Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Construction of foundation for Chimney for 1500 KVA DG Set at Second vertical Shaft at Chikla mine.(CH/Civil/2020-21/316 date 01.06.2020) 04-06-2020 13-06-2020 13-06-2020 13-06-2020 03:30 PM Active View
2. PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE-ENESTEE ENGINEERING LTD., MODEL-E-VF-1016-001- 1 NO. FOR BALAGHAT MINE (M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/239/E-3/35-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
3. PURCHASE OF WHEEL AND EXCEL ASSEMBLY WITH GEARBOX COMPLETE WITHOUT MOTOR - 1 SET, MAKE- M/S OVIS EQUIPMENT PVT.LTD., HYDERABAD, MODEL- 4 TON BATTERY OPERATED LOCOMOTIVE (SR.NO.603 AND 582) OPERATING AT BALAGHAT MINE(M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/4/E-4/36-M DT.03/06/2020) 04-06-2020 24-06-2020 24-06-2020 24-06-2020 03:30 PM Active View
4. DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/BGT/B-HOLE/20-21/188) 04-06-2020 15-06-2020 15-06-2020 15-06-2020 04:30 PM Active View
5. Providing and installation of Effluent Treatment Plant in work shop area at Chikla Mine.(CH/Civil/2020-21/211 date 16.05.2020) 03-06-2020 10-06-2020 10-06-2020 10-06-2020 03:30 PM Active View
6. purchase of Pneumatically Operated Double Diaphragm Pumps for Various Mines - 10 Nos. (2 Lots)(WE-13(ET-57) DT.01/06/2020) 02-06-2020 24-06-2020 24-06-2020 25-06-2020 03:30 PM Active View
7. Obtaining Final Forest Clearance from Ministry of Environment, Forest and Climate Change over an area of 150.586 Ha., 3.986 Ha. and 4.734 Ha. within Mining lease of Tirodi, Ukwa and Sitapatore respectively(MOIL/20-21/ET/27) 02-06-2020 01-07-2020 01-07-2020 01-07-2020 03:30 PM Active View
8. Supply of Medicines 235 items(PUR/MOIL/C-10/35/WE-06/ET/59) 02-06-2020 09-07-2020 09-07-2020 10-07-2020 03:30 PM Active View
9. PURCHASE OF MOTOROLA MAKE MOTOTRBO SLR 5300 REPEATER ALONG WITH ACCESSORIES FOR DONGRI BUZURG MINE(DB/ELECT/20-21/211) 01-06-2020 26-06-2020 26-06-2020 26-06-2020 04:30 PM Active View
10. TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED FLP GATE END BOX FOR LHD, WITH ALL ACCESSORIES MUNSAR MINE 1 NO(ELECT/MUN/ADGM/20-21/269) 01-06-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
11. Purchase of SULPHURIC ACID with Transportation-400 MT(MOIL/20-21/ET-58 dt.01.06.2020) 01-06-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
12. Purchase of Cement Injection Pump Sets for Various Mines - 15 Nos.(2 Lots) (Only Through e-procurement)(WE-12(ET-56) DT.01/06/2020) 01-06-2020 29-06-2020 29-06-2020 30-06-2020 03:30 PM Active View
13. Requirement of manpower for collection of canteen food items and serving it to mine employees at Chikla Mine(MOIL/20-21/ET/29) 30-05-2020 29-06-2020 29-06-2020 29-06-2020 03:30 PM Active View
14. Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) 2 Nos. (1 Lot) (Only Through e-procurement)(WE-7(ET-55) DT.30/05/2020) 30-05-2020 22-06-2020 22-06-2020 23-06-2020 03:30 PM Active View
15. Request for Empanelment (RFE) For Empanelment of Consultant/ Transaction Advisor(MOIL/RFE/CTA/20-21) 28-05-2020 18-06-2020 18-06-2020 24-06-2020 11:30 AM Active View
16. Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) 27-05-2020 13-06-2020 13-06-2020 15-06-2020 04:30 PM Active View
17. Exploratory core drilling in ML area of Lugma village, ThParaswada, DistBalaghat over an area of 48.974 Ha(MOIL/20-21/ET/28) 27-05-2020 26-06-2020 26-06-2020 26-06-2020 03:30 PM Active View
18. Repairing of approach road from PWD road to New satak Mine at Beldongri MINE(Civil/Bel/20-21/310 Date 21/05/2020) 26-05-2020 02-06-2020 02-06-2020 02-06-2020 04:30 PM Active View
19. Loading transportation and unloading of Manganese ore ROM at Beldongri Mine(Min/BEL/20-21/299 dATE 20.05.2020) 25-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
20. Digging screening and stacking of fines from various places at Beldongri Mine(Min/BEL/20-21/309 Date 21.05.2020) 25-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
21. Cleaning of drain sewer lines of camp colonies of Balaghat Mine(Civil/BGT/LT/2020-21/140) 25-05-2020 04-06-2020 04-06-2020 04-06-2020 04:30 PM Active View
22. Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/20-21/130) 23-05-2020 12-06-2020 12-06-2020 12-06-2020 04:30 PM Active View
23. Providing, supplying and installation of Neutral grounding resistance and monitoring relay on 11kV/3.3kV surface transformer at Balaghat Mine.(BGT/ELECT/20-21/131) 23-05-2020 16-06-2020 16-06-2020 16-06-2020 04:30 PM Active View
24. CONSTRUCTION OF PARTITION WALLS FOR NEW OCF AT MUNSAR MINE.(MUN/CIVIL/NIT/20-21/22 DT 23.05.2020) 23-05-2020 30-05-2020 30-05-2020 30-05-2020 04:30 PM Active View
25. Repairing of Bucket cylinder and Arm Cylinder of LT make CK300 3 Hyd Excavator of Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/167) 22-05-2020 09-06-2020 09-06-2020 09-06-2020 04:30 PM Active View
26. Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mine(MOIL/20-21/ET/26) 22-05-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
27. Repairing and Rewinding of 2 Nos. 1000KVA, 33KV/11KV, Outdoor type Oil Cooled Power transformers of Main Electrical Substation at Ukwa Mine(MOIL/20-21/ET/24) 22-05-2020 22-06-2020 22-06-2020 22-06-2020 03:30 PM Active View
28. Supply, Installation and Commissioning of Elevators in The Residential Towers (Two Nos.) at the CMS Compound, MOIL Ltd., Nagpur - 2 Nos.(2 Lots) (Only Through e-procurement)(WE-10(ET-46) DT.22/05/2020) 22-05-2020 15-06-2020 15-06-2020 16-06-2020 03:30 PM Active View
29. Purchase of Instruments for Rock Mechanics Lab at Head office, Nagpur - 10 Items.(10 Lots) (Only Through e-procurement)(WE-9(ET-45) DT.22/05/2020) 22-05-2020 11-06-2020 11-06-2020 12-06-2020 03:30 PM Active View
30. Repairing of LHS Track Chain Assy of TATAHitachi zx 450 Hyd Exc No.1 at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/168) 21-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
31. Repairing of Bucket Assembly of TATAHitachi Zx450 Hyd Excavator No.1 at operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/169) 21-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
32. Construction of barricade wall around open pits Gudma Chhitalwar Kasturi Chainage 1700 to 3500 at Ukwa Mine(MOIL/20.21/ET/43) 21-05-2020 06-07-2020 06-07-2020 06-07-2020 03:30 PM Active View
33. Replacement of Buntons, Sollars, Platform, Ladder and Fencing of Jawahar Vertical Shaft at Chikla Mine(MOIL/20-21/ET/25) 20-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
34. Tender for providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/GrpIII/SYS/NW/2020-21/213) 20-05-2020 29-05-2020 29-05-2020 29-05-2020 04:30 PM Active View
35. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Annual Maintenance Contract of Chikla AND Dongri Buzurg Mine(TE/CH/SYSTEM/AMC/2020-21/159) 19-05-2020 06-06-2020 06-06-2020 06-06-2020 04:30 PM Active View
36. Underground concreting work to establish crosscut for preparation of Chute and manways at Chikla Mine(MOIL/20-21/ET/38) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
37. Loading of explosives from Magazine and unloading at different location of Tirodi mine(MOIL/20-21/ET/42) 19-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
38. Making of stemming material Mug Plug used for blasting at Ukwa Mine(MOIL/20-21/ET/40) 19-05-2020 19-06-2020 19-06-2020 19-05-2020 03:30 PM Active View
39. Filling and Spreading of waste rock generated through rock development in 300 L between Ch. 34 to Ch. 40 in Gumgaon Mine(MOIL/20-21/ET/37) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
40. Hiring of machinery for sub grade mineral reject of UG ROM handling from Magazine area at Kandri Mine(MOIL/20-21/ET/35) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
41. Transportation of bottom ash from Adani Power Plant, Tiroda to Ukwa Mine of M S MOIL Ltd. for stowing purpose(MOIL/19-20/ET/34) 19-05-2020 18-06-2020 18-06-2020 18-06-2020 03:30 PM Active View
42. Retiling and Reroofing of Camp Quarters as Monsoon Preparatory Works at Kandri Mine.(Kan/Civil/NIT/2020-21/219 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
43. Cleaning of Storm Water Drain of Surface and Underground Sump at Kandri Mine.(Kan/Civil/NIT/2020-21/320 Date 17.05.2020) 18-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
44. Hiring of Consultant for Estimation Drawings including working drawings and structural design for centralized store building with storage sheds yards and peripheral boundary wall at Balaghat Mine.(Civil/BGT/T E/2020-21/340) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
45. Hiring of structural Consultant services for Construction of foundation work for installation of new gear box and motor for Cage winder of Home shaft at Balaghat Mine(Civil/BGT/T E/2020-21/338) 18-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
46. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR RE-TILLING ROOF REPAIR INCLUDING LAYING OF POLYTHENE COVER OF CAMP QUARTER AT CHIKLA MINE.(TE-CH/CIVIL/20-21/210) 18-05-2020 25-05-2020 25-05-2020 25-05-2020 03:30 PM Active View
47. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -170 LEVEL AT CHIKLA MINE(TE-03 Dt.18052020) 18-05-2020 28-05-2020 28-05-2020 28-05-2020 04:30 PM Active View
48. Renovation of Production Shaft by replacing Buntons at Balaghat Mine(MOIL/20-21/ET/23) 18-05-2020 25-06-2020 25-06-2020 25-06-2020 03:30 PM Active View
49. Fencing of Electrical Switchyard beside existing Compressor House at Munsar Mine.(MUN/CIVIL/NIT/19-20/19 DT.16.05.2020) 16-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
50. Maintenance and Upkeeping of ETP at EMD Plant,Dongri Mine 2020(MOIL/EMD/CH/Jt.GM/20-21/134) 15-05-2020 26-05-2020 26-05-2020 26-05-2020 11:00 AM Active View
51. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
52. Vertical development at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/32) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
53. Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) 15-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
54. Picking and Collection of Ferro Grade 34 percent Mn. Lump Ore KD-4543 and 30 percent Mn. Lump ore KDL-435 from sub grade mineral reject of underground ROM at Kandri Mine(MOIL/20-21/ET/39) 15-05-2020 22-05-2020 22-05-2020 22-05-2020 03:30 PM Active View
55. Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) 15-05-2020 02-07-2020 02-07-2020 02-07-2020 03:30 PM Active View
56. Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) 15-05-2020 19-06-2020 19-06-2020 19-06-2020 03:30 PM Active View
57. REPAIRIRNG OF MATHER and PLATT AT 250HP CENTRIFUGAL PUMP NO 1 SR N 81237467/30/1 OPEARTING AT DONGRI BUZURG MINE(DB/MECH/Workshop/20-21/110) 12-05-2020 05-06-2020 05-06-2020 05-06-2020 04:30 PM Active View
58. Procurement of Drill Pipe 89 mm for Di500 Drill Machine at DongriBuzurg mine(PUR/DB/20-21/109) 12-05-2020 09-06-2020 09-06-2020 09-06-2020 04:30 PM Active View
59. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) 11-05-2020 15-06-2020 15-06-2020 15-06-2020 03:30 PM Active View
60. Engaging Housekeeping Agency for cleaning of MOIL Bhawan, CMD Bungalow, CMS premises etc(MOIL/20-21/ET/22) 11-05-2020 11-06-2020 11-06-2020 11-06-2020 03:30 PM Active View
61. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) 11-05-2020 10-07-2020 10-07-2020 10-07-2020 03:30 PM Active View
62. Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) 08-05-2020 23-05-2020 23-05-2020 23-05-2020 04:30 PM Active View
63. PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/20-21/78 dated 07.05.2020) 08-05-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
64. Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine(AGT/BGT/MECH/JIG/20-21/256) 07-05-2020 15-05-2020 15-05-2020 15-05-2020 04:30 PM Active View
65. Construction of Shed over Sand Stowing Plant near DSU at Munsar Mine(Mun/Civil/NIT/2020-21/12 Date 06.05.2020) 06-05-2020 16-05-2020 16-05-2020 16-05-2020 04:30 PM Active View
66. Providing Designing Fabrication Installation and commissioning of motorized gate for mine workshop at Chikla mine(TE-22 DT.02042020) 06-05-2020 20-05-2020 20-05-2020 20-05-2020 04:30 PM Active View
67. Purchase of Undercarriage assemblies for HEMM.(MOIL/20-21/ET-31 dt.06.05.2020) 06-05-2020 11-06-2020 11-06-2020 12-06-2020 03:30 PM Active View
68. Purchase of CEMENT-824 MT(MOIL/20-21/ET-41 dt.06.05.2020) 06-05-2020 08-06-2020 08-06-2020 09-06-2020 03:30 PM Active View
69. PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED, PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-1/35 -M DT.06/05/2020) 06-05-2020 12-06-2020 12-06-2020 12-06-2020 03:30 PM Active View
70. Design, Manufacturing and Supply of 200 mm Butterfly valve Assy. without actuator for APIC Jig as per OEM Dimension along with material for I.M.B. plant.(AGT/BGT/MECH/IMB/20-21/71 Dated 04.05.2020) 05-05-2020 05-06-2020 05-06-2020 05-06-2020 04:30 PM Active View
71. Laying of Paver Blocks from CC Road upto Administrative Building Entrance at Kandri Mine.(KAN/Civil/NIT/2020-21/214 Date 02.05.2020) 04-05-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
72. Procurement of Telephone Exchange 200 lines for Balaghat Mine(BGT/ELECT/20-21/204) 02-05-2020 01-06-2020 01-06-2020 01-06-2020 04:30 PM Active View
73. Laying of Paver block for approach pathway and allied civil works for sewage treatment plant at Munsar Mine(MUN/CIVIL/NIT/20-21/08 DT.02.05.2020) 02-05-2020 16-05-2020 16-05-2020 16-05-2020 04:30 PM Active View
74. Repairing of civil work for 6th level substation premises at Balaghat Mine(Civil/BGT/TE/2020-21/42) 01-05-2020 12-05-2020 12-05-2020 12-05-2020 04:30 PM Active View
75. Procurement of 650Metres of 4CX50SQMM aluminum Armoured Cable for Dongri Buzurg Mine(DB/ELECT/20-21/88) 30-04-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
76. Purchase of Aluminum and Copper Lugs and DC Glands for Dongri Buzurg Mine.(DB/ELECT/20-21/89) 30-04-2020 26-05-2020 26-05-2020 26-05-2020 04:30 PM Active View
77. Purchase of Hydraulic Rock Breaker Attachment for Excavator at Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-130(ET-19) DT.30/04/2020) 30-04-2020 26-05-2020 26-05-2020 27-05-2020 03:30 PM Active View
78. Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) 30-04-2020 20-05-2020 20-05-2020 21-05-2020 03:30 PM Active View
79. Purchase of Jaw Crusher, Size 750 X 375 mm for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-2(ET-20) DT.30/04/2020) 30-04-2020 28-05-2020 28-05-2020 29-05-2020 03:30 PM Active View
80. Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) 30-04-2020 01-06-2020 01-06-2020 02-06-2020 03:30 PM Active View
81. Purchase of Ammonium Nitrate-Prilled-119 MT(WE-128 DT.29.04.2020 (e-Tender no.MOIL/20-21/ET/18) 29-04-2020 21-05-2020 21-05-2020 22-05-2020 03:30 PM Active View
82. Maintenance and Watering of Plantation at Kandri Mine(KAN/Civil/NIT/2020-21/160 Date 21.04.2020) 28-04-2020 04-05-2020 04-05-2020 04-05-2020 04:30 PM Active View
83. Repairing rubber lining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/7) 27-04-2020 27-05-2020 27-05-2020 27-05-2020 03:30 PM Active View
84. Recovery of Reduced Ore and EMD Powder and Washing of Bottom EMD at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/6) 27-04-2020 27-05-2020 27-05-2020 27-05-2020 03:30 PM Active View
85. Removal of waste rock from the dump at 265 MRL near Jawahar Shaft of Chikla mine(TE-23 DT.09042020) 27-04-2020 04-05-2020 04-05-2020 04-05-2020 04:30 PM Active View
86. Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/2020-21/31) 25-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
87. Renovation of old floor Tiles with water supply and sanitary fittings work for Guest room bath of MM bunglow at Balaghat Mine(Civil/BGT/LT/2020-21/10) 22-04-2020 12-05-2020 12-05-2020 12-05-2020 04:30 PM Active View
88. Monsoon preparatory work for cleaning of surface drain in industrial premises at Balaghat Mine.(Civil/BGT/LT/2020-2021/14) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
89. Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine.(Civil/BGT/LT/2020-21/16) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
90. RCC roof repair of camp quarters at Balaghat Mine.(Civil/BGT/LT/2020-21/18) 22-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 PM Active View
91. Components of Cage Suspension Gear(PUR/MOIL/C-12/12/WE-01/ET/17) 22-04-2020 05-05-2020 05-05-2020 06-05-2020 03:30 PM Active View
92. Purchase of Spares for Flameproof Make Miners Cap Lamps(KD/Elect/TE/20-21/119, Dtd - 20.04.2020) 21-04-2020 01-06-2020 01-06-2020 10-06-2020 04:30 PM Active View
93. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND CONCRETING WORK OF MANWAY AT STOPE NO 2365 AT -270L OF CHIKLA MINE(TE-02 Dt.19042020) 20-04-2020 28-04-2020 28-04-2020 28-04-2020 03:30 pm Active View
94. Maintenance and Upkeeping of ETP at EMD PLANT Dongri Buzurg Mine 2020 (MOIL/EMD/CH/Jt.GM/20-21/35) 20-04-2020 05-05-2020 05-05-2020 05-05-2020 11:00 am Active View
95. Repairing of Multi Stage Centrifugal Pump 150HP of 4th Level with material.(Mech/KD/19-20/4045) 20-04-2020 11-05-2020 11-05-2020 11-05-2020 04:30 pm Active View
96. WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -270L AT CHIKLA MINE(TE-01 Dt.19042020) 20-04-2020 28-04-2020 28-04-2020 28-04-2020 03:30 pm Active View
97. Comprehensive Annual Maintenance Contract (CAMC) of 127 Nos. of Air-Conditioners of MOIL Ltd Nagpur(MOIL/20-21/ET/5) 20-04-2020 18-05-2020 18-05-2020 18-05-2020 03:30 pm Active View
98. Purchase of Spares for Exide Make Miners Cap Lamps(KD/Elect/TE/20-21/118, Dtd - 20.04.2020) 20-04-2020 01-07-2020 01-07-2020 01-07-2020 04:30 pm Active View
99. Shifting and Transport of pebbles accumulated due to Sand Stowing by old open plant at 234 MRL and dropping into the winze No. 2 of the level 193 MRL and Spreading at Beldongri Mine(MOIL/20-21/ET/9) 15-04-2020 13-05-2020 13-05-2020 13-05-2020 03:30 pm Active View
100. Hiring of equipment for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/20-21/ET/10) 15-04-2020 13-05-2020 13-05-2020 13-05-2020 03:30 pm Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.