Tenders
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Annual repair to camp Quarters at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/25-26/ET/7) | 23-05-2025 | 23-06-2025 | 23-06-2025 | 23-06-2025 | 04:00 PM | Active | View |
2. | Bid Number: GEM/2025/B/6261538 Dated: 22-05-2025 (Large Dia. Explosives (LDE) -Primer (83 mm) , Large Dia. Explosives (LDE) -Column (83 mm)) | 22-05-2025 | 13-06-2025 | 13-06-2025 | 13-06-2025 | 11:30:00 | Active | View |
3. | Bid Number: GEM/2025/B/6261241 Dated: 22-05-2025 (Flatbed trailer with prime mover Min. 54 Tonne GVW, Tripple axle.) | 22-05-2025 | 13-06-2025 | 13-06-2025 | 13-06-2025 | 11:30:00 | Active | View |
4. | Bid Number: GEM/2025/B/6256274 Dated: 21-05-2025 (STANDBY 800 KW AC DRIVE PANEL) | 21-05-2025 | 12-06-2025 | 12-06-2025 | 12-06-2025 | 11:30:00 | Active | View |
5. | PURCHASE OF SPARES FOR TATA TIPPERS BS-IV AND BS-VI of BALAGHAT MINE(PUR/MOIL/BGT/Tipper/25-26/235) | 22-05-2025 | 11-06-2025 | 11-06-2025 | 11-06-2025 | 04:30 PM | Active | View |
6. | PURCHASE OF SPARES FOR EIMCO ELECON MAKE WHEEL LOADER AL-520 OF BALAGHAT MINE.(PUR/MOIL/BGT/EE/25-26/236) | 22-05-2025 | 11-06-2025 | 11-06-2025 | 11-06-2025 | 04:30 PM | Active | View |
7. | Procurement of Cement 1445 MT for various mines, through Government e-Market Place (GeM). (BID NO: GEM/2025/B/6250383) | 20-05-2025 | 10-06-2025 | 10-06-2025 | 10-06-2025 | 12:30 PM | Active | View |
8. | Request for proposal for Appointment of General Insurance Intermediary/Broker for MOIL Limited(MOIL/MOIL LIMITED/CMC/25-26/ET/6) | 09-05-2025 | 09-06-2025 | 09-06-2025 | 09-06-2025 | 04:00 PM | Active | View |
9. | Bid Number: GEM/2025/B/6225526 Dated: 17-05-2025 (LOT - 1: LT PANEL - 1000 A, ACB - BALAGHAT MINE , LOT - 2: LT PANEL OUTDOOR TYPE 200A MCCB - KANDRI MINE , LOT - 3: L T PANLE INDOOR TYPE 200 A MCCB - KANDRI MINE , LOT - 4: LT ACB Stand Alone panel 800A, ACB - KANDRI MINE , LOT - 5: LT PANEL 800A ACB - TIRODI MINE , LOT - 6: L T PANEL 400A MCCB - SITAPAHORE MINE , LOT - 7: L T PANLE 1600 A ACB - CHIKLA MINE , LOT - 8: LT PANEL 1000A ACB - GUMGAON MINE , LOT - 9: LT MCCB Stand Alone Panel 400 A MCCB - GUMGAON MINE , LOT - 10: LT PANEL 1600A ACB - GUMGAON MINE , LOT - 11: LT ACB Trolleys WITH 800 Amp ACB - GUMGAON MINE , LOT - 12: LT ACB Trolleys WITH 1600 Amp ACB - GUMGAON MINE , LOT - 13: LT PANEL 800 A ACB - GUMGAON MINE , LOT - 14: LT PANEL Two Incomer of 1600 Amps ACB - BELDONGRI MINE , LOT - 15: Standalone Panel LT MCCB, 400A - BELDONGRI MINE) | 17-05-2025 | 09-06-2025 | 09-06-2025 | 09-06-2025 | 11:30:00 | Active | View |
10. | Construction of Cricket Pitch including net besides three sides of Cricket Pitch(LT/CIVIL/GUM/2025-26/566) | 23-05-2025 | 06-06-2025 | 06-06-2025 | 06-06-2025 | 04:00 PM | Active | View |
11. | Processing of ROM from 70TPH Crusher of Dongri Buzurg Mine by outsourcing 3 nos. semi-skilled and 3 nos. unskilled man-power(Processing of ROM from 70TPH Crusher of DB MINE) | 18-05-2025 | 05-06-2025 | 05-06-2025 | 05-06-2025 | 04:30 PM | Active | View |
12. | Providing fabrication and installation at site portable rest shelter for OCF at Gumgaon Mine(LT/CIVIL/GUM/2025-26/548) | 21-05-2025 | 02-06-2025 | 02-06-2025 | 02-06-2025 | 04:00 PM | Active | View |
13. | Providing fabrication and installation at site portable toilet for OCF at Gumgaon Mine(LT/CIVIL/GUM/2025-26/546) | 21-05-2025 | 02-06-2025 | 02-06-2025 | 02-06-2025 | 04:00 PM | Active | View |
14. | Hydraulic Pressing of Solid Tyres-10.00X20 -60nos. for LHD Machines of Balaghat Mine.(AGT/BGT/Solid-Tyre/25-26/236) | 09-05-2025 | 30-05-2025 | 30-05-2025 | 30-05-2025 | 04:30 PM | Active | View |
15. | Repairing of complete final drive planetary gear assembly of LHD machine of Balaghat Mine.(AGT/MECH/FD-LHD/25-26/279) | 14-05-2025 | 30-05-2025 | 30-05-2025 | 30-05-2025 | 04:30 PM | Active | View |
16. | Repairing of 240HP Kirloskar Make Multistage Pump RKB125/30K-8ST of 12th Level underground at Balaghat Mine.(AGT/BGT/MECH/PUMP/25-26/278) | 14-05-2025 | 30-05-2025 | 30-05-2025 | 30-05-2025 | 04:30 PM | Active | View |
17. | Cleaning of strom water drains at surface and UG SUMPS and drain at dIff level for Mansoon prepratory works at Kandri Mine(CIVIL/KD/T.E./25-26/217 Date 17.05.2025) | 19-05-2025 | 30-05-2025 | 30-05-2025 | 30-05-2025 | 04:30 PM | Active | View |
18. | Construction of Exhaust fan house with Evasee and Boundary wall for east and west ventilation fans at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/25-26/ET/5) | 29-04-2025 | 29-05-2025 | 29-05-2025 | 29-05-2025 | 04:00 PM | Active | View |
19. | Purchase of Detonators fuse (DF) For blasting in Underground at Ukwa Mine(LT/MINING/UK/HTA/2025-26/318) | 22-05-2025 | 29-05-2025 | 29-05-2025 | 29-05-2025 | 04:30 PM | Active | View |
20. | Purchase of Hammer for FRD DCR 20 Drilling machine operating at Dongri Buzurg mine.(PUR/DB/MECH/AGT/2025-26/297) | 23-05-2025 | 29-05-2025 | 29-05-2025 | 29-05-2025 | 04:30 PM | Active | View |
21. | Operation of Pumps installed at pit bottom for dewatering from 06 no.and 05 no.pit at Sitapatore mine. (04 manpower in 1st shift and 04 manpower in 2nd shift )Total 08 Manpower is required.(MOIL/SP01/MECH/25-26/228 DT-23.05.2025) | 23-05-2025 | 29-05-2025 | 29-05-2025 | 29-05-2025 | 01:00 PM | Active | View |
22. | Proposal for cleaning of crushing plant ROM by sorting and sizing.(MOIL/SP01/MINING/25-26/219 DT-22/05/2025) | 23-05-2025 | 29-05-2025 | 29-05-2025 | 29-05-2025 | 03:00 PM | Active | View |
23. | Proposal for Operation and maintenance of Crushing and screening plant at Sitapatore/Sukli Mine.(MOIL/SP01/MINING/25-26/227 DT-23/05/2025) | 23-05-2025 | 29-05-2025 | 29-05-2025 | 29-05-2025 | 03:30 PM | Active | View |
24. | Laying of 4 inch G.I Pipe Lines for New Sand Stowing Plant at CH-13 in North Section of Mine form Old North Sand Stowing(AGT/BGT/MECH/SS-PP/25-26/207) | 05-05-2025 | 28-05-2025 | 28-05-2025 | 28-05-2025 | 04:30 PM | Active | View |
25. | Cleaning and Collection of Garbage and Cleaning of Drains at Kandri(KD/PER/NIT/25-26/354 Date - 09.05.2025) | 10-05-2025 | 28-05-2025 | 28-05-2025 | 28-05-2025 | 04:30 PM | Active | View |
26. | Processing of ROM from 30TPH Crusher of Dongri Buzurg Mine by outsourcing 9 nos. semi-skilled man-power (Fitter, welder, helper) on daily basis to ensure the smooth operation, maintenance and housekeeping of the Plant.(DB/MECH/25-26/ 587) | 18-05-2025 | 28-05-2025 | 28-05-2025 | 28-05-2025 | 04:30 PM | Active | View |
27. | Purchase of Non-Electric Detonators (Nonel) For blasting in underground at Ukwa Mine.(LT/MINING/UK/HTA/2025-26 /317 Date20.05.2025) | 21-05-2025 | 28-05-2025 | 28-05-2025 | 28-05-2025 | 04:30 PM | Active | View |
28. | Laying of 6 inch G.I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine(AGT/BGT/MECH/PIPE/25-26/206) | 05-05-2025 | 27-05-2025 | 27-05-2025 | 27-05-2025 | 04:30 PM | Active | View |
29. | Bid Number: GEM/2025/B/6193664 Dated: 02-05-2025 (Control Panel (CMC) with Microprocessor (Mp) based controller, Ingersoll Rand (IR) make.) | 05-05-2025 | 26-05-2025 | 26-05-2025 | 26-05-2025 | 11:30:00 | Active | View |
30. | Repairing of old C type load bearing C type quarters at Munsar Mine(LT/CIVIL/MUN/AGT/25-26/) | 14-05-2025 | 26-05-2025 | 26-05-2025 | 26-05-2025 | 04:00 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |