निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | PURCHASE OF DTH HAMMER AND BUTTON BITS FOR WAGON DRILL MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/DTH/23-24/1512) | 28-12-2023 | 19-01-2024 | 19-01-2024 | 19-01-2024 | 04:30 PM | Active | और देखें |
2. | Proposal for RCC work to establish Chute and Manways for preparation of Stopes at minus 370 ft L.(Mining/CH/T.E./23-24/1385) | 28-12-2023 | 03-01-2024 | 03-01-2024 | 03-01-2024 | 04:30 PM | Active | और देखें |
3. | Drilling and reflushing of Bore holes at Chikla Mine.(Mining/CH/T.E./23-24/1386) | 28-12-2023 | 03-01-2024 | 03-01-2024 | 03-01-2024 | 04:30 PM | Active | और देखें |
4. | Painting work to Industrial Buildings for Safety Week function at Chikla Mine.(CH/Civil/NIT/23-24/1382 Date-26.12.2023) | 27-12-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:30 PM | Active | और देखें |
5. | Repair of SIEMENS PLC CPU 315-2 PN/DP DIGITAL OUTPUT MODULE ET 200S 8 CH. and Power Supply 6.2A/24V DC of Kandri Mine(AGENT/GR-III/ELECT/23-24/1460, 20/12/2023) | 25-12-2023 | 05-01-2024 | 05-01-2024 | 06-01-2024 | 04:30 PM | Active | और देखें |
6. | Purchase of electrode blower motor with complete auxiliaries as per mentioned tech specifications(TE/MOIL/FMP/ELECT/23-24/412) | 25-12-2023 | 04-01-2024 | 04-01-2024 | 04-01-2024 | 04:30 PM | Active | और देखें |
7. | Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGT/BGT/MECH/IMB/23-24/1499) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | और देखें |
8. | PURCHASE OF BRASS BRAZING ROD OF SIZE-1/8 FOR BALAGHAT MINE.(PUR/MOIL/BRAZ-ROD/23-24/1496) | 23-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | और देखें |
9. | PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/BGT/IMB/SOL/23-24/1494) | 23-12-2023 | 16-01-2024 | 16-01-2023 | 16-01-2023 | 04:30 PM | Active | और देखें |
10. | PURCHASE OF MS NUT OF SIZE M-20X2.5X25MM FOR ROOF BOLT SUPPORT SYSTEM OF BALAGHAT MINE.(PUR/MOIL/BGT/M-20/23-24/1495) | 23-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | और देखें |
11. | PURCHASE OF MS NUT OF SIZE M-20X2.5X25MM FOR ROOF BOLT SUPPORT SYSTEM OF BALAGHAT MINE.(PUR/MOIL/BGT/M-20/23-24/1495) | 23-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | और देखें |
12. | NDT of Vital Components of Holmes Shaft Cage Winder, Holmes Shaft Skip Winder and Production Shaft Winder of Balaghat Mine.(AGT/BGT/MECH/NDT/23-24/1497) | 23-12-2023 | 11-01-2023 | 11-01-2023 | 11-01-2023 | 04:30 PM | Active | और देखें |
13. | Painting of various structures of Winding Engine Installations, Waste Rock bunker and spillage bunker of Balaghat Mine.(AGT/BGT/PAINT/23-24/1498) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | और देखें |
14. | Underground sand stowing/Bottom Ash operation at Ukwa Mine(1750 Level).(AGT/MINING/UK/LT/23-24/1462 DT.23.12.2023) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | और देखें |
15. | Drilling of Muck generation hole at 950 Level 2nd vertical Shaft at Ukwa Mine.(AGT/MINING/UK/LT/23-24/1461 dT.23.12.2023) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | और देखें |
16. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PRINTING OF COMPANY CALENDAR(PUR/MOIL/C-12/26/E-4/169-M) | 22-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 03:30 PM | Active | और देखें |
17. | Construction of Weigh Bridge Foundation along with Office Building at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/90) | 22-12-2023 | 29-01-2024 | 29-01-2024 | 29-01-2024 | 04:00 PM | Active | और देखें |
18. | Annual Repairs to camp Quarters at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/89) | 22-12-2023 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:00 PM | Active | और देखें |
19. | Construction of weigh Bridge and room at Ferro Manganese plant (FMP) at Balaghat.(MOIL/MOIL LIMITED/CMC/23-24/ET/87) | 22-12-2023 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:00 PM | Active | और देखें |
20. | Construction / Renovation of old Transit House at west Court Nagpur (HO).(MOIL/MOIL LIMITED/CMC/23-24/ET/88) | 22-12-2023 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 04:00 PM | Active | और देखें |
21. | Annual Maintenance Contract for replacement of Boiler tubes and General Inspection of FBC Boiler at EMD plant(MOIL/DB/EMD/ADGM/23-24/1337) | 21-12-2023 | 30-12-2023 | 30-12-2023 | 30-12-2023 | 04:30 PM | Active | और देखें |
22. | EOI DOCUMENT FOR EMPANELMENT OF ONLINE MEDICINE CHAINS FOR PAN INDIA SUPPLY OF MEDICINES TO OUR EMPLOYEES, FOR A PERIOD OF 3 (THREE) YEARS(EOI/MOIL/CMC/MED/2023/01) | 21-12-2023 | 06-02-2024 | 06-02-2024 | 06-02-2024 | 04:00 PM | Active | और देखें |
23. | Purchase of Nut-Bolt various size for Chikla Mine.(CH/MECH/23-24/1-9118/550/1312) | 19-12-2023 | 26-12-2023 | 26-12-2023 | 26-12-2023 | 04:30 PM | Active | और देखें |
24. | Purchase of spares of Terex Make Backhoe loader of Chikla mine.(CH/MECH/23-24/1-9195/1238) | 19-12-2023 | 26-12-2023 | 26-12-2023 | 26-12-2023 | 04:30 PM | Active | और देखें |
25. | Preparation of Leaching Batches and Cleaning of Leaching vessel at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1257) | 18-12-2023 | 26-12-2023 | 26-12-2023 | 26-12-2023 | 04:30 PM | Active | और देखें |
26. | Removal of filter press and leaching vessel sludge at Leaching section of EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1258) | 18-12-2023 | 26-12-2023 | 26-12-2023 | 26-12-2023 | 04:30 PM | Active | और देखें |
27. | Drilling of one Borehole and installation of submersible pump with starter panel for drinking water supply at Kalaphata sand ghat premises Kandri Mine(CIVIL/KD/TE/23-24/3408) | 18-12-2023 | 30-12-2023 | 30-12-2023 | 30-12-2023 | 04:30 PM | Active | और देखें |
28. | Desilting and cleaning of sump and surrounding area of sump at 300L.(Agent/Gum/Min/23-24/1448, date 18.12.2023) | 18-12-2023 | 27-12-2023 | 27-12-2023 | 27-12-2023 | 04:30 PM | Active | और देखें |
29. | Strengthening of main girders frame of different floors of IMB plant of Balaghat Mine.(AGT/MECH/IMB/23-24/1466) | 16-12-2023 | 22-12-2023 | 22-12-2023 | 22-12-2023 | 04:30 PM | Active | और देखें |
30. | Replacement of axle shaft bearings and Fabrication of New axle shaft for 4MT Battery locomotives of Balaghat Mine.(AGT/MECH/B-LOCO/23-24/1465) | 16-12-2023 | 22-12-2023 | 22-12-2023 | 22-12-2023 | 04:30 PM | Active | और देखें |
31. | Construction Cement Concrete Road at Chakhdehi village, Dist. Mandala(M.P.)(MOIL/MOIL LIMITED/CMC/23-24/ET/80) | 16-12-2023 | 23-01-2024 | 23-01-2024 | 23-01-2024 | 04:00 PM | Active | और देखें |
32. | Painting Works, allied civil works and Plumbing Works for Ravindranath Tagore Public School, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/79) | 16-12-2023 | 23-01-2024 | 23-01-2024 | 23-01-2024 | 04:00 PM | Active | और देखें |
33. | Repairs and Renovation works to 04 Nos type A quarters (Old) at CMS premises adjacent to MOIL Bhavan Nagpur.(MOIL/MOIL LIMITED/CMC/23-24/ET/78) | 16-12-2023 | 23-01-2024 | 23-01-2024 | 23-01-2024 | 04:00 PM | Active | और देखें |
34. | PUSHING OF TUBS AT VARIOUS PLACES AT MUNSAR MINE(MUN/TENDER/23-24/1428) | 15-12-2023 | 22-12-2023 | 22-12-2023 | 22-12-2023 | 04:30 PM | Active | और देखें |
35. | Revamping, Upgradation of Fire Detection and alarm System (FDA) of MOIL Bhavan.(MOIL/MOIL LIMITED/CMC/23-24/ET/71) | 15-12-2023 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:00 PM | Active | और देखें |
36. | Construction of LT Room Sitapatore Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/72) | 15-12-2023 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:00 PM | Active | और देखें |
37. | Construction of security Guard Room Tirodi Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/70) | 15-12-2023 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:00 PM | Active | और देखें |
38. | Construction of sports Complex at Balaghat Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/74) | 15-12-2023 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:00 PM | Active | और देखें |
39. | Providing, Installation and testing of Piston type Accumulator with fittings in 250 HP winder(Mech/KD/23-24/ 1415) | 15-12-2023 | 11-01-2024 | 11-01-2024 | 12-01-2024 | 04:30 PM | Active | और देखें |
40. | PROVIDING, INSTALLATION OF FIRE DETECTION, PROTECTION ARRANGEMENT FOR QUENCHING THE FIRE FOR XMER(BGT/TE/ELECT/AJGM/23-24/1467) | 15-12-2023 | 27-12-2023 | 27-12-2023 | 27-12-2023 | 03:30 PM | Active | और देखें |
41. | Shifting of DTH Machine in various level of Underground.(CH/MECH/23-24/714600/1062/1304) | 14-12-2023 | 19-12-2023 | 19-12-2023 | 19-12-2023 | 04:30 PM | Active | और देखें |
42. | Providing and laying drinking water pipeline from various wells to filtration plant, Tirodi Mine.(TRD/CIVIL/23-24/1445 DATED 12/12/2023) | 14-12-2023 | 21-12-2023 | 21-12-2023 | 21-12-2023 | 03:30 PM | Active | और देखें |
43. | Construction of toilet block, fabricating open urinals at 6 no. pit surface, Tirodi Mine.(TRD/CIVIL/23-24/1446 DATED 12/12/2023) | 14-12-2023 | 21-12-2023 | 21-12-2023 | 21-12-2023 | 04:00 PM | Active | और देखें |
44. | Construction of 500 KVA DG foundation and allied works at new Generator Room near 6 no. pit, Tirodi Mine.(TRD/CIVIL/23-24/1073 DATED 28/09/2023) | 14-12-2023 | 21-12-2023 | 21-12-2023 | 21-12-2023 | 04:00 PM | Active | और देखें |
45. | lnternal and external painting at Mine Magazine, Tirodi Mine.(TRD/CIVIL/23-24/1444 DATED 12/12/2023) | 14-12-2023 | 21-12-2023 | 21-12-2023 | 21-12-2023 | 04:00 PM | Active | और देखें |
46. | Repairing of RH Track chain of PC450NO-2 Hydraulic Excavator(DB/MECH/AGT/23-24/1288) | 13-12-2023 | 30-12-2023 | 30-12-2023 | 30-12-2023 | 04:30 PM | Active | और देखें |
47. | Repairing work of Electrode No 2 repairing of cooling cylinder Lower Mantle, erection of bottom holding distance piece, flange and related work of 6 MVA Submerged Arc Furnace of Ferro Manganese Plant of Balaghat Mine(MOIL/FMP/AGT/MECH/23-24/400 Date 12/12/2023) | 13-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | और देखें |
48. | Repairing Bucket Assy- of PC 450-3 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/AGT/23-24/1087) | 12-12-2023 | 28-12-2023 | 28-12-2023 | 28-12-2023 | 04:30 PM | Active | और देखें |
49. | Outsourcing of Operation and General Maintenance of Load Haul Dump Loader at 2nd Vertical Underground of Ukwa Mine.(AJGM/UK/MECH/2023-24/1420) | 12-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
50. | Purchase of spring steel wire mesh screen 25mm sq. opening for IMB plant of Dongri Buzurg Mine.(PUR/MOIL/AGT/DB/2023-24/1280) | 12-12-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:30 PM | Active | और देखें |
51. | Laying and Fixing of GI Pipe Line 4 and 6 at Haulage Road in Underground at Ukwa Mine.(AJGM/UK/MECH/2023-24/1422) | 12-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
52. | Outsourcing of 9 Nos. Manpower for operation General maint.of crushings,screening plant at Ukwa Mine.(AJGM/UK/MECH/2023-24/1421) | 12-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
53. | Providing supplying and repairing of PC SCADA software applications for controlling winder processes at Munsar Mine(AGT/ELECTR/MUN/NIT/23-24/1407 DT 12/12/2023) | 12-12-2023 | 22-12-2023 | 22-12-2023 | 22-12-2023 | 04:30 PM | Active | और देखें |
54. | Sorting of surplus ROM Underground section for grade UKL448 from Ch 12800 of Ukwa Mine.(AGT/MINING/UK/LT/23-24/1441 Dt.12.12.2023) | 12-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
55. | Cleaning of Jig tank at OCF tank(MINING/BGT/LT/AGT/2023-24/1405 DT. 07.12.2023) | 11-12-2023 | 13-12-2023 | 13-12-2023 | 13-12-2023 | 04:30 PM | Active | और देखें |
56. | Approval for procurment of bottom ash settling Agent for Sand stowing purpose(MINING/BGT/LT/AGT/2023-24/1406 DT. 07.12.2023) | 11-12-2023 | 13-12-2023 | 13-12-2023 | 13-12-2023 | 04:30 PM | Active | और देखें |
57. | PROVIDING, SUPPLYING, FIXING , INSTALLATION OF 250A MCCB PANEL FOR LHD MACHINE AT UNDERGROUND(BGT/TE/ELECT/AJGM/23-24/1411) | 11-12-2023 | 20-12-2023 | 20-12-2023 | 20-12-2023 | 03:30 PM | Active | और देखें |
58. | PROVIDING, SUPPLYING, FIXING , INSTALLATION OF 250A MCCB PANEL FOR LHD MACHINE AT UNDERGROUND(BGT/TE/ELECT/AJGM/23-24/1411) | 11-12-2023 | 20-12-2023 | 20-12-2023 | 20-12-2023 | 03:30 PM | Active | और देखें |
59. | Purchase of Turbocharger for Tata Hitachi 1200 no-5 Hydraulic Excavator(PUR/MOIL/AGT/DB/2023-24/1286) | 11-12-2023 | 28-12-2023 | 28-12-2023 | 28-12-2023 | 04:30 PM | Active | और देखें |
60. | Construction of Earth Pits for 45 chainage substation of Ukwa Mine.(UK/ELECT/2023-24/1444) | 11-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
61. | Repairing of Transformer Oil Leakages of Power Distribution Transformers of Ukwa Mine(UK/ELECT/2023-24/1445) | 11-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
62. | ELECTRICAL WIRING AND FIXTURES AT NEWLY CONSTRUCTED PANEL ROOM AT 33KV SUBSTATION AND SKIP WINDER(BGT/TE/ELECT/AJGM/23-24/1412) | 11-12-2023 | 21-12-2023 | 21-12-2023 | 21-12-2023 | 03:30 PM | Active | और देखें |
63. | Cleaning of accumulated sand from -150L at Kandri Mine(KD/MINES/NIT/23-24/3338) | 11-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
64. | Handling reported complaints of repairing/rewiring of electrical wiring of residential/non-residential quarter of Gumgaon mine(GUM/ELECT/23-24/2346 DT 11.12.2023) | 11-12-2023 | 30-12-2023 | 30-12-2023 | 30-12-2023 | 04:30 PM | Active | और देखें |
65. | Removal of accumulated sand from haulage of minus 70 L and minus 170 L at vertical section Chikla Mine.(Mining/CH/T.E./23-24/1274) | 11-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
66. | RCC work to establish Chute and Manways for preparation of Stopes at minus 470ft L Vertical section of Chikla Mine.(Mining/CH/T.E./23-24/1275) | 11-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
67. | PURCHASE OF NEUTRAL DISPLACEMENT RELAY SYSTEM FOR 11KV CAPACITOR BANK, 11KV HT VCB INSTALLED AT 33KV/11KV MAIN SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/23-24/1419) | 11-12-2023 | 19-12-2023 | 19-12-2023 | 19-12-2023 | 03:30 PM | Active | और देखें |
68. | In house Maintenance of Rest house, Mine Manager Bungalow, Canteen and Recreational hall at Gumgaon Mine.(AGT/GUM/HR/LT/23-24/1403, Date 08.12.2023) | 11-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
69. | Repairing work of Electrode No1 repairing of cooling cylinder Lower Mantle erection of bottom holding distance Piece flange and related work of 6 MVA Submerged Arc Furnace of Ferro Manganese Plant of Balaghat Mine( | 11-12-2023 | 27-12-2023 | 27-12-2023 | 27-12-2023 | 04:30 PM | Active | और देखें |
70. | Extension of Transformer cum rectifier room towards installation of higher capacity transformer and rectifier for EMD Plant, Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/2462 09.12.23) | 09-12-2023 | 19-12-2023 | 19-12-2023 | 19-12-2023 | 04:30 PM | Active | और देखें |
71. | Repairing Works for Rest Shelter, Old Smithi Section comprising of replacement of old and damaged corrugated GI Sheets inside Workshop Premises and Parking Shed of Main Administrative Building of Dongribuzurg Mine(DB/CIVIL/NIT/TE/23-24/2464 08.12.23) | 09-12-2023 | 16-12-2023 | 16-12-2023 | 16-12-2023 | 04:30 PM | Active | और देखें |
72. | Allied Civil Works to be carried out to create Office Space at Ground and First Floor inside existing Workshop Building, Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/2463 09.12.23) | 09-12-2023 | 19-12-2023 | 19-12-2023 | 19-12-2023 | 04:30 PM | Active | और देखें |
73. | Outsourcing of General Maintenance of Electrical Equipments for 2 Months at Tirodi Mine(TRD/ELECT/2023-24/ 529/1396) | 09-12-2023 | 16-12-2023 | 16-12-2023 | 16-12-2023 | 03:30 PM | Active | और देखें |
74. | Purchase of Submersible Pump 2 Nos. Set for Chikla Mine.(CH/MECH/23-24/CAP/124/1269 09/12) | 09-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
75. | Purchase of Float Gear Box for Tub Tipper for Chikla Mine.(CH/Mech/23-24/CAP/125/1270 09/12) | 09-12-2023 | 18-12-2023 | 18-12-2023 | 18-12-2023 | 04:30 PM | Active | और देखें |
76. | Removal of Waste Rock and Handling the same by mechanized means at Old Underground Area, South Section without Drilling and Blasting at Tirodi Mine(TRD/23-24/1390 DATED 03/12/2023) | 09-12-2023 | 15-12-2023 | 15-12-2023 | 15-12-2023 | 04:00 PM | Active | और देखें |
77. | Outsourcing manpower for the maintenance work of the OCF jig machinery dump scr(MINING/BGT/LT/AGT/2023-24/1399 Date 06.12.2023) | 08-12-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:30 PM | Active | और देखें |
78. | Providing and Installation of Bio toilets at 5th and 6th level in underground mine at Kandri Mine(CIVIL/KD/TE/23-24/3326) | 08-12-2023 | 23-12-2023 | 23-12-2023 | 23-12-2023 | 04:30 PM | Active | और देखें |
79. | Construction of Foundation and Hopper for installing and screening unit at BDC Section, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/2414 05.12.23) | 06-12-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:30 PM | Active | और देखें |
80. | Removal of Garbage, Cleaning of Drains and Septic Tanks including collection of garbage for camp colonies i.e. Syndicate Camp, Chandmara Camp and Officers Colony at Dongribuzurg Mine(DB/PER/NIT/TE/2023-24/2412 05.12.23) | 06-12-2023 | 09-12-2023 | 09-12-2023 | 09-12-2023 | 04:30 PM | Active | और देखें |
81. | Sample preparation for WDXRF unit of laboratory at EMD Plant DB Mine(MOIL/DB/EMD/ADGM/23-24/1256) | 06-12-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:30 PM | Active | और देखें |
82. | NDT of Vital components of Winders of Chikla Mine.(CH/MECH/2324/76-28477/FLM/1240) | 06-12-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:30 PM | Active | और देखें |
83. | Procurement of Bamboo Mat at Chikla Mine(MINING/CH/T.E./23-24/1245) | 04-12-2023 | 05-12-2023 | 05-12-2023 | 05-12-2023 | 04:30 PM | Active | और देखें |
84. | Procurement of Differential Spares of Eimco Elecon make Front end Loader model AL520 of Gumgaon Mine.(AGENT/GM/MECH/2023-24/1366) | 04-12-2023 | 11-12-2023 | 11-12-2023 | 11-12-2023 | 04:30 PM | Active | और देखें |
85. | Purchase of Spares of Terex make Backhoe Loader of Chikla Mine.(CH/TE/MECH/23-24/10009195/1238 DT 25/11/2023) | 04-12-2023 | 11-12-2023 | 11-12-2023 | 11-12-2023 | 04:30 PM | Active | और देखें |
86. | PURCHASE OF CS WHEEL ASSEMBLY WITH COVER-46 NOS. FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/23-24/1385) | 02-12-2023 | 19-12-2023 | 19-12-2023 | 19-12-2023 | 04:30 PM | Active | और देखें |
87. | Providing and Installation of 15 HP open well submersible pump 02 nos at clean water sump at water treatment Plant(MUN/GUM/CIVIL/LT/23-24/2256 DT 30.11.2023) | 02-12-2023 | 30-12-2023 | 30-12-2023 | 30-12-2023 | 04:30 PM | Active | और देखें |
88. | PURCHASE OF DRIFTER ROD R32-H-25-R-25 LENGTH-1600MM FOR UNDERGROUND ELECTRO-HYDRAULIC CRAWLER DRILL MACHINE BALAGHAT MINE(PUR/MOIL/BGT/D-ROD/23-24/1386) | 02-12-2023 | 19-12-2023 | 19-12-2023 | 19-12-2023 | 04:30 PM | Active | और देखें |
89. | Purchase of Rear Vision System for HEMMS operating at Dongri Buzurg Mine(PUR/MOIL//DB/2023-24/1213) | 30-11-2023 | 15-12-2023 | 15-12-2023 | 15-12-2023 | 04:30 PM | Active | और देखें |
90. | Repairing of 3 Cylinder Engine assy. of 4T-Locomotive of Balaghat Mine(AGT/MECH/D-LOCO/23-24/1378) | 29-11-2023 | 08-12-2023 | 08-12-2023 | 08-12-2023 | 04:30 PM | Active | और देखें |
91. | Replacement of 6 mm 8 mm thick liner plates at 14.5 th level loading station of production shaft at Balaghat Mine.(AGT/MECH/PS-LS/23-24/1379) | 29-11-2023 | 08-12-2023 | 08-12-2023 | 08-12-2023 | 04:30 PM | Active | और देखें |
92. | Repairing Works for Old Cell Bay Section of EMD Plant, Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/2340 28.11.23) | 29-11-2023 | 08-12-2023 | 08-12-2023 | 08-12-2023 | 04:30 PM | Active | और देखें |
93. | Providing and fixing of amusement rides for Children Park in Officers and Staff Colony of Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/ 23.11.2023) | 29-11-2023 | 05-12-2023 | 05-12-2023 | 05-12-2023 | 04:30 PM | Active | और देखें |
94. | Construction of Shed for storage of SLS Drums(Foaming Agent) for suppression of corrosive sulphuric acid fumes for EMD Plant, Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/2349 29.11.2023) | 29-11-2023 | 08-12-2023 | 08-12-2023 | 08-12-2023 | 04:30 PM | Active | और देखें |
95. | Partial Engine Repairing of PC450-1 Hydraulic Excavator(DB/MECH/23-24/ 1241) | 28-11-2023 | 12-12-2023 | 12-12-2023 | 12-12-2023 | 04:30 PM | Active | और देखें |
96. | Construction of Earth Pits for 11KV Lightening Arrestors of Overhead Lines of Ukwa Mine(UK/ELECT/2023-24/1374) | 27-11-2023 | 04-12-2023 | 04-12-2023 | 04-12-2023 | 04:30 PM | Active | और देखें |
97. | Providing and Installation of Solar Blinking light (Amber) at varioud Location of Dongri Buzurg Mine.(DB/MECH/23-24/1201) | 25-11-2023 | 14-12-2023 | 14-12-2023 | 16-12-2023 | 04:30 PM | Active | और देखें |
98. | Purchase of Shank Adaptor of Electro-Hydraulic Drill machine of Chikla Mine.(CH/MECH/23/4-3312/FLM/596/1228) | 24-11-2023 | 28-11-2023 | 28-11-2023 | 28-11-2023 | 04:30 PM | Active | और देखें |
99. | Prepration of Ground and Cleaning works upcoming programe at Balaghat Mine(CIVIL/BGT/LT/2023-24/1354 Dt.22.11.2023) | 24-11-2023 | 30-11-2023 | 30-11-2023 | 30-11-2023 | 04:30 PM | Active | और देखें |
100. | Providing and fixing Shed on Units of WTP at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/68) | 24-11-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:00 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |