निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Construction of 02 nos Substation Building one each at chainage 12000 and chainage 50 at ukwa Mine.(MOIL/23-24/ET/17) | 31-05-2023 | 30-06-2023 | 30-06-2023 | 30-06-2023 | 03:30 PM | Active | और देखें |
2. | Construction of shed for 1500 KVA D.G. Set near second Vertical Shaft at Chikla Mine.(MOIL/23-24/ET/21) | 31-05-2023 | 30-06-2023 | 30-06-2023 | 30-06-2023 | 03:30 PM | Active | और देखें |
3. | Water proofing to various Buildings at Tirodi Mine.(MOIL/23-24/ET/24) | 31-05-2023 | 30-06-2023 | 30-06-2023 | 30-06-2023 | 03:30 PM | Active | और देखें |
4. | Various development work at the east court and west court premises of the MOIL, Nagpur.(MOIL/23-24/ET/25) | 31-05-2023 | 30-06-2023 | 30-06-2023 | 30-06-2023 | 03:30 PM | Active | और देखें |
5. | Cleaning and collection of garbage and cleaning of drains cleaning and collecting waste from septic tanks chambers at Kandri Mine(KD/MINES/NIT/2022-23/515) | 29-05-2023 | 03-06-2023 | 03-06-2023 | 03-06-2023 | 04:30 PM | Active | और देखें |
6. | Monsoon preparatory work for drain cleaning work in Industrial premises of Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/328 DT.29.05.2023) | 29-05-2023 | 05-06-2023 | 05-06-2023 | 05-06-2023 | 04:30 PM | Active | और देखें |
7. | Structural design Consultancy for new foundation for mounting of higher capacity gear box and DC motor for capacity enhancement of 1st Vertical shaft at Gumgaon mine(AGT/GUM/CIVIL/LT/23-24/ 494 DT 27/05/2023) | 27-05-2023 | 06-06-2023 | 06-06-2023 | 06-06-2023 | 04:30 PM | Active | और देखें |
8. | Widening and Deepening of Existing Surface Drain Network inside EMD Plant Premises for streamlining drainage issues of EMD Plant, Dongribuzurg Mine.(DB/EMD/CIVIL/NIT/2023-24/587 26.05.2023) | 27-05-2023 | 06-06-2023 | 06-06-2023 | 06-06-2023 | 04:30 PM | Active | और देखें |
9. | Retiling of Mangalore Tiled Quarters and Industrial Buildings, Roof Repair including laying of polythene sheets/tarpaulin sheets over roof of Camp Quarters and water proofing of slab of quarters at Dongribuzurg Mine.(DB/CIVIL/NIT/2023-24/583 26.05.2023) | 27-05-2023 | 06-06-2023 | 06-06-2023 | 06-06-2023 | 04:30 PM | Active | और देखें |
10. | Cleaning of Storm water drains of surface and Underground Sumps and drains under Monsoon Preparatory Works at Kandri Mine.(KAN/CIVIL/NIT/23-24/532 DT 27.05.2023) | 27-05-2023 | 03-06-2023 | 03-06-2023 | 03-06-2023 | 04:30 PM | Active | और देखें |
11. | Slab Waterproofing Works and allied civil repairing works for Main Electrical Substation Building of Dongribuzurg Mine.(DB/CIVIL/NIT/2023-24/585 26.05.2023) | 27-05-2023 | 06-06-2023 | 06-06-2023 | 06-06-2023 | 04:30 PM | Active | और देखें |
12. | Construction of Boundary Pillars for Balapur Hamesha Purchased Land 60.22 Hectares South Side at Dongribuzurg Mine.(DB/CIVIL/NIT/2023-24/586 26.05.2023) | 27-05-2023 | 06-06-2023 | 06-06-2023 | 06-06-2023 | 04:30 PM | Active | और देखें |
13. | Construction of Foundation and Shed for AMF Panel and change over Panel for operation of 2 Nos 500kVA DG Set for EMD Plant, Dongribuzurg Mine.(DB/EMD/CIVIL/NIT/2023-24/ 26.05.2023) | 27-05-2023 | 06-06-2023 | 06-06-2023 | 06-06-2023 | 04:30 PM | Active | और देखें |
14. | Removal of damaged buntons and installation of new buntons between 10th level to 13.5th level of production shaft of Balaghat mine.(AGT/BGT/MECH/BUNTON/23-24/303) | 26-05-2023 | 02-06-2023 | 02-06-2023 | 02-06-2023 | 04:30 PM | Active | और देखें |
15. | Cleaning of Grizzly in OTC of 300L and bunker near vertical shaft(Agent/Gum/Min/23-24/307, Dt 26.05.2023) | 26-05-2023 | 02-06-2023 | 02-06-2023 | 02-06-2023 | 04:30 PM | Active | और देखें |
16. | Filling and Spreading at minus 30 feet L from plus 70 feet L and minus 130 feet L at Underground Munsar Mine(Munsar/MINES/NIT/2023-24) | 26-05-2023 | 02-06-2023 | 02-06-2023 | 02-06-2023 | 04:30 PM | Active | और देखें |
17. | Fabrication of Double Acting Hydraulic Cylinder 6Nos. for the Holme shaft 100MT surface bunker and flap door of skip compartments of Balaghat Mine.(AGT/BGT/MECH/Bunker/23-24/294) | 25-05-2023 | 15-06-2023 | 15-06-2023 | 15-06-2023 | 04:30 PM | Active | और देखें |
18. | Dismantling of 6mm vibrating screen From 3rd floor of IMB plant and installation of repaired 6mm vibrating screen body at IMB Plant of Balaghat Mine.(AGENT/BGT/MECH/IMB/23-24/295) | 25-05-2023 | 08-06-2023 | 08-06-2023 | 08-06-2023 | 04:30 PM | Active | और देखें |
19. | Hiring of Equipment for removal of sub grade mineral reject of U/G ROM to recover S.M Grade ore at Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/302 DT.25.05.2023) | 25-05-2023 | 31-05-2023 | 31-05-2023 | 31-05-2023 | 04:30 PM | Active | और देखें |
20. | Design, procurement, supply, fabrication, erection, installation and commissioning of additional bunker of 100 MT capacity along with tub tippler arrangement near 2nd Vertical Shaft at Ukwa Mine(MOIL/23-24/ET/19) | 24-05-2023 | 04-07-2023 | 04-07-2023 | 04-07-2023 | 03:30 PM | Active | और देखें |
21. | Extra excavation and RCC work for ore pass installation at - 350 Level at Kandri Mine(KD/MINES/NIT/2023-24/512) | 24-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 04:30 PM | Active | और देखें |
22. | The transportation of sand from Kanhan River to the area near Rest House.(Agent/Gum/Min/23-24/298, Dt 24/05/2023) | 24-05-2023 | 31-05-2023 | 31-05-2023 | 31-05-2023 | 04:30 PM | Active | और देखें |
23. | Procurement of 17A 3 phase inverter for VFD Panel at Chikla Mine(CH/ELECT/23-24/235) | 23-05-2023 | 29-05-2023 | 29-05-2023 | 29-05-2023 | 04:30 PM | Active | और देखें |
24. | Pre-Monsoon cleaning and deepening of surface water drains and repairs of canal in Mine Area.(TRD/CIVIL/23-24/255 DATED 15/05/2023) | 22-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 04:00 PM | Active | और देखें |
25. | Operation and Maintenance of solid waste management at Munsar Mine.(Mun/Civil/NIT/23-24/19 DATED 21/05/2023) | 22-05-2023 | 29-05-2023 | 29-05-2023 | 29-05-2023 | 04:30 PM | Active | और देखें |
26. | Retiling and roof repair including laying of talpatri over roof of camp quarters.(TRD/CIVIL/23-24/254 DATED 15/05/2023) | 22-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 03:30 PM | Active | और देखें |
27. | Retiling and roof repair including laying polythene sheet over roof of camp quarters and industrial buildings at chikla Mine.(Civil/CH/TE/23-24/225 Date-21.05.2023) | 22-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 04:30 PM | Active | और देखें |
28. | Retiling and roof repair including laying of talpatri over roof of camp quarters.(TRD/CIVIL/22-23/254 DATED 15/05/2023) | 22-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 04:00 PM | Active | और देखें |
29. | Construction of screen foundation for contaminated ROM screening at south siding, Tirodi Mine.(TRD/CIVIL/23-24/256 DATED 15/05/2023) | 20-05-2023 | 23-05-2023 | 23-05-2023 | 23-05-2023 | 04:00 PM | Active | और देखें |
30. | Garbage disposal, drain cleaning, grass cutting and other sanitation work at Tirodi Mine.(TRD/CIVIL/23-24/278 DATED 18/05/2023) | 20-05-2023 | 23-05-2023 | 23-05-2023 | 23-05-2023 | 04:00 PM | Active | और देखें |
31. | Drilling of bore hole for lowering Electrical Cables from surface to 2nd level at Kandri Mine.(KAN/CIVIL/NIT/23-24/467 DT 19.05.2023) | 19-05-2023 | 29-05-2023 | 29-05-2023 | 29-05-2023 | 04:30 PM | Active | और देखें |
32. | Proposal for sorting of Surplus Underground ROM for grade UKL448 at Ch10000 of Ukwa Mine(AGT/Min/UK/LT/2023-24/275 Date- 18.05.2023) | 18-05-2023 | 25-05-2023 | 25-05-2023 | 25-05-2023 | 04:30 PM | Active | और देखें |
33. | Purchase of High Speed Diesel (HSD)(E-1 DT.18.05.2023) | 18-05-2023 | 05-06-2023 | 05-06-2023 | 05-06-2023 | 03:30 PM | Active | और देखें |
34. | Fabrication of new Grizzly sigments at IMB Plant of DB Mine(DB/IMB/23-24/206 Dated 13.05.2023) | 16-05-2023 | 29-05-2023 | 29-05-2023 | 29-05-2023 | 04:00 PM | Active | और देखें |
35. | Removal of Garbage, Cleaning Colony at Munsar Mine of Septic Tanks and Drains from Kalnchi Wahitola and Chargoan at Munsar(PER/MS/23-24/204, 11.05.2023) | 16-05-2023 | 24-05-2023 | 24-05-2023 | 24-05-2023 | 04:30 PM | Active | और देखें |
36. | Major Overhauling of Maxflow make multistage Pump 150HP of Balaghat Mine.(AGENT/BGT/MECH/PUMP/23-24/244) | 15-05-2023 | 24-05-2023 | 24-05-2023 | 24-05-2023 | 04:30 PM | Active | और देखें |
37. | Fabrication of Pump spares by pattern making, casting and machining work for 300HP Multistage Pump of Balaghat Mine.(AGENT/BGT/MECH/PUMP/23-24/245) | 15-05-2023 | 24-05-2023 | 24-05-2023 | 24-05-2023 | 04:30 PM | Active | और देखें |
38. | Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/23-24/246) | 15-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 04:30 PM | Active | और देखें |
39. | Cleaning of Underground Sumps and Underground drains under the Monsoon preparatory works at Munsar Mine(MUN/TENDER/23-24/458) | 15-05-2023 | 23-05-2023 | 23-05-2023 | 23-05-2023 | 04:30 PM | Active | और देखें |
40. | Providing PVC Polythene Sheets to Mangalore Tiled Roofing to camp Quarters and tarpaulin sheets over Bungalows including various miscellaneous repair works and retiling at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/243 DT.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
41. | RCC roof repairs of camp quarters at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/240 dt.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
42. | RCC roof repairs of 6th level substation Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/242 dt.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
43. | Construction of Drain near Block no. 2 at KC Colony at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/241 DT.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
44. | Opening of LHDs chute and pushing of loaded tubs 36 CFT from X cut to haulage road and empty tubs from haulage road to LHDs X cut face Manually in 300L(Agent/Gum/Min/23-24/259, Dt 15/05/2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
45. | Construction of RCC Ramp on both side of Weigh Bridge at Kalaphata Sand ghat.(KAN/CIVIL/NIT/23-24/404 DT 12.05.2023) | 13-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
46. | Loading unloading and spreading of filling at 70Level Chikla B Section at Chikla Mine.(MINING/CH/T.E./23-24/148) | 13-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
47. | In House Maintenance of Rest House Mine Manager Bungalow Canteen and Recreation Hall at Gumgaon Mine(AGT/GUM/PER/LT/23-24/ 321 DT 11/05/2023) | 12-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
48. | Providing and Laying RCC Hume pipe sever line from new A type quarters colony up to STP at Gumgaon Mine(AGT/GUM/CIVIL/LT/23-24/ 320 DT 11/05/2023) | 12-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
49. | Laying and Lowering of 3C x 240Sqmm 1.1KV PVDWA Copper Cable at Gumgaon Mine(GUM/ELECT/23-24/342 DT 12/05/2023) | 12-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
50. | PURCHASE OF STATION BATTERY SET 2 VOLT / 100AH (PLANT CELL) FOR 6TH LEVEL SURFACE SUBATION FOR BALAGHAT MINE.(BGT/TE/ELECT/AJGM/23-24/232) | 12-05-2023 | 18-05-2023 | 18-05-2023 | 18-05-2023 | 03:30 PM | Active | और देखें |
51. | Purchase of Couplings and V Belt Pulley for IMB Plant of DB Mine(DB/TE/IMBP/23-24/10007776/1992) | 12-05-2023 | 26-05-2023 | 26-05-2023 | 26-05-2023 | 04:00 PM | Active | और देखें |
52. | The Manual collection of sand from Pench River Bank to sand stock yard at Kalaphata Ghat(Munsar/MINES/NIT/2023-24) | 12-05-2023 | 19-05-2023 | 19-05-2023 | 19-05-2023 | 04:30 PM | Active | और देखें |
53. | Proposal for cleaning and painting of 1st and 2nd crushing and screening plant at Chikla mine.(TE/CH/MECH/23-24/76-25502/161 date 6/5/2023) | 10-05-2023 | 18-05-2023 | 18-05-2023 | 18-05-2023 | 03:30 PM | Active | और देखें |
54. | The Manual collection of sand from Pench River Bank to sand stock yard at Kalaphata Ghat(KD/MINES/NIT/2023-24/371) | 09-05-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 04:30 PM | Active | और देखें |
55. | Proposal for Additional excavation in Magniferrous rock at 1150 L 1050 L AND 950 LEVEL AT 2ND VERTICAL SHAFT AT UKWA MINE(AGT/MIN/UK/LT/2023-24/191) | 09-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
56. | Proposal for Drain excavation and concreting at 1150 level at 2nd vertical shaft at Ukwa Mine(AGT/MIN/UK/LT/ 2023-24/192 Date - 08.05.2023) | 09-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
57. | Fabrication of steel Manways 1.5 X 0.84 M for Chikle Mine.(TE/CH/MECH/GEN/2023/181/149 date 03.05.2023) | 08-05-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 03:30 PM | Active | और देखें |
58. | RCC roof repair of Camp quarters at Chikla Mine.(Civil/CH/TE/23-24/147 Date-02.05.2023) | 08-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | और देखें |
59. | Retiling and roof repair including laying opolythene sheet over roof of camp quarters and industrial buildings at chikla M(Civil/CH/TE/23-24/144 Date-02.05.2023) | 06-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | और देखें |
60. | PROCUREMENT OF COLD VULCANIZING SOLUTION and HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/MOIL/BGT/IMB/SOL/23-24/177) | 05-05-2023 | 26-05-2023 | 26-05-2023 | 26-05-2023 | 04:30 PM | Active | और देखें |
61. | PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/178) | 05-05-2023 | 12-05-2023 | 12-05-2023 | 12-05-2023 | 04:30 PM | Active | और देखें |
62. | PURCHASE OF HIGHER GRADE CONCAVE-2NOS. and MANTLE-2NOS. (Gr-MNS-10) FOR CONE CRUSHER UNIT OF PILOT PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/PP-CC/23-24/176) | 05-05-2023 | 19-05-2023 | 19-05-2023 | 19-05-2023 | 04:30 PM | Active | और देखें |
63. | Formation of base foundation for installation of chock in underground faces.(Agent/Gum/Min/23-24/200, Dt 05/05/2023) | 05-05-2023 | 12-05-2023 | 12-05-2023 | 12-05-2023 | 04:30 PM | Active | और देखें |
64. | Excavation and filling rehandling work at 15th level main Haulage road of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/154 dt.02.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | और देखें |
65. | Filling spreading of waste rock at 10th level of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/153 dt.03.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | और देखें |
66. | RCC work at 13.5 level north in extension areas of X-cut 29 and Haulage road of 13.5 Level North section of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/155 dt.03.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | और देखें |
67. | Drilling of 57mm dia hole for cable bolting at 12th level north section of Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/151 dt.02.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | और देखें |
68. | Drilling of 57mm dia hole for cable bolting at 12th level north section of Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/151 dt.02.05.2023) | 02-05-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | और देखें |
69. | Laying of 60lbs Tramline at 10th level Holmes Shaft orepass and Production Shaft of Balaghat Mine(MINING/BGT/LT/AGT/2022-23/152 dt.02.05.2023) | 02-05-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | और देखें |
70. | RCC work at 15 level main Haulage road of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/150 dt.02.05.2023) | 02-05-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | और देखें |
71. | Desilting and cleaning of sump and surrounding of area of sump at 13L(Agent/Gum/Min/23-24/168, Dt 29/04/2023) | 01-05-2023 | 08-05-2023 | 08-05-2023 | 08-05-2023 | 04:30 PM | Active | और देखें |
72. | Construction of Foundation and Shed for mounting and installation of 2 Nos 500kVA DG Set for EMD Plant, Dongribuzurg Mine.(DB/CIVIL/EMD/NIT/2023-24/317 28.04.2023) | 29-04-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | और देखें |
73. | Painting to Plant Structures of Electromagnetic Dioxide, EMD Plant of Dongribuzurg Mine(DB/EMD/CIVIL/NIT/2023-24/316 28.04.23) | 29-04-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | और देखें |
74. | Replacement of VCB Sprouts of 11KV ABB Make VCB Panels of Main Hill Substation of Chikla Mine(CH/ELECT/23-24/138) | 29-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 04:30 PM | Active | और देखें |
75. | Provision of Alternate Power Supply to 4L Underground at Chikla Mine(CH/ELECT/23-24/137) | 29-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 04:30 PM | Active | और देखें |
76. | Hiring of backhoe cum loader for handling of subgrade ore(Agent/Gum/Min/23-24/156, Dt 28/04/2023) | 28-04-2023 | 05-05-2023 | 05-05-2023 | 05-05-2023 | 04:30 PM | Active | और देखें |
77. | MAJOR REPAIRING OF BUCKET OF TATA 450 HYD EXCAVATOR TIRODI MINE(PREFFERED THOSE WHO HAD DONE SIMILAR TYPE OF WORK IN LAST THREE YEARS)(TRD/MECH/2022-23/1698 DATE 31.03.2023) | 28-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 03:30 PM | Active | और देखें |
78. | Hiring of Tipper for 2nd vertical shaft at Ukwa Mine(MOIL/UK01/MECH/GEN/2023/117/90) | 25-04-2023 | 08-05-2023 | 08-05-2023 | 08-05-2023 | 04:30 PM | Active | और देखें |
79. | Construction of Barricade wall with Gate in Chitawer Section at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/79 Date- 17.04.2023) | 25-04-2023 | 04-05-2023 | 04-05-2023 | 04-05-2023 | 04:30 PM | Active | और देखें |
80. | Operation and maintenance of Purification Vessel on trial basis at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/82) | 21-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 04:30 PM | Active | और देखें |
81. | Concreting work for offsetting of manway wall at -350L stope Kandri Mine(KD/MINES/NIT/2023-24/158) | 19-04-2023 | 25-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | और देखें |
82. | Cutting and Levelling of waste Material near 12000 section at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/80 Date- 17.04.2023) | 19-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | और देखें |
83. | Drilling of Borewells at 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/57 Date- 10.04.2023) | 18-04-2023 | 29-04-2023 | 29-04-2023 | 29-04-2023 | 04:30 PM | Active | और देखें |
84. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF LEATHER SHOES MAKE - BATA, MODEL - REMO(PUR/MOIL/C-1/26/E-26/360-M) | 18-04-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | और देखें |
85. | Spreading Moorum for Repair to roads from Mine Magazine to 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/55 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | और देखें |
86. | Exterior Painting and white washing in Mine Premises at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/54 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | और देखें |
87. | Levelling cleaning of entire Premises of 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/58 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | और देखें |
88. | Land scaping and Beautification works in 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/56 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | और देखें |
89. | Renewal of Sanitation Line including making Septic Tanks, Inspection Chambers to streamline sanitation system of Syndicate Camp Colony of Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/55 15.04.2023) | 17-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | और देखें |
90. | PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF CABLE CLAMP FOR 3Cx120SQMM 11KV XLPE CABLE IN SHAFT(BGT/TE/ELECT/AJGM/23-24/71) | 13-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | और देखें |
91. | Extension of street light at mine siding at Gumgaon Mine(GUM/ELECT/23-24/78 DT 11.04.2023) | 12-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 04:30 PM | Active | और देखें |
92. | SUPPLY OF SPARES FOR FLAME PROOF MAKE CAPLAMP FOR GUMGAON MINE(PUR/GUM/ELECT/23-24/85 Dt 11.04.2023) | 12-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | और देखें |
93. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all Winders for one year at Balaghat Mine(AGENT/BGT/MECH/WINDER/23-24/48) | 12-04-2023 | 27-04-2023 | 27-04-2023 | 27-04-2023 | 04:30 PM | Active | और देखें |
94. | CLEANING OF ACCUMULATED SAND FROM -50L AND -150L AT KANDRI MINE(KD/MINES/NIT/2023-24/114) | 12-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | और देखें |
95. | Repairing/Fabrication of both Tap hole spout during shutdown for furnace relining work of Ferro Manganese Plant, Balaghat Mine(MOIL/FMP/AGT/MECH/23-24/19 dt.11.04.2023) | 12-04-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | और देखें |
96. | RCC OF WALL AND ROOF IN 7 NO CROSS CUT AT -450LEVEL UNDERGROUND IN KANDRI MINE(KD/MINES/NIT/2023-24/117) | 12-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | और देखें |
97. | Requirement of Manpower for collection of canteen food items and serving it to Mine employees at Chikla Mine.(Civil/CH/TE/23-24/30 Date-12.04.2023) | 12-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 04:30 PM | Active | और देखें |
98. | RCC work at 13.5 Level north in extension areas of x-cut 29 at 13.5 Level north section of Balaghat mine(MINING/BGT/LT/AGT/2023-24/61 Dt.12.04.2023) | 12-04-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:30 PM | Active | और देखें |
99. | Insulation and painting of air cooler duct installed at New Administrative building at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/62 Dt.12.04.2023) | 12-04-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:30 PM | Active | और देखें |
100. | Replacement/fabrication of Furnace shell plate of 6 MVA Submerged Arc Furnace around Tap Holes of Ferro Manganese Plant, Balaghat Mine.(MOIL/FMP/AGT/MECH/23-24/11 dt.09.04.23) | 12-04-2023 | 25-04-2023 | 25-04-2023 | 25-04-2023 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |