निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Hiring of equipment for removal of subgrade mineral reject at U/G at Balaghat Mine(MINING/BGT/LTE/24-25/497 Dated 03.07.2024) | 05-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | और देखें |
2. | Filling and spreading at -170 L Chikla B section at Chikla Mine.(Mining/CH/T.E./24-25/487) | 04-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | और देखें |
3. | Purchase of Track Roller of FRD DRILLING MACHINE OF DONGRI BUZURG MINE(PUR/MOIL/AGT/DB/2024-25/514) | 03-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | और देखें |
4. | Proposal for Hiring of 3 Nos winding Engine Driver for 622 HP winder of Ukwa Mine.(AJGM/UK/MECH/2024-25/493) | 03-07-2024 | 09-07-2024 | 09-07-2024 | 09-07-2024 | 04:30 PM | Active | और देखें |
5. | Providing and supplying of Disc Brake Status Indication System for 350HP Winder driver cabin at Gumgaon Mine(GUM/ ELECT / 24-25 / 900 DT 02.07.2024) | 03-07-2024 | 13-07-2024 | 13-07-2024 | 13-07-2024 | 04:30 PM | Active | और देखें |
6. | Purchase of Seal kit cushion sub and Joint piece of FRD DRILLING MACHINE OF DONGRI BUZURG MINE.(PUR/MOIL/AGT/DB/2024-25/513) | 03-07-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 04:30 PM | Active | और देखें |
7. | Repairs and renovation of existing Sewage Treatment Plant at Kandri Mine(CIVIL/KD/T.E./24-25/491 Date 01.07.2024) | 03-07-2024 | 20-07-2024 | 20-07-2024 | 20-07-2024 | 04:30 PM | Active | और देखें |
8. | Repair and Rewinding of 2 Nos 50 HP Submersible Pump set of -400Ft L U/G of Gumgaon Mine(Gum/ELECT/24-25/902 DT 02.07.2024) | 03-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:30 PM | Active | और देखें |
9. | Repairing of 3phase 5wire LT Overhead line terminated to mine rest house and mine magazine at Gumgaon mine.(GUM/ELECT/24-25/898 DT 02.07.2024) | 03-07-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | और देखें |
10. | Providing, supplying and distributing Fruit bearing plants (1000 nos.) to Tirodi GrarM Panchayat under MOIL CER(TRD/CIVIL/24-25/665 DATE 30/06/2024) | 03-07-2024 | 10-07-2024 | 10-07-2024 | 10-07-2024 | 04:00 PM | Active | और देखें |
11. | Providing, supplying and distributing Fruit bearing plants (1000 nos.) to Sitapatore Grarm PanchayaT under MOIL CER(SP/CIVIL/24-25/425 DATED 30/06/2024) | 03-07-2024 | 10-07-2024 | 10-07-2024 | 10-07-2024 | 04:00 PM | Active | और देखें |
12. | Reparing of roads in Sand lease Kalaphata ghat at Kandri Mine(CIVIL/KD/T.E./24-25/498 Date 02.07.2024) | 03-07-2024 | 20-07-2024 | 20-07-2024 | 20-07-2024 | 04:30 PM | Active | और देखें |
13. | Miscellaneous Civil repairing works of camp quarters at Munsar Mine(LT/MUN/HO-AGT/2024-25/ Date 01.07.2024) | 02-07-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 09:00 AM | Active | और देखें |
14. | Refurbishment of Production Shaft by replacing Guide Rails from zero to 4th level at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/39) | 02-07-2024 | 09-08-2024 | 09-08-2024 | 09-08-2024 | 04:00 PM | Active | और देखें |
15. | Repairing of double deck vibration screen of Niagra plant Ukwa Mine(AJGM/UK/MECH/2024-25/454) | 29-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | और देखें |
16. | Major Repairing of 80 HP centrifugal pump of 1st Vertical 2nd level of Ukwa Mine.(AJGM/UK/MECH/2024-25/463) | 29-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | और देखें |
17. | Up-gradation of Tramline by replacing with Diamond, RHS and LHS crossing at Underground of Ukwa Mine(AJGM/UK/MECH/2024-25/462) | 29-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | और देखें |
18. | Rollers for conveyor belts installed at DSU and MSP at Munsar Mine(PUR/MOIL/AGTGRIII/MS/2425/466) | 29-06-2024 | 16-07-2024 | 16-07-2024 | 16-07-2024 | 04:30 PM | Active | और देखें |
19. | Construction of Stores Complex at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/35) | 29-06-2024 | 30-07-2024 | 30-07-2024 | 30-07-2024 | 04:00 PM | Active | और देखें |
20. | construction of Boundary wall at Government middle School of Sukali Village under MOIL CER.(MOIL/MOIL LIMITED/CMC/24-25/ET/28) | 29-06-2024 | 06-08-2024 | 06-08-2024 | 06-08-2024 | 04:00 | Active | और देखें |
21. | Hiring front end loader to make up for the breakdown time of departmental loader and shovel and ensure the smooth running of our production and dispatch activities at Balaghat Mine(MINING/BGT/LTE/24-25/468 Dated 28.06.2024) | 28-06-2024 | 04-07-2024 | 04-07-2024 | 04-07-2024 | 04:30 PM | Active | और देखें |
22. | Chemical Analysis by different methods at EMD Plant Laboratory Dongri Buzurg Mine. (2nd Call)(MOIL/DB/EMD/ADGM/TE/24-25/482) | 27-06-2024 | 19-07-2024 | 19-07-2024 | 19-07-2024 | 04:30 PM | Active | और देखें |
23. | Digging of suppressed muck at 13.5th level North from Ch 40 to Ch 27 Balaghat Mine(MINING/BGT/LTE/24-25/1133 Dated 27.06.2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:30 PM | Active | और देखें |
24. | Hiring of JCB for cutting of open drain along canal of Sitapatore Mine(SP/Mining/24-25/415 Dated 27/06/2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:00 PM | Active | और देखें |
25. | Repair of kachcha road from new Industrial Shed to 6 no. pit at Sitapatore Mine(SP/Mining/24-25/417 Dated 27/06/2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:00 PM | Active | और देखें |
26. | Making of safety embankment along benches at 2 no. and 3 no. pit in mine area of Sitapatore Mine(SP/Mining/24-25/416 Dated 27/06/2024) | 27-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:00 PM | Active | और देखें |
27. | REPAIR AND REWINDING OF 80V, 7.5KW, 10HP DC SERIES MOTOR, 02NOS.(BGT/TE/ELECT/AJGM/24-25/460) | 27-06-2024 | 11-07-2024 | 11-07-2024 | 11-07-2024 | 03:30 PM | Active | और देखें |
28. | Drain Cleaning at 1750L 1st vertical from Ch 6900 to Ch 5100 around 540m.(AGT/MINING/UK/LT/2024-25/461 Dt. 27.06.2024) | 27-06-2024 | 03-07-2024 | 03-07-2024 | 03-07-2024 | 06:30 PM | Active | और देखें |
29. | Transportation of Bottom Ash from Khasala Ash Pond to sand stowing plant of Gumgaon Mine.(Gum/Min/2024-25/839, Date 26.06.2024) | 26-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 04:30 PM | Active | और देखें |
30. | Proprietory Single Tender enquiry in Single bid for purchase of Servomesh XP 460 oil for Shanthi make Gear box of 350 HP Winder at Gumgaon Mine.(GUM/ENGG/PUR/24-25/831) | 26-06-2024 | 06-07-2024 | 06-07-2024 | 06-07-2024 | 03:30 PM | Active | और देखें |
31. | Construction of Earth Pits for 12000 Chainage Substation at Ukwa Mine(UK/ELECT/2024-25/450) | 25-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:30 PM | Active | और देखें |
32. | Major Repairing of 80 HP centrifugal pump of 9500 Section at Ukwa Mine.(AJGM/UK/MECH/2024-25/435) | 25-06-2024 | 03-07-2024 | 03-07-2024 | 03-07-2024 | 04:30 PM | Active | और देखें |
33. | Reconditioning Radiator of 1500 KVA streling Generator of Ukwa Mine.(AJGM/UK/MECH/2024-25/446) | 25-06-2024 | 04-07-2024 | 04-07-2024 | 04-07-2024 | 04:30 PM | Active | और देखें |
34. | Leaf spring assy. Repairing, Up-gradation and tensioning work of Tippers of Ukwa Mine.(AJGM/UK/MECH/2024-25/436) | 25-06-2024 | 04-07-2024 | 04-07-2024 | 04-07-2024 | 04:30 PM | Active | और देखें |
35. | Painting to residential quarters ( transfer from Mine) at Munsar Mine(LT/CIVIL/MUN/2024-25/459 Date 25.06.2024) | 25-06-2024 | 08-07-2024 | 08-07-2024 | 08-07-2024 | 04:00 PM | Active | और देखें |
36. | Providing and supplying of Jute folder as per sample at Vocational training at Munsar Mine.(LT/ VT/MUN/AGT/2024-25/460 Date 25.06.2024) | 25-06-2024 | 09-07-2024 | 09-07-2024 | 09-07-2024 | 04:00 PM | Active | और देखें |
37. | Requirement of manpower for watch and ward at Sitapatore Mine(SP/PERS/24-25/407 DATED 25/06/2024) | 25-06-2024 | 01-07-2024 | 01-07-2024 | 01-07-2024 | 04:00 PM | Active | और देखें |
38. | Cleaning of surface drains and deepening work in industrial premises at Balaghat Mine(CIVIL/BGT/LTE/24-25/1070 Dt.23.06.2024) | 24-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
39. | Laying and repairing of tramline at Ch-12000 adit section.(AGT/MINING/UK/LT/2024-25/377 DT. 22.06.2024) | 22-06-2024 | 29-06-2024 | 29-06-2024 | 29-06-2024 | 04:30 PM | Active | और देखें |
40. | Laying and repairing of Tramline at Ch-12000 adit Section.(AGT/MINING/UK/LT/2024-25/377 DT. 22.06.2024) | 22-06-2024 | 27-06-2024 | 27-06-2024 | 27-06-2024 | 04:30 PM | Active | और देखें |
41. | Drain Cleaning at 1750L 1st vertical from Ch-6900 to Ch5100, around 540m.(AGT/MINING/UK/LT/2024-25/378 DT. 22.06.2024) | 22-06-2024 | 29-06-2024 | 29-06-2024 | 29-06-2024 | 04:30 PM | Active | और देखें |
42. | Purchase of Button Bit for Furukawa Rock Drill Machine operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2024-25/441) | 21-06-2024 | 27-06-2024 | 27-06-2024 | 27-06-2024 | 04:30 PM | Active | और देखें |
43. | RCC Roof repair works to camp quarters of Gudma Camp near old hospital and officers Colony at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/376 DT. 20.06.2024) | 20-06-2024 | 27-06-2024 | 27-06-2024 | 27-06-2024 | 05:30 PM | Active | और देखें |
44. | Drilling of Bore hole (12 inch) with M.S. casing pipe (8 inch) for drinking water supply scheme at Munsar Mine(LT/CIVIL/MUN/2024-25/414 Date 16.06.2024) | 19-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:00 PM | Active | और देखें |
45. | Removing and repairing of 7.5 Hp pump, 5 HP, , 2 HP old submercible and Instalaltion of new 5 HP submersible pump and 2 HP mono block pump near Hanuman temple, rest house, STp, officer colony, siding area and KL pit at Munsar Mine(LT/CIVIL/MUN/2024-25/413 Date 16.06.2024) | 19-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:00 PM | Active | और देखें |
46. | Miscellaneous plumbing works at Camp quarters at Munsar Mine(LT/CIVIL/MUN/2024-25/412 Date 16.06.2024) | 19-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:00 PM | Active | और देखें |
47. | Monsoon Preparation work at open cast surface area at Munsar Mine(LT/CIVIL/MUN/2024-25/411 Date 16.06.2024) | 19-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:00 PM | Active | और देखें |
48. | PURCHASE OF DRIVE COOLING FAN FOR 160KW, 445AMPS, AC DRIVE OF SOUTH VENTILATION FAN(BGT/TE/ELECT/AJGM/24-25/415) | 19-06-2024 | 08-07-2024 | 08-07-2024 | 08-07-2024 | 03:30 PM | Active | और देखें |
49. | Digging and cleaning of suppressed muck from Ch 25 to Ch 40 at 12th level Balaghat Mine(MINING/BGT/LTE/24-25/1011 Dated 17.06.2024) | 18-06-2024 | 24-06-2024 | 24-06-2024 | 24-06-2024 | 04:30 PM | Active | और देखें |
50. | Hiring of equipment for removal of waste rock and handeling the same by mechanized means at 50 52 area south section without drilling and blasting at Tirodi Mine.(MOIL/TD01/MINE/2024/464/405 DATED 17/06/2024) | 18-06-2024 | 24-06-2024 | 24-06-2024 | 24-06-2024 | 04:00 PM | Active | और देखें |
51. | Outsourcing the work of making, collecting canteen items and serving it in UG, BDC, Workshop and Administrative building of Kandri Mine.(KD/PER/NIT/ 24-25/636) | 18-06-2024 | 10-07-2024 | 10-07-2024 | 10-07-2024 | 04:30 PM | Active | और देखें |
52. | Providing and Installation of water flow meter for New Water Supply Scheme at Gumgaon Mine(MMT/GUM/Civil/LT/24-25/756 DT 18.06.2024/05/2023) | 18-06-2024 | 02-07-2024 | 02-07-2024 | 02-07-2024 | 04:30 PM | Active | और देखें |
53. | RETILING AND ROOF REPAIR INCLUDING LAYING POLYTHENE SHEET OVER ROOF OF CAMP QUARTER.(CH/CIVIL/NIT/24-25/910 DT.15.06.2024) | 18-06-2024 | 27-06-2024 | 27-06-2024 | 27-06-2024 | 04:30 PM | Active | और देखें |
54. | CLEANING AND DESILTING OF WELL (3 NOS) OF CHIKLA MINE.(CH/Civil/NIT/24-25/411 DT.15.06.2024) | 18-06-2024 | 27-06-2024 | 27-06-2024 | 27-06-2024 | 04:30 PM | Active | और देखें |
55. | Purchase of Drill Pipe 89mm for FRD DCR 20 Drill Machine Operating at Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2024-25/406) | 17-06-2024 | 29-06-2024 | 29-06-2024 | 29-06-2024 | 04:30 PM | Active | और देखें |
56. | Purchase of Hammer Mission for FRD DCR 20 DRILLING MACHINE Operating at Dongri Buzurg Mine(PUR/MOIL/AGT/DB/2024-25/405) | 17-06-2024 | 29-06-2024 | 29-06-2024 | 29-06-2024 | 04:30 PM | Active | और देखें |
57. | RCC roof repairs of camp quarters at Balaghat Mine(CIVIL/BGT/LTE/24-25/1022 Dt.17.06.2024) | 17-06-2024 | 24-06-2024 | 24-06-2024 | 24-06-2024 | 04:30 PM | Active | और देखें |
58. | Providing PVC Polythene Sheets to mangalore Tiled Roofing to camp Quarter and tarpaulin sheets over Quarter allotted to SISF security persons including various miscellaneous repair works and retiling at Ukwa mine.(AGT/CIVIL/UK/LT/2024-25/375 DT. 17.06.2024) | 17-06-2024 | 24-06-2024 | 24-06-2024 | 24-06-2024 | 04:30 PM | Active | और देखें |
59. | Construction of Drain inside of rest house no 2 at Balaghat Mine(CIVIL/BGT/LTE/24-25/1023 Dt.17.06.2024) | 17-06-2024 | 24-06-2024 | 24-06-2024 | 24-06-2024 | 04:30 PM | Active | और देखें |
60. | Operation of Pumps and other related works at Beldongri underground mine at various locations.(AGT/MIN/BEL/2024-25/389 DT. 14.06.2024) | 15-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:30 PM | Active | और देखें |
61. | Digging ,Screening and Stacking of Fines From Various Places Beldongri and Satak Mine.(AGT/MIN/BEL/2024-25/388 DT. 14.06.2024) | 15-06-2024 | 04-07-2024 | 04-07-2024 | 04-07-2024 | 04:00 PM | Active | और देखें |
62. | Operation of Pumps and other related works at Old and New Satak Mine(AGT/MIN/BEL/2024-25/390 DT. 14.06.2024) | 15-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:30 PM | Active | और देखें |
63. | Providing and fixing of FRP doors in WC/Bath to camp quarters at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/373 DT. 15.06.2024) | 15-06-2024 | 22-06-2024 | 22-06-2024 | 22-06-2024 | 04:30 PM | Active | और देखें |
64. | Drain Cleaning from Ch-12000 adit from entrance to 11th incline (Ch- 12800 to Ch14056), around 330m at Ukwa Mine.(AGT/MINING/UK/LT/2024-25/372 DT. 15/06/2024) | 15-06-2024 | 22-06-2024 | 22-06-2024 | 22-06-2024 | 04:30 PM | Active | और देखें |
65. | Construction of new high Explosive Magazine along with office and Security Watch tower at Chikla Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/37) | 15-06-2024 | 23-07-2024 | 23-07-2024 | 23-07-2024 | 04:00 PM | Active | और देखें |
66. | Construction of ventilation fan room for 50 section of Ukwa mine.(AGT/CIVIL/UK/LT/2024-25/374 DT. 15.06.2024) | 15-06-2024 | 22-06-2024 | 22-06-2024 | 22-06-2024 | 05:30 PM | Active | और देखें |
67. | Construction of ventilation fan room for 50 section of Ukwa mine.(AGT/CIVIL/UK/LT/2024-25/374 DT. 15.06.2024) | 15-06-2024 | 22-06-2024 | 22-06-2024 | 22-06-2024 | 05:30 PM | Active | और देखें |
68. | XTRA EXCAVATION AT 2ND LEVEL IN MUNSAR MINE(MUN/TENDER/24-25/406) | 15-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:30 PM | Active | और देखें |
69. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/24-25/391 Date-14.06.2024) | 14-06-2024 | 24-06-2024 | 24-06-2024 | 24-06-2024 | 04:30 PM | Active | और देखें |
70. | Hiring of Statutory Staff (Mine Mate) for High Speed Shaft at Gumgaon Mine.(AGT/GUM/HR/LT/24-25/393, Date 14.06.2024) | 14-06-2024 | 22-06-2024 | 22-06-2024 | 22-06-2024 | 04:30 PM | Active | और देखें |
71. | Construction of foundation and other Steel Structural support System for Installation and commissioning of 3 TPH fluidized Bed combustion Steam Boiler at EMD plant, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/34) | 14-06-2024 | 22-07-2024 | 22-07-2024 | 22-07-2024 | 04:00 PM | Active | और देखें |
72. | Providing and Installation of bio Toilets at 5th Level and 6h level in under ground Mine at kandri Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/29) | 14-06-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:00 PM | Active | और देखें |
73. | Construction of Storm water drains at Tighai village (420 Rmt) and Bawangaon village (230 Rmt) under MOIl CER of Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/24-25/ET/27) | 14-06-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:00 PM | Active | और देखें |
74. | Construction of Bituminous Tar Road along with allied works in industrial premises and residential quarters of Balaghat Mine.(MOIL/MOIL LIMITED/CMC/24-)25/ET/30 | 14-06-2024 | 15-07-2024 | 15-07-2024 | 15-07-2024 | 04:00 PM | Active | और देखें |
75. | Repairing of IR make Air compressor model R160IU-7.5 of Ukwa Mine.(AJGM/UK/MECH/2024-25/362) | 13-06-2024 | 20-06-2024 | 20-06-2024 | 20-06-2024 | 04:30 PM | Active | और देखें |
76. | Premonsoon Preparatory Works at Tirodi mine.(TRD/CIVIL/24-25/482 Date 9/06/2024) | 13-06-2024 | 19-06-2024 | 19-06-2024 | 19-06-2024 | 04:00 PM | Active | और देखें |
77. | Repairing of road from Agent bungalow to New Ventilation shaft at Balaghat Mine(CIVIL/BGT/LTE/24-25/336 Dt.09.06.2024) | 13-06-2024 | 19-06-2024 | 19-06-2024 | 19-06-2024 | 04:30 PM | Active | और देखें |
78. | Providing and laying concrete floor shed and drain in the area of winder house near vertical shaft at gumgaon Mine(MM/GUM/CIVIL/LT/24-25/ 711) | 13-06-2024 | 27-06-2024 | 27-06-2024 | 27-06-2024 | 04:30 PM | Active | और देखें |
79. | Repairing of road by spreading of filling material at approach road of West Ventilation Shaft at Ukwa Mine.(AGT/CIVIL/UK/LT/2024-25/370 Dt.12.06.2024) | 12-06-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:30 PM | Active | और देखें |
80. | Filling spreading at Ch- 12000 adit for Tugger Haulage chamber and supportat Ukwa Mine.(AGT/MINING/UK/LT/2024-25/371 DT.12.06.2024) | 12-06-2024 | 18-06-2024 | 18-06-2024 | 18-06-2024 | 04:30 PM | Active | और देखें |
81. | Repairing of Diesel Engine of LT Make Wheel Loader-9020 of Balaghat Mine.(AGT/BGT/MECH/MG/24-25/346) | 11-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:30 PM | Active | और देखें |
82. | Fabrication and Installation of New Moving Launder Chute for 14.5th L loading Station.(AGT/BGT/MECH/PS/24-25/351) | 11-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
83. | Hydraulic Pressing of Solid Tyres-10.00X20 -60nos. for LHD Machines of Balaghat Mine.(AGT/BGT/Solid-Tyre/24-25/345) | 11-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
84. | PURCHASE OF MS NUT AND BOLT OF SIZE 3/4X4 inch and 5/8X4 inch fOR BALAGHAT MINE.(PUR/BGT/MS Bolt/24-25/347) | 11-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:00 PM | Active | और देखें |
85. | PURCHASE OF 6 inch GI FLANGES FOR BALAGHAT MINE.(PUR/BGT/GI-Flanges/24-25/348) | 11-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
86. | Purchase of V Belts from Authorized dealer of Fenner/PIX/SKF Make for IMB Plant of Balaghat Mine.(PUR/MOIL/BGT/V-BELT/24-25/349) | 11-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
87. | PURCHASE OF GI Welded Wire Mesh Panel for Underground level of Balaghat Mine(PUR/BGT/Wire-Mesh/24-25/350) | 11-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:30 PM | Active | और देखें |
88. | Overhauling of 150 hp Pump(MECHKD2425561) | 11-06-2024 | 01-07-2024 | 01-07-2024 | 01-07-2024 | 04:30 PM | Active | और देखें |
89. | Repairing of Boom and Arm Assembly of Tata Hitachi Excavator No.02 of Balaghat Mine.(AGT/BGT/MECH/EXCV/24-25/343) | 11-06-2024 | 21-06-2024 | 21-06-2024 | 21-06-2024 | 04:30 PM | Active | और देखें |
90. | Modification of Main Conveyor Belt Gantry by replacing Head Pulley, Gear Box and Electric Motor of Production Shaft.(AGT/MECH/PS/24-25/344) | 11-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
91. | Providing and Installation of Digital Distance cum Speed Indicator in 50HP Haulage at Beldongri Mine(BEL/MECH/24-25/341) | 10-06-2024 | 01-07-2024 | 01-07-2024 | 01-07-2024 | 04:30 PM | Active | और देखें |
92. | HANDLING OF BIG CHUNKS AT MUNSAR MINE OCF(MUN/TENDER/24-25/355) | 10-06-2024 | 17-06-2024 | 17-06-2024 | 17-06-2024 | 04:30 PM | Active | और देखें |
93. | Hiring of Statutory Staff (Mine Foreman) for High Speed Shaft at Gumgaon Mine.(Gum/Min/2024-25/677, DT. 10.06.2024) | 10-06-2024 | 17-06-2024 | 17-06-2024 | 17-06-2024 | 04:30 PM | Active | और देखें |
94. | Providing and Installation of Computerized Automatic Speed Indicator Cum Recorder for 100 HP winder at cage winder of Beldongri Mine(PUR/MOIL/BL/WINDER/24-25/494) | 07-06-2024 | 28-06-2024 | 28-06-2024 | 28-06-2024 | 04:30 PM | Active | और देखें |
95. | Collection and disposal of Garbage and cleaning of drains ,sewer lines in camp colony at Balaghat Mine(HR/BGT/LTE/23-24/327 Dated 07.06.2024) | 07-06-2024 | 14-06-2024 | 14-06-2024 | 14-06-2024 | 04:30 PM | Active | और देखें |
96. | Outsourcing of LHD Machine Opertor at Balaghat Mine.(MINING/BGT/LTE/24-25/328 Dated 07.06.2024) | 07-06-2024 | 14-06-2024 | 14-06-2024 | 14-06-2024 | 04:30 PM | Active | और देखें |
97. | Cutting of open trench near Jamrapani nallah towards plantation area at Tirodi Mine.(TRD/CIVIL/24-25/390DATE 25/05/2024) | 06-06-2024 | 11-06-2024 | 11-06-2024 | 11-06-2024 | 04:00 PM | Active | और देखें |
98. | Supply of Chisel for Rock Breaker of TATA -ZX -220LC Excavator of Chikla Mine.(CH/MECH/24-25/10009861/GEN/332) | 06-06-2024 | 12-06-2024 | 12-06-2024 | 12-06-2024 | 04:30 PM | Active | और देखें |
99. | Procurement of Interface Modules and DI/DO Modules for Ukwa Mine(UK/ELECT/2024-25/320) | 06-06-2024 | 13-06-2024 | 13-06-2024 | 13-06-2024 | 04:30 PM | Active | और देखें |
100. | Purchase of Tooth Point and Adaptor for PC450 Hydraulic Excavator operating at Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/311) | 05-06-2024 | 15-06-2024 | 15-06-2024 | 15-06-2024 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(205) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |