निविदा संग्रह

निविदाएं संग्रह

खोज के लिए शीर्षक निविदा जारी करने की तिथि निविदा जारी करने की अंतिम तिथि
क्रमांक शीर्षक अंक प्रारंभ दिनांक अंक अंतिम तिथी प्रस्तुत करने की अंतिम तिथि खुलने की तिथि खुलने का समय स्थिति और देखें
1. Shifting of 33kV Overhead Line for installation of Solar Panels at Balaghat Mine.(MOIL/TE/Elect/2017-18/6341 Date 26.12.2017) 29-12-2017 18-01-2018 18-01-2018 18-01-2018 04:30 PM Active और देखें
2. Rate Contract for one year for supply of Compressed Oxygen Gas and Diss. Acetylene Gas Cylinders.(WE-206 e-tender No.MOIL/17-18/ET-403, Dt.29.12.17) 29-12-2017 22-01-2018 22-01-2018 22-01-2018 03:30 PM Active और देखें
3. Picking, collection and cleaning of 20 percent mineralized ore from ROM Mix dump particles at Beldongri Mine(MOIL/17-18/ET/365) 29-12-2017 30-01-2018 30-01-2018 30-01-2018 03:30 PM Active और देखें
4. Picking and collection of UKL 471 20 percent SM grade of Mn. Ore from Ch.6800 to 9500 at F W dump area at Ukwa Mine (MOIL/17-18/ET/362) 28-12-2017 29-01-2018 29-01-2018 29-01-2018 3:30 PM Active और देखें
5. Picking and collection of material from East side of A dump at Tirodi Mine (MOIL/17-18/ET/364) 28-12-2017 29-01-2018 29-01-2018 29-01-2018 3:30 PM Active और देखें
6. Washing picking and collection of material from off the pit area at Tirodi Mine (MOIL/17-18/ET/363) 28-12-2017 29-01-2018 29-01-2018 29-01-2018 3:30 PM Active और देखें
7. New bay for 2500KVA 33KV/11KV outdoor transformer at 33KV substation at Balaghat Mine(MOIL/17-18/ET/369) 22-12-2017 22-01-2018 22-01-2018 22-01-2018 03:30 PM Active और देखें
8. Supply of Timber (Only Through e-procurement)(WE-200 DT.22/12/2017, eTENDER NO.MOIL/17-18/ET/388) 22-12-2017 29-01-2018 29-01-2018 29-01-2018 03:30 PM Active और देखें
9. Drilling of 115 mm dia. holes for Opencast development at Dongri Buzurg Mine(MOIL/17-18/ET/374) 21-12-2017 31-01-2018 31-01-2018 31-01-2018 03:30 PM Active और देखें
10. Cleaning , maintenance, watch and ward and operation pump of Sewage treatment plant Kandri mine(Kan/Civil/NIT/17-18/2813 Date 19/12/2017) 20-12-2017 29-12-2017 29-12-2017 29-12-2017 04:30 PM Active और देखें
11. WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF LIQUID LEVEL LIMITER (MOBRAY CONTROL)(PUR/MOIL/C-11/7/E-54/930-M Dt. 19-12-2017) 19-12-2017 22-01-2018 22-01-2018 22-01-2018 03:30 PM Active और देखें
12. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Chikla Mine(MOIL/17-18/ET/361) 18-12-2017 10-01-2018 10-01-2018 10-01-2018 03:30 PM Active और देखें
13. PURCHASE OF PORTABLE MAGAZINE(PUR/MOIL/C-6/214/E-52/900-M DT.16/12/2017) 16-12-2017 03-01-2018 03-01-2018 03-01-2018 03:30 PM Active और देखें
14. LED street lighting from Mine office to Wahitola camp colony, Munsar Mine(MOIL/17-18/ET/346) 16-12-2017 10-01-2018 10-01-2018 10-01-2018 03:30 PM Active और देखें
15. Stability Test along with designing and Preparation of drawing and detailed cost Estimation for modification work required Strengthening of Head Gear structure of Vertical Shaft at Kandri Mine(A-III/KAN/17-18/2748) 16-12-2017 10-01-2018 10-01-2018 10-01-2018 04:30 PM Active और देखें
16. Construction of Boundary wall at Goverment school Adarsh Vidalaya Munsar under CSR(MOIL/17-18/ET/360) 15-12-2017 29-12-2017 29-12-2017 29-12-2017 03:30 PM Active और देखें
17. Construction of Classrooms in RNT School Ukwa Under CSR(MOIL/17-18/ET/ 359) 14-12-2017 10-01-2018 10-01-2018 10-01-2018 03:30 PM Active और देखें
18. Providing, Installing, and Commissioning of Hydraullic power pack with cylinders for Vertical shaft 100 ton Bunker at Ukwa Mine(UK/Mech/17-18/1891 Dated 03/12/2017) 13-12-2017 26-12-2017 26-12-2017 26-12-2017 04:30 pm Active और देखें
19. Providing and fixing of wooden support (Cleats) for cable laid in underground through vertical shaft at Kandri Mine(MOIL/17-18/ET/349) 13-12-2017 12-01-2018 12-01-2018 12-01-2018 03:30 PM Active और देखें
20. Monitoring and operation of 33KV substation at Balaghat Mine (MOIL/17-18/ET/347) 12-12-2017 10-01-2017 10-01-2017 10-01-2017 03:30 PM Active और देखें
21. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE. (PUR/MOIL/C-5/58/E-41/896-M Dt. 12/12/2017) 12-12-2017 03-01-2018 03-01-2018 03-01-2018 03:30 PM Active और देखें
22. Monitoring and operation of 33KV substation at Balaghat Mine(MOIL/17-18/ET/347) 12-12-2017 10-01-2018 10-01-2018 10-01-2018 03:30 PM Active और देखें
23. Hiring of Front End Loader 1 No. and Tipper (10 MT)- 2 Nos. at Dongri Buzurg Mine(MOIL/17-18/ET/355) 12-12-2017 11-01-2018 11-01-2018 11-01-2018 03:30 PM Active और देखें
24. Collecting and removing of Ash from Boiler house to ash dump area at EMD plant, Dongri Buzurg Mine(MOIL/17-18/ET/350) 11-12-2017 29-12-2017 29-12-2017 29-12-2017 03:30 PM Active और देखें
25. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR WIPRO MAKE HYDRAULIC SYSTEM FOR ASHOK LEYLAND TIPPER.(PUR/MOIL/C-5/23/E-48/835-M Dt. 11/12/2017) 11-12-2017 03-01-2018 03-01-2018 03-01-2018 03:30 PM Active और देखें
26. Monitoring of Environment Parameters at MOIL Mines Plants AND Sand Lease under Water Act 1974 AND Air Act 1981 and Noise Survey(MOIL/17-18/ET/344) 11-12-2017 08-01-2018 08-01-2018 08-01-2018 03:30 PM Active और देखें
27. Underground Drivage for Electrical Sub-station at 13.5 Ft. L at Balaghat Mine(MOIL/17-18/ET/354) 11-12-2017 11-01-2018 11-01-2018 11-01-2018 03:30 PM Active और देखें
28. Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine(AGT/BGT/MECH/IMB/17-18/451 DTD 07.12.2017) 09-12-2017 19-12-2017 19-12-2017 19-12-2017 04:30 PM Active और देखें
29. Replacement of CT and PT metering unit and associated work for HT Service connection of Kandri Mine( MOIL/17-18/ET/351) 09-12-2017 26-12-2017 26-12-2017 26-12-2017 03:30 PM Active और देखें
30. Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine(MOIL/17-18/ET/345) 09-12-2017 08-01-2018 08-01-2018 08-01-2018 03:30 PM Active और देखें
31. Drilling 57mm diameter holes a premining support for installing cable bolt in Mangeneferrous rock in between CH-15 to CH-7 of 12 L North at Balaghat Mine(AGT/BGT/MECH/CB/17-18/450 dtd 07.12.2017) 08-12-2017 14-12-2017 14-12-2017 14-12-2017 04:30 PM Active और देखें
32. Underground Development at -350 Level at Kandri Mine(MOIL/17-18/ET/353) 08-12-2017 08-01-2018 08-01-2018 08-01-2018 03:30 PM Active और देखें
33. Consultancy Services for Preparation Of Design, Drawings and Detail Estimate for construction Of Material Handling Systems and Crushing and Screening Plants etc. at Chikla and Kandri Mine(MOIL/17-18/ET/352) 08-12-2017 08-01-2018 08-01-2018 08-01-2018 03:30 PM Active और देखें
34. Picking and Collection of Mn. Ore from 6 no. Old Dump at SitaPatore Mine(SS/MINE/HO/2017-18/2411) 07-12-2017 15-12-2017 15-12-2017 15-12-2017 03:30 PM Active और देखें
35. Hiring of Architect for rendering Architectural and Design Engineering Services for Proposed Construction of Residences for Directors Sr Executives at West Court Compound , Nagpur(MOIL/17-18/ET/ 341) 06-12-2017 22-12-2017 22-12-2017 22-12-2017 03:30 PM Active और देखें
36. purchase of Video Conferencing solution - 1 No. (4 Lots) (Only Through e-procurement)(WE-201 DT.04/12/2017, eTENDER NO.MOIL/17-18/ET/357) 04-12-2017 02-01-2018 02-01-2018 02-01-2018 03:30 PM Active और देखें
37. Purchase of Jumbo Bags-12,600 Nos(WE-203 e-tender No.MOIL/17-18/ET-356, Dt.04.12.17) 04-12-2017 05-01-2018 05-01-2018 05-01-2018 03:30 PM Active और देखें
38. Removal of spillage from the bottom of conveyor belt of 14.5 level Loading station Production Shaft(BGT/MECH/Spillage/17-18/5657) 02-12-2017 06-12-2017 06-12-2017 06-12-2017 5:00 PM Active और देखें
39. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR VIBRATORY CUP MILL.(PUR/MOIL/C-11/44/E-51/873-M Dt. 30-11-2017) 30-11-2017 22-12-2017 22-12-2017 22-12-2017 03:30 PM Active और देखें
40. Maintenance OF Garden at Tirodi Mine( TRD/CIVIL/2017-18/2255) 28-11-2017 05-12-2017 05-12-2017 05-12-2017 03:30 PM Active और देखें
41. Construction of OCF Shed and office at Dongri Buzurg Mine(MOIL/17-18/ET/274) 28-11-2017 22-12-2017 22-12-2017 22-12-2017 03:30 PM Active और देखें
42. Renovation of sample room at Dongri Buzurg Mine(MOIL/17-18/ET/269) 28-11-2017 29-12-2017 29-12-2017 29-12-2017 03:30 PM Active और देखें
43. Construction of stone masonry for making drain and retaining wall for nallah from railway crossing to IMB plant at Dongri Buzurg Mine(MOIL/17-18/ET/275) 28-11-2017 29-12-2017 29-12-2017 29-12-2017 03:30 PM Active और देखें
44. Construction of Cement Concrete road with retaining wall from administrative building to Pit office at Munsar Mine(MOIL/17-18/ET/271) 28-11-2017 29-12-2017 29-12-2017 29-12-2017 03:30 PM Active और देखें
45. Construction of Shed beside Rest Shelter of Siding of Balaghat Mine(Civil/BGT/T.E./2017-18/5699) 27-11-2017 30-11-2017 30-11-2017 30-11-2017 04:30 PM Active और देखें
46. Construction of Panel room 5 nos at Munsar Mine(MOIL/17-18/ET/273) 27-11-2017 27-12-2017 27-12-2017 27-12-2017 03:30 PM Active और देखें
47. Repair for Camp Residential Quarters of Balaghat Mine(Civil/BGT/T.E./2017-18/5538) 23-11-2017 27-11-2017 27-11-2017 27-11-2017 04:30 PM Active और देखें
48. Major repairs/overhauling Leyland Engine AL 411 of JCB loader No 3 operating at Balaghat Mine(AGT/BGT/MECH/LMV/17-18/427 dtd 23.11.2017) 23-11-2017 01-12-2017 01-12-2017 01-12-2017 04:30 PM Active और देखें
49. Shotcrete work for retaining structure for Mobile Crushing plant at Munsar Mine(CIVIL/MUN/17-18/55 DT. 21.11.2017) 22-11-2017 01-12-2017 01-12-2017 01-12-2017 04:30 PM Active और देखें
50. Desilting of Silts accumulated around Jack Well towards smoothening water supply at Balaghat(Civil/BGT/T.E./2017-18/5571) 21-11-2017 27-11-2017 27-11-2017 27-11-2017 03:30 PM Active और देखें
51. Provision of regenerative control system for 4T capacity Battery Locomotive of Balaghat Mine(MOIL/17-18/ET/335) 21-11-2017 30-12-2017 30-12-2017 30-12-2017 03:30 PM Active और देखें
52. Providing and fixing of Pumping machineries, gs flarring unit,aeration work of STP at Munsar Mine(CIVIL/MUN/17-18/50 DT. 19.11.2017) 20-11-2017 29-11-2017 29-11-2017 29-11-2017 04:30 PM Active और देखें
53. Provision of audio communication between employees riding in Cage and Master Banksman at Men winder of Balaghat Mine(MOIL/17-18/ET/334) 20-11-2017 20-12-2017 20-12-2017 20-12-2017 03:30 PM Active और देखें
54. Pattern making, casting,Machining and dynamic balancing of Pumps Spares for 150 HP Maxflow make Mutti stage Pump (Float) of 8th Level Underground of Balaghat Mine(AGT/BGT/MECH/PUMP/17-18/412 DTD 16.11.2017) 18-11-2017 28-11-2017 28-11-2017 28-11-2017 04:30 PM Active और देखें
55. Fabrication of drive and Driven gear set for vibratory Assembly at IMB Plant Balaghat Mine(AGT/BGT/MECH/IMB/17-18/411 dtd 16.11.2017) 18-11-2017 28-11-2017 28-11-2017 28-11-2017 04:30 PM Active और देखें
56. PURCHASE OF MS OFFICE STD.2016 and MS VISUAL STUDIO PROFESSIONAL SOFTWARE 18-11-2017 06-12-2017 06-12-2017 06-12-2017 3:30 PM Active और देखें
57. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL- MB -1500.( PUR/MOIL/C-5/23/E-49/841-M Dt. 18/11/2017) 18-11-2017 11-12-2017 11-12-2017 11-12-2017 03:30 PM Active और देखें
58. Supplying, providing, erection, installation and commissioning of L.T. 3 phase, 5 wires LT Overhead line, from Balapur camp to Mine Magazine of Dongri Buzurg Mine(MOIL/17-18/ET/333) 18-11-2017 18-12-2017 18-12-2017 18-12-2017 03:30 PM Active और देखें
59. Purchase of Track rollers of EIMCO Elecon make SDL At Gumgaon Mine(GUM/17-18 /349 Dt-15.11.2017) 17-11-2017 24-11-2017 24-11-2017 24-11-2017 03:30 PM Active और देखें
60. Repairing of Roof at Existing Post Office Building in Side syndicate bank at Tirodi Mine(TRD/CIVIL /L/2017-18/2218-A) 17-11-2017 22-11-2017 22-11-2017 22-11-2017 03:30 PM Active और देखें
61. Collecting Caneen Food Item drinks and carrying it on head load for serving it to Mine employee at Tirodi Mine(TRD/Civil/L/2017-18/2195-B) 17-11-2017 22-11-2017 22-11-2017 22-11-2017 03:30 PM Active और देखें
62. PRINTING OF DIARY FOR THE YEAR 2018(WE-106 e-tender No.MOIL/17-18/ET-340, Dt.17.11.17) 17-11-2017 29-11-2017 29-11-2017 29-11-2017 03:30 PM Active और देखें
63. Maintenance of Gardens at Ukwa Mine.(16/Civil/UM/17-18/1765) 17-11-2017 02-12-2017 02-12-2017 02-12-2017 04:30 PM Active और देखें
64. Purchase of Steel Braided Rubber Hose.(WE-50 e-tender No.MOIL/17-18/ET-339, Dt.17.11.17) 17-11-2017 19-12-2017 19-12-2017 19-12-2017 03:30 PM Active और देखें
65. Muffling for Blasting at 6 A 6 B and 6 C section of North at Tirodi Mine(MOIL/17-18/ET/332) 16-11-2017 15-12-2017 15-12-2017 15-12-2017 03:30 PM Active और देखें
66. Hiring of Front End Loader and Tipper at Dongri Buzurg Mine(MOIL/17-18/ET/331) 15-11-2017 30-11-2017 30-11-2017 30-11-2017 03:30 PM Active और देखें
67. Repair of roof slab of old ESR behind Mine Hospital at Chikla Mine.(TE/CH/CIVIL/17-18/3243 dated 06/11/2017) 15-11-2017 28-11-2017 28-11-2017 28-11-2017 03:30 PM Active और देखें
68. Concreting work for chamber Prepration at 1750 level Ukwa Mine.(16/Mining/UM/17-18/1740) 15-11-2017 02-12-2017 02-12-2017 02-12-2017 04:30 PM Active और देखें
69. Sinking 14 in Bore Hole with MS Casing of 8 in Dia and associated works at Gumgaon Mine.(MOIL/17-18/ET/328) 15-11-2017 15-12-2017 15-12-2017 15-12-2017 03:30 PM Active और देखें
70. Construction of 15 No Bath room and Toilets for Residential Quarters at Tirodi Mine(MOIL/17-18/ET/326) 15-11-2017 15-12-2017 15-12-2017 15-12-2017 03:30 PM Active और देखें
71. Transportation of sand from Bawanthadi River lease to Chikla Mine and Kanhan River lease to Gumgaon Mine(MOIL/17-18/ET/321) 15-11-2017 13-12-2017 13-12-2017 13-12-2017 03:30 PM Active और देखें
72. Construction of Boundary wall for administrative building premises and along the approach at Sitapatore Mine(MOIL/17-18/ET/327) 15-11-2017 15-12-2017 15-12-2017 15-12-2017 03:30 PM Active और देखें
73. Renovation and mass renovation works for Awlajhari, Tavejhari and Bodha Pumping Station towards Water Supply Scheme at Balaghat Mine(MOIL/17-18/ET/298) 14-11-2017 30-11-2017 30-11-2017 30-11-2017 03:30 PM Active और देखें
74. Development and beautification of New Colony Garden, Balaghat Mine.(MOIL/17-18/ET/296) 14-11-2017 30-11-2017 30-11-2017 30-11-2017 03:30 PM Active और देखें
75. Purchase of PEARL COKE with Transportation - 3360 MT(WE-80 e-tender No.MOIL/17-18/ET-338, Dt.14.11.17) 14-11-2017 05-12-2017 05-12-2017 05-12-2017 03:30 PM Active और देखें
76. Construction of Medical Administrative Building at Nagpur(MOIL/17-18/ET/ 323) 14-11-2017 14-12-2017 14-12-2017 14-12-2017 03:30 PM Active और देखें
77. Transportation of sand from Kalaphata Ghat to Kandri, Munsar and Beldongri Mine(MOIL/17-18/ET/329) 14-11-2017 15-12-2017 15-12-2017 15-12-2017 03:30 PM Active और देखें
78. Supplying Providing Fixing of Electronic Boom barrier at Entry point of Kandri Mines(Agent-MH/TENDER/17-18/2353) 13-11-2017 06-12-2017 06-12-2017 06-12-2017 04:30 PM Active और देखें
79. Purchase of Oil and Lubricants - 29 items (Only Through e-procurement)(WE-60 DT.13/11/2017 (MOIL/17-18/ET/336-337) 13-11-2017 04-12-2017 04-12-2017 04-12-2017 03:30 PM Active और देखें
80. PURCHASE OF STEEL WIRE ROPE-USHA MARTIN MAKE(PUR/MOIL/C-3/23/E-47/781-M DT.10.11.2017) 10-11-2017 24-11-2017 24-11-2017 24-11-2017 03:30 PM Active और देखें
81. Picking and collection of material from contaminated low grade ROM at South West Part-3 of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/325) 10-11-2017 20-11-2017 20-11-2017 20-11-2017 03:30 PM Active और देखें
82. Picking and collection of material from contaminated low grade ROM at South West Part-2 side of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/324) 10-11-2017 20-11-2017 20-11-2017 20-11-2017 03:30 PM Active और देखें
83. Purchase of Cross Bit, 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine.(WE-105 e-tender No.MOIL/17-18/ET-330, Dt.10.11.17) 10-11-2017 11-12-2017 11-12-2017 11-12-2017 03:30 PM Active और देखें
84. Shifting of 3 phase 3 wire existing 11 KV HT overhead line from CH no 49 MRL 345 CH no 49, MRL 353 CH no 52, MRL 356 to CH no 49,MRL 345 CH no 53, MRL 348-CH no 52, MRL 356 at Dongri Buzurg Mine(MOIL/17-18/ET/313) 10-11-2017 04-12-2017 04-12-2017 04-12-2017 03:30 PM Active और देखें
85. Erection of 11KV HT Overhead line from Chikla B New substation to Gadhaghat Substation (2nd Vertical Shaft) of Chikla Mine(MOIL/17-18/ET/314) 10-11-2017 04-12-2017 04-12-2017 04-12-2017 03:30 PM Active और देखें
86. Erection of new 11KV HT Overhead line from 50-52 substation to south bed mine substation at Tirodi Mine(MOIL/17-18/ET/315) 10-11-2017 04-12-2017 04-12-2017 04-12-2017 03:30 PM Active और देखें
87. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3 TON AND 4 TON BATTERY-DIESEL LOCO FROM OVIS EQUIPMENTS PVT. LTD., HYDERABAD(PUR/MOIL/C-5/27/E-08/267-M Dt. 08/11/2017) 08-11-2017 29-11-2017 29-11-2017 29-11-2017 03:30 PM Active और देखें
88. Automation of underground Pumping Operation at Chikla Mine(MOIL/17-18/ET/288) 08-11-2017 06-12-2017 06-12-2017 06-12-2017 03:30 PM Active और देखें
89. Loading and transportation of Mill tailing from Malajkhand Mine of M/s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/17-18/ET/295) 08-11-2017 07-12-2017 07-12-2017 07-12-2017 03:30 PM Active और देखें
90. Picking and collection of material from contaminated low grade ROM at South West Part-I of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/319) 07-11-2017 16-11-2017 16-11-2017 16-11-2017 03:30 PM Active और देखें
91. Picking and collection of material from contaminated low grade ROM at South Part of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/320) 07-11-2017 16-11-2017 16-11-2017 16-11-2017 03:30 PM Active और देखें
92. Screening sorting and stacking of jigged ferro manganese metal Ferro Manganese Plant Balaghat Mine(BGT/FM/TE/2017-18/338 Date 06.11.2017) 07-11-2017 22-11-2017 22-11-2017 22-11-2017 04:30 PM Active और देखें
93. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR RD-60 DRILL MACHINE AND RD-395 WATER PUMP(PUR/MOIL/C-5/28/E-10/293-M Dt. 07/11/2017) 07-11-2017 11-12-2017 11-12-2017 11-12-2017 03:30 PM Active और देखें
94. Sinking of Winzes (Manually) from 70ft Level to 30ft Level at Munsar Mine(MOIL/17-18/ET/301) 07-11-2017 07-12-2017 07-12-2017 07-12-2017 03:30 PM Active और देखें
95. Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/17-18/ET/297) 07-11-2017 07-12-2017 07-12-2017 07-12-2017 03:30 PM Active और देखें
96. Extra excavation in Manganiferous rock at 5th Level (Western side of -470 ft L) of vertical section at Chikla Mine(MOIL/17-18/ET/299) 07-11-2017 07-12-2017 07-12-2017 07-12-2017 03:30 PM Active और देखें
97. PURCHASE OF INDUSTRIAL SAFETY SHOES AND PVC HALF GUM BOOT(PUR/MOIL/C-11/109/E-45/772-M Dt. 06-11-2017) 06-11-2017 27-11-2017 27-11-2017 27-11-2017 03:30 PM Active और देखें
98. PURCHASE OF HYDRATED LIME POWDER-15MT(PUR/MOIL/C-11/34/E-46/774-M Dt. 06-11-2017) 06-11-2017 27-11-2017 27-11-2017 27-11-2017 03:30 PM Active और देखें
99. Annual Rate Contract for supply of Cement Capsules - 430397 Nos.((WE-104 dt.06.11.2017(e-Tender No.MOIL/17-18/ET/322) 06-11-2017 27-11-2017 27-11-2017 27-11-2017 03:30 PM Active और देखें
100. 11KV Overhead line for Chikla B new substation at Chikla Mine(MOIL/17-18/ET/289) 06-11-2017 27-11-2017 27-11-2017 27-11-2017 03:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें