procurement)(Purchase of Ore-Petrology Microscope and Microscope Camera - 1 No.each (2 Lots) (Only Through e-procurement)(WE-27 (MOIL/18-19/ET/64) DT.14/05/201 14-05-2018 25-06-2018 25-06-2018 26-06-2018 03:30 PM Active View
74. Filling and spreading work at haulage road Munsar Mine (Mining/MUN/18-19/417) 14-05-2018 25-05-2018 25-05-2018 25-05-2018 04:30 PM Active View
75. Cleaning of sand from 170 L and 70 L at Munsar Mine (Mining/MUN/18-19/416) 14-05-2018 14-05-2018 25-05-2018 25-05-2018 04:30 PM Active View
76. Construction of New Vehicle washing pit near workshop premises at Ukwa Mine(16/Civil/UM/18-19/338) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 04:30 PM Active View
77. Concreting work for Chamber Prepration at1850 level Ukwa Mine(16/Mining/UM/18-19/335) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 04:30 PM Active View
78. Providing Polymers Based Lining with acid referactory bricks at EMD Plant at Dongri Buzurg Mine(MOIL/18-19/ET/27) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 03:30 PM Active View
79. Design Supply and Installation of FRVE and HDPE piping work for supply of feed and spent solution and Insulation work including material for steam and condensate pipeline and One Condensate Tank at EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/28) 14-05-2018 28-05-2018 28-05-2018 28-05-2018 03:30 PM Active View
80. Cage Suspension Gear -3sets(C-12-12-WE26-ET-63 D.14-5-2018) 14-05-2018 07-06-2018 07-06-2018 08-06-2018 03:30 PM Active View
81. Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine (AGT/BGT/MECH/IMB/18-19/75 DTD 10.05.2018) 12-05-2018 12-05-2018 25-05-2018 25-05-2018 04:30 PM Active View
82. Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine (MOIL/18-19/ET/48) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active View
83. Underground Vertical Development and allied work at 1750 Level at Ukwa Mine (MOIL/18-19/ET/42) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active View
84. Washing picking and collection of material from West side of D Dump waste dump at Tirodi Mine (MOIL/18-19/ET/44) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active View
85. Picking and collection of material to recover Ferro Grade Ore KD 2272 from Dumps at Kandri Mine (MOIL/18-19/ET/45) 11-05-2018 11-06-2018 11-06-2018 11-06-2018 03:30 PM Active View
86. Construction of Additions to Third Floor East and WestWings of MOIL Bhavan Nagpur (MOIL/18-19/ET/ 26) 11-05-2018 12-06-2018 12-06-2018 12-06-2018 03:30 PM Active View
87. Laying of 6 G.I. Pipe line -180 mtrs and 4 G.I. Pipe line-180 mtrs in vertical shaft for pumping operation at Kandri Mine (MOIL/18-19/ET/31 ) 11-05-2018 13-06-2018 13-06-2018 13-06-2018 03:30 PM Active View
88. TESTING OF HOT AND EOT CRANRS INSTALLED IN BALAGHAT MINE (BGT/MECH/CRANE-TEST/18-19/1050 ) 11-05-2018 11-05-2018 22-05-2018 22-05-2018 4:00 PM Active View
89. Shifting of 3 phase 3 wire HT Overhead line of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/67) 11-05-2018 11-05-2018 17-05-2018 17-05-2018 04:30 PM Active View
90. PURCHASE OF TRACK ROLLER ASSEMBLY FOR EIMCO ELECON MADE SIDE DUMP LOADER MODEL 625CR, PART NO- 1027C050000005 (PUR/MOIL/BGT/SDL/18-19/73 dtd 09.05.2018) 11-05-2018 11-05-2018 24-05-2018 24-05-2018 04:30 PM Active View
91. Open e-Tender No. WE-09-ET-62 for purchase of PEARL COKE with Transportation (WE-09 e-tender No.MOIL/18-19/ET-62, Dt.11.05.18) 11-05-2018 04-06-2018 04-06-2018 05-06-2018 03:30 PM Active View
92. Purchase of industrial power heaters for cells of EMD Plant at Dongri Buzurg Mine. (ADGM/DB/EMD/ELECT/18-19/66) 10-05-2018 16-05-2018 16-05-2018 16-05-2018 4:00 PM Active View
93. Arc Flash Protective wear (PUR-MOIL-C-1-WE-25-ET-61) 10-05-2018 11-06-2018 11-06-2018 12-06-2018 03:30 PM Active View
94. Shifting of 3 phase, 3 wire HT OH line and 11KV outdoor substation at Dongri Buzurg Mine (MOIL/18-19/ET/32 ) 10-05-2018 10-05-2018 08-06-2018 08-06-2018 03:30 PM Active View
95. SUPPLY OF BLACK GITTI FOR CONCRETING AT CHIKLA MINE (TE-03 DT.08052018) 09-05-2018 09-05-2018 15-05-2018 15-05-2018 04:30 PM Active View
96. Purchase of Geological Modelling, Mine Planning and Design Software for Four Modules i.e. Core, Tools, Geology and Surveying (WE-3 Dt.09/05/2018 (e-Tender No.MOIL/18-19/ET/60)) 09-05-2018 12-06-2018 12-06-2018 13-06-2018 03:30 PM Active View
97. Design, Manufacture and Supply Plummer Block of Pinion shaft of Production Shaft winder of Balaghat Mine (BGT/MECH/PS/18-19/ 989) 09-05-2018 24-05-2018 24-05-2018 24-05-2018 4:00 PM Active View
98. Open e-Tender No. WE-24-ET-56 for Purchase of copper bus bar, aluminium bus bar, Z bar and various type copper-aluminium bus with other electrical accessories for new Cell-Bay section at EMD PLANT, DONGRI BUZURG MINE (WE-24 e-tender No.MOIL/18-19/ET-56, D 09-05-2018 09-05-2018 30-05-2018 31-05-2018 03:30 PM Active View
99. TENDER ENQUIRY FOR ANNUAL MAINTENANCE CONTRACT OF COMPUTER, LAPTOPS, PRINTER, UPS AND NETWORKS (SYS/HW MAINTENANCE/2018-19/2) 09-05-2018 30-05-2018 30-05-2018 30-05-2018 3:00 PM Active View
100. Purchase of 550 H.P., 1000 RPM, Laminated Yoke, Shunt Wound, D.C.Motor - 2 Nos. for Double Drum Winder of Balaghat Mine (WE-23 (MOIL/18-19/ET/58) DT.09/05/2018) 09-05-2018 09-05-2018 06-06-2018 07-06-2018 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2027) Year Tenders
View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.