Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Purchase of Siemens make spares for Ukwa Mine(UK/ELECT/2017-18/193) 02-05-2017 17-05-2017 17-05-2017 17-05-2017 04:00 PM Active View
2. Construction of a Water Tank (GSR) of 1.00 Lac Cumt. Capacity near Sand Stowing Plant at Kandri Mine(MOIL/ET/17-18/24) 02-05-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
3. Repair of Shed and replacement of old damaged sheets at rear side near Kitchen of Guest House at West Court, MOIL, Nagpur.(Civil /HO/17-18/HO /14 Dated 25/04/2017) 29-04-2017 17-05-2017 17-05-2017 17-05-2017 03:30 PM Active View
4. STRUCTURE STABILITY TEST ALONG WITH DESIGNING AND PREPARATION OF DRAWING AND DETAILED ESTIMATION OF COST OF MODIFICATION WORKS REQUIRED FOR STRENGTHENING OF HEAD GEAR OF HOLMES SHAFT BALAGHAT MINE FOR CHANGING OF LOCKED COIL WINDING ROPE FROM 32 MM(/BGT/M 28-04-2017 10-05-2017 10-05-2017 10-05-2017 04:30 PM Active View
5. Refilling and maintenance of fire equipment and fire extinguishers(SDGM(M)63/Fire Extinguisher/17-18/06 dt.27.4.2017) 28-04-2017 09-05-2017 09-05-2017 09-05-2017 03:00 PM Active View
6. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Dongri buzurg Mine.(MOIL/17-18/ET/22) 26-04-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active View
7. Recovery of dump fines (GMF-527) from dumps at Gumgaon Mine(Min/Gum/17-18/180 Date 25.04.2017) 26-04-2017 03-05-2017 03-05-2017 03-05-2017 04:30 PM Active View
8. Providing and Applying white washing distempering and grass cleaning etc.(Agent/Civil/DB/2016-17/3525 Date 15 .03.2017) 26-04-2017 04-05-2017 04-05-2017 04-05-2017 04:30 PM Active View
9. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Ukwa Mine.(MOIL/17-18/ET/21) 26-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active View
10. Construction of Boundary wall area at Gumgaon Mine(MOIL/17-18/ET/ 23) 26-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active View
11. Recertification of Kandri, Chikla,Tirodi and Ukwa mines under OHSAS(SDGM(SE)/Re-Cert-OHSAS/17-18/05 dt.24-04-2017) 25-04-2017 08-05-2017 08-05-2017 08-05-2017 03:00 PM Active View
12. Recertification of Kandri,Chikla Tirodi and Ukwa mines under OHSAS.(SDGM(SE)/Re-Cert-OHSAS/17-18/05 dt.24-04-2017) 25-04-2017 08-05-2017 08-05-2017 08-05-2017 03:00 PM Active View
13. RETILING AND REROOFING OF CAMP QUARTERS AT KANDRI MINE(KAN/CIVIL/17-18/15 DT. 24.04.2017) 25-04-2017 03-05-2017 03-05-2017 03-05-2017 03:30 PM Active View
14. Cleaning of Storm Water drains, U/G Sump and misc. repair at Kandri Mine. (KAN/CIVIL/17-18/16 DT 24.04.2017) 25-04-2017 03-05-2017 03-05-2017 03-05-2017 3:30 pm Active View
15. Pushing and unloading of ROM rock tubs in underground and on surface AT GUMGAON MINE(Mining/Gum/17-18/154 Date 21.04.2017) 22-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
16. Additional excavation in Maganeferous rock adjacent X cut no19 to X cut no 21 at 200 ft L at Gumgaon Mine.(Mining/Gum/17-18/155 Date 21.04.2017) 22-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
17. Construction of lease boundary pillars at Gumgaon Mine (CIVIL/17-18/GUM/156 Date-21.04.2017) 22-04-2017 29-04-2017 29-04-2017 29-04-2017 4:30 pm Active View
18. Construction of retaining wall near new Evasee fan house at Gumgaon Mine (CIVIL/17-18/GUM/157 Date-21.04.2017) 22-04-2017 29-04-2017 29-04-2017 29-04-2017 4:30 pm Active View
19. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200L at Gumgaon Mine(Min/Gum/17-18/141 Date-20.04.2017) 21-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
20. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200L at Gumgaon Mine(Min/Gum/17-18/141 Date-20.04.2017) 21-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
21. Trench cutting in ore stacks for sampling at Chikla Mine(Gr.II/GM(M)/CONT/Trench-cut/83/CH/2017-18/2) 21-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active View
22. Strengthening and construction of RCC Side walls for Railway Siding at Balaghat Mine(MOIL/17-18/ET/14) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
23. Construction of Drain Motor garage Black smith Shop near workshop and construction of Shed and Cycle Stand near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/13) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
24. Maintenance and Operation of Water Supply Scheme Dongri Bz. Mine(MOIL/17-18/ET/15) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
25. Construction of tar road from main PWD road to MOIL Rest house, MOIL gate no.1 to PWD road and mine and bungalow no.2 towards Jamrapani staff quarter at Tirodi Mine.(MOIL/17-18/ET/16) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
26. Construction of substation building at Dongri Bz. Mine(MOIL/17-18/ET/20) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
27. Construction of Railway Siding Platform at Chikla Mine(MOIL/17-18/ET/11) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active View
28. Renovation of Office of Electrical Department and Cap Lamp Room and construction of shed for storage purpose at 6 th level premises at Balaghat Mine.(Civil /HO/17-18/BGT /09 Dated 18/04/2017) 20-04-2017 18-05-2017 18-05-2017 18-05-2017 03:30 PM Active View
29. Removal of waste rock and handling the same by mechanized means from Magazine dump at Gumgaon Mine(MOIL/17-18/ET/17) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active View
30. Picking and collection of material from dumps at Munsar Mine(MOIL/17-18/ET/19) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active View
31. Removal of waste rock and magniferous rock and handling the same by mechanized means from Pit No.5 at Sitapatore Mine(MOIL/17-18/ET/18) 20-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active View
32. Picking and Collection of Material from East Side of A Dump at Tirodi Mine(TRD/Mine/HO/2017-18/158) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
33. Picking and Collection of Material from Off The Pit area at Dump at Tirodi Mine(TRD/Mine/HO/2017-18/157) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
34. Picking and Collection of Material from North Dump at Tirodi Mine(TRD/Mine/HO/2017-18/156) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
35. Providing and Laying epoxy flooring for Work Shop at Munsar Mine.(Mun/C/HO/Agent/17-18/64 dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
36. Providing and Fitting PVC over head water tank at 20 No. A type Quarter in Wahitola at Munsar Mine.(Mun/C/HO/Agent/17-18/63 Dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active View
37. PURCHASE OF HSD-3882 KL (AS PER ANNEXURE - A ENCLOSED).(E-3 DT.19.04.2017) 19-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
38. Cleaning of Surplus underground ROM at Munsar Mine.(Mun/Mine/HO/Agent/17-18/59 dt18/04/2017) 18-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active View
39. Construction of Barbed wire fencing at near 6 No North Section Tirodi Mine.(TRD/Civil/A/2017-18/133) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active View
40. Transportation of Sand for sand stowing at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SAND/02/BGT/2017-18/02) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 05:00 PM Active View
41. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
42. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
43. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
44. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
45. Replacement of old damaged and worn out steel doors and windows with new steel doors and windows for Camp Quarters of Balaghat Mine.(CIVIL/BGT/T.E./2017-18/304 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
46. Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine(CIVIL/BGT/T.E./2017-18/307 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
47. Repair to roof of labour and staff quarter of New Colony, F.M.Colony, Chikla Type Quarters, Imlitekra Camp, Hirapur Camp, Awlajhari Camp under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/298 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
48. Cleaning of surface drains under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/301 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
49. Trench cutting in ore Stacks at Beldongri Mine.(bel/trench cut/sampling/17-18/103) 13-04-2017 25-04-2017 25-04-2017 25-04-2017 04:30 PM Active View
50. Annual Repair to camp quarters at Chikla Mine.(Civil /HO/17-18 /CH/01 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
51. Picking and sorting of SM grade ore from dumps at Kandri Mine(MOIL/17-18/ET/10) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
52. Construction of vehicle maintenance pit at work shop premises at Chikla Mine.(Civil /HO/17-18 /CH/02 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active View
53. Disposal of Sludge at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/04) 13-04-2017 05-05-2017 04-05-2017 04-05-2017 03:30 PM Active View
54. U/G Sump Cleaning of Ukwa Mine (i) Vertical shaft U/G Section (ii) Ch 50 U/G Section.(A and Sr DGM(M)/Civil/UM/17-18/72) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
55. Construction of OCF Shed at Beldongri Mine.(Bel/Civil//Mine/AGT/17-18/90) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active View
56. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
57. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active View
58. 550 H.P., 1000 RPM, LAMINATED YOKE, SHUNT WOUND, D.C. MOTOR-1 NO. (FOR DOUBLE DRUM WINDER OF BALAGHAT MINE) (AS PER ANNEXURE - C ENCLOSED)(Only Through e-procurement)(WE-123 DT.24/03/2017, eTENDER NO.MOIL/17-18/ET/5) 12-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active View
59. Cleaning of Sump in Underground at Balaghat Mine.(Agent Dy DGM/Mining/BGT/17-18/52 Dt 03.04.2017) 11-04-2017 14-04-2017 14-04-2017 14-04-2017 04:30 PM Active View
60. Providing and Supplying of On Road DC Motor Speed Controller (DC Chopper) 550Amps, (72 to 120) Volts probably Curtis make of model 1231C 7701 or equivalent to for Gumgaon mine ( GM/Elect/TE/17-18/52,Dtd - 10.04.2017 ) 11-04-2017 24-04-2017 24-04-2017 24-04-2017 3:30 PM Active View
61. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active View
62. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active View
63. Replacement of existing 3 phase, 5 wire, LT Overhead Line erected from IMB plant to tale end pond at Dongri Buzurg Mine.(DB/ELECT/17-18/1085) 07-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active View
64. Construction of gantry for U/G development waste rock disposal near BDC at Kandri Mine.(KAN/CIVIL/17-18/02 DT.05.04.2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active View
65. Maintenance,watch ward of Garden in front of administrative building,Rest House, type B C quarters,M.M.Bungalow, Hospital,near Hanuman Mandir (Type A qtrs) garden at Kandri.(KAN/CIVIL/17-18/01 DT. 05/04/2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active View
66. Removal of accumulated Pebbles near sand stowing plants at Balaghat Mine(Gr.-I/CGM(PR)/CONT/PEBBLES/34/BGT/2017-18/01) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active View
67. Pushing of tubs and unloading in Underground at Chikla Mine(Gr.II/CGM/CONT/TUB/81/CH/2017-18/1) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active View
68. PARAFFIN WAX(PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 02-05-2017 02-05-2017 02-05-2017 03:30 PM Active View
69. PARAFFIN WAX (PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 11-05-2017 11-05-2017 11-05-2017 3:30 PM Active View
70. Replacement of conductor and cable of 3 phase, 3 wire, 11 KV HT Overhead Line from main electrical substation to IMB Plant at Dongri Buzurg Mine.(DB/ELECT/17-18/1084) 06-04-2017 11-04-2017 11-04-2017 11-04-2017 04:35 PM Active View
71. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active View
72. Making of Road from Manoj Trivedi dump to 9 No. near Jamrapani development area at Tirodi Mine.(TRD/Civil/A/2016-17/3751A) 04-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active View
73. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active View
74. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active View
75. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active View
76. Miscellaneous Contract works namely Cleaning of Leaching Vessels Stripping of EMD Flakes and Removing Bottom of EMD at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/03) 03-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active View
77. Miscellaneous Contract works at EMD Plant, Dongri Buzurg Mine.(CGM (P and D)/EMD/17-18/02) 03-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active View
78. Washing and Neutralization of Sludge at EMD Plant, Dongri Buzurg Mine.(CGM (P and D)/EMD/17-18/01) 01-04-2017 20-04-2017 20-04-2017 20-04-2017 03:30 PM Active View
79. Cleaning of Sump at Ch. 9500 and Ch. 10800 U/G Section of Ukwa Mine(Gr.-I/CGM(PR)/CONT/UG-SUMP/35/UK/2016-17/17) 31-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active View
80. Cleaning of Sump at Ch. 9500 and Ch. 10800 U/G Section of Ukwa Mine(Gr.-I/CGM(PR)/CONT/UG-SUMP/35/UK/2016-17/17) 31-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active View
81. Cleaning of surplus opencast ROM at Kandri Mine(GM(M)-III/CONT/ROM-CL/58/KAN/2016-17/56) 30-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active View
82. Maintenance of Garden in Mine Office and Mine Manager Bungalow at Beldongri Mine(Bel/Mine/Civil/AGT/16-17/3468) 30-03-2017 05-04-2017 05-04-2017 05-04-2017 04:30 PM Active View
83. Design and Detail Engineering ,supply Fabrication,Erection ang Commisioining,Testing of water softener at EMD PLANT Dongri Buzurg Mine(MOIL/EMD/CH/ADGM/2016-17/1063) 29-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active View
84. Maintenance and operation of Water Filtration Plant and Water Supply Scheme at Tirodi Mine(TRD/Civil/A/2016-17/1045) 28-03-2017 07-04-2017 07-04-2017 07-04-2017 04:30 PM Active View
85. Installation of LED Lights in place of Metal Halide Lamps at Badminton Court, West Court, MOIL Ltd. Nagpur(SDGM(E)/86/ HO/16-17/ 346) 24-03-2017 12-04-2017 12-04-2017 12-04-2017 03:30 PM Active View
86. Supply of Drenging Submersible Pump With agitator and other attachment for Cleaning of underground Sump of Balaghat Mine (SDGM/BGT/MECH/PUMP/16-17/8750) 23-03-2017 30-03-2017 30-03-2017 30-03-2017 4:30 PM Active View
87. purchase of Flexible Trailing Copper Conductor Cable 1200 Mtrs. (WE-122 (e-tender no. MOIL/17-18/ET/4)) 23-03-2017 19-04-2017 19-04-2017 19-04-2017 3:30 PM Active View
88. Water Proofing to RCC Slabs Quarters/Repairs to roof of Labor and staff and executive quarter Ukwa ,Gudma and Prem Nagar camp at Ukwa Mine.(A and Sr DGM(M)/Civil/UM/16-17/3536) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active View
89. Replacement of old damaged doors and windows with new steel doors and windows at camp quarters at Ukwa Mine.(A and Sr DGM(M)/Civil/UM/16-17/3527) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active View
90. Retiling and Providing and laying Polythene sheet and GI sheet for repairs of roofs work of camp Qtr at UkwaMine(A and Sr DGM(M)/Civil/UM/16-17/3533) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active View
91. Cleaning of Surface Drain at Ukwa Mine(A and Sr DGM(M)/Civil/UM/16-17/3530) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active View
92. Cleaning of underground ROM sorting at Beldongri Mine(MOIL/17-18/ET/2) 22-03-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active View
93. Underground development of ore drive at 13.50 feet level at Balaghat Mine(MOIL/17-18/ET/1) 22-03-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active View
94. Picking and collection of material from North dump at Tirodi Mine(MOIL/17-18/ET/3) 22-03-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active View
95. Purchase of 120 W LED Street Light fittings for Chikla mine(TE/CH/PUR-ELECT/16-17/1020) 21-03-2017 30-03-2017 30-03-2017 30-03-2017 03:30 PM Active View
96. Construction of Sampal room at Sitapatore Mine(S-S/Civil/HO/2016-17/3715) 21-03-2017 30-03-2017 30-03-2017 30-03-2017 04:30 PM Active View
97. TENDER FOR ANNUAL REPAIRS AND MAINTENANCE CONTRACT FOR DOMESTICELECTRICAL INSTALLATION OF RESIDENTIAL AND NON RESIDENTIAL BUILDINGS AT UKWA MINE(UK/ELECT/2016-17/3506) 21-03-2017 05-04-2017 05-04-2017 05-04-2017 04:30 PM Active View
98. Construction of Retaining wall, drain and providing and fixing precast RCC covers over drain at new 64 nos. A-Type quarters at Chikla Mine.(MOIL/16-17/ET/201) 21-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active View
99. for Construction of compound wall for guest house at TirodiMine(MOIL/16-17/ET/202) 21-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active View
100. Providing Furniture and Interior For Director staff on 3rd Floor of MOIL BHAWAN, Katol Road, Nagpur(MOIL/16-17/ET/200) 21-03-2017 17-04-2017 17-04-2017 17-04-2017 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.