निविदाएं संग्रह
| क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
|---|---|---|---|---|---|---|---|---|
| 1. | Outsourcing of maintenance and repair of LT and HT Overhead lines of Chikla Mines for a period of 9 months.(CH/ELECT/21-22/374) | 15-06-2021 | 29-06-2021 | 29-06-2021 | 29-06-2021 | 04:30 PM | Active | और देखें |
| 2. | Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months.(CH/ELECT/21-22/372) | 14-06-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 04:30 PM | Active | और देखें |
| 3. | DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/21-22/JGM(MEC)/356) | 14-06-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 04:30 PM | Active | और देखें |
| 4. | Regular Cleaning/unblocking of main bunker ore flow in IMB Plant at Dongr Buzurg Mine.(DB/MECH/21-22/JGM(MEC)/376) | 14-06-2021 | 22-06-2021 | 22-06-2021 | 22-06-2021 | 04:30 PM | Active | और देखें |
| 5. | Cleaning of Underground Sumps and Underground Drains under Monsoon Preparatory Works at Munsar Mine.(Mun/Mining/LT/2021-22/373 Date 12.05.2021) | 14-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 04:30 PM | Active | और देखें |
| 6. | Limited tender inviting in single bid system for Housekeeping work at C and s plant at Chikla mine(CH/Agent/Mech/21-22/358) | 11-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
| 7. | Replacement of Liner Plate(8/10mmm) of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/21-22/315) | 09-06-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 PM | Active | और देखें |
| 8. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PARKER MAKE SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-51/31-M Dt. 09-06-2021) | 09-06-2021 | 30-06-2021 | 30-06-2021 | 30-06-2021 | 03:30 PM | Active | और देखें |
| 9. | Handling of ore by manual mean into the Tipper / Truck at Tirodi Mine.(MOIL/HO/MINE/2021/322 , DATED 04/6/2021) | 07-06-2021 | 15-06-2021 | 15-06-2021 | 15-06-2021 | 03:30 PM | Active | और देखें |
| 10. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Chikla Mine and Dongri Buzurg Mine.(CH/SYS/AMC/21-22/341) | 07-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 04:30 Pm | Active | और देखें |
| 11. | Handling of ore into wagaon / Trucks by mechanical means at Tirodi Mine.(MOIL/HO/MINE/2021/323, Dated 04/06/2021) | 07-06-2021 | 15-06-2021 | 15-06-2021 | 15-06-2021 | 03:30 PM | Active | और देखें |
| 12. | Retiling, roof repair including laying polythene sheet over roof of camp quarters and cleaning, deepening of surface drains in mine area at Dongri Buzurg Mine(DB/CIVIL/21-22/911) | 05-06-2021 | 12-06-2021 | 12-06-2021 | 12-06-2021 | 04:30 PM | Active | और देखें |
| 13. | Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mines(MOIL/21-22/ET/17) | 05-06-2021 | 05-07-2021 | 05-07-2021 | 05-07-2021 | 03:30 PM | Active | और देखें |
| 14. | Supply of brake liners for BEML make BH60M dumpers Operating at Dongri Buzurg Mine(PUR/DB/MECH/21-22/313) | 04-06-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 Pm | Active | और देखें |
| 15. | Purchase of spares for fitting of Vibro Ripper on PC450 Hydraulic Excavator.(MOIL/21-22/ET-42 Dt.03.06.2021) | 03-06-2021 | 24-06-2021 | 24-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
| 16. | Purchase of Rollers for Conveyor Belts at Dongri Buzurg Mine.(DB/PUR/JGM/AGT/2021-22/312) | 02-06-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 PM | Active | और देखें |
| 17. | Waterproofing to RCC Slab of old A Type AT Syndicate Camp Babu line area quarters at Dongri Buzurg Mine(DB/CIVIL/21-22/650 dt 29.05.2021) | 01-06-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
| 18. | MODIFCATION IN AS BUILT DRAWING OF 40 TPH CRUSHING AND SCREENING PLANT AT MUNSAR MINE.(MUN/ENGG/TENDER/21-22/262) | 01-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 04:30 PM | Active | और देखें |
| 19. | Operation of 240 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/314) | 31-05-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 PM | Active | और देखें |
| 20. | Retiling and roof repair including laying polythene sheet over of camp quarters and Industrial building at Chikla Mine(CIVIL/CH/T.E./21-22/767) | 31-05-2021 | 10-06-2021 | 10-06-2021 | 10-06-2021 | 04:30 PM | Active | और देखें |
| 21. | Repairing of 50 MT Road Weighing Bridge at MOIL Limited Dongri Buzurg Mine.(DB/MEC/21-22/JGM(MECH)/292) | 30-05-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:40 PM | Active | और देखें |
| 22. | Providing and Installation of DGMS approved Computerized Automatic Speed Indicator Cum Recorder (CASICR) for 550 HP winder at Production Shaft of Balaghat Mine(PUR/MOIL/BGT/WINDER/21-22/285) | 28-05-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 04:30 PM | Active | और देखें |
| 23. | Replacement of 6 mm thick liner plates at 15.5 th level loading station of Holmes shaft at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/286) | 28-05-2021 | 14-06-2021 | 14-06-2021 | 14-06-2021 | 04:30 PM | Active | और देखें |
| 24. | Handling and Despatch of ore for Munsar Mine(MOIL/21-22/ET/39) | 28-05-2021 | 28-06-2021 | 28-06-2021 | 28-06-2021 | 03:30 PM | Active | और देखें |
| 25. | Handling and Despatch of ore for Gumgaon Mine(MOIL/21-22/ET/40) | 28-05-2021 | 28-06-2021 | 28-06-2021 | 28-06-2021 | 03:30 PM | Active | और देखें |
| 26. | Handling and Despatch of ore for Kandri Mine(MOIL/21-22/ET/38) | 28-05-2021 | 28-06-2021 | 28-06-2021 | 28-06-2021 | 03:30 PM | Active | और देखें |
| 27. | Manpower to assistance pumping operation in 10800 CH 12000 at Ukwa Mine(UK/MECH/21-22/17771/310) | 27-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
| 28. | Cleaning of sump Ch 9500 sec and 108800 UG Section(AGT/Min/UK/LT/20-21/277) | 27-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
| 29. | Pattern making, casting, Machining and Dynamic balancing Of pump spares with complete fitting of 300Hp Kirloskar Pump of 10th Level Underground of Balaghat Mine.(AGT/BGT/MECH/PUMP/21-22/272) | 25-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
| 30. | Handling and Despatch of ore for Dongri Buzurg Mine(MOIL/21-22/ET/36) | 25-05-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
| 31. | Handling and Despatch of ore for Beldongri Mine(MOIL/21-22/ET/37) | 25-05-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
| 32. | Handling and Despatch of ore for Chikla Mine(MOIL/21-22/ET/35) | 25-05-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
| 33. | Providing PVC polythene sheet to manglore til(CIVI/BGT/LT/AGT/20-21/245 DT. 20.05.2021) | 25-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
| 34. | RCC roof repair water proofing work of camp quarters at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/246 DT.20.05.2021) | 25-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
| 35. | Laying of New 6 inch and 4 inch GI Pipeline for discharging Underground water and Supplying Compressed air from 13.5th level to 15th level at Second Outlet shaft of Balaghat Mine(AGT/BGT/MECH/WINDER/21-22/249) | 24-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
| 36. | Laying of G.I. pipeline with pumps from 3 lakh lit capacity Ground storage reservoir to Ferrow Manganese Plant at Balaghat Mine(MOIL/21-22/ET/29) | 24-05-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 03:30 PM | Active | और देखें |
| 37. | Providing and fixing profile sheet on roof of Boiler House at EMD plant at Dongri Buzurg Mine(MOIL/21-22/ET/31) | 24-05-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 03:30 PM | Active | और देखें |
| 38. | Manpower to assistance pumping operation in CH95 at Ukwa Mine(UK/TE/MECH/21-22/17270/309) | 24-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
| 39. | providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/Group-III/SYS/NW /2021-22/252) | 24-05-2021 | 01-06-2021 | 01-06-2021 | 01-06-2021 | 04:00 PM | Active | और देखें |
| 40. | Construction of cremation shed at village Gurha Beldaran, Tahsil Hiranagar, Dist Kathua, UT of Jammu and Kashmir, under CSR(MOIL/21-22/ET/26) | 24-05-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 03:30 PM | Active | और देखें |
| 41. | Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/533 DT 21.05.2021) | 22-05-2021 | 04-06-2021 | 04-06-2021 | 04-06-2021 | 04:30 PM | Active | और देखें |
| 42. | Handling and Despatch of ore for Tirodi Mine(MOIL/21-22/ET/33) | 22-05-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
| 43. | Handling and Despatch of ore for Balaghat Mine(MOIL/21-22/ET/32) | 22-05-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
| 44. | Handling and Despatch of ore for Sitapatore Mine(MOIL/21-22/ET/34) | 22-05-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
| 45. | Cleaning of Storm water drain in surface and underground sump under monsoon preparatory work at Kandri Mine(KAN/CIVIL/NIT/21-22/521 DT 19.05.2021) | 21-05-2021 | 28-05-2021 | 28-05-2021 | 28-05-2021 | 04:30 PM | Active | और देखें |
| 46. | False ceiling work of Transformer, Electric panel and Electrical store rooms of IMB Plant, Moil Ltd BGT mine(AGT/BGT/IMB PLANT/21-22/233) | 21-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
| 47. | Removal of Spillage from the bottom of Conveyor belt structure and Bottom of the shaft at 15.5th Level Loading station Holmes Shaft.(AGT/BGT/MECH/WINDER/21-22/248) | 21-05-2021 | 07-06-2021 | 07-06-2021 | 07-06-2021 | 04:30 PM | Active | और देखें |
| 48. | Cleaning of Surface Drains as monsoon preparatory work at Chikla Mine(CIVIL/CH/T.E./21-22/638) | 20-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
| 49. | REAIRING OF TRACK COMPONENTS OF SIDE DUMP LOADERS MACHINE AT MUNSAR MINE.(Agent and DGM (Mines)/GrpIII/2021-22/214) | 19-05-2021 | 07-06-2021 | 07-06-2021 | 07-06-2021 | 04:30 PM | Active | और देखें |
| 50. | Loading of Slag at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/19) | 19-05-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 03:30 PM | Active | और देखें |
| 51. | Breaking of Slag and Other Associated Works at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/18) | 19-05-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 03:30 PM | Active | और देखें |
| 52. | OUTSOURCING METER READING, PREPARATION OF ELECTRICITY RECOVERY LIST AND PROCESSING OF LOCAL DOCUMENMTATION OF ELECTRICAL DEPARTMENT FOR THE PERIOD 6 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/223) | 18-05-2021 | 25-05-2021 | 25-05-2021 | 25-05-2021 | 03:30 PM | Active | और देखें |
| 53. | WEB SITE TENDER ENQUIRY FOR PIPELINE FITTING OF 200 MM, WITH CLAMPS BY LOWERING AND COMPLETE INSTALLED WITH FLANGES WELDING AND COMPLETE PAINTING OF PIPELINE AT MUNSAR MINE.(MUN/ENGG/TENDER/20-21/213) | 17-05-2021 | 07-06-2021 | 07-06-2021 | 07-06-2021 | 04:30 PM | Active | और देखें |
| 54. | SELECTION OF ANNUAL REPORT CONSULTING SERVICE PROVIDER FOR MOIL LIMITED FOR THE FINANCIAL YEAR 2020-21(MOIL/21-22/ET/41) | 17-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 03:30 PM | Active | और देखें |
| 55. | Repair and construction of front Compound Wall of Mine Managers Bungalow at Gumgaon Mine.(Agent/GUM/Civil/NIT/21-22/228 14/05/2021) | 15-05-2021 | 22-05-2021 | 22-05-2021 | 22-05-2021 | 04:30 PM | Active | और देखें |
| 56. | Hiring of Machinery for loading unloading transportation of waste from Chitawer section to Nagara Plant at Section Ukwa Mine(AGT/Min/UK/LT/21-22/192) | 15-05-2021 | 21-05-2021 | 21-05-2021 | 21-05-2021 | 04:30 PM | Active | और देखें |
| 57. | Supplying and Installation of Portable Toilet for deployed ladies workers in BDC/OCF Section at Gumgaon Mine.(GUM/Civil/NIT/21-22/217 13.05.2021) | 14-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
| 58. | CAPLAMP MAINTENANCE, DISTRIBUTION AND COLLECTION FROM 18MAY 2021ONWARDS FOR 118 DAYS AT MANSAR MINE(ELECT/MUN/ADGM/21-22/157, Dated 03.05.2021) | 12-05-2021 | 15-05-2021 | 15-05-2021 | 15-05-2021 | 05:00 PM | Active | और देखें |
| 59. | Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-50/17-M DT.10/05/2021) | 11-05-2021 | 24-05-2021 | 24-05-2021 | 24-05-2021 | 03:30 PM | Active | और देखें |
| 60. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT MAKE PUMP MODEL PUMP 10/12BLF, 132 KW.(PUR/MOIL/C-5/28/E- 48/ 14 -M Dt. 11/05/2021) | 11-05-2021 | 02-06-2021 | 02-06-2021 | 02-06-2021 | 03:30 PM | Active | और देखें |
| 61. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPARATION PLANT(PUR/MOIL/C-5/23/E- 46/ 12 -M Dt. 07/05/2021) | 07-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 03:30 PM | Active | और देखें |
| 62. | Structural Design consultancy for construction of screening plant for Pebble handling at Sand stowing Plant(Jt.GM/CH/MECH/TE/2021-22/192) | 06-05-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
| 63. | Purchase and Installation of Digital Water Flow Meters with telemetry system for Munsar Mine(MS/GEO/NIT/2021-22/141 Date 02.05.2021) | 03-05-2021 | 17-05-2021 | 17-05-2021 | 17-05-2021 | 04:30 PM | Active | और देखें |
| 64. | Purchase and Installation of Digital Water Flow Meters with telemetry system for Parsoda Mine(PS/GEO/NIT/2021-22/142 Date 02.05.2021) | 03-05-2021 | 17-05-2021 | 17-05-2021 | 17-05-2021 | 04:30 PM | Active | और देखें |
| 65. | Procurement of Hydraulic Power Pack and Hydraulic Cylinders for Pit Bottom Buffer of production shaft at Balaghat Mine.(PUR/MOIL/BGT/WINDER/21-22/141) | 03-05-2021 | 18-05-2021 | 18-05-2021 | 18-05-2021 | 04:30 PM | Active | और देखें |
| 66. | Dismantling, shifting and reassembling of 20Nos. of Joplin jig assembly from old site to New OCF Shed constructed along the Ferro Plant of Balaghat Mine.(AGT/BGT/MECH/OCF/21-22/139) | 01-05-2021 | 17-05-2021 | 17-05-2021 | 17-05-2021 | 04:30 PM | Active | और देखें |
| 67. | Regular cleaning/ unblocking of main bunker ore flow in IMB Plant at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/164) | 01-05-2021 | 04-05-2021 | 04-05-2021 | 04-05-2021 | 04:30 PM | Active | और देखें |
| 68. | OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/124) | 28-04-2021 | 01-05-2021 | 01-05-2021 | 01-05-2021 | 03:30 PM | Active | और देखें |
| 69. | Erection of 11KV Overhead Line from Mine Pit Substation to Aggregate Crusher Plant.(DB/ELECT/21-22/163) | 28-04-2021 | 06-05-2021 | 06-05-2021 | 06-05-2021 | 04:30 PM | Active | और देखें |
| 70. | Replacement of IBR Riser Tubes of FBC Boiler at EMD Plant, Dongri Buzurg Mine(MOIL/EMD/DB/AJGM/2021-22/159) | 27-04-2021 | 03-05-2021 | 03-05-2021 | 03-05-2021 | 04:30 PM | Active | और देखें |
| 71. | Empanelment of Consultant Advisor for Identification of Domestic and Overseas assets for partial or total acquisition(MOIL/21-22/ET/20) | 27-04-2021 | 27-05-2021 | 27-05-2021 | 27-05-2021 | 03:30 PM | Active | और देखें |
| 72. | Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from South side A dump at Tirodi Mine(MOIL/21-22/ET/24) | 26-04-2021 | 26-05-2021 | 26-05-2021 | 26-05-2021 | 03:30 PM | Active | और देखें |
| 73. | Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/21-22/ET/25) | 26-04-2021 | 26-05-2021 | 26-05-2021 | 26-05-2021 | 03:30 PM | Active | और देखें |
| 74. | Underground exploratory drivage at -130 Level of Munsar Mine(MOIL/21-22/ET/23) | 26-04-2021 | 26-05-2021 | 26-05-2021 | 26-05-2021 | 03:30 PM | Active | और देखें |
| 75. | Cleaning and collection waste from septic tanks, chambers in camp colony at Kandri Mine(KD/PER/NIT/2021-22/214) | 24-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 04:30 PM | Active | और देखें |
| 76. | Cleaning and collection of Garbage and cleaning of Drains at Kandri Mine(KD/PER/NIT/2021-22/218) | 24-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 04:30 PM | Active | और देखें |
| 77. | Cleaning maintenance and up keeping of Rest House at Kandri Mine(KD/PER/NIT/2021-22/216) | 24-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 04:30 PM | Active | और देखें |
| 78. | Hiring of Machinery for loading(AGT/Min/UK/LT/21-22/94) | 21-04-2021 | 01-05-2021 | 01-05-2021 | 01-05-2021 | 04:30 PM | Active | और देखें |
| 79. | Development cutting and levelling of Hill rock portion for consrtuction of WTP ESR for construction of new water supply schme at Ukwa Mine(Civil/UK/LT/21-22/153 Date- 19.04.2021) | 21-04-2021 | 01-05-2021 | 01-05-2021 | 01-05-2021 | 04:30 PM | Active | और देखें |
| 80. | Handling and Despatch of ore from Tirodi and Sitapatore Mines for the period of two month(MOIL/21-22/ET/22) | 20-04-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
| 81. | Removal of burnt LT and HT panel and shifting it to the required location.(AGT/BGT/IMB PLANT/21-22/60) | 19-04-2021 | 27-04-2021 | 27-04-2021 | 27-04-2021 | 04:30 PM | Active | और देखें |
| 82. | labor assistant for material shifting during replacement of heavy assembly or repairing work in underground machineries like SDL, LHD, battery locomotive and Jumbo machines deployed in underground at Balaghat Mine(AGENT/BGT/MECH/WS/21-22/90) | 19-04-2021 | 27-04-2021 | 27-04-2021 | 27-04-2021 | 04:30 PM | Active | और देखें |
| 83. | Operation of vibrating screen to screen sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/12) | 19-04-2021 | 19-05-2021 | 19-05-2021 | 19-05-2021 | 03:30 PM | Active | और देखें |
| 84. | Drilling 57 mm dia. drill holes for installing cable bolt in Manganiferous rock at 11 Level 12 Level and 13 Levels of underground at Balaghat Mine(MOIL/21-22/ET/13) | 19-04-2021 | 19-05-2021 | 19-05-2021 | 19-05-2021 | 03:30 PM | Active | और देखें |
| 85. | Removal of spillage from the bottom of production shaft at 15th Level and bottom of Holmes shaft at 16.5th Level at Balaghat Mine(MOIL/21-22/ET/14) | 19-04-2021 | 19-05-2021 | 19-05-2021 | 19-05-2021 | 03:30 PM | Active | और देखें |
| 86. | Picking and collection of 20 percent Mn. SM Grade Ore BGL-564 from sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/15) | 19-04-2021 | 21-05-2021 | 21-05-2021 | 21-05-2021 | 03:30 PM | Active | और देखें |
| 87. | Repairing of three row concertina coil fencing and lease boundary on Manegaon magazine side at Balaghat mine(CIVI/BGT/LT/AGT/21-22/72 DATE 15.04.2021) | 16-04-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 04:30 PM | Active | और देखें |
| 88. | Providing and supplying of black gitti for underground concreating at Balaghat Mine(MIN/BGT/AGT/LT/21-22/73 DATE 15.04.2021) | 16-04-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 04:30 PM | Active | और देखें |
| 89. | Underground Development at 13.5th Level South section at Balaghat Mine(MOIL/21-22/ET/10) | 15-04-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
| 90. | Underground Development at -370 Level and -470 Level of Vertical Section at Chikla Mine(MOIL/21-22/ET/9) | 15-04-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
| 91. | Extra excavation and RCC for sub-station at -450 Level and loco battery charging station at -450 Level and -550 Level of Kandri Mine(MOIL/21-22/ET/11) | 15-04-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
| 92. | Pushing and Pulling of empty / loaded tubs / rock tubs in to / from cage at pit top and tipping the loaded tubs / rock tubs at OCF Gala / tipping point(BEL/MIN/2021-22/108) | 13-04-2021 | 19-04-2021 | 19-04-2021 | 19-04-2021 | 04:30 PM | Active | और देखें |
| 93. | Removal of burnt cable and retrieving partially burnt cable for providing supply to equipment of IMB Plant(AGT/BGT/IMB PLANT/20-21/1379) | 10-04-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 04:30 PM | Active | और देखें |
| 94. | Loading Transportation and Unloading of Manganese Ore ROM at Beldongri Mine(BEL/MIN/2021-22/73) | 09-04-2021 | 15-04-2021 | 15-04-2021 | 15-04-2021 | 04:30 PM | Active | और देखें |
| 95. | Large Diameter drilling at Old Satak section at Beldongri Mine(BEL/MIN/2021-22/69) | 09-04-2021 | 15-04-2021 | 15-04-2021 | 15-04-2021 | 04:00 PM | Active | और देखें |
| 96. | Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from east side of South Staff Quarter dump at Tirodi Mine(MOIL/20-21/ET/327) | 09-04-2021 | 10-05-2021 | 10-05-2021 | 10-05-2021 | 03:30 PM | Active | और देखें |
| 97. | Cleaning of Underground ROM at Beldongri Mine(MOIL/20-21/ET/326) | 09-04-2021 | 10-05-2021 | 10-05-2021 | 10-05-2021 | 03:30 PM | Active | और देखें |
| 98. | Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Jawahar vertical shaft at Chikla Mine(MOIL/20-21/ET/329) | 09-04-2021 | 10-05-2021 | 10-05-2021 | 10-05-2021 | 03:30 PM | Active | और देखें |
| 99. | GENERAL DAILY MAINT OF HEMMS AND LVS (TATA1200 HYD EXC, BD155 DOZER, DUMPERS, DRILL MC ICM 260, LV ETC.(DB/MECH/21-22/JGM(MECH)/21) | 08-04-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 04:30 PM | Active | और देखें |
| 100. | Underground Development work at -450 Level of Kandri Mine(MOIL/20-21/ET/325) | 07-04-2021 | 07-05-2021 | 07-05-2021 | 07-05-2021 | 03:30 PM | Active | और देखें |
| निविदाएं अधिक जानकारी |
|---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
| (2027) वर्ष के निविदाएं देखें |
| (2025) वर्ष के निविदाएं देखें |
| (2024) वर्ष के निविदाएं देखें |
| (2023) वर्ष के निविदाएं देखें |
| (2022) वर्ष के निविदाएं देखें |
| (2021) वर्ष के निविदाएं देखें |
| (2020) वर्ष के निविदाएं देखें |
| (2019) वर्ष के निविदाएं देखें |
| (2018) वर्ष के निविदाएं देखें |
| (2017) वर्ष के निविदाएं देखें |
| (2016) वर्ष के निविदाएं देखें |
| (2015) वर्ष के निविदाएं देखें |
| (2014) वर्ष के निविदाएं देखें |
| (2013) वर्ष के निविदाएं देखें |
| (2012) वर्ष के निविदाएं देखें |
| (24) वर्ष के निविदाएं देखें |
| पूर्ण निविदा पुरालेख देखें |
| सभी मॉयल निविदाएं देखें |