निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Construction of Tar road from south staff quarters to Jamrapani Railway line and Jamrapani village at Tirodi Mine. (Civil /HO/15-16 /TRD/59 Dated - 30/12/2015) | 31-12-2015 | 12-01-2016 | 12-01-2016 | 12-01-2016 | 3:30 PM | Active | और देखें |
2. | PURCHASE OF SPIRAL LINER(PUR/MOIL/C-11/135/E-97/2076-M) | 30-12-2015 | 22-01-2016 | 22-01-2016 | 22-01-2016 | 3:30 PM | Active | और देखें |
3. | Pushing of tubs in underground at Minus 150 L, Minus 250L and Minus 350 L and at surface at Kandri Mine(SDGM(M)-III/CONT/28/TUBS/KAN/2015-16/28) | 29-12-2015 | 06-01-2016 | 06-01-2016 | 06-01-2016 | 3:30 PM | Active | और देखें |
4. | Annual operation and Maintenance Contract of Heavy Earth Moving Machines at Dongri Buzurg Mine(MOIL/15-16/ET/88) | 29-12-2015 | 10-02-2016 | 10-02-2016 | 10-02-2016 | 3:30 PM | Active | और देखें |
5. | Miscellaneous Civil repair Works at site of GSR and Filtration Palnt and Painting Works to Water Storage Reservoir (5.00 Lacs Liters) at Balaghat Mine.(83/Civil/BGT/15-16/6469 Date 21.12.2015) | 25-12-2015 | 04-01-2016 | 04-01-2016 | 04-01-2016 | 4:30 PM | Active | और देखें |
6. | Requirement of Power Pack for Change Over System at Production Shaft, Balaghat Mine(BGT/MECH/Powerpack/15-16/6437) | 25-12-2015 | 25-01-2016 | 25-01-2016 | 25-01-2016 | 4:30 PM | Active | और देखें |
7. | Construction of Boundary Wall at Tihlibai Govt. Middle School at Tahsil Waraseoni Dist. Balaghat (M.P. under MOIL CSR)(Civil/HO/15-16/ BGT-CSR/58 Dt. 22.12.2015) | 23-12-2015 | 08-01-2016 | 08-01-2016 | 08-01-2016 | 3:30 PM | Active | और देखें |
8. | Construction of Store room at Substation near Vertical Shaft, Office Cum multipurpose room at Ch 10800 and L.T. Panel room at Chitawar Section at Ukwa Mine(Civil /HO/15-16 /UK/57) | 22-12-2015 | 30-12-2015 | 30-12-2015 | 30-12-2015 | 3:30 PM | Active | और देखें |
9. | PURCHASE OF SPARES FOR BC II CRUSHING AND SCREENING PLANT(PUR/MOIL/C-5/51/E-67/1287-M) | 22-12-2015 | 06-01-2016 | 06-01-2016 | 06-01-2016 | 3:30 PM | Active | और देखें |
10. | Replacement of complete Monorail beam at ferro manganese plant at Balaghat Mine(FMP/BGT/15-16/877 Dt 17.12.2015) | 21-12-2015 | 29-12-2015 | 29-12-2015 | 29-12-2015 | 4:30 PM | Active | और देखें |
11. | PURCHASE OF SPARES FOR SAICO 5 T HOIST (PUR/MOIL/C-5/59/E-89/1961-M) | 21-12-2015 | 08-01-2016 | 08-01-2016 | 08-01-2016 | 3:30 PM | Active | और देखें |
12. | Purchase of Curtis make spares are required for Battery Operated Locomotives of Balaghat Mine(BGT/TE/Elect./15-16/6292 Date 14.12.201) | 21-12-2015 | 18-01-2016 | 18-01-2016 | 18-01-2016 | 4:30 PM | Active | और देखें |
13. | e-procurement of G.I.Wire Netting and S.S.Screen Cloth.(WE-81, e-tender No.MOIL/15-16/ET-87 Dt.21.12.2015) | 21-12-2015 | 28-01-2016 | 28-01-2016 | 28-01-2016 | 3:30 PM | Active | और देखें |
14. | PURCHASE OF OFFICE FURNITURE (4 DRAWER FILING CABINET), MAKE - GODREJ - 6 NOS. (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/54/E-95/2012-M DT.19/12/2015) | 19-12-2015 | 28-12-2015 | 28-12-2015 | 28-12-2015 | 3:30 PM | Active | और देखें |
15. | PURCHASE OF NEOPRENE RUBBER CUSHION (PUR/MOIL/C-11/147/E-87/2008-M) | 19-12-2015 | 20-01-2016 | 20-01-2016 | 20-01-2016 | 3:30 PM | Active | और देखें |
16. | PURCHASE OF SPARES FOR KIRLOSKAR COMPRESSOR(PUR/MOIL/C-5/38/E-61/1181-M) | 18-12-2015 | 06-01-2016 | 06-01-2016 | 06-01-2016 | 3:30 PM | Active | और देखें |
17. | PURCHASE OF TUB COUPLING CHAINS AND PINS.(PUR/MOIL/C-12/6/E-92/1981-M Dt.17.12.2015) | 17-12-2015 | 08-01-2016 | 08-01-2016 | 08-01-2016 | 3:30 PM | Active | और देखें |
18. | PURCHASE OF GYMNASIUM ITEMS VIZ. AEROFIT COMMERCIAL ELLIPTICAL (700E)- 1NO., AEROFIT COMMERCIAL RECUMBENT BIKE (9.7)- 1 NO. AND VIVA DOMESTIC RECUMBENT BIKE (704 RB)- 1 NO. (PUR/MOIL/C-4/301/E-91/1979-M Dt.15.12.2015) | 16-12-2015 | 21-12-2015 | 21-12-2015 | 21-12-2015 | 3:30 PM | Active | और देखें |
19. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(SDGM(M)-III/CONT/23/TUBS/2015-16/27) | 16-12-2015 | 23-12-2015 | 23-12-2015 | 23-12-2015 | 3:30 PM | Active | और देखें |
20. | MINE VENTILATION FAN - 4 SET. AND FAN BLADE - 2 SET. FOR VARIOUS MINES (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-74 DT.16/12/2015, e-TENDER NO.MOIL/15-16/ET/86) | 16-12-2015 | 20-01-2016 | 20-01-2016 | 20-01-2016 | 3:30 PM | Active | और देखें |
21. | Maintenance and Operation of Water Supply scheme at Chikla Mine.(TE/CH/MECH/WATER SUPPLY/2015-16/701) | 15-12-2015 | 29-12-2015 | 29-12-2015 | 29-12-2015 | 4:30 PM | Active | और देखें |
22. | Renovation of Plantation on Road Divider from Anjuman Square to MSEB Square Katol Road Nagpur under CSR(Civil /HO/15-16 /HO/CSR/55) | 15-12-2015 | 21-12-2015 | 21-12-2015 | 22-12-2015 | 3:30 PM | Active | और देखें |
23. | Construction of Cement concrete path ways, Paving Block paths and kyari at garden area at West Court premises, MOIL,Nagpur.( Civil /HO/15-16 /HO/56) | 15-12-2015 | 21-12-2015 | 21-12-2015 | 22-12-2015 | 3:30 PM | Active | और देखें |
24. | Empanelment of Advertising Agency(MOIL/PR/2015-2016/001) | 15-12-2015 | 15-01-2016 | 15-01-2016 | 15-01-2016 | 4:00 PM | Active | और देखें |
25. | TIPPERS (10 TON) - 2 NOS. (1 NO.EACH FOR TIRODI AND DONGRI BUZURG MINE) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)( WE-75 DT.15/12/2015, e-TENDER NO.MOIL/15-16/ET/85) | 15-12-2015 | 18-01-2016 | 18-01-2016 | 18-01-2016 | 3:30 PM | Active | और देखें |
26. | Sinking of borehole for Sand Stowing at Balaghat Mine(83/Civil/BGT/15-16/6262 Date 13.12.2015) | 14-12-2015 | 17-12-2015 | 17-12-2015 | 17-12-2015 | 4:30 PM | Active | और देखें |
27. | PURCHASE OF SPARES FOR SAYAJI JAW CRUSHERS (PUR/MOIL/C-5/30/E-80/1777-M) | 14-12-2015 | 30-12-2015 | 30-12-2015 | 30-12-2015 | 3:30 PM | Active | और देखें |
28. | PURCHASE OF SCREEN FRAME WITH SCREEN PANEL FOR JIG(PUR/MOIL/C-11/130/WE-71 (MOIL/15-16/ET/83)) | 14-12-2015 | 07-01-2016 | 07-01-2016 | 07-01-2016 | 3:30 PM | Active | और देखें |
29. | PURCHASE OF STEEL SCREEN PANEL ( PUR/MOILC-11/127/WE-70 (MOIL/15-16/ET/ET-82) ) | 14-12-2015 | 07-01-2016 | 07-01-2016 | 07-01-2016 | 3:30 PM | Active | और देखें |
30. | ELECTRICALLY OPERATED CENTRIFUGAL PUMPS FOR VARIOUS MINES - 9 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-73 DT.14/12/2015, e-TENDER NO.MOIL/15-16/ET/84) | 14-12-2015 | 15-01-2016 | 15-01-2016 | 15-01-2016 | 3:30 PM | Active | और देखें |
31. | CRAWLER MOUNTED COMPOSITE DTH HAMMER DRILLING MACHINE - 2 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-72 DT.14/12/2015, e-TENDER NO.MOIL/15-16/ET/81) | 14-12-2015 | 15-01-2016 | 15-01-2016 | 15-01-2016 | 3:30 PM | Active | और देखें |
32. | PURCHASE OF SCREEN FRAME WITH SCREEN PANEL FOR JIG (PUR/MOIL/C-11/130/WE-71 (MOIL/15-16/ET/83)) | 14-12-2015 | 18-01-2016 | 18-01-2016 | 18-01-2016 | 3:30 PM | Active | और देखें |
33. | Construction of stone masonry retaining wall along the west dump in North Section and for new purchased land at Dongri Buzurg Mine (CIVIL/HO/15-16/DB/52 Dt 10/12/2012) | 11-12-2015 | 30-12-2015 | 30-12-2015 | 30-12-2015 | 3:30 PM | Active | और देखें |
34. | PURCHASE OF SPARES FOR LAB JAW CRUSHER (PUR/MOIL/C-5/51/E-88/1943-M ) | 10-12-2015 | 30-12-2015 | 30-12-2015 | 30-12-2015 | 3:30 PM | Active | और देखें |
35. | PURCHASE OF GREASE GUNS. (PUR/MOIL/C-1/90/E-85/1932-M Dt.10.12.0215) | 10-12-2015 | 01-01-2016 | 01-01-2016 | 01-01-2016 | 3:30 PM | Active | और देखें |
36. | Augmentation of 33 KV Outdoor and 11 KV Indoor Substation of Ukwa Mine, Dist. Balaghat (MP) (DGM(E)/3/ UKW/15-16/ 190 Dated 10/12/2015) | 10-12-2015 | 31-12-2015 | 31-12-2015 | 31-12-2015 | 3:30 PM | Active | और देखें |
37. | WELDING RECTIFIER - 16 NOS. AND WELDING TRANSFORMER - 3 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-79 DT.09/12/2015, e-TENDER NO.MOIL/15-16/ET/80) | 09-12-2015 | 01-01-2016 | 01-01-2016 | 01-01-2016 | 3:30 PM | Active | और देखें |
38. | PILLAR DRILLING MACHINE - 4 NOS. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)(WE-80 DT.09/12/2015, e-TENDER NO.MOIL/15-16/ET/79) | 09-12-2015 | 31-12-2015 | 31-12-2015 | 31-12-2015 | 3:30 PM | Active | और देखें |
39. | Annual repairs and maintenance contract for domestic electrical installation of residential and non-residential buildings of Ukwa mine.(UK/ELECT/15-16/2380) | 08-12-2015 | 15-12-2015 | 15-12-2015 | 15-12-2015 | 4:30 PM | Active | और देखें |
40. | Construction of Siding Office and Sample Preparation Room at Balaghat Mine.(Civil /HO/15-16 /BGT/54 Dated - 07/12/2015) | 08-12-2015 | 30-12-2015 | 30-12-2015 | 30-12-2015 | 3:30 PM | Active | और देखें |
41. | PURCHASE OF BUCKET ROCK (5.6 CU.M) ASSEMBLY - 1 NO FOR DONGRI BUZURG MINE (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/303/E-84/1877-M) | 05-12-2015 | 21-12-2015 | 21-12-2015 | 21-12-2015 | 3:30 PM | Active | और देखें |
42. | Purchase of flexible trailing copper conductor cable(WE-77 Dt.04/12/2015(e-Tender No. MOIL/15-16/ET/77)) | 04-12-2015 | 05-01-2016 | 05-01-2016 | 05-01-2016 | 3:30 PM | Active | और देखें |
43. | PURCHASE OF STEEL WIRE ROPES(WE-78 Dt.04/12/2015(e-Tender no. MOIL/15-16/ET/78)) | 04-12-2015 | 05-01-2016 | 05-01-2016 | 05-01-2016 | 3:30 PM | Active | और देखें |
44. | PURCHASE OF DUST MASK(PUR/MOIL/C-1/90/E-83/1865-M dt.04.12.2015) | 04-12-2015 | 28-12-2015 | 28-12-2015 | 28-12-2015 | 3:30 PM | Active | और देखें |
45. | Purchase of Hydraulic Cylinders (PUR/MOIL/C-5/35/WE-69 (ET-70)) | 03-12-2015 | 01-01-2015 | 01-01-2015 | 01-01-2015 | 3:30 PM | Active | और देखें |
46. | Provide a standby Control System for Vertical shaft winder of Gumgaon Mine, Dist. Nagpur (M.S.) (DGM(E)/12/ GUM/15-16/ 176 Dated 02/12/2015) | 03-12-2015 | 29-12-2015 | 29-12-2015 | 29-12-2015 | 3:30 PM | Active | और देखें |
47. | Purchase of Hydraulic Cylinders (PUR/MOIL/C-5/35/WE-69 (ET-70)) | 03-12-2015 | 01-01-2016 | 01-01-2016 | 01-01-2016 | 3:30 PM | Active | और देखें |
48. | e-procurement of Non-Medicinal Miscellaneous Items-7 Items(WE-76, e-tender No.MOIL/15-16/ET-75 Dt.03.12.2015) | 03-12-2015 | 05-01-2016 | 05-01-2016 | 05-01-2016 | 3:30 PM | Active | और देखें |
49. | Construction of Gantry wall at Ch. 11600 at Ukwa Mine.(Civil /HO/15-16/ UK/ 53 Dt- 01/12/2015) | 02-12-2015 | 15-12-2015 | 15-12-2015 | 15-12-2015 | 3:30 PM | Active | और देखें |
50. | PURCHASE OF NON-MEDICINAL MISCELLANEOUS ITEMS FROM MSE (MICRO AND SMALL ENTERPRISE) FIRMS ONLY. (PUR/MOIL/C-10/35/E-82/1821-M Dt.02.12.2015) | 02-12-2015 | 23-12-2015 | 23-12-2015 | 23-12-2015 | 3:30 PM | Active | और देखें |
51. | Removal of spillage material during hoisting of skip from 14.50th level of Production Shaft at Balaghat Mine(Agent DGM/Mining/BGT/15-16/5962 Date 30.11.2015) | 01-12-2015 | 11-12-2015 | 11-12-2015 | 11-12-2015 | 4:30 PM | Active | और देखें |
52. | Maintenance of Plantation of road divider from Anjuman Sq to MSEB Sq. Katol Road Nagpur Under MOIL CSR. (Civil /HO/15-16 /HO/CSR/51 Dt- 30/11/2015) | 01-12-2015 | 10-12-2015 | 10-12-2015 | 10-12-2015 | 3:30 PM | Active | और देखें |
53. | Pushing of Loaded Waste Rock tubs at 13.50th Level from Main Haulage Road to Ore Pass at Balaghat Mine (Agent DGM/Gr-I/Mining/BGT/15-16/5941 Date 29.11.15) | 30-11-2015 | 14-12-2015 | 14-12-2015 | 14-12-2015 | 3:30 PM | Active | और देखें |
54. | PURCHASE OF SPARES FOR MATHER AND PLATT MAKE PUMPS (PUR/MOIL/C-5/28/E-72/1816-M) | 30-11-2015 | 14-12-2015 | 14-12-2015 | 14-12-2015 | 3:30 PM | Active | और देखें |
55. | PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MB 1500 (PUR/MOIL/C-5/70/E-81/1804-M) | 30-11-2015 | 16-12-2015 | 16-12-2015 | 16-12-2015 | 3:30 PM | Active | और देखें |
56. | Construction of pump house near vertical shaft and nagra plant at Ukwa Mine (16/Civil/UM/15-16/2362) | 30-11-2015 | 09-12-2015 | 09-12-2015 | 09-12-2015 | 4:30 pm | Active | और देखें |
57. | Cleaning of ROM at Sitapatore Mine.(GR.-II/SDGM(M)/CONT/CL-ROM/28/SITA/2015-16/33) | 27-11-2015 | 07-12-2015 | 07-12-2015 | 07-12-2015 | 3:00 PM | Active | और देखें |
58. | Maintenance and up keeping of effluent treatment plant at EMD plant Dongri Buzurg Mine.(EMD/DB/ADGM/TE/2015-16/656) | 27-11-2015 | 08-12-2015 | 08-12-2015 | 09-12-2015 | 4:00 PM | Active | और देखें |
59. | HEARSE VAN - 1 NO. (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement)( WE-68 DT.26/11/2015, e-TENDER NO.MOIL/15-16/ET/74) | 26-11-2015 | 18-12-2015 | 18-12-2015 | 18-12-2015 | 3:30 PM | Active | और देखें |
60. | SUPPLY OF BLACK METAL GITTI FOR U/G CONCRETING WORK AT BALAGHAT MINE (Gr.-I/GM(S AND E)/CONT/GITTI/15/BGT/2015-16/20) | 24-11-2015 | 03-12-2015 | 03-12-2015 | 03-12-2015 | 3:00 PM | Active | और देखें |
61. | Consultancy Services for evaluation, advice and assistance to participate in the auction/bidding process of Ferrous/Non Ferrous Ore Mines by MOIL Limited(GM(P D)/15-16/01) | 24-11-2015 | 21-12-2015 | 21-12-2015 | 21-12-2015 | 3:00 PM | Active | और देखें |
62. | Renovation of Old Substation Building Near Blasting Room at Dongri Buzurg Mine.(Agent/Civil/DB/ 2015-16/ 2611-A Dated- 1/11/2015) | 23-11-2015 | 28-11-2015 | 28-11-2015 | 28-11-2015 | 4:30 PM | Active | और देखें |
63. | Recovery of 42 -44 percent lumpy ore from contaminated ROM at Dongri Buzurg Mine. (GR.-II/SDGM(M)/CONT/CL-ROM/29/DB/2015-16/32) | 23-11-2015 | 01-12-2015 | 01-12-2015 | 01-12-2015 | 3:00 PM | Active | और देखें |
64. | Recovery of Ferro grade ore and LGHS ore by washing from West Side of A dump (U/G Top) at Tirodi Mine (GR.-II/SDGM(M)/CONT/R-DUMP/27/TRD/2015-16/31) | 23-11-2015 | 01-12-2015 | 01-12-2015 | 01-12-2015 | 3:00 PM | Active | और देखें |
65. | Recovery of Ferro grade ore, LGHS ore and SM grade ore from South A dump at Tirodi Mine (GR.-II/SDGM(M)/CONT/R-DUMP/31/TRD/2015-16/29) | 23-11-2015 | 01-12-2015 | 01-12-2015 | 01-12-2015 | 3:00 PM | Active | और देखें |
66. | Recovery of LGHS ore and SM grade ore from Sidha Baba Mandir dump at Tirodi Mine. (GR.-II/SDGM(M)/CONT/R-DUMP/32/TRD/2015-16/30) | 23-11-2015 | 01-12-2015 | 01-12-2015 | 01-12-2015 | 3:00 PM | Active | और देखें |
67. | e-procurement of Belt Conveyor Roller/Idler -30 Items (WE-67, e-tender No.MOIL/15-16/ET-73 Dt.23.11.2015) | 23-11-2015 | 07-01-2016 | 07-01-2016 | 07-01-2016 | 3:30 PM | Active | और देखें |
68. | Sinking of borehole for sand stowing at Balaghat Mine(83/Civil/BGT/15-16/5766) | 20-11-2015 | 24-11-2015 | 24-11-2015 | 24-11-2015 | 4:30 PM | Active | और देखें |
69. | Annual Repair to camp Quarters at Kandri Mine.(Civil /HO/15-16 /KAN/49 Dt- 19/11/2015) | 20-11-2015 | 04-12-2015 | 04-12-2015 | 04-12-2015 | 3:30 PM | Active | और देखें |
70. | e-procurement of Conveyor Belts-3 Items(WE-65, e-tender No.MOIL/15-16/ET-72 Dt.19.11.2015 ) | 19-11-2015 | 29-12-2015 | 29-12-2015 | 29-12-2015 | 3:30 PM | Active | और देखें |
71. | Making of supporting stone pitching wall for infront of cap lamp room and infront of new compressor house at new vertical shaft ukwa mine(16/civil/um/15-16/2254) | 16-11-2015 | 21-11-2015 | 21-11-2015 | 21-11-2015 | 4:30 PM | Active | और देखें |
72. | Miscellaneous civil repair work at GSR and Filtration plant and Painting to water storage reservoir ( 5.0 Lacs Litres) at Balaghat Mine(83/Civil/BGT/15-16/5706 Date 16.11.2015) | 16-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 4:30 PM | Active | और देखें |
73. | Miscellaneous civil repair work at GSR and Filtration plant and Painting to water storage reservoir ( 5.0 Lacs Litres) at Balaghat Mine(83/Civil/BGT/15-16/5706 Date 16.11.2015) | 16-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 4:30 PM | Active | और देखें |
74. | PURCHASE OF SPARES FOR SDL (PUR/MOIL/C-5/27/E-68/1323-M ) | 07-11-2015 | 20-11-2015 | 20-11-2015 | 20-11-2015 | 3:30 PM | Active | और देखें |
75. | Rate Contract for one year for supply of Compressed Oxygen Gas and Dissolved Acetylene Gas. (PUR/MOIL/C11/115/WE-49 (MOIL/15-16/ET/70)) | 07-11-2015 | 03-12-2015 | 03-12-2015 | 03-12-2015 | 3:30 PM | Active | और देखें |
76. | PURCHASE OF SPARES FOR SDL (PUR/MOIL/C-5/27/E-68/1323-M ) | 07-11-2015 | 30-11-2015 | 30-11-2015 | 30-11-2015 | 3:30 PM | Active | और देखें |
77. | HYDRAULIC POWER SAW MACHINE - 6 NOS. FOR VARIOUS MINES (1 NO.EACH FOR BALAGHAT, UKWA, CHIKLA, KANDRI, GUMGAON AND MUNSAR MINE) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-64 DT.07/11/2015, e-TENDER NO.MOIL/15-16/ET/71) | 07-11-2015 | 10-12-2015 | 10-12-2015 | 10-12-2015 | 3:30 PM | Active | और देखें |
78. | Making of Steaming Material ( Mud Plug ) use for blasting at Kandri Mine(KAN/MIN/15-16/132 Dt.06.11.2015 | 06-11-2015 | 14-11-2015 | 14-11-2015 | 14-11-2015 | 3:30 PM | Active | और देखें |
79. | PURCHASE OF SPARES OF BUTTERFLY VALVE AND HYDRAULIC POWER PACK (PUR/MOIL/C-11/129/E-78/1629-M) | 06-11-2015 | 11-12-2015 | 11-12-2015 | 11-12-2015 | 3:30 PM | Active | और देखें |
80. | PURCHASE OF SPARES OF BUTTERFLY VALVE AND HYDRAULIC POWER PACK(PUR/MOIL/C-11/129/E-78/1629-M) | 06-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 3:30 PM | Active | और देखें |
81. | PURCHASE OF SPARES FOR LAB JAW CRUSHER(PUR/MOIL/C-5/51/E-66/1286-M) | 06-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 3:30 PM | Active | और देखें |
82. | PURCHASE OF SINGLE SOLENOID VALVE AND SOLENOID COIL(PUR/MOIL/C-11/131/E-79/1635-M) | 06-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 3:30 PM | Active | और देखें |
83. | PURCHASE OF SPARES OF BUTTERFLY VALVE AND HYDRAULIC POWER PACK(PUR/MOIL/C-11/129/E-78/1629-M) | 06-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 3:30 PM | Active | और देखें |
84. | PURCHASE OF SPARES FOR LAB JAW CRUSHER(PUR/MOIL/C-5/51/E-66/1286-M) | 06-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 3:30 PM | Active | और देखें |
85. | PURCHASE OF SINGLE SOLENOID VALVE AND SOLENOID COIL(PUR/MOIL/C-11/131/E-79/1635-M) | 06-11-2015 | 27-11-2015 | 27-11-2015 | 27-11-2015 | 3:30 PM | Active | और देखें |
86. | POLYHYDRON COUNTER BALANCE VALVE(PUR/MOIL/C-11/118/E-76/1621-M) | 03-11-2015 | 20-11-2015 | 20-11-2015 | 20-11-2015 | 3:30 PM | Active | और देखें |
87. | HINDUSTAN COMPOSITES MAKE BRAKE LINER(PUR/MOIL/C-11/154/E-77/1622-M) | 03-11-2015 | 23-11-2015 | 23-11-2015 | 23-11-2015 | 3:30 PM | Active | और देखें |
88. | POLYHYDRON COUNTER BALANCE VALVE (PUR/MOIL/C-11/118/E-76/1621-M) | 03-11-2015 | 11-12-2015 | 11-12-2015 | 11-12-2015 | 3:30 pm | Active | और देखें |
89. | POLYHYDRON COUNTER BALANCE VALVE (PUR/MOIL/C-11/118/E-76/1621-M) | 03-11-2015 | 30-11-2015 | 30-11-2015 | 30-11-2015 | 3:30 PM | Active | और देखें |
90. | POLYHYDRON COUNTER BALANCE VALVE (PUR/MOIL/C-11/118/E-76/1621-M) | 03-11-2015 | 30-11-2015 | 30-11-2015 | 30-11-2015 | 3:30 PM | Active | और देखें |
91. | PRINTING OF COMPANY CALENDARS FOR THE YEAR 2016(PUR/MOIL/C-12/26/E-75/1615-M Dt.02.11.2015) | 02-11-2015 | 23-11-2015 | 23-11-2015 | 23-11-2015 | 3:30 PM | Active | और देखें |
92. | Removal of waste rock and magniferous rock and handling the same by mechanized means from Chikla Main Extension at Chikla Mine(GR.-II/SDGM(M)/CONT/OCD/59/CH/2015-16/28) | 31-10-2015 | 09-11-2015 | 09-11-2015 | 09-11-2015 | 3:00 PM | Active | और देखें |
93. | HEAVY DUTY PEDESTAL GRINDING MACHINE - 4 NOS. FOR VARIOUS MINES (1 NO.EACH FOR CHIKLA, BELDONGRI, DONGRI BUZURG AND UKWA MINE) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-63 DT.31/10/2015, e-TENDER NO.MOIL/15-16/ET/69) | 31-10-2015 | 02-12-2015 | 02-12-2015 | 02-12-2015 | 3:30 PM | Active | और देखें |
94. | HEAVY DUTY PEDESTAL GRINDING MACHINE - 4 NOS. FOR VARIOUS MINES (1 NO.EACH FOR CHIKLA, BELDONGRI, DONGRI BUZURG AND UKWA MINE) (AS PER ANNEXURE - C ENCLOSED) (Only Through e-procurement) (WE-63 DT.31/10/2015, e-TENDER NO.MOIL/15-16/ET/69) | 31-10-2015 | 11-12-2015 | 11-12-2015 | 11-12-2015 | 3:30 PM | Active | और देखें |
95. | Monitoring of environmental parameters at MOIL mines, plants and sand leases under the water act 1974 and the Air Act 1981(SDGM(Mines)/Monitoring/15-16/06 date 28/10/2015) | 29-10-2015 | 06-11-2015 | 06-11-2015 | 06-11-2015 | 03:00 PM | Active | और देखें |
96. | MAJOR OVERHAULING OF 220 H.P. MAXFLOW PUMP AT 6TH LEVEL UNDERGROUND OF BALAGHAT MINE( BGT/PUMP/15-16/5177) | 29-10-2015 | 23-11-2015 | 23-11-2015 | 23-11-2015 | 05:00 PM | Active | और देखें |
97. | Supplying, providing, erection, installation and commissioning of 11 KV H.T. 3 Phase, 3 Wire, Overhead line to reroute existing 11 KV Overhead line providing power supply to HT Point of supply for residential colony at Dongri Buzurg Mine ( DGM(E)/9/ DB/15 | 29-10-2015 | 24-11-2015 | 24-11-2015 | 24-11-2015 | 3:30 PM | Active | और देखें |
98. | Construction of Rest Shelter cum office at Ch. 22 at Ukwa Mine.(Civil /HO/15-16 /UK/50 Dt- 28/10/2015) | 29-10-2015 | 17-11-2015 | 17-11-2015 | 17-11-2015 | 3:30 PM | Active | और देखें |
99. | PURCHASE OF RUBBER HOSE PIPE(PUR/MOIL/C-11/117/E-73/1569-M) | 28-10-2015 | 09-11-2015 | 09-11-2015 | 09-11-2015 | 3:30 PM | Active | और देखें |
100. | PURCHASE OF TEFLON BUSH(PUR/MOIL/C-11/119/E-74/1574-M) | 28-10-2015 | 09-11-2015 | 09-11-2015 | 09-11-2015 | 3:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |