Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Construction of DAV Public school at village Munsar Distt Nagpur, under CSR(MOIL/19-20/ET/100) 20-05-2019 24-06-2019 24-06-2019 24-06-2019 03:30 PM Active View
2. Repairing of Bucket Assembly TATA Hitachi 450-1 Hyd Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/52) 18-05-2019 06-06-2019 06-06-2019 06-06-2019 04:30 PM Active View
3. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-12/114-M Dt. 17-05-2019) 17-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
4. Removal of waste rock and Manganiferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/19-20/ET/86) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
5. Purchase of sand required for Underground concreting work at Ukwa Mine(MOIL/19-20/ET/87) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
6. Transportation of underground tubs at Ch.5000 section of Ukwa Mine(MOIL/19-20/ET/89) 17-05-2019 17-06-2019 17-06-2019 17-06-2019 03:30 PM Active View
7. Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/19-20/ET/88) 17-05-2019 19-06-2019 19-06-2019 19-06-2019 03:30 PM Active View
8. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF NON RETURN VALVES, GATE VALVES AND BUTTERFLY VALVES.(PUR/MOIL/C-11/148/E-13/116-M Dt. 17-05-2019) 17-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
9. Purchase of Traction Battery Chargers for Various Mines - 10 Nos. (5 Lots) (Only Through e-procurement)(WE-19(ET/115) DT.17/05/2019) 17-05-2019 13-06-2019 13-06-2019 14-06-2019 03:30 PM Active View
10. Fabrication of wooden and Iron Clamps for lowering of 120 Sqmm XLPE copper cable from Production shaft surface inset to 13.5L Underground at Balaghat Mine(BGT/TE/Elect/19-20/123) 16-05-2019 04-06-2019 04-06-2019 04-06-2019 04:30 PM Active View
11. Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines - 6 Nos.(4 Lots) with Operation and Maintenance Spares (Only Through e-procurement)(WE-7(ET/113) DT.16/05/2019) 16-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
12. Transporting one no. TATA Hitachi make Excavator (Tata from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer.( DB/MECH/19-20/SDGM(MECH)/ 51) 16-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
13. Designing and printing of Annual Report 2018-19 Deluxe Version in English, Hindi and Marathi, Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/19-20/ET/83) 16-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
14. Purchase of Ventilation Fan Complete for various Mines - 3 Sets.(2 Lots) (Only Through e-procurement)(WE-9(ET/114) DT.16/05/2019) 16-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
15. Purchase of Dry Type Transformers for Various Mines - 6 Nos.(4 Lots) (Only Through e-procurement)(WE-8(ET/112) DT.15/05/2019) 15-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
16. PURCHASE OF TRIMBLE MAKE (S-6 MODEL) TOTAL STATION BATTERY.(PUR/MOIL/C-13/19/E-15/151-M DT.14.05.2019) 15-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
17. Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-14/142-M DT.14/05/2019) 14-05-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
18. Purchase of Motorised Rotary Tub Tippler for Gumgaon Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-16 (ET/110) DT.14/05/2019) 14-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
19. Purchase of Double Deck Circular Motion Vibratory Screen for Munsar Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-17 (ET/111) DT.14/05/2019) 14-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
20. LOADING UNLOADING AND FILLING SPREADING AT -70 LEVEL AND 60 LEVEL OF CHIKLA-B SECTION AT CHIKLA MINE(TE-32 Dt.13052019) 13-05-2019 20-05-2019 20-05-2019 20-05-2019 04:30 PM Active View
21. WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR RCC WORK AT CH 1830 OF -470 LEVEL AND CH 1920 OF -370 LEVEL AT CHIKLA MINE(TE-31 Dt.13052019) 13-05-2019 20-05-2019 20-05-2019 20-05-2019 04:30 PM Active View
22. Maintenance, Distribution and Collection of Caplamps for One Month( Elect/BGT/Caplamps/19-20/111) 13-05-2019 24-05-2019 24-05-2019 24-05-2019 04:30 PM Active View
23. Facility Management Services for ERP Data Center(MOIL/19-20/ET/68) 13-05-2019 12-06-2019 12-06-2019 12-06-2019 03:30 PM Active View
24. Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine(16/Mining/UM/19-20/195) 11-05-2019 25-05-2019 25-05-2019 25-05-2019 04:30 PM Active View
25. Recovery of cleaned ore from O/C ROM at Parsoda Mine(MOIL/19-20/ET/85) 10-05-2019 24-05-2019 24-05-2019 24-05-2019 03:30 PM Active View
26. Picking and collection of Ferro grade and SM grade ore TDL-439 TDL-499 and TDL-469 from South Staff Quarter Dump at Tirodi Mine(MOIL/19-20/ET/64) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
27. Recovery of Ferro grade TD-4505 and SM grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine( MOIL/19-20/ET/74) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
28. Hiring of tippers for ore transportation from C and S Plant to siding at Chikla Mine(MOIL/19-20/ET/73) 10-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
29. Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/19-20/ET/49) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
30. Construction of Residential quarters Tirodi Mine.(MOIL/19-20/ET/61) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
31. Providing and installation of Bio toilets at Dongri Buzurg and Chikla Mine.(MOIL/19-20/ET/43) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
32. Annual service maintenance contract for Winder System installed at Various Mine(MOIL/19-20/ET/67) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
33. Annual repairs to camp quarters at Balaghat Mine.(MOIL/19-20/ET/47) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
34. TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-30 Dt.09052019) 09-05-2019 16-05-2019 16-05-2019 16-05-2019 04:30 PM Active View
35. Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine(AGT/BGT/MECH/IMB/19-20/640) 09-05-2019 28-05-2019 28-05-2019 28-05-2019 04:30 PM Active View
36. Major repairs/overhauling Ashok Leyland Engine AL 412TC2/1 of JCB-3 loader operating at Balaghat Mine(AGT/BGT/MECH/JCB/19-20/641) 09-05-2019 28-05-2019 28-05-2019 28-05-2019 04:30 PM Active View
37. Purchase of SODIUM LAURYL SULPHATE - 5875 KG(WE-6 e-tender No.MOIL/19-20/ET-96, Dt.09.05.2019) 09-05-2019 03-06-2019 03-06-2019 04-06-2019 03:30 PM Active View
38. Construction of sewage treatment plant at new colony (Chandmara) at Dongri Buzurg Mine .(MOIL/19-20/ET/44) 09-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
39. Providing furniture and interior works and civil works for laboratory on ground floor and Geology and Survey department at second floor of MOIL BHAWAN Nagpur(MOIL/19-20/ET/48) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
40. Construction of Hostel building for Navin Desai Residential school Panchgaon Distt Nagpur under CSR(MOIL/19-20/ET/45) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
41. Construction of Canteen building at Kandri Mine.(MOIL/19-20/ET/50) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
42. Construction of shed over mobile crusher unit at Munsar Mine.(MOIL/19-20/ET/46) 09-05-2019 10-06-2019 10-06-2019 10-06-2019 03:30 PM Active View
43. Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos. operating at Balaghat Mine(AGT/BGT/MECH/SDL/19-20/127) 08-05-2019 17-05-2019 17-05-2019 17-05-2019 04:30 PM Active View
44. Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/19-20/127) 08-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
45. Retiling and Reroofing of camp quarters at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) 08-05-2019 18-05-2019 18-05-2019 18-05-2019 04:30 PM Active View
46. Cleaning of storm water drain of surface and underground sump at Kandri mine.(Kan/Civil/NIT/19-20/436 Dated 10.05.2019) 08-05-2019 18-05-2019 18-05-2019 18-05-2019 04:30 PM Active View
47. Disposal and door to door collection of liquid and dry Garbage at camp qr. Ukwa Mine(16/Civil/UM/19-20/128) 08-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
48. Making of stone pitching wall and Hiring of JCB for road repair work near Ch 10000 and New workshop premises Ukwa Mine(16/Civil/UM/19-20/129) 08-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
49. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT WATER PUMP.(PUR/MOIL/C-5/28/E-10/105-M Dt. 08-05-2019) 08-05-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
50. Making and Supply of stemming material mud plug used for blasting at Ukwa Mine(MOIL/19-20/ET/60) 07-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
51. Loading and unloading steel sections cement bags and other materials with stacking at Balaghat Mine Store(MOIL/19-20/ET/59) 07-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
52. Skywater Generating System capacity 100 Liters( PUR/MOILDB/18-19/12/36) 07-05-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
53. Construction of 25000 lit GSR RCC water tank for New sand stowing plant near Ist vertical shaft at Ukwa Mine.(16/Civil/UM/19-20/130) 07-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
54. Repairs to roof of Labor and staff quarter Ukwa ,Gudma and Prem Nagar camp at Ukwa Mine .(16/Civil/UM/19-20/126) 07-05-2019 21-05-2019 21-05-2019 21-05-2019 04:30 PM Active View
55. Washing Picking and collection of material from rejected dump West side of D dump at Tirodi Mine(MOIL/19-20/ET/63) 07-05-2019 07-06-2019 07-06-2019 07-06-2019 03:30 PM Active View
56. Dustworx Water Additive for Mine Haul Road dust suppression.(PUR/MOIL/DB/2019/119/35) 06-05-2019 15-05-2019 15-05-2019 15-05-2019 04:30 PM Active View
57. Prov. consultancy for producing aggregates manufactured sand from waste rock reject generated at DB Mine((GM(MECH)/TEN/AGGRE/19-20/294) 06-05-2019 31-05-2019 31-05-2019 31-05-2019 04;00 PM Active View
58. Underground development for winze -350 L to -450 L at Kandri Mine(MOIL/19-20/ET/58) 06-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
59. Underground development at 7th and 8th level North section and OTC from 8th to 10th Level at Balaghat Mine(MOIL/19-20/ET/56) 06-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
60. Horizontal and Vertical Development at -70 Level of Chikla Vertical Section at Chikla Mine(MOIL/19-20/ET/57) 06-05-2019 06-06-2019 06-06-2019 06-06-2019 03:30 PM Active View
61. Hiring of Equipment for removal of soil without drilling and Blasting at Parsoda Mine.(ASDGM(M)/Min/Par/LT/19-20/07 Date 23.04.19) 04-05-2019 06-05-2019 06-05-2019 06-05-2019 04:30 PM Active View
62. ANNUAL MAINTANCE CONTRACT FOR REPAIRS AND REWIRING OF RESIDENTIAL QUARTERS AND OFFICE BUILDINGS TRD(TRD/ELECT/19-20/7400002346/283) 04-05-2019 11-05-2019 11-05-2019 11-05-2019 03:30 PM Active View
63. Drilling of 01 Bore along with starter panel and pump for Drinking water at Kandri Mine(KAN/CIvil/NIT/19-20/362 Date 01.05.2019) 04-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
64. WEBSITE SINGLE TENDER ENQUIRY FOR PURCHASE OF CAR SKODA OCTAVIA STYLE 1.8TSI (AUTOMATIC TRANSMISSION) PETROL - 1 NO. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/161/E-11/110-M DT.03.05.2019) 03-05-2019 20-05-2019 20-05-2019 20-05-2019 03:30 PM Active View
65. Purchase of Dust Extraction System Complete with All Accessories with Ducting Work for Above Dust Extraction System - 1 Set (2 Lots.) for Munsar Mine(M.S) (Only Through e-procurement)(WE-2 DT.03/05/2019(ET/82)) 03-05-2019 23-05-2019 23-05-2019 24-05-2019 03:30 PM Active View
66. Washing Picking and collection of material from South A waste dump at Tirodi Mine(MOIL/19-20/ET/53) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
67. Cleaning of excess ROM at Beldongri Mine(MOIL/19-20/ET/54) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
68. Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of subgrade mineral reject from ROM at Magazine dump East side section of Chikla Mine(MOIL/19-20/ET/55) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
69. Picking collection and cleaning of 20 parcent Mn. ore from sub-grade mineral reject from underground ROM at Beldongri Mine(MOIL/19-20/ET/71) 03-05-2019 03-06-2019 03-06-2019 03-06-2019 03:30 PM Active View
70. Major repairs/overhauling Ashok Leyland Engine H6ETIC3R23 of LT loader operating at Balaghat Mine from authorize service dealer of M/s. Ashok Leyland Ltd( AGT/BGT/MECH/LT/19-20/529) 02-05-2019 06-05-2019 06-05-2019 06-05-2019 04:30 PM Active View
71. PURCHASE OF TRACTION BATTERIES(WE-135 DT.01.05.2019 (e-Tenderno. MOIL/19-20/ET/80) 02-05-2019 06-06-2019 06-06-2019 07-06-2019 03:30 PM Active View
72. ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-29 Dt.02.05.2019) 02-05-2019 09-05-2019 09-05-2019 09-05-2019 04:30 PM Active View
73. Making Stair case for outside approch to hospital building first floor to be converted into vocational training centre at Balalghat Mine(BGT/CIVIL/19-20/LT/15 DT. 01.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
74. Collection of garbage and cleaning of drain at Balaghat Mine(BGT/CIVIL/19-20/LT/16 DATE 01.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
75. Making and Supplying of stemming sticks material (Mud plug) used for blasting/fragmentation in underground at various levels at Balaghat mine( Min/BGT/19-20/LT/ 543 Date 02.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
76. Repairing of boundary wall at Mine Manager Bunglow at Balaghat Mine(BGT/CIVIL/19-20/LT/17 DATE 01.05.2019) 02-05-2019 10-05-2019 10-05-2019 10-05-2019 04:30 PM Active View
77. PURCHASE OF WELDING CABLE(WE-145 DT.01.05.2019 (e-Tender no.MOIL/19-20/ET/81) 02-05-2019 30-05-2019 30-05-2019 31-05-2019 03:30 PM Active View
78. Construction of Rest Shelter at Parsoda Mine.(Civil/Parsoda/TE/19-20/12 Date 30.04.2019) 01-05-2019 07-05-2019 07-05-2019 07-05-2019 04:30 PM Active View
79. Construction of Sedimentation Tank to comply as per MPCB Norms at Parsoda Mine.(Civil/Parsoda/TE/19-20/11 Date 30.04.2019) 01-05-2019 07-05-2019 07-05-2019 07-05-2019 04:30 PM Active View
80. PURCHASE OF AMMONIUM NITRATE PRILLED(WE-152 DT.01.05.2019 (e-Tender No.MOIL/19-20/ET/79) 01-05-2019 23-05-2019 23-05-2019 24-05-2019 03:30 PM Active View
81. Design and Detailed engineering, supply, erection, commissioning and testing of rotary kiln including all accessories for Manganese Ore reduction at EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/51) 30-04-2019 29-05-2019 29-05-2019 29-05-2019 03:30 PM Active View
82. Purchase of PPG CORRUGATED ROOF SHEET(WE-3 e-tender No.MOIL/19-20/ET-78, Dt.30.04.2019) 30-04-2019 17-06-2019 17-06-2019 18-06-2019 03:30 PM Active View
83. Construction of Water tank and Laying RCC Hume Pipe Drain near Crushing Plant area at Chikla mine(TE Civil 424) 29-04-2019 08-05-2019 08-05-2019 08-05-2019 03:30 PM Active View
84. Drilling of Bore Holes through DTh at -170L and -270L underground(7100001400) 29-04-2019 13-05-2019 13-05-2019 13-05-2019 03:30 PM Active View
85. Providing Unskilled Manpower in CS Plant Chikla Mine(7100001392) 29-04-2019 13-05-2019 13-05-2019 13-05-2019 03:30 PM Active View
86. Procurement of Roller/Idler for conveyor Belt of IMB Plant at Dongri Buzurg Mine.(PUR/DB/19-20/18) 29-04-2019 22-05-2019 22-05-2019 22-05-2019 04:30 PM Active View
87. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-08/49-M Dt. 29-04-2019) 29-04-2019 20-05-2019 20-05-2019 20-05-2019 03:30 PM Active View
88. Drilling of Bore Holes through DTh at -170L and -270L underground(7100001400) 27-04-2019 13-05-2019 13-05-2019 13-05-2019 03:30 PM Active View
89. Purchase of Air Receiver Tank for Various Mines - 4 Nos.(2 Lots.) (2 Nos.each for Kandri Mine(M.S) and Ukwa Mine(M.P)) (Only Through e-procurement)(WE-4 DT.26/04/2019 (ET/76) 26-04-2019 16-05-2019 16-05-2019 17-05-2019 03:30 PM Active View
90. Purchase of High end Laptop(Mobile workstation) - 1 No.(Lot No.1), High Performance VR compatible Computer - 1 No.(Lot No.2) and Laptop - 1 No.(Lot No.3) (Only Through e-procurement)(WE-5 DT.26/04/2019 (ET/77)) 26-04-2019 20-05-2019 20-05-2019 21-05-2019 03:30 PM Active View
91. Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestals Etc.( WE-153 DT25.04.2019(e-TENDER NO. MOIL/19-20/ET/75)) 26-04-2019 30-05-2019 30-05-2019 31-05-2019 03:30 PM Active View
92. Hiring of Equipment for removal of soil withour drilling and blasting at Parsoda Mine( ASDGM(M)/Min/Par/LT/19-20/07 Date 23.04.19) 24-04-2019 03-05-2019 03-05-2019 03-05-2019 04:30 PM Active View
93. Supply of black gitti for underground concreting work at Chikla Mine(MOIL/19-20/ET/41) 24-04-2019 24-05-2019 24-05-2019 24-05-2019 03:30 PM Active View
94. Underground concreting work to established cross cut for preparation of chute and manways at Chikla Mine(MOIL/19-20/ET/42) 24-04-2019 24-05-2019 24-05-2019 24-05-2019 03:30 PM Active View
95. Cleaning of Mn fines from different places from ore sorting area at Munsar Mine(MOIL/19-20/ET/40) 24-04-2019 24-05-2019 24-05-2019 24-05-2019 03:30 PM Active View
96. Plantation near Shiv Tekdi and Old OCF at Munsar Mine.(MUN/Civil/NIT/2019-20/02 Date 19.04.2019) 23-04-2019 29-04-2019 29-04-2019 29-04-2019 04:30 PM Active View
97. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF TENOVA DELKOR MAKE 200 NB BUTTERFLY VALVE(PUR/MOIL/C-11/129/E-07/47-M Dt. 23-04-2019) 23-04-2019 15-05-2019 15-05-2019 15-05-2019 03:30 PM Active View
98. Purchase of Vibration Monitoring Equipments - 2 Nos.(4 Lots) for Open Cast Mines (1 No.each for Tirodi and Dongri Buzurg Mine) (Only Through e-procurement)(WE-1 DT.23/04/2019(ET/52)) 23-04-2019 16-05-2019 16-05-2019 17-05-2019 03:30 PM Active View
99. Picking and collection of material from surplus contaminated low grade ROM at South East Part of the quarry at Dongri Buzurg Mine(MOIL/19-20/ET/38) 23-04-2019 23-05-2019 23-05-2019 23-05-2019 03:30 PM Active View
100. Picking and collection of material from surplus contaminated low grade ROM at North West Part of the quarry at Dongri Buzurg Mine(MOIL/19-20/ET/39) 23-04-2019 23-05-2019 23-05-2019 23-05-2019 03:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above

 


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.