निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Procurement of 250A MCCB Panel with safety interlocks for Chikla Mine(CH/ELECT/22-23/1356) | 28-02-2023 | 09-03-2023 | 09-03-2023 | 09-03-2023 | 04:30 PM | Active | और देखें |
2. | PROVIDING AND INSTALLATION OF SMOKE DETECTORS AND FIRE ALARM SYSTEM FOR WINDER ENGINE ROOMS(BGT/TE/ELECT/AJGM/22-23/1527) | 28-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 03:30 PM | Active | और देखें |
3. | Construction of Cabin at Ground Floor of Workshop Building of Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2022-23/3512 24.02.23) | 27-02-2023 | 15-03-2023 | 15-03-2023 | 15-03-2023 | 04:30 PM | Active | और देखें |
4. | Replacement of Old And Damaged Wooden And Steel Doors for Camp Quarters i.e. Syndicate Camp, Chandmara Colony and Officers Colony at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2022-23/3511 24.03.2023) | 27-02-2023 | 15-03-2023 | 15-03-2023 | 15-03-2023 | 04:30 PM | Active | और देखें |
5. | Drilling of cable bolting hole, machine shifting rope jamming grouting and general maintenance of machine stopes (as and when required) at chikla mine.(MINING/CH/TE/22-23/1345) | 27-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 04:30 PM | Active | और देखें |
6. | Cleaning of silt accumulated in drain haulage road and sump of 300L(Agent/Gum/Min/21-22/1725) | 27-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 04:30 PM | Active | और देखें |
7. | Filling spreading of waste rock at 13.5th level North section at Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/1523 Dt.27.02.2023) | 27-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 04:30 PM | Active | और देखें |
8. | Drilling of 57mm dia hole for cable bolting at 12th level north at Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/1524 Dt.27.02.2023) | 27-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 04:30 PM | Active | और देखें |
9. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR ENTERING BLANKET RATE CONTRACT FOR SUPPLY OF ESAB MAKE WELDING ACCESSORIES AND INDUSTRIAL GAS EQUIPMENTS(PUR/MOIL/C-3/16/E-24/321-M DT.24/02/2023) | 27-02-2023 | 10-03-2023 | 10-03-2023 | 10-03-2023 | 03:30 PM | Active | और देखें |
10. | Fabrication of steel manway 1.5 X 0.84 M for Chikla Mine.(TE/CH/MECH/GEN/55/1348 DATE 26/02/2023) | 27-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 03:30 PM | Active | और देखें |
11. | Annual Blanket Rate Contract for supply of various types and Sizes of Bearings, Sleeves With Nuts, C.I. Pedestals Etc (Only Through e-procurement)(WE-14(ET-99) DT.27.02.2023) | 27-02-2023 | 22-03-2023 | 22-03-2023 | 23-03-2023 | 03:30 PM | Active | और देखें |
12. | Repairing of 1010KVA DG Set of Dongri Buzurg Mine(DB/ELECT/22-23/1344) | 27-02-2023 | 14-03-2023 | 14-03-2023 | 14-03-2023 | 04:30 PM | Active | और देखें |
13. | Requirement of manpower for trommel operation at tirodi mine(trd/mining/22-23/1502 dt-22/02/2023) | 25-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 04:00 PM | Active | और देखें |
14. | FABRICATION AND SUPPLY OF SS HOOKS TO EMD PLANT(MOIL/DB/EMD/ADGM/22-23/1327) | 24-02-2023 | 09-03-2023 | 09-03-2023 | 09-03-2023 | 04:30 PM | Active | और देखें |
15. | PURCHASE OF SPARES OF GATE END BOX OF UNDERGROUND MACHINE LHD AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/22-23/1476) | 23-02-2023 | 07-03-2023 | 07-03-2023 | 07-03-2023 | 03:30 PM | Active | और देखें |
16. | Purchase of Hydraulic power pack system 1 No for underground ROM tub loading at Gumgaon Mine.(PUR/MOIL/GM/HPP/22-23/1690) | 23-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 04:30 PM | Active | और देखें |
17. | Purchase of Vibrating Feeder 1 no for Crushing and Screening Plant at Gumgaon Mine(PUR/MOIL/GM/VFEEDER/22-23/1691) | 23-02-2023 | 06-03-2023 | 06-03-2023 | 06-03-2023 | 04:00 PM | Active | और देखें |
18. | Operation and Maintenance of 30TPH Mounted Crushing Screening Plant of Dongri Buzurg Mine(DB/MECH/22-23/AGENT/1330) | 23-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 04:30 PM | Active | और देखें |
19. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MAXFLOW PUMP(PUR/MOIL/C-5/28/E-23/314-M Dt 23/02/2023) | 23-02-2023 | 17-03-2023 | 17-03-2023 | 17-03-2023 | 03:30 PM | Active | और देखें |
20. | Production of 20 percent Mn. SM Grade ore BGL 509 from UG old sub grade mineral reject material at Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/1496 dt.21.02.2023) | 21-02-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 04:30 PM | Active | और देखें |
21. | Construction of Community Hall at Two locations (1 ) Tapangajaga Kalyan Mandap, Harchandisahi Puri Municipal ward No. 6, Puri (2) Jodalinga Kalyan Mandap, Bagha Gram Panchayat Gadamugasira, Puri under MOIL CSR.(MOIL/22-23/ET/90) | 21-02-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 03:30 PM | Active | और देखें |
22. | Peripheral Developmental Works / Civil Works in the area around Dr. Babasaheb Ambedkar statue at CMS compound at Nagpur.(MOIL/22-23/ET/94) | 21-02-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 03:30 PM | Active | और देखें |
23. | Fixing of Aluminium Sliding Windows by replacing old damaged wooden windows in camp quarters at Tirodi Mine.(MOIL/22-23/ET/91) | 21-02-2023 | 23-03-2023 | 23-03-2023 | 23-03-2023 | 03:30 PM | Active | और देखें |
24. | Annual Repairs to camp quarters at Tirodi Mine.(MOIL/22-23/ET/92) | 21-02-2023 | 23-03-2023 | 23-03-2023 | 23-03-2023 | 03:30 PM | Active | और देखें |
25. | Annual Repairs to Residential and Camp Quarters at Kandri Mine.(MOIL/22-23/ET/93) | 21-02-2023 | 20-03-2023 | 20-03-2023 | 20-03-2023 | 03:30 PM | Active | और देखें |
26. | Proposal for Second Recovery of UKL 471 20 PER 239 mt From Chitawer ch 12000 foot wall old sub grade area(AGT/MIN/UK/LT/2022-23/1478 Date- 16.02.2023) | 20-02-2023 | 25-02-2023 | 25-02-2023 | 25-02-2023 | 04:30 PM | Active | और देखें |
27. | Proposal for Second Recovery of UKL 553 small size 20 per 242 MT FROM 1000 FOOT OLD SUB GRADE(AGT/CIVIL/UK/LT/2022-23/1477 Date- 16.02.2023) | 20-02-2023 | 25-02-2023 | 25-02-2023 | 25-02-2023 | 04:30 PM | Active | और देखें |
28. | Maintenance and Operation water supply scheme at Gumgaon Mine(AGT/GUM/CIVIL/LT/22-23/ 2564 DT 17/02/2023) | 17-02-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 04:30 PM | Active | और देखें |
29. | Providing 10 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(ADGM/GrpIIISYS/NW/2022-23/1654) | 15-02-2023 | 21-02-2023 | 21-02-2023 | 21-02-2023 | 03:30 PM | Active | और देखें |
30. | Trommel operation at Tirodi mine(TRD/MINING/22-23/1395 DATE 30/01/2023) | 14-02-2023 | 21-02-2023 | 21-02-2023 | 21-02-2023 | 04:00 PM | Active | और देखें |
31. | Repairing of Final Drive spares of BEML make BH60M Dumper No-2 operating at Dongri Buzurg Mine.(MOIL/DB/MECH/2022-2023/1271) | 13-02-2023 | 03-03-2023 | 03-03-2023 | 03-03-2023 | 04:30 PM | Active | और देखें |
32. | Repairing of Rear suspension assembly of BEML make BH60M dumper number 6 and 7 operating at Dongribuzurg Mine(MOIL/DB/MECH/2022-2023/1270) | 13-02-2023 | 03-03-2023 | 03-03-2023 | 03-03-2023 | 04:30 PM | Active | और देखें |
33. | Construction of Security Check Post at Workshop premises at Ukwa Mine(AGT/CIVIL/UK/LT/2022-23/1414 Date- 02.02.2023) | 08-02-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:00 PM | Active | और देखें |
34. | Fabrication of Roof Bolts and Bearing Plate for Underground support.(TE/CH/MECH/22-23/76-23678/1250 Date 31.01.2023) | 07-02-2023 | 18-02-2023 | 18-02-2023 | 18-02-2023 | 03:30 PM | Active | और देखें |
35. | Providing and installation of DGMS approved Comp Auto Speed Indicator Cum Recorder for 250 HP Winder(TE/CH/MECH/22-23/76-23238/1254 Date 31.01.2023) | 07-02-2023 | 18-02-2023 | 18-02-2023 | 18-02-2023 | 03:30 PM | Active | और देखें |
36. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OEPL MAKE 3 AND 4 TON BATTERY/DIESEL LOCOMOTIVE OPERATIVE AT BALAGHAT, KANDRI AND GUMGAON MINES(PUR/MOIL/C-5/44/E-22 / 304-M Dt. 07/02/2023) | 07-02-2023 | 01-03-2023 | 01-03-2023 | 01-03-2023 | 03:30 PM | Active | और देखें |
37. | Cleaning of drain,sewer lines of camp colonies at Balaghat Mine.(HR/BGT/LT/AGT/2022-23/1433 DT.06.02.2023) | 06-02-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 04:30 PM | Active | और देखें |
38. | Collection of garbage from camp colonies at Balaghat Mine.(HR/BGT/LT/AGT/2022-23/1432 dt.06.02.2023) | 06-02-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 04:30 PM | Active | और देखें |
39. | Transportation of ROM Rock Clean Ore tubs from underground BDC at Kandri Mine(KD/MINES/NIT/2022-23/3297) | 04-02-2023 | 10-02-2023 | 10-02-2023 | 10-02-2023 | 04:30 PM | Active | और देखें |
40. | Hiring of backhoe cum loader for loading of subgrade ore into tubs for unloading into bunker near vertical shaft(Agent/Gum/Min/22-23/1610 Date-04.02.2023) | 04-02-2023 | 11-02-2023 | 11-02-2023 | 11-02-2023 | 04:30 PM | Active | और देखें |
41. | Transportation of Underground and Surface tubs at Gumgaon Mine(Agent/Gum/Min/22-23/1611 Date-04.02.2023) | 04-02-2023 | 11-02-2023 | 11-02-2023 | 11-02-2023 | 04:30 PM | Active | और देखें |
42. | Construction of RCC foundation of Weigh Bridge near Security Check Post at Kalaphata Ghat of Kandri Mine.(KAN/CIVIL/NIT/22-23/3296 dt 04.02.2023) | 04-02-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 04:30 PM | Active | और देखें |
43. | Coupling and Transportation of tubs by battery Locomotives in Underground and transportation of tubs between plant OCF and Siding at Surface at Gumgaon Mine(Agent/Gum/Min/22-23/1615 Dt 04.02.2023) | 04-02-2023 | 11-02-2023 | 11-02-2023 | 11-02-2023 | 05:30 PM | Active | और देखें |
44. | Pushing of tubs from LHD faces in 300L at Gumgaon Mine(Agent/Gum/Min/22-23/1616 Dt 04.02.2023) | 04-02-2023 | 11-02-2023 | 11-02-2023 | 11-02-2023 | 05:30 PM | Active | और देखें |
45. | Fabrication of Rubber Pad Size-920mmX890mmX50mm 6Nos. for Discharge Launder of Holmes Shaft Skip Assembly of Balaghat Mine.(AGT/BGT/MECH/HSS/22-23/1413) | 03-02-2023 | 24-02-2023 | 24-02-2023 | 24-02-2023 | 04:30 PM | Active | और देखें |
46. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Underground levels of Balaghat Mine for a period of 10 days(AGT/BGT/MECH/PUMP/22-23/1410) | 02-02-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
47. | Replacement of sewer line, septic tank at Block no.01 and 02 A Type quarters of K.C Colony at Balaghat Mine.(CIVIL/BGT/LT/AGT/2022-23/1416 Dt.02.02.2023) | 02-02-2023 | 08-02-2023 | 08-02-2023 | 08-02-2023 | 04:30 PM | Active | और देखें |
48. | Construction of Cable trench and Miscellaneous plumbing fitting work in 33 KV Substation at Balaghat Mine.(CIVIL/BGT/LT/AGT/2022-23/1415 Dt.02.02.2023) | 02-02-2023 | 08-02-2023 | 08-02-2023 | 08-02-2023 | 04:30 PM | Active | और देखें |
49. | Filling spreading of waste rock at 13.5th level North section at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1417 Dt.02.02.2023) | 02-02-2023 | 08-02-2023 | 08-02-2023 | 08-02-2023 | 04:30 PM | Active | और देखें |
50. | Replacement of old damaged G.I Sheets with new Galvalume sheets and minor repairing work and painting work of Badminton hall at west Court premises, MOIL, Nagpur(MOIL/22-23/ET/85) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
51. | Providing and applying distempering, painting of ground floor, first floor, second floor and third floor and outer exterior emulsion paint to MOIL Bhavan, Nagpur.(MOIL/22-23/ET/86) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
52. | Construction of canteen Building at Ukwa Mine.(MOIL/22-23/ET/88) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
53. | Construction of water collection tank and installation of tyre washer system at kandri Mine.(MOIL/22-23/ET/87) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
54. | SUPPLY INSTALLATION and COMMISSIONING OF OFC WIRED LAN CONNECTIVITY FROM MINE STORES TO WORK SHOP VIA ELECTRICAL DEPARTMENT ,OIL STORES AND RE SETUP OF LAN OF ADMIN BUILDING AND WORK SHOP OFFICE AT DONGRI BUZURG MINE(DB/SYSTEM/NETWORK/2022-23/1245) | 31-01-2023 | 10-02-2023 | 10-02-2023 | 10-02-2023 | 04:00 PM | Active | और देखें |
55. | PURCHASE OF NEUTRAL DISPLACEMENT RELAY SYSTEM FOR 11KV HT VCB OF 11KV HT CAPACITOR BANK(BGT/TE/ELECT/AJGM/22-23/1377) | 30-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 03:30 PM | Active | और देखें |
56. | Repairing of Upper and Lower Casing of 100HP Kirloskar Make Split casing Centrifugal Pump(Model-100/36) of 13.5th L and 8th Level Underground(AGENT/BGT/MECH/PUMP/22-23/1373) | 30-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
57. | Fencing Works and other allied civil works for bouser filling station for existing diesel pump of Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2022-23/3235 Date 29.01.2023) | 30-01-2023 | 07-02-2023 | 07-02-2023 | 07-02-2023 | 04:30 PM | Active | और देखें |
58. | Filling spreading of waste rock at 6th level South section at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1391 DT.30.01.2023) | 30-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
59. | Removal of waste rock at 9th level north and laying of tramline at 13.5th Level.(MINING/BGT/LT/AGT/2022-23/1392 DT.30.01.2023) | 30-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
60. | Design, Manufacturing and Supplying of Plumber Block-1No. of Pinion Gear Shaft of Holmes Shaft 550HP Skip Winder of Balaghat Mine(AGENT/BGT/MECH/HS/22-23/1370) | 28-01-2023 | 03-03-2023 | 03-03-2023 | 03-03-2023 | 04:30 PM | Active | और देखें |
61. | Repairing of Worn Our Wheels-50nos. and Axle Shaft-10 nos. of G.B.Car Deployed in Underground Levels of Balaghat Mine(AGT/BGT/MECH/GB/22-23/1371) | 28-01-2023 | 16-02-2023 | 16-02-2023 | 16-02-2023 | 04:30 PM | Active | और देखें |
62. | Major Overhauling of 220HP MP Make Multistage Pump of 06th Level underground at Balaghat Mine(AGENT/BGT/MECH/PUMP/22-23/1372) | 28-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
63. | Fabrication of Track Regular bushing and track pin for Tata 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/22-23/JGM(MECH)/1222) | 27-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 04:30 PM | Active | और देखें |
64. | Laying of 6lbs Tramline at 10th level Production Shaft Orepass.(MINING/BGT/LT/AGT/2022-23/1376 Dt.27.01.2023) | 27-01-2023 | 02-02-2023 | 02-02-2023 | 02-02-2023 | 04:30 PM | Active | और देखें |
65. | Filling spreading of waste rock at 10th level at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1375 Dt.27.01.2023) | 27-01-2023 | 02-02-2023 | 02-02-2023 | 02-02-2023 | 04:30 PM | Active | और देखें |
66. | Renovation of toilets and bathrooms including tiling and replacement of fixtures etc. at CMD Bunglow, MOIL Nagpur(MOIL/22-23/ET/97) | 27-01-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 03:30 PM | Active | और देखें |
67. | External and internal painting including miscellaneous civil works etc. at CMD Bunglow, MOIL Nagpur.(MOIL/22-23/ET/98) | 27-01-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 03:30 PM | Active | और देखें |
68. | Replacing the old roofing sheets including the supporting structure with roofing shingles at CMD Bunglow, MOIL Nagpur(MOIL/22-23/ET/96) | 27-01-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 03:30 PM | Active | और देखें |
69. | Construction of foundation and Retaining wall for screen unit at OCF at Gumgaon Mine(AGT/GUM/CIVIL/LT/22-23/ 2347 DT 25/01/2023) | 25-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
70. | Repairing of 1010KVA DG Set of Dongri Buzurg Mine(DB/ELECT/22-23/1226) | 25-01-2023 | 07-02-2023 | 07-02-2023 | 07-02-2023 | 04:30 PM | Active | और देखें |
71. | Purchase of Electrically operated Auxiliary Ventilation Fan 1 no for Gumgaon Mine(PUR/MOIL/GM/VFAN/22-23/1560) | 24-01-2023 | 02-02-2023 | 02-02-2023 | 02-02-2023 | 04:30 PM | Active | और देखें |
72. | Transportation of ROM Rock Clean Ore tubs from underground and BDC at Kandri Mine(KD/MINES/NIT/2022-23/3134) | 23-01-2023 | 28-01-2023 | 28-01-2023 | 28-01-2023 | 04:30 PM | Active | और देखें |
73. | Mono block Pump Sets 15 HP 50M Head 1080 LPM discharge 2800 RPM with Starter 2 NOS.(PUR/MOIL//DB/2022-23/809) | 23-01-2023 | 04-02-2023 | 04-02-2023 | 04-02-2023 | 04:30 PM | Active | और देखें |
74. | Power Pack Machine Hand Pump for Track Chain pin remover 1 NO.(PUR/MOIL//DB/2022-23/1133) | 23-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
75. | REG REMOVAL OF WASTE ROCK UNDER IBM VIOLATION AT TIRODI MINE(MOIL/HO/MINE/2022-23/31 DT- 08/01/2023) | 23-01-2023 | 31-01-2023 | 31-01-2023 | 31-01-2023 | 04:30 PM | Active | और देखें |
76. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASES OF SPARES FOR INDUS MAKE ROCK BREAKER AND DRILL MACHINE IRB-300 AND IRB-400(PUR/MOIL/C-5/77 /E-21/281-M Dt. 21.01.2023) | 21-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 03:30 PM | Active | और देखें |
77. | In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine(AGT/GUM/PER/LT/22-23/ 2283 DT 21/01/2023) | 21-01-2023 | 30-01-2023 | 30-01-2023 | 30-01-2023 | 04:30 PM | Active | और देखें |
78. | PROVIDING AND FITTING OF GPS POSTIONING AND FUEL LEVEL MONITORING SYSTEM IN SCHOOL BUS OF DONGRI BUZURG MINE(DB/MECH/22-23/AGENT/808) | 19-01-2023 | 04-02-2023 | 04-02-2023 | 04-02-2023 | 04:30 PM | Active | और देखें |
79. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Underground levels of Balaghat Mine for a period of 10 days(AGT/BGT/MECH/PUMP/22-23/1345) | 19-01-2023 | 23-01-2023 | 23-01-2023 | 23-01-2023 | 04:30 PM | Active | और देखें |
80. | Empanellment of Consultant / advisor to provide advisory/consultancy services for improving the business processes / activities of MOIL(MOIL/22-23/ET/74) | 19-01-2023 | 13-03-2023 | 13-03-2023 | 13-03-2023 | 03:30 PM | Active | और देखें |
81. | PROVIDING AND FITTING OF GPS POSTIONING AND FUEL LEVEL MONITORING SYSTEM IN SCHOOL BUS OF DONGRI BUZURG MINE(DB/MECH/22-23/AGENT/808) | 19-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
82. | Repairing of Track Chain Assy of Tata Hitachi 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/22-23/JGM(MEC)/1169) | 18-01-2023 | 31-01-2023 | 31-01-2023 | 31-01-2023 | 04:30 PM | Active | और देखें |
83. | Providing unskilled manpower in C and S Plant for housekeeping and for smooth operation of Plant.(TE/CH/MECH/22-23/71-3844/1125 date 05/01/2023) | 18-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 03:30 PM | Active | और देखें |
84. | Out sourcing of 3 numbers of manpower for general maintenance and operation of C and S Plant.(TE/CH/MECH/22-23/76-24163/1129 date 05.01.2023) | 18-01-2023 | 28-01-2023 | 28-01-2023 | 28-01-2023 | 03:30 PM | Active | और देखें |
85. | Desilting and cleaning of sump and surrounding area of sump situated at 200L and 300L of Gumgaon Mine(Agent/Gum/Min/21-22/1510 Date-16.01.2023) | 18-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 04:30 PM | Active | और देखें |
86. | Handling and Transport of Material From Ch 1000 to 1500 at Ukwa Mine(AGT/CIVIL/UK/LT/2022-23/1319 DATE11.01.2023) | 17-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 04:30 PM | Active | और देखें |
87. | Repairing of 36, 24 and 16 CFT Tubs and Trolleys at Chikla Mine.(TE/CH/MECH/22-23/76-23871/1127 date 05/01/2023) | 17-01-2023 | 30-01-2023 | 30-01-2023 | 30-01-2023 | 03:30 PM | Active | और देखें |
88. | Replacement of Damaged doors with new FRP doors in A Type quarters at Ukwa Mine(AGT/CIVIL/UK/LT/2022-23/1227 Date- 26.12.2022) | 16-01-2023 | 21-01-2023 | 21-01-2023 | 21-01-2023 | 04:30 PM | Active | और देखें |
89. | DRILLING OF BORE WELL NEAR NEWLY CONSTRUCTED A TYPE COLONY AT KANDRI MINE.(KAN/CIVI/NIT/2022-23/3050 DT 15.01.2023) | 16-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 04:30 PM | Active | और देखें |
90. | MAINTENANCE OF GARDEN AT MINE MANAGER BUNGALOW AT TIRODI MINE(trd/civil/22-23/1320 dt 12/01/2023) | 14-01-2023 | 20-01-2023 | 20-01-2023 | 20-01-2023 | 04:30 PM | Active | और देखें |
91. | Waterproofing by means of laying torch shield on roof of old substation building no 1 and 2 at Kandri Mine.(KAN/CIVI/NIT/2022-23/3031 DT 14.01.2023) | 14-01-2023 | 24-01-2023 | 24-01-2023 | 24-01-2023 | 04:30 PM | Active | और देखें |
92. | Painting, Waterproofing, Miscellaneous plumbing works and drain construction in Guest House at balaghat mine.(MOIL/22-23/ET/81) | 13-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 03:30 PM | Active | और देखें |
93. | Construction of Transformer Room, Compressor Room and Room for Active Harmonic Filter in 33KV Sub station at balaghat Mine.(MOIL/22-23/ET/82) | 13-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 03:30 PM | Active | और देखें |
94. | Construction and installation of Bio Toilet in U/G 1650 Level, 1750 Level and 1850 Level at Ukwa Mine.(MOIL/22-23/ET/83) | 13-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 03:30 PM | Active | और देखें |
95. | Annual Repairs to Camp and Resindential Quarters at Chikla Mine.(MOIL/22-23/ET/84) | 13-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 03:30 PM | Active | और देखें |
96. | LAYING OF 3C X 240 SQMM, 1.1KV PVCDWA CU CABLE FROM 13.5TH LEVEL 15TH LEVEL SUBSTATION(BGT/TE/ELECT/AJGM/22-23/1316) | 13-01-2023 | 19-01-2023 | 19-01-2023 | 19-01-2023 | 03:30 PM | Active | और देखें |
97. | Transportation of ROM Rock Clean Ore tubs from underground and BDC at Kandri Mine(KD/MINES/NIT/2022-23/3000) | 11-01-2023 | 17-01-2023 | 17-01-2023 | 17-01-2023 | 04:30 PM | Active | और देखें |
98. | Concreting work for offsetting of manway wall at 350L stop at Kandri Mine(KD/MINES/NIT/2022-23/3002) | 11-01-2023 | 17-01-2023 | 17-01-2023 | 17-01-2023 | 04:30 PM | Active | और देखें |
99. | Purchase of Triple spur gear chain pulley block Capacity 5 T for Ferro Manganese Plant Balaghat Mine under Capital Budget for the year 2022 and 23(TE/MOIL/FMP/MECH/22-23/268) | 11-01-2023 | 03-02-2023 | 03-02-2023 | 03-02-2023 | 04:30 PM | Active | और देखें |
100. | Purchase of gear Box with motor and coupling set complete for Ferro Manganese Plant Balaghat Mine under Capital Budget for the year 2022 and 23(TE/MOIL/FMP/MECH/22-23/266 Dt.10.01.2023) | 11-01-2023 | 03-02-2023 | 03-02-2023 | 03-02-2023 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |