निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Dismantling of existing 30lb Tram line of pit top and laying of 60lb Tram line and Fabrication of 60lb rail LH and diamond crossing(Mech/KD/24-25/94) | 11-04-2024 | 30-04-2024 | 30-04-2024 | 30-04-2024 | 04:30 PM | Active | और देखें |
2. | Construction of RCC retaining wall for new Crushing and screening Plant at Sitapatore Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/4) | 10-04-2024 | 10-05-2024 | 10-05-2024 | 10-05-2024 | 04:00 PM | Active | और देखें |
3. | Overhauling Centrifugal Pump Kirloskar 150HP second level(Mech/KD/24-25/105) | 10-04-2024 | 01-05-2024 | 01-05-2024 | 01-05-2024 | 04:30 PM | Active | और देखें |
4. | Miscellaneous civil works for Slime pond at Nagra plant of Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/15 DT. 09/04/2024) | 09-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
5. | providing, supplying and installing fire fighting system FMP, balaghat mine(TE/MOIL/AGT/FMP/ELECT/24-25/08) | 08-04-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:25 PM | Active | और देखें |
6. | Purchase of spring Steel Mesh Wire Panel for 6mm and 25mm Vibrating Screen of IMB plant of Balaghat Mine.(PUR/MOIL/BGT/IMB/24-25/16) | 08-04-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | और देखें |
7. | PURCHASE OF SPARES FOR AIR AND WATER COOLED COMPRESSORS FOR KANDRI MINE(PUR/MOIL/KD/MECH/01) | 08-04-2024 | 27-04-2024 | 27-04-2024 | 27-04-2024 | 04:30 PM | Active | और देखें |
8. | Hiring of JCB Machine with Tolley Breaker at Tirodi Mine.(MOIL/TRD/MINE/2024/257 dated - 23/03/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:00 PM | Active | और देखें |
9. | Stripping of ore body, loading of blasted muck and pushing of loaded tubs upto haulage Road and supporting of the stripping Area.(MUN/TENDER/24-25/43) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
10. | Construction of boundary wall for Existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/13 DT. 08/04/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
11. | Construction of ventilation fan room for 2nd vertical shaft of ukwa mine.(AGT/CIVIL/UK/LT/2024-25/14 DT. 08/04/2024) | 08-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
12. | Supply of Spears for TR Bearing, 30209 for Tub Trolley maintenance.(CH/MECH/24-25/10009732/14) | 08-04-2024 | 17-04-2024 | 17-04-2024 | 17-04-2024 | 04:30 PM | Active | और देखें |
13. | Repairing to Old Gantry wall with stone Masonry at Siding Premises at Kandri Mine(CIVIL/KD/T.E./24-25/24 26.04.2024) | 06-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | और देखें |
14. | Requirement of Spares for 150HP Mather and Platt Make Pump Model ET ISO32 0 150X125 500 for BALAGHAT MINE(PUR/BGT/PUMP/24-25/18) | 06-04-2024 | 26-04-2024 | 26-04-2024 | 26-04-2024 | 04:30 PM | Active | और देखें |
15. | purchase of Button Bit for FRD DCR 20 DRILL MACHINE for Dongri Buzurg Mine(PUR/MOIL/DB/2024-25/24) | 05-04-2024 | 11-04-2024 | 11-04-2024 | 11-04-2024 | 04:30 PM | Active | और देखें |
16. | Flushing of Septic Tanks, Inspection Chambers and conveying pipeline of Sewage System of Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ 31.03.2024) | 05-04-2024 | 10-04-2024 | 10-04-2024 | 10-04-2024 | 04:30 PM | Active | और देखें |
17. | De-silting and cleaning of sump and surrounding area of sump at 13L, 100L, 200L, 300L and 400L.(Agent/Gum/Min/24-25/17, date 03.04.2024) | 03-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
18. | Hiring of equipment for removal of waster rock and handeling the same by mechanized means at uderground area,south section with drilling and blasting at Tirodi Mine.(MOIL/TRD/MINE/2024/211/2067 DATED 10/03/2024) | 02-04-2024 | 09-04-2024 | 09-04-2024 | 09-04-2024 | 04:00 PM | Active | और देखें |
19. | Repairing and servicing of Air After cooler and Oil cooler of IR Compressor and Godrej compressor.(CH/Mech/23-24/76-30097/1924) | 02-04-2024 | 09-04-2024 | 09-04-2024 | 09-04-2024 | 04:30 PM | Active | और देखें |
20. | Major Overhaul of Engine of L and T make Loader at Chikla Mine.(CH/Mech/23-24/76-30443/1928) | 02-04-2024 | 09-04-2024 | 09-04-2024 | 09-04-2024 | 04:30 PM | Active | और देखें |
21. | Repairing of 4 Stage Hydraulic Pump and feed motor of Universal Drill Machine operating at 4TH Level(CH/MECH/23-24/76-30072/1925) | 02-04-2024 | 16-04-2024 | 16-04-2024 | 16-04-2024 | 04:30 PM | Active | और देखें |
22. | LANDSCAPE WORKS COMPRISING OF LAYING OF TURF TOWARDS DEVELOPMENT OF LAWN SPACE INSIDE AGENTS BUNGALOW CHIKLA MINE.(CH/CIVIL/NIT/23-24/04 DATE-01.04.2024) | 02-04-2024 | 16-04-2024 | 16-04-2024 | 16-04-2024 | 04:30 PM | Active | और देखें |
23. | Purchase of Spares for TATA make Tipper of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1910) | 01-04-2024 | 23-04-2024 | 23-04-2023 | 23-04-2023 | 04:30 PM | Active | और देखें |
24. | Purchase of Spares for TATA make Tipper of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1910) | 01-04-2024 | 23-04-2024 | 23-04-2024 | 23-04-2024 | 04:30 PM | Active | और देखें |
25. | Pro and fit RVA and Seat Belt reminder with human voice of Excavator Dumper and Tipper at TRD Mine(MOIL/TRD/ME/GEN/2024/139/2093 DT-28.03.2024) | 01-04-2024 | 10-04-2024 | 10-04-2024 | 10-04-2024 | 03:30 PM | Active | और देखें |
26. | Maintenance and repair of L.T and H.T. overhead line at Chikla Mine.(AGENT/GR-II/ELECT/23-24/1929) | 01-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
27. | Providing supplying and installation of 79 Mtr. radius Lightening Arrester.(AGENT/GR-II/ELECT/23-24/1936) | 01-04-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
28. | Fabrication of Pump Spares by Pattern Making, Casting and Machining work for 240 HP Kirloskar Make Multistage Pump of Balaghat Mine.(AGT/BGT/MECH/PUMP/23-24/2107) | 30-03-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | और देखें |
29. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all Winders for one year at Balaghat Mine.(AGT/BGT/MECH/WINDER/23-24/2108) | 30-03-2024 | 22-04-2024 | 22-04-2024 | 22-04-2024 | 04:30 PM | Active | और देखें |
30. | Underground Sump cleaning including drain at Chikla Mine.(Mining/CH/T.E./23-24/1912) | 30-03-2024 | 06-04-2024 | 06-04-2024 | 06-04-2024 | 04:30 PM | Active | और देखें |
31. | Hiring front end loader to draw back the sub grade mineral reject within7.5 meters of mine lease boundary at Balaghat Mine(MINING/BGT/LTE/23-24/2095 Dt 29.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:30 PM | Active | और देखें |
32. | SPARES FOR INDUS ROCK TOOL MAKE DRILL MACHINE IRB 400 FOR TIRODI MINE(MOIL/HO/MECH/GEN/2024/134/2081 DT- 27.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 03:30 PM | Active | और देखें |
33. | Proposal for Major repairing of bucket PC450 AND TATA220 Hyd Excavator at Tirodi Mine(MOIL/TD01/ME/GEN/2024/139/2092 DT-28.03.2024) | 29-03-2024 | 06-04-2024 | 06-04-2024 | 06-04-2024 | 03:30 PM | Active | और देखें |
34. | Misc works for firefighting arrangement in 33 KV substation at Balaghat Mine(CIVIL/BGT/LTE/23-24/2100 Dt 29.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:30 PM | Active | और देखें |
35. | Replacement of sand filter of water filtration plant at Balaghat Mine(CIVIL/BGT/LTE/23-24/2103 Dt 29.03.2024) | 29-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:30 PM | Active | और देखें |
36. | Transportation of Unloading of ROM/Rock tubs at Beldongri Mine.(AGT/MINE/BEL/2023-24/1995 Dt.27.03.2024) | 28-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:30 PM | Active | और देखें |
37. | Purchase of Rotating assy DSM5 for Kirloskar make DSM80/36 (60HP) Centrifugal pump of IMB plant of D.B.Mine.(PUR/MOIL/DB/23-24/1911) | 28-03-2024 | 18-04-2024 | 18-04-2024 | 18-04-2024 | 04:30 PM | Active | और देखें |
38. | Providing and fitting of safety device in HEMM/vehicles of Ukwa Mine(AJGM/UK/MECH/2023-24/2082) | 28-03-2024 | 03-04-2024 | 03-04-2024 | 03-04-2024 | 04:30 PM | Active | और देखें |
39. | Providing and laying 2 GI pipeline with sockets as per ground level from 4300 CH section to vertical for operation of Niagra Plant at Ukwa Mine(AJGM/UK/MECH/2023-24/2083) | 28-03-2024 | 03-04-2024 | 03-04-2024 | 03-04-2024 | 04:30 PM | Active | और देखें |
40. | Exploratory drill at various places of mine area,Tirodi Mine.(TRD/CIVIL/2023-24/2018 DATED 18/03/2024) | 28-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:00 PM | Active | और देखें |
41. | Fabrication and erection of conveyor belt structure, shifting and installation of 30Hp Haulage at 12000Ch section Underground at Ukwa Mine.(AJGM/UK/MECH/2023-24/2063) | 28-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:30 PM | Active | और देखें |
42. | Purchase of AVTEC 6610M Transmission filters for BEML make BH60 M dumpers.(PUR/MOIL/DB/2023-24/1914) | 28-03-2024 | 17-04-2024 | 17-04-2024 | 17-04-2024 | 04:30 PM | Active | और देखें |
43. | Repairing of Scrubber Fan assembly at EMD Plant, Dongri Buzurg Mine(MOIL/DB/EMD/ADGM/23-24/1899) | 28-03-2024 | 10-04-2024 | 10-04-2024 | 10-04-2024 | 04:30 PM | Active | और देखें |
44. | Miscellaneous works at Administrative Building,Security quarter and Meeting Hall at Sitapatore Mine.(TRD/CIVIL/2023-24/2017 DATED 18/03/2024) | 27-03-2024 | 03-04-2024 | 03-04-2024 | 03-04-2024 | 04:00 PM | Active | और देखें |
45. | Providing, fabricating and fixing box ladies ladies urinal in mine area at Tirodi Mine.(TRD/CIVIL/2023-24/2016 DATED 18/03/2024) | 27-03-2024 | 03-04-2024 | 03-04-2024 | 03-04-2024 | 04:00 PM | Active | और देखें |
46. | Construction of Panel room at south bed at Tirodi Mine.(TRD/CIVIL/2023-24/2015 DATED 18/03/2024) | 27-03-2024 | 03-04-2024 | 03-04-2024 | 03-04-2024 | 04:00 PM | Active | और देखें |
47. | Removal of suppressed muck from Ch. 25 to Ch 40 at 10th L North Balaghat Mine(MINING/BGT/LTE/23-24/2080 Dt 27.03.2024) | 27-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:30 PM | Active | और देखें |
48. | WATER PROOFING BY MEANS OF LAYING TORCH SHIELD ON OLD RCC ROOF OF KHOSLA COMPRESSOR, CAP LAMP ROOM AND PANEL ROOM AT 1ST AND 2ND VERTICAL SHAFT PREMISES AT CHIKLA MINE.(CH/CIVIL/NIT/23-24/1891 DATE-24.03.2024) | 26-03-2024 | 06-04-2024 | 06-04-2024 | 06-04-2024 | 04:30 PM | Active | और देखें |
49. | Procurement of 385 Cu. Mtrs. of Dissolved Acetylene Gas Cylinders for the Balaghat Mine.(PUR/BGT/DA-CYL/23-24/2060) | 25-03-2024 | 01-04-2024 | 01-04-2024 | 01-04-2024 | 04:30 PM | Active | और देखें |
50. | PROVIDING, SUPPLYING, STRINGING PAVING OF ACSR CONDUCTOR OF 33KV OVERHEAD LINE(BGT/TE/ELECT/AJGM/23-24/2057) | 25-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 03:30 PM | Active | और देखें |
51. | Fabrication of Bearing Plates of Roof Bolts for the year 2024 for Balaghat Mine.(AGT/BGT/MECH/RB/23-24/2062) | 25-03-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
52. | Overhauling of Hydraulic Pump and Charging Pump of LHD Machine of Balaghat Mine(AGT/MECH/LHD-PUMP/23-24/2061) | 25-03-2024 | 15-04-2024 | 15-04-2024 | 15-04-2024 | 04:30 PM | Active | और देखें |
53. | Comprehensive Annual Maintenance Contract (CAMC) of computer hardware and peripherals(ADGM/Grp3/Sys/AMC/2023-24/1975) | 23-03-2024 | 03-04-2024 | 03-04-2024 | 03-04-2024 | 04:00 PM | Active | और देखें |
54. | Laying of Alternate Line in between Septic Tanks and Sewage Treatment Plant, Cleaning Works and allied civil works for STP of Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ Date 22.03.2024) | 22-03-2024 | 30-03-2024 | 30-03-2024 | 30-03-2024 | 04:30 PM | Active | और देखें |
55. | Drain beside Septic Tanks to facilitate overflow for Sewage Treatment Plant, STP of Chandmara Colony Dongribuzurg Mine.(DB/CIVI/NIT/TE/2023-24/ Date 22.03.24) | 22-03-2024 | 30-03-2024 | 30-03-2024 | 30-03-2024 | 04:30 PM | Active | और देखें |
56. | Cleaning and uprooting unwanted weeds, repair barbed wire fencing and allied Civil works at Magazine at Dongri-Buzurg Mine(DB/CIVIL/NIT/TE/2023-24/ 20.03.2024) | 21-03-2024 | 30-03-2024 | 30-03-2024 | 30-03-2024 | 04:30 PM | Active | और देखें |
57. | Waterproofing work of Toilet and Bathroom Portion of A Type Staff Quarters at Syndicate Colony and Chandmara Colony at Dongri-Buzurg Mine.(DB/CIVIL/NIT/TE/2023-24/ Dt 20.03.2024) | 21-03-2024 | 30-03-2024 | 30-03-2024 | 30-03-2024 | 04:30 PM | Active | और देखें |
58. | Distribution, collection, maintenance and cleaning of cap.(AGENT/GR-II/ELECT/23-24/1868) | 21-03-2024 | 23-03-2024 | 23-03-2024 | 23-03-2024 | 04:30 PM | Active | और देखें |
59. | Providing and fixing of Aluminium Sliding windows and ventilations in Existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2024 DT. 20.03.2024) | 20-03-2024 | 23-03-2024 | 23-03-2024 | 23-03-2024 | 04:30 PM | Active | और देखें |
60. | Landscaping and beautification work at Existing School Building at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2025 DT. 19.03.2024) | 19-03-2024 | 23-03-2024 | 23-03-2024 | 23-03-2024 | 04:30 PM | Active | और देखें |
61. | Construction of Bituminous Tar Road from Gate No 1 to Canteen and from Mine Entrance Gate via DAV Public School towards Katangi Highway at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/3) | 19-03-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:00 PM | Active | और देखें |
62. | Construction of 1,00,000 litres and 30,000 Litres capacity Ground Storage industrial Effluent collection Tank along with pipe line Network at EMD Plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/2) | 19-03-2024 | 18-04-2024 | 18-04-2024 | 18-04-2024 | 04:00 PM | Active | और देखें |
63. | Maintenance and operation of water supply scheme at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/2027 DT. 19.03.2024) | 19-03-2024 | 23-03-2024 | 23-03-2024 | 23-03-2024 | 05:30 PM | Active | और देखें |
64. | Renovation of existing old Administrative Building at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/1) | 19-03-2024 | 25-04-2024 | 25-04-2024 | 25-04-2024 | 04:00 PM | Active | और देखें |
65. | Purchase of Filters of CAT C13 ENGINE of FRD DCR 20 Drilling Machine operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1852) | 18-03-2024 | 26-03-2024 | 26-03-2024 | 26-03-2024 | 04:30 PM | Active | और देखें |
66. | PURCHASE OF FURNITURE FOR REST HOUSE of Gumgaon MINE(PUR/GUM/PER/23-24/ 1946) | 18-03-2024 | 28-03-2024 | 28-03-2024 | 28-03-2024 | 04:30 PM | Active | और देखें |
67. | Tub transportation from all level inset (U/g) to surface at 2nd vertical shaft.(AGT/MINING/UK/LT/2023-24/2023 DT. 18.03.202) | 18-03-2024 | 23-03-2024 | 23-03-2024 | 23-03-2024 | 04:30 PM | Active | और देखें |
68. | ALLIED WORKS AND LANDSCAPING WORKS FOR DEVELOPING CHILDREN PARK IN OFFICERS COLONY, CHIKLA MINE.(CH/Civil/NIT/23-24/1861 Date- 18.03.2024) | 18-03-2024 | 01-04-2024 | 01-04-2024 | 01-04-2024 | 04:30 PM | Active | और देखें |
69. | HIRING OF SERVICES OF ARCHITECT AND DESIGN ENGINEERS CONSULTANT FOR CONSTRUCTION OF NEW C TYPE QUARTERS - 16 UNITS AT CHIKLA MINE.(CH/Civil/NIT/23-24/1841 Date-14.03.2024) | 18-03-2024 | 01-04-2024 | 01-04-2024 | 01-04-2024 | 04:30 PM | Active | और देखें |
70. | Purchase of SHELL CORENA S3 R46 OIL FOR FRD DCR20 Drilling Machine of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1812) | 14-03-2024 | 20-03-2024 | 20-03-2024 | 20-03-2024 | 04:00 PM | Active | और देखें |
71. | Purchase of Spares for D155 NO 5 Dozer of Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2023-24/1811) | 14-03-2024 | 20-03-2024 | 20-03-2024 | 20-03-2024 | 04:30 PM | Active | और देखें |
72. | Purchase of Hydraulic filters for BEML make BH60 M dumpers.(PUR/MOIL/DB/2023-24/1814) | 14-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:30 PM | Active | और देखें |
73. | Purchase of Transmission Oil, TES439 OR Servo TransXL 439 for BEML 60T Dumpers of Dongri Buzurg Mine.(PUR/MOIL/DB/2023-24/1813) | 14-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:30 PM | Active | और देखें |
74. | Repairing of 6 Cyl. Diesel engine of Eicher School Bus of Balaghat Mine.(AGT/BGT/MECH/MG/23-24/1984) | 13-03-2024 | 20-03-2024 | 20-03-2024 | 20-03-2024 | 04:30 PM | Active | और देखें |
75. | Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/MECH/IMB/23-24/1983) | 13-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:30 PM | Active | और देखें |
76. | HIRING OF SERVICES OF ARCHITECT AND DESIGN ENGINEERS CONSULTANT FOR MODIFICATIONB, UPGRADATION OF EXISTING GUEST HOUSE AT CHIKLA MINE.(Civil/CH/NIT/23-24/1810 Date-13.03.2024) | 13-03-2024 | 27-03-2024 | 27-03-2024 | 27-03-2024 | 04:30 PM | Active | और देखें |
77. | Repairing of three layers fencing in north sanction at Balaghat Mine(CIVIL/BGT/LTE/23-24/1982 Dt 12.03.2024) | 12-03-2024 | 20-03-2024 | 20-03-2024 | 20-03-2024 | 04:30 PM | Active | और देखें |
78. | Providing 06 nos of pump operator for south bed pit at tirodi mine(MOIL/TRD/MINE/2024/137/1935 DT 05.03.2024) | 11-03-2024 | 19-03-2024 | 19-03-2024 | 19-03-2024 | 03:30 PM | Active | और देखें |
79. | Preparation of Comprehensive Hydrogeological Report for renewal of existing ground water NOC of CGWA for Kandri Mine(Geol/KD/CGWA/T.E./23-24/1855 Date 04.03.2024) | 11-03-2024 | 18-03-2024 | 18-03-2024 | 18-03-2024 | 04:30 PM | Active | और देखें |
80. | Collection of primary and secondary data regarding ground water development and filling of CGWA NOC renewal application for Kandri Mine(Geo/KD/CGWA/T.E./23-24/1854 Date 04.03.2024) | 11-03-2024 | 18-03-2024 | 18-03-2024 | 18-03-2024 | 04:30 PM | Active | और देखें |
81. | In house Maintenance of Rest house, Mine Manager Bungalow, Canteen and Recreational hall at Gumgaon Mine(AGT/GUM/HR/LT/23-24/1898) | 11-03-2024 | 18-03-2024 | 18-03-2024 | 18-03-2024 | 04:30 PM | Active | और देखें |
82. | PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/1965) | 09-03-2024 | 28-03-2024 | 28-03-2024 | 28-03-2024 | 04:30 PM | Active | और देखें |
83. | PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/1965) | 09-03-2024 | 28-03-2024 | 28-03-2024 | 28-03-2024 | 04:30 PM | Active | और देखें |
84. | PURCHASE OF PIPE-FITTINGS AND ACCESSORIES FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/PIPE-FITGS/23-24/1966) | 09-03-2024 | 28-03-2024 | 28-03-2024 | 28-03-2024 | 04:30 PM | Active | और देखें |
85. | PROVIDING, FIXING AND INSTALLATION OF SUBMERSIBLE PUMPS FOR WATER SUPPLY SCHEME AT CHIKLA MINE.(CH/Civil/NIT/23-24/1799 Dt.09.03.2024) | 09-03-2024 | 19-03-2024 | 19-03-2024 | 19-03-2024 | 04:30 PM | Active | और देखें |
86. | Supplying of Different Plant Species Indoor and Outdoor for Guest House, Administrative Office of EMD and Mine and Childrens Park at Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/1791 07.03.2024) | 08-03-2024 | 16-03-2024 | 16-03-2024 | 16-03-2024 | 04:30 PM | Active | और देखें |
87. | Procurement of 2500 Cu. Mtrs. of Dissolved Oxygen Gas Cylinders for the Balaghat Mine.(PUR/BGT/OXY-CYL/23-24/1956) | 08-03-2024 | 15-03-2024 | 15-03-2024 | 15-03-2024 | 04:30 PM | Active | और देखें |
88. | PURCHASE OF SPARES FOR BBC-16 DRILL MACHINE AND BMT-51 AIR LEGS FOR UNDERGROUND DRILL MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/BBC/23-24/1957) | 08-03-2024 | 20-03-2024 | 20-03-2024 | 20-03-2024 | 04:30 PM | Active | और देखें |
89. | PURCHASE OF COPPER WELDING CABLE AND PTFE GLAND ROPE FOR UNDERGROUND PUMPS OF BALAGHAT MINE.(UR/MOIL/PTFE-CABLE/23-24/1955) | 08-03-2024 | 29-03-2024 | 29-03-2024 | 29-03-2024 | 04:30 PM | Active | और देखें |
90. | Major Overhauling of 150HP Flow-More Multistage Pump of Balaghat Mine.(AGT/BGT/MECH/PUMP/23-24/1958) | 08-03-2024 | 28-03-2024 | 28-03-2024 | 28-03-2024 | 04:30 PM | Active | और देखें |
91. | Magazine materials handling of Mine Magazine at Gumgaon Mine.(Agent/Gum/Min/23-24/1827, date 01.03.2024) | 08-03-2024 | 18-03-2024 | 18-03-2024 | 18-03-2024 | 04:30 PM | Active | और देखें |
92. | Providing and fixing of Amusement Rides for developing Children Park and Recreational Space in Chandmara Colony, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1756 01.03.24) | 07-03-2024 | 12-03-2024 | 12-03-2024 | 12-03-2024 | 04:30 PM | Active | और देखें |
93. | Widening of Lane adjacent to Diesel Pump to ensure smooth mobility of heavy vehicles inside Workshop Premises from safety perspective at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/1755 01.03.24) | 07-03-2024 | 12-03-2024 | 12-03-2024 | 12-03-2024 | 04:30 PM | Active | और देखें |
94. | Construction of Two Wheeler Parking shed and fixing of Grill and paving Block beside Medical administrative Building, MOIL Nagpur.(MOIL/MOIL LIMITED/CMC/23-24/ET/126) | 06-03-2024 | 05-04-2024 | 05-04-2024 | 05-04-2024 | 04:00 PM | Active | और देखें |
95. | MS NUT AND BOLT OF SIZE 5 8 X 3 inch FOR BALAGHAT(PUR/BGT/MS Bolt/23-24/1929) | 05-03-2024 | 20-03-2024 | 20-03-2024 | 20-03-2024 | 04:30 PM | Active | और देखें |
96. | Construction of Community hall for Chandmara colony, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/125) | 05-03-2024 | 04-04-2024 | 04-04-2024 | 04-04-2024 | 04:00 PM | Active | और देखें |
97. | Construction of Sand Stowing Plant at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/128) | 05-03-2024 | 12-04-2024 | 12-04-2024 | 12-04-2024 | 04:00 PM | Active | और देखें |
98. | Construction of Two Wheeler Parking shed near BDC and Pit office premises at Kandri Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/127) | 05-03-2024 | 12-04-2024 | 12-04-2024 | 12-04-2024 | 04:00 PM | Active | और देखें |
99. | Filling and spreading at minus 470 ft Level Chikla main section at Chikla Mine.(Mining/CH/T.E./23-24/1749) | 05-03-2024 | 12-03-2024 | 12-03-2024 | 12-03-2024 | 04:30 PM | Active | और देखें |
100. | Collection and disposal of Garbage and cleaning of drains sewer lines in camp colony at Balaghat Mine(HR/BGT/LTE/23-24/1941 Dt 05.03.2024) | 05-03-2024 | 13-03-2024 | 13-03-2024 | 13-03-2024 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |