निविदाएं
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Construction of Boundary wall around government Primary and secondary School at ukwa under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/5) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | और देखें |
2. | Laying of water Distribution Line to Chikla Village under CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/6) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | और देखें |
3. | Construction of Toilet Block in Government Girls School in Ukwa Village under Corporate Environment Responsibility (CER).(MOIL/MOIL LIMITED/CMC/24-25/ET/7) | 16-04-2024 | 16-05-2024 | 16-05-2024 | 16-05-2024 | 04:00 PM | Active | और देखें |
4. | Construction of RCC retaining wall for new Crushing and screening Plant at Sitapatore Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/4) | 10-04-2024 | 10-05-2024 | 10-05-2024 | 10-05-2024 | 04:00 PM | Active | और देखें |
5. | Cleaning of accumulated sand incline to from -150L at Kandri Mine(KD/MINES/NIT/2024-25/115) | 13-04-2024 | 06-05-2024 | 06-05-2024 | 06-05-2024 | 04:30 PM | Active | और देखें |
6. | Annual repair work of School Bus MH40N3405 of kandri Mine(Mech/KD/24-25/107) | 11-04-2024 | 04-05-2024 | 04-05-2024 | 04-05-2024 | 04:30 PM | Active | और देखें |
7. | Cleaning of accumulated sand from -50L at Kandri Mine(KD/MINES/NIT/2024-25/112) | 13-04-2024 | 04-05-2024 | 04-05-2024 | 04-05-2024 | 04:30 PM | Active | और देखें |
8. | REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR OF BALAGHAT MINE 2 NOS.(BGT/TE/ELECT/AJGM/24-25/62) | 12-04-2024 | 02-05-2024 | 02-05-2024 | 02-05-2024 | 03:30 PM | Active | और देखें |
9. | Overhauling Centrifugal Pump Kirloskar 150HP second level(Mech/KD/24-25/105) | 10-04-2024 | 01-05-2024 | 01-05-2024 | 01-05-2024 | 04:30 PM | Active | और देखें |
10. | Dismantling of existing 30lb Tram line of pit top and laying of 60lb Tram line and Fabrication of 60lb rail LH and diamond crossing(Mech/KD/24-25/94) | 11-04-2024 | 30-04-2024 | 30-04-2024 | 30-04-2024 | 04:30 PM | Active | और देखें |
11. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/24-25/90, date 17.04.2024) | 17-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
12. | Providing and Applying weather shield paint, Interior emulsion and oil paint to MOIL VT Center building at Munsar Mine(AGT/GUM/CIVIL/LT/24-25/102) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
13. | Drilling of Muck generation hole for production at -30 Level at Munsar Mine.(AGT/MUN/MIN/LT/24-25/103) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
14. | Recover SM grade Ore Underground sub grade mineral rejects Mn rock at Munsar Mine(AGT/MUN/MIN/NIT/24-25/121) | 22-04-2024 | 29-04-2024 | 29-04-2024 | 29-04-2024 | 04:30 PM | Active | और देखें |
15. | PURCHASE OF SPARES FOR AIR AND WATER COOLED COMPRESSORS FOR KANDRI MINE(PUR/MOIL/KD/MECH/01) | 08-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
16. | Supply, Installation, Commissioning of Wired Networking Equipment with necessary accessories/equipment for Re-setup of LAN of Admin Building at Ukwa Mine(AGT/UK/SYS/NETWORK/2024-25/65) | 12-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:00 PM | Active | और देखें |
17. | PRINTING OF VARIOUS FORMS, FORMATS AND REGISTER FOR CHIKLA MINE.(CH/TE/PERS/24-25/30 DATE-08.04.2024) | 16-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 03:30 PM | Active | और देखें |
18. | DEVELOPMENT OF GARDEN IN FRONT OF ADMINISTRATIVE BUILDING AT CHIKLA MINE.(CH/CIVIL/NIT/24-25/57 DATE-15.04.2024) | 16-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
19. | Formation of base foundation for installation of Chock in underground faces.(Gum/Min/24-25/191, date 17.04.2024) | 17-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
20. | cleaning underground sump drain at munsar mine(MUN/TENDER/24-25/96) | 22-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
21. | Drilling of Bore Hole 110mm(Diameter)5nos (30 Meters each)150RMT at 2nd level(MUN/TENDER/24-25/98) | 22-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
22. | Repairing to Old Gantry wall with stone Masonry at Siding Premises at Kandri Mine(CIVIL/KD/T.E./24-25/24 26.04.2024) | 06-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | और देखें |
23. | Requirement of Spares for 150HP Mather and Platt Make Pump Model ET ISO32 0 150X125 500 for BALAGHAT MINE(PUR/BGT/PUMP/24-25/18) | 06-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | और देखें |
24. | Development Works towards making of approach ramps, drains around Slime Pond near Integrated Manganese Beneficiation Plant, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2024-25/ Date 16.04.2024) | 18-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | और देखें |
25. | Construction of Bituminous Tar Road from Gate No 1 to Canteen and from Mine Entrance Gate via DAV Public School towards Katangi Highway at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/3) | 19-03-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:00 PM | Active | और देखें |
26. | Renovation of existing old Administrative Building at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/1) | 19-03-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:00 PM | Active | और देखें |
27. | providing, supplying and installing fire fighting system FMP, balaghat mine(TE/MOIL/AGT/FMP/ELECT/24-25/08) | 08-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:25 PM | Active | और देखें |
28. | Providing and laying 1 GI pipeline for drinking water with accessories as per inset level of 2nd Vertical shaft of Ukwa Mine(AJGM/UK/MECH/2024-25/86) | 18-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:30 PM | Active | और देखें |
29. | Repairing of lubi make 40HP and 15HPN Submersible Pump of Ukwa Mine.(AJGM/UK/MECH/2024-25/85) | 18-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:30 PM | Active | और देखें |
30. | EXTRA EXCAVATION IN 2ND LEVEL AT MUNSAR MINE(MUN /TENDER/24-25/100) | 17-04-2024 | 24-04-2024 | 24-04-2024 | 24-04-2024 | 04:30 PM | Active | और देखें |