Tender-Archive-2018
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Additional excavation in Mangeniferous rock between Ch.33 to Ch.35 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/374) | 31-12-2018 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 03:30 PM | Active | और देखें |
2. | Picking and collection of 20 percent SM Grade ore CHL 535 from cleaning of sub-grade mineral reject from ROM at Magazine Dump West side section of Chikla Mine(MOIL/18-19/ET/375) | 31-12-2018 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 03:30 PM | Active | और देखें |
3. | Transportation of sand from Kalaphata Ghat to Beldongri Mine(MOIL/18-19/ET/373) | 31-12-2018 | 11-02-2019 | 11-02-2019 | 11-02-2019 | 03:30 PM | Active | और देखें |
4. | WASHING OF BOTTOM EMD AT EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/CH/SDGM/18-19/527) | 29-12-2018 | 08-01-2019 | 08-01-2019 | 09-01-2019 | 10:30 AM | Active | और देखें |
5. | Recovery of Reduced ore and EMD powder(MOIL/EMD/CH/SDGM/18-19/528) | 29-12-2018 | 08-01-2019 | 08-01-2019 | 09-01-2019 | 10:30 AM | Active | और देखें |
6. | Supply, Fabrication, Erection, Installation and Commissioning of belt Conveyor Charging System at Ferro Manganese Plant, Balaghat Mine.(MOIL/18-19/ET/364) | 27-12-2018 | 25-01-2019 | 25-01-2019 | 25-01-2019 | 03:30 PM | Active | और देखें |
7. | Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/18-19/ET/369) | 27-12-2018 | 28-01-2019 | 28-01-2019 | 28-01-2019 | 03:30 PM | Active | और देखें |
8. | Construction of stone pitching and RCC Ramp for Diesel Pump at Munsar Mine( MUN/CIVIL/NIT/18-19/144 DT 25.12.2018) | 25-12-2018 | 05-01-2019 | 05-01-2019 | 05-01-2019 | 04:30 PM | Active | और देखें |
9. | Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine( 16/Mining/UM/18-19/1991) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
10. | Drilling of Borehole with casing pipe at Ukwa camp Ukwa Mine(16/Civil/UM/18-19/1981 Date 23-12-2018) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
11. | Recovery of 1.5 mm Chilly grade ore from fines of mobile screening plant through trammel at Ukwa Mine(16/Mining/UM/18-19/1987) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
12. | Providing, Fabrication, Erection and Commissioning of 6 Nos Charging bins at Ferro Manganese Plant, Balaghat mine(MOIL/18-19/ET/355) | 24-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
13. | FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/18-19/1244 dtd 21.12.2018) | 22-12-2018 | 04-01-2019 | 04-01-2019 | 04-01-2019 | 04:30 PM | Active | और देखें |
14. | Upgradation and renovation of 20 A type quarters at Munsar Mine(MOIL/18-19/ET/370) | 21-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
15. | A Construction of boundry wall at FMP B Construction of Re wall on hilly side of FMP, C) Construction of drain network at FMP at Balaghat Mine( MOIL/18-19/ET/360) | 21-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
16. | A New administrative building B Office for ferrow manganese plant C Vocational training center and D Gradute trainees hostel at Balaghat Mine(MOIL/18-19/ET/359) | 21-12-2018 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
17. | Providing ,Supplying and erection of 11KV D.P. Structure Near 50-52 Substation Tirodi Mine.(TRD/ELE/18-19/7400002555/3088) | 20-12-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
18. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FUEL DISPENSING AND CONSUMPTION MONITORING SYSTEM AT DONGRI BUZURG MINE.(PUR/MOIL/C-5/23/E-59/854-M Dt. 20/12/2018) | 20-12-2018 | 11-01-2019 | 11-01-2019 | 11-01-2019 | 03:30 PM | Active | और देखें |
19. | Repairing and Relining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/354) | 20-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | और देखें |
20. | Purchase of HYDRATED LIME POWDER- 60 MT(WE-122 e-tender No.MOIL/18-19/ET-372, Dt.19.12.18) | 19-12-2018 | 16-01-2019 | 16-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
21. | PURCHASE OF GEAR MOTOR FOR TIPPLER AT MUNSAR MINE(ASDGM(Mines)/GrpIII/18-19/662) | 19-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
22. | PURCHASE OF ADOBE ACROBAT PRO LATEST VER(PUR/MOIL/C-4/138/E-60/860-M Dt. 19/12/2018) | 19-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
23. | Construction of drain in village Tighai Distt Nagpur under CSR(MOIL/18-19/ET/365) | 19-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
24. | Construction of cement concrete approch road and toilet block at Fetri under CSR(MOIL/18-19/ET/366) | 19-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
25. | Purchase of SULPHURIC ACID with Transportation-250 MT(WE-120 e-tender No.MOIL/18-19/ET-371, Dt.19.12.18) | 19-12-2018 | 09-01-2019 | 09-01-2019 | 10-01-2019 | 03:30 PM | Active | और देखें |
26. | Collection of fines from different areas at Kandri Mine(MOIL/18-19/ET/363) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
27. | Underground concreting work RCC for stope preparation at 70 Level, -30 Level and -230 Level at Munsar Mine(MOIL/18-19/ET/362) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
28. | Horizontal development at -70 Level of Chikla B incline section of Chikla Mine(MOIL/18-19/ET/361) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
29. | Extra excavation in Mangeniferous rock at pluse 160 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/368) | 17-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
30. | Loading AND transportation of Mill Tailing from Malajkhand mine of M s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/18-19/ET/367) | 17-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
31. | Cleaning of Spillage Material Under and Around all the Equipment at I.M.B Plant at Balaghat Mine( MOIL/18-19/ET/353) | 17-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | और देखें |
32. | Electrical heating system for electrolyte, in place of steam boiler heating system at new 500MT EMD Plant at Dongri Buzurg(MOIL/18-19/ET/352) | 15-12-2018 | 15-01-2019 | 15-01-2019 | 15-01-2019 | 03:30 PM | Active | और देखें |
33. | Excavation, Cutting and Dressing Works towards development of approach road near Second Vertical Shaft at Munsar Mine.( MUN/CIVIL/NIT/18-19/134 Date 11.12.2018) | 14-12-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 04:30 PM | Active | और देखें |
34. | PURCHASE OFGEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/18-19/1191 Dt. 10.12.2018) | 14-12-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 04:30 PM | Active | और देखें |
35. | Fabrication of steel ore-pass and manways for Underground Mines i.e Balaghat, Ukwa Chikla Beldongri Munsar Kandri and Gumgaon Mine( MOIL/18-19/ET/351) | 14-12-2018 | 14-01-2019 | 14-01-2019 | 14-01-2019 | 03:30 PM | Active | और देखें |
36. | PURCHASE OF STEEL WIRE ROPE - 12 MM (USHA MARTIN MAKE)(PUR/MOIL/C-3/23/E-40/588-M DT.13/12/2018) | 13-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
37. | PURCHASE OF CONTROL VALVE FOR CTH141F FOR SANDVIK MAKE JUMBO DRILL MACHINE PN-77793404 AT BALAGHAT MINE( PUR/MOIL/BGT/18-19/1190 dtd 10.12.2018) | 13-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 04:30 PM | Active | और देखें |
38. | Providing contractual manpower in IMB Plant for smooth operation of Plant at Dongri Buzurg Mine(MOIL/18-19/ET/356) | 11-12-2018 | 10-01-2019 | 10-01-2019 | 10-01-2019 | 03:30 PM | Active | और देखें |
39. | Making a Retaining Wall on entry of IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5372) | 10-12-2018 | 19-12-2018 | 19-12-2018 | 19-12-2018 | 04:30 PM | Active | और देखें |
40. | Making of hume Pipe Culvert on Junction of Entry of Entry of IMB Plant at Balaghat Mine( Civil/BGT/T.E./2018-19/5386) | 10-12-2018 | 19-12-2018 | 19-12-2018 | 19-12-2018 | 04:30 PM | Active | और देखें |
41. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HAMMER MILL( PUR/MOIL/C-11/23/E-54/836-M Dt. 10-12-2018) | 10-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
42. | Renewal of Environmental Clearance in respect of Three Sand Mining leases i.e. Rajna, Ramdongri (Gumgaon), Kalaphata (Kandri) and Pathri (Chikla) of MOIL Ltd.(MOIL/18-19/ET/349) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | और देखें |
43. | Hiring of 50 MT Capacity 2 Nos. Mobile Crane with 360 Degree revolving Telescopic Extended Boom for unloading and assembling of BH 60M Dumper 3 Nos. at Dongri Buzurg Mine(MOIL/18-19/ET/350) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 05:30 PM | Active | और देखें |
44. | Obtaining Environmental Clearance for Ferro Alloy Plant (Metallurgical Ferrous and Non Ferrous Industry) at Gumgaon Mine (Maharashtra)(MOIL/18-19/ET/357) | 07-12-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | और देखें |
45. | Construction of GSR for newly constructed A and C type Qtrs at Balaghat Mine(MOIL/18-19/ET/336) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
46. | Maintenance of garden at Various places at Dongri Buzurg Mine(MOIL/18-19/ET/337) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
47. | Maintenance and opration of water supply scheme at Dongri Buzurg Mine(MOIL/18-19/ET/338) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
48. | Cleaning of sanitary pipe line drain chambers and removal of garbage from MOIL Premises Nagpur(MOIL/18-19/ET/339) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
49. | Construction of Bituminous Tar road including widening of existing concrete road from village Mouli to kalaphata sand ghat tehsil Ramtek Distt Nagpur Under CSR(MOIL/18-19/ET/340) | 07-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
50. | Strengthening of Foundation of 132 kw in IMB Plant at Balaghat Mine(Civil/BGT/T.E./2018-19/5332) | 06-12-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 04:30 PM | Active | और देखें |
51. | Repairing of Roads from Arjun colony to Manegaon Mine Magazine and Agent Bungalaow to Service Magine at Balaghat Mine(Mining/BGT/T.E./18-19/5335) | 06-12-2018 | 14-12-2018 | 14-12-2018 | 14-12-2018 | 04:30 PM | Active | और देखें |
52. | Purchase of Main PLC Control Panel with HMI for Operation of IMB Plant, Balaghat Mine(M.P) - 1 Set (1 Lot) (Only Through e-procurement)(WE-121 DT.05/12/2018 (MOIL/18-19/ET/358)) | 05-12-2018 | 01-01-2019 | 01-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
53. | PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN BLADE - 2 SETS FOR NORTH AND SOUTH VENTILATION FAN AT BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/148/E-56/827-M DT.03/12/2018) | 03-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
54. | Purchase of Steel RAILS 50 LBS/YARD for Vertical Shaft( WE-107 DT.01.12.2018(e-TenderNo. MOIL/18-19/ET/348) | 01-12-2018 | 26-12-2018 | 26-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
55. | Purchase of Electrically Operated Air Cooled Screw Air Compressor with VFD, Capacity-1000 CFM - 2 Nos. (1 No.each for Gumgaon and Kandri Mine)(1 Lot.) (Only Through e-procurement)( WE-101 DT.30/11/2018 (MOIL/18-19/ET/347)) | 30-11-2018 | 14-01-2019 | 14-01-2019 | 15-01-2019 | 03:30 PM | Active | और देखें |
56. | Purchase of Pneumatically operated Double Diaphragm Pumps for Various Mines - 11 Nos.(2 Lots) (Only Through e-procurement)(WE-119 DT.30/11/2018 (MOIL/18-19/ET/346)) | 30-11-2018 | 31-12-2018 | 31-12-2018 | 01-01-2019 | 03:30 PM | Active | और देखें |
57. | Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) | 29-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
58. | Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) | 29-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
59. | Transportation of Coal to EMD Plant Dongri Buzurg Mine- 4800 MT(WE-114 e-tender No.MOIL/18-19/ET-345, Dt.29.11.18) | 29-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
60. | Providing internet connectivity at Kandri., Munsar, Beldongri, Gumgaon, Ukwa Mines and and Nagpur Office(MOIL/18-19/ET/318) | 29-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
61. | Miscellaneous Contract Works to be carried out at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/316) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
62. | Collection of canteen food items Collection of canteen food items and servicing it to mine employees at Chikla Mine through outside agency(MOIL/18-19/ET/335) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
63. | Collection of canteen food items and servicing it to mine employees at Tirodi Mine through outside agency(MOIL/18-19/ET/334) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
64. | Cleaning and sorting of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/332) | 28-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
65. | Trench cutting in ore stacks at Kandri Mine(MOIL/18-19/ET/331) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
66. | Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/329) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
67. | Purchase of Sand for Sand Stowing Plant at Kandri Munsar and Beldongri Mine(MOIL/18-19/ET/328) | 27-11-2018 | 27-12-2018 | 27-12-2018 | 27-12-2018 | 03:30 PM | Active | और देखें |
68. | Loading of Slag at Ferro Manganese Plant, Balaghat Mine( MOIL/18-19/ET/315) | 27-11-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 03:30 PM | Active | और देखें |
69. | Purchase of HIGH DENSITY POLY ETHYLENE-HDPE WOOVEN SACKS - 30150 NOS.(WE-108 e-tender No.MOIL/18-19/ET-344, Dt.27.11.18) | 27-11-2018 | 01-01-2019 | 01-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
70. | Extra excavation in Mangeniferous rock at 5th Level of vertical shaft section of Chikla Mine(MOIL/18-19/ET/330) | 26-11-2018 | 10-12-2018 | 10-12-2018 | 10-12-2018 | 03:30 PM | Active | और देखें |
71. | Extra excavation in Mangeniferous rock at 70 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/333) | 26-11-2018 | 10-12-2018 | 10-12-2018 | 10-12-2018 | 03:30 PM | Active | और देखें |
72. | PURCHASE OF MOTOR REDUCER (TRACK DRIVE GEAR BOX) (MAKE - SANDVIK ASIA PVT.LTD.) - 1 NO.FOR BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/240/E-55/794-M DT.26/11/2018) | 26-11-2018 | 21-12-2018 | 21-12-2018 | 21-12-2018 | 03:30 PM | Active | और देखें |
73. | REPAIRING OF AIR CONDITIONING UNIT OF HEAVY EARTH MOVING MACHINERIES AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/482) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | और देखें |
74. | REPAIRING OF TRACK ROLLERS OF BEML DOZER BD155 NO.3 OF DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/483) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | और देखें |
75. | REPAIRING OF BOOM CYLINDER OF TATAT HITACHI 450 HYDRAULIC EXCAVATOR OPERTING AT DONGRI BUZURG MINE.(DB/MECH/EXC/18-19/481) | 26-11-2018 | 07-12-2018 | 07-12-2018 | 07-12-2018 | 04:30 PM | Active | और देखें |
76. | Drilling of 57 mm dia holes apremining support for installing cabel bolt in Manginifferous rock in between ch 07 to 11 Level at Balaghat Mine( Mining/BGT/T.E./18-19/5214) | 26-11-2018 | 04-12-2018 | 04-12-2018 | 04-12-2018 | 04:30 PM | Active | और देखें |
77. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 04:30 PM | Active | और देखें |
78. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE(PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 12-12-2018 | 12-12-2018 | 12-12-2018 | 04:30 PM | Active | और देखें |
79. | PURCHASE OF HDPE PIPES 140 MM FOR BALAGHAT MINE( PUR/MOIL/BGT/HDPE/18-19/1091 dtd 22/11/2018) | 23-11-2018 | 03-12-2018 | 03-12-2018 | 03-12-2018 | 04:30 PM | Active | और देखें |
80. | Annual Rate Contract for supply of Cement Capsules - 446700 Nos.(WE-109 DT.22.11.2018(e-TenderNo. MOIL/18-19/ET/342) | 22-11-2018 | 13-12-2018 | 13-12-2018 | 14-12-2018 | 03:30 PM | Active | और देखें |
81. | Designing, Engineering, Supplying, Installation, Commissioning and Testing of 2 X 1600KVA, 11KV/433V Indoor Substation for Second Vertical Shaft Project at Ukwa Mine(MOIL/18-19/ET/307) | 22-11-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
82. | Diamond Drill Bits and Accessories- 7 Items.(WE-105 DT.22.11.2018 (e-TenderNo.MOIL/18-19/ET/343) | 22-11-2018 | 24-01-2019 | 24-01-2019 | 25-01-2019 | 03:30 PM | Active | और देखें |
83. | DUST MASK, EAR PLUGS, EAR MUFF(PUR-MOIL-C-1 190-WE-103-ET-327 dt. 20/11/2018) | 20-11-2018 | 17-12-2018 | 17-12-2018 | 18-12-2018 | 03:30 PM | Active | और देखें |
84. | C. I. SHEAVE WHEEL 2800mm DIA(PUR-MOIL-C-12-50-WE-113-ET-326 dt. 19-11-2018) | 19-11-2018 | 10-12-2018 | 10-12-2018 | 11-12-2018 | 03:30 PM | Active | और देखें |
85. | Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) | 19-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
86. | Purchase of Jaw Plates for Sayaji Make Jaw Crushers(WE-110 e-tender No.MOIL/18-19/ET-325, Dt.19.11.18) | 19-11-2018 | 11-12-2018 | 11-12-2018 | 12-12-2018 | 03:30 PM | Active | और देखें |
87. | Extension of existing old metering room at Kandri Mine.(KAN/Civil/NIT/2018-19/2624 Dated 17.11.2018) | 19-11-2018 | 26-11-2018 | 26-11-2018 | 26-11-2018 | 04:30 PM | Active | और देखें |
88. | Printing of Company Diary 2019(PUR-MOIL-C-12-26-WE-111-ET-323 dt.16/11/2018) | 17-11-2018 | 05-12-2018 | 05-12-2018 | 06-12-2018 | 03:30 PM | Active | और देखें |
89. | Renovation of Vertical Shaft by replacement of Guide Rails, Buntons, Sollars, Laaders and Fencing at Chikla Mine( MOIL/18-19/ET/303) | 17-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
90. | Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/18-19/ET/306) | 17-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
91. | Purchase of Steel Cages for Munsar Mine - 3 Nos.(1 Lot) (Only Through e-procurement)( WE-112 DT.17/11/2018 (MOIL/18-19/ET/324)) | 17-11-2018 | 17-12-2018 | 17-12-2018 | 18-12-2018 | 03:30 PM | Active | और देखें |
92. | Construction of Rest Shelter Near Screening Plant, near Siding Region at Munsar Mine(MOIL/18-19/ET/313) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
93. | Construction of collection tank and circulation network for sewage treatment plant at Munsar Mine(MOIL/18-19/ET/312) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
94. | Replacement of old damage steel doors and windows with new steel doors and windows for camp quarters at UKWA mine(MOIL/18-19/ET/308) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
95. | Civil House Keeping Works to Industrial and Alliied Building inside Mine premises for upcoming Safety Week at Balaghat Mine(Civil/BGT/T.E./2018-19/4959) | 16-11-2018 | 23-11-2018 | 23-11-2018 | 23-11-2018 | 04:30 PM | Active | और देखें |
96. | Construction of foundation and extended platform for Elevated feeding hopper of Mobile Crusher at Munsar Mine(MOIL/18-19/ET/311) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
97. | Construction and installation of bio toilet for underground in Kandri Mine(KAN/CIVIL/NIT/2018-19/2544 Date 10.11.2018) | 16-11-2018 | 17-11-2018 | 17-11-2018 | 17-11-2018 | 04:30 PM | Active | और देखें |
98. | COMPANY CALENDAR(PUR/MOIL/C-12/26/E-52/781-M dt. 16/11/2018) | 16-11-2018 | 30-11-2018 | 30-11-2018 | 30-11-2018 | 03:30 PM | Active | और देखें |
99. | Construction of Durga Stage including other amenities at Football ground at Kandri Mine(MOIL/18-19/ET/310) | 16-11-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 03:30 PM | Active | और देखें |
100. | Providing and fixing of paving blocks in rest house at Chikla Mine.(TE/CH/CIVIL/18-19/432 date 25/10/2018) | 15-11-2018 | 21-11-2018 | 21-11-2018 | 21-11-2018 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |