निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Fabrication of Rubber Pad Size-920mmX890mmX50mm 6Nos. for Discharge Launder of Holmes Shaft Skip Assembly of Balaghat Mine.(AGT/BGT/MECH/HSS/22-23/1413) | 03-02-2023 | 24-02-2023 | 24-02-2023 | 24-02-2023 | 04:30 PM | Active | और देखें |
2. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Underground levels of Balaghat Mine for a period of 10 days(AGT/BGT/MECH/PUMP/22-23/1410) | 02-02-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
3. | Replacement of sewer line, septic tank at Block no.01 and 02 A Type quarters of K.C Colony at Balaghat Mine.(CIVIL/BGT/LT/AGT/2022-23/1416 Dt.02.02.2023) | 02-02-2023 | 08-02-2023 | 08-02-2023 | 08-02-2023 | 04:30 PM | Active | और देखें |
4. | Construction of Cable trench and Miscellaneous plumbing fitting work in 33 KV Substation at Balaghat Mine.(CIVIL/BGT/LT/AGT/2022-23/1415 Dt.02.02.2023) | 02-02-2023 | 08-02-2023 | 08-02-2023 | 08-02-2023 | 04:30 PM | Active | और देखें |
5. | Filling spreading of waste rock at 13.5th level North section at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1417 Dt.02.02.2023) | 02-02-2023 | 08-02-2023 | 08-02-2023 | 08-02-2023 | 04:30 PM | Active | और देखें |
6. | Replacement of old damaged G.I Sheets with new Galvalume sheets and minor repairing work and painting work of Badminton hall at west Court premises, MOIL, Nagpur(MOIL/22-23/ET/85) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
7. | Providing and applying distempering, painting of ground floor, first floor, second floor and third floor and outer exterior emulsion paint to MOIL Bhavan, Nagpur.(MOIL/22-23/ET/86) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
8. | Construction of canteen Building at Ukwa Mine.(MOIL/22-23/ET/88) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
9. | Construction of water collection tank and installation of tyre washer system at kandri Mine.(MOIL/22-23/ET/87) | 01-02-2023 | 02-03-2023 | 02-03-2023 | 02-03-2023 | 03:30 PM | Active | और देखें |
10. | SUPPLY INSTALLATION and COMMISSIONING OF OFC WIRED LAN CONNECTIVITY FROM MINE STORES TO WORK SHOP VIA ELECTRICAL DEPARTMENT ,OIL STORES AND RE SETUP OF LAN OF ADMIN BUILDING AND WORK SHOP OFFICE AT DONGRI BUZURG MINE(DB/SYSTEM/NETWORK/2022-23/1245) | 31-01-2023 | 10-02-2023 | 10-02-2023 | 10-02-2023 | 04:00 PM | Active | और देखें |
11. | PURCHASE OF NEUTRAL DISPLACEMENT RELAY SYSTEM FOR 11KV HT VCB OF 11KV HT CAPACITOR BANK(BGT/TE/ELECT/AJGM/22-23/1377) | 30-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 03:30 PM | Active | और देखें |
12. | Repairing of Upper and Lower Casing of 100HP Kirloskar Make Split casing Centrifugal Pump(Model-100/36) of 13.5th L and 8th Level Underground(AGENT/BGT/MECH/PUMP/22-23/1373) | 30-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
13. | Fencing Works and other allied civil works for bouser filling station for existing diesel pump of Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2022-23/3235 Date 29.01.2023) | 30-01-2023 | 07-02-2023 | 07-02-2023 | 07-02-2023 | 04:30 PM | Active | और देखें |
14. | Filling spreading of waste rock at 6th level South section at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1391 DT.30.01.2023) | 30-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
15. | Removal of waste rock at 9th level north and laying of tramline at 13.5th Level.(MINING/BGT/LT/AGT/2022-23/1392 DT.30.01.2023) | 30-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
16. | Design, Manufacturing and Supplying of Plumber Block-1No. of Pinion Gear Shaft of Holmes Shaft 550HP Skip Winder of Balaghat Mine(AGENT/BGT/MECH/HS/22-23/1370) | 28-01-2023 | 03-03-2023 | 03-03-2023 | 03-03-2023 | 04:30 PM | Active | और देखें |
17. | Repairing of Worn Our Wheels-50nos. and Axle Shaft-10 nos. of G.B.Car Deployed in Underground Levels of Balaghat Mine(AGT/BGT/MECH/GB/22-23/1371) | 28-01-2023 | 16-02-2023 | 16-02-2023 | 16-02-2023 | 04:30 PM | Active | और देखें |
18. | Major Overhauling of 220HP MP Make Multistage Pump of 06th Level underground at Balaghat Mine(AGENT/BGT/MECH/PUMP/22-23/1372) | 28-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
19. | Fabrication of Track Regular bushing and track pin for Tata 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/22-23/JGM(MECH)/1222) | 27-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 04:30 PM | Active | और देखें |
20. | Laying of 6lbs Tramline at 10th level Production Shaft Orepass.(MINING/BGT/LT/AGT/2022-23/1376 Dt.27.01.2023) | 27-01-2023 | 02-02-2023 | 02-02-2023 | 02-02-2023 | 04:30 PM | Active | और देखें |
21. | Filling spreading of waste rock at 10th level at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1375 Dt.27.01.2023) | 27-01-2023 | 02-02-2023 | 02-02-2023 | 02-02-2023 | 04:30 PM | Active | और देखें |
22. | Renovation of toilets and bathrooms including tiling and replacement of fixtures etc. at CMD Bunglow, MOIL Nagpur(MOIL/22-23/ET/97) | 27-01-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 03:30 PM | Active | और देखें |
23. | External and internal painting including miscellaneous civil works etc. at CMD Bunglow, MOIL Nagpur.(MOIL/22-23/ET/98) | 27-01-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 03:30 PM | Active | और देखें |
24. | Replacing the old roofing sheets including the supporting structure with roofing shingles at CMD Bunglow, MOIL Nagpur(MOIL/22-23/ET/96) | 27-01-2023 | 27-02-2023 | 27-02-2023 | 27-02-2023 | 03:30 PM | Active | और देखें |
25. | Construction of foundation and Retaining wall for screen unit at OCF at Gumgaon Mine(AGT/GUM/CIVIL/LT/22-23/ 2347 DT 25/01/2023) | 25-01-2023 | 06-02-2023 | 06-02-2023 | 06-02-2023 | 04:30 PM | Active | और देखें |
26. | Repairing of 1010KVA DG Set of Dongri Buzurg Mine(DB/ELECT/22-23/1226) | 25-01-2023 | 07-02-2023 | 07-02-2023 | 07-02-2023 | 04:30 PM | Active | और देखें |
27. | Purchase of Electrically operated Auxiliary Ventilation Fan 1 no for Gumgaon Mine(PUR/MOIL/GM/VFAN/22-23/1560) | 24-01-2023 | 02-02-2023 | 02-02-2023 | 02-02-2023 | 04:30 PM | Active | और देखें |
28. | Transportation of ROM Rock Clean Ore tubs from underground and BDC at Kandri Mine(KD/MINES/NIT/2022-23/3134) | 23-01-2023 | 28-01-2023 | 28-01-2023 | 28-01-2023 | 04:30 PM | Active | और देखें |
29. | Mono block Pump Sets 15 HP 50M Head 1080 LPM discharge 2800 RPM with Starter 2 NOS.(PUR/MOIL//DB/2022-23/809) | 23-01-2023 | 04-02-2023 | 04-02-2023 | 04-02-2023 | 04:30 PM | Active | और देखें |
30. | Power Pack Machine Hand Pump for Track Chain pin remover 1 NO.(PUR/MOIL//DB/2022-23/1133) | 23-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
31. | REG REMOVAL OF WASTE ROCK UNDER IBM VIOLATION AT TIRODI MINE(MOIL/HO/MINE/2022-23/31 DT- 08/01/2023) | 23-01-2023 | 31-01-2023 | 31-01-2023 | 31-01-2023 | 04:30 PM | Active | और देखें |
32. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASES OF SPARES FOR INDUS MAKE ROCK BREAKER AND DRILL MACHINE IRB-300 AND IRB-400(PUR/MOIL/C-5/77 /E-21/281-M Dt. 21.01.2023) | 21-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 03:30 PM | Active | और देखें |
33. | In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine(AGT/GUM/PER/LT/22-23/ 2283 DT 21/01/2023) | 21-01-2023 | 30-01-2023 | 30-01-2023 | 30-01-2023 | 04:30 PM | Active | और देखें |
34. | PROVIDING AND FITTING OF GPS POSTIONING AND FUEL LEVEL MONITORING SYSTEM IN SCHOOL BUS OF DONGRI BUZURG MINE(DB/MECH/22-23/AGENT/808) | 19-01-2023 | 04-02-2023 | 04-02-2023 | 04-02-2023 | 04:30 PM | Active | और देखें |
35. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Underground levels of Balaghat Mine for a period of 10 days(AGT/BGT/MECH/PUMP/22-23/1345) | 19-01-2023 | 23-01-2023 | 23-01-2023 | 23-01-2023 | 04:30 PM | Active | और देखें |
36. | Empanellment of Consultant / advisor to provide advisory/consultancy services for improving the business processes / activities of MOIL(MOIL/22-23/ET/74) | 19-01-2023 | 13-03-2023 | 13-03-2023 | 13-03-2023 | 03:30 PM | Active | और देखें |
37. | PROVIDING AND FITTING OF GPS POSTIONING AND FUEL LEVEL MONITORING SYSTEM IN SCHOOL BUS OF DONGRI BUZURG MINE(DB/MECH/22-23/AGENT/808) | 19-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 04:30 PM | Active | और देखें |
38. | Repairing of Track Chain Assy of Tata Hitachi 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/22-23/JGM(MEC)/1169) | 18-01-2023 | 31-01-2023 | 31-01-2023 | 31-01-2023 | 04:30 PM | Active | और देखें |
39. | Providing unskilled manpower in C and S Plant for housekeeping and for smooth operation of Plant.(TE/CH/MECH/22-23/71-3844/1125 date 05/01/2023) | 18-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 03:30 PM | Active | और देखें |
40. | Out sourcing of 3 numbers of manpower for general maintenance and operation of C and S Plant.(TE/CH/MECH/22-23/76-24163/1129 date 05.01.2023) | 18-01-2023 | 28-01-2023 | 28-01-2023 | 28-01-2023 | 03:30 PM | Active | और देखें |
41. | Desilting and cleaning of sump and surrounding area of sump situated at 200L and 300L of Gumgaon Mine(Agent/Gum/Min/21-22/1510 Date-16.01.2023) | 18-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 04:30 PM | Active | और देखें |
42. | Handling and Transport of Material From Ch 1000 to 1500 at Ukwa Mine(AGT/CIVIL/UK/LT/2022-23/1319 DATE11.01.2023) | 17-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 04:30 PM | Active | और देखें |
43. | Repairing of 36, 24 and 16 CFT Tubs and Trolleys at Chikla Mine.(TE/CH/MECH/22-23/76-23871/1127 date 05/01/2023) | 17-01-2023 | 30-01-2023 | 30-01-2023 | 30-01-2023 | 03:30 PM | Active | और देखें |
44. | Replacement of Damaged doors with new FRP doors in A Type quarters at Ukwa Mine(AGT/CIVIL/UK/LT/2022-23/1227 Date- 26.12.2022) | 16-01-2023 | 21-01-2023 | 21-01-2023 | 21-01-2023 | 04:30 PM | Active | और देखें |
45. | DRILLING OF BORE WELL NEAR NEWLY CONSTRUCTED A TYPE COLONY AT KANDRI MINE.(KAN/CIVI/NIT/2022-23/3050 DT 15.01.2023) | 16-01-2023 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 04:30 PM | Active | और देखें |
46. | MAINTENANCE OF GARDEN AT MINE MANAGER BUNGALOW AT TIRODI MINE(trd/civil/22-23/1320 dt 12/01/2023) | 14-01-2023 | 20-01-2023 | 20-01-2023 | 20-01-2023 | 04:30 PM | Active | और देखें |
47. | Waterproofing by means of laying torch shield on roof of old substation building no 1 and 2 at Kandri Mine.(KAN/CIVI/NIT/2022-23/3031 DT 14.01.2023) | 14-01-2023 | 24-01-2023 | 24-01-2023 | 24-01-2023 | 04:30 PM | Active | और देखें |
48. | Painting, Waterproofing, Miscellaneous plumbing works and drain construction in Guest House at balaghat mine.(MOIL/22-23/ET/81) | 13-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 03:30 PM | Active | और देखें |
49. | Construction of Transformer Room, Compressor Room and Room for Active Harmonic Filter in 33KV Sub station at balaghat Mine.(MOIL/22-23/ET/82) | 13-01-2023 | 15-02-2023 | 15-02-2023 | 15-02-2023 | 03:30 PM | Active | और देखें |
50. | Construction and installation of Bio Toilet in U/G 1650 Level, 1750 Level and 1850 Level at Ukwa Mine.(MOIL/22-23/ET/83) | 13-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 03:30 PM | Active | और देखें |
51. | Annual Repairs to Camp and Resindential Quarters at Chikla Mine.(MOIL/22-23/ET/84) | 13-01-2023 | 13-02-2023 | 13-02-2023 | 13-02-2023 | 03:30 PM | Active | और देखें |
52. | LAYING OF 3C X 240 SQMM, 1.1KV PVCDWA CU CABLE FROM 13.5TH LEVEL 15TH LEVEL SUBSTATION(BGT/TE/ELECT/AJGM/22-23/1316) | 13-01-2023 | 19-01-2023 | 19-01-2023 | 19-01-2023 | 03:30 PM | Active | और देखें |
53. | Transportation of ROM Rock Clean Ore tubs from underground and BDC at Kandri Mine(KD/MINES/NIT/2022-23/3000) | 11-01-2023 | 17-01-2023 | 17-01-2023 | 17-01-2023 | 04:30 PM | Active | और देखें |
54. | Concreting work for offsetting of manway wall at 350L stop at Kandri Mine(KD/MINES/NIT/2022-23/3002) | 11-01-2023 | 17-01-2023 | 17-01-2023 | 17-01-2023 | 04:30 PM | Active | और देखें |
55. | Purchase of Triple spur gear chain pulley block Capacity 5 T for Ferro Manganese Plant Balaghat Mine under Capital Budget for the year 2022 and 23(TE/MOIL/FMP/MECH/22-23/268) | 11-01-2023 | 03-02-2023 | 03-02-2023 | 03-02-2023 | 04:30 PM | Active | और देखें |
56. | Purchase of gear Box with motor and coupling set complete for Ferro Manganese Plant Balaghat Mine under Capital Budget for the year 2022 and 23(TE/MOIL/FMP/MECH/22-23/266 Dt.10.01.2023) | 11-01-2023 | 03-02-2023 | 03-02-2023 | 03-02-2023 | 04:30 PM | Active | और देखें |
57. | Purchase of gear Box with motor and coupling set complete for shuttle conveyor of Ferro Manganese Plant Balaghat Mine under Capital Budget for the year 2022and23(TE/MOIL/FMP/MECH/22-23/267) | 11-01-2023 | 03-02-2023 | 03-02-2023 | 03-02-2023 | 04:30 PM | Active | और देखें |
58. | Purchase of EOT crane LT gear Box HR350 R set complete for EOT Crane of Ferro Manganese Plant Balaghat Mine under Capital Budget for the year 2022and23(TE/MOIL/FMP/MECH/22-23/ 265 dt.10.01.2023) | 11-01-2023 | 03-02-2023 | 03-02-2023 | 03-02-2023 | 04:30 PM | Active | और देखें |
59. | Supply of HT NUT AND BOLT M30X97MM for Tata make Hydraulic Excavator operating at Dongr Buzurg Mine(DB/MECH/22-23/JGM(MEC)/1132) | 10-01-2023 | 27-01-2023 | 27-01-2023 | 27-01-2023 | 04:30 PM | Active | और देखें |
60. | PROVIDING SUPPLYING OF CCTV SURVIELLANCE SYSTEM AT DIFFERENT LOCATIONS AT BALAGHAT MINE.(BGT/TE/ELECT/AJGM/22-23/1282) | 09-01-2023 | 16-01-2023 | 16-01-2023 | 16-01-2023 | 04:30 PM | Active | और देखें |
61. | Purchase of Electrically operated Auxiliary Ventilation Fan for Ukwa Mine(AGT/UK/MECH/2022-23/1263) | 09-01-2023 | 12-01-2023 | 12-01-2023 | 12-01-2023 | 04:30 PM | Active | और देखें |
62. | Fabrication of Single Acting Hydraulic Cylinder 4 Nos. for the Service Brakes of Holmes Shaft Skip Winder and Production Shaft Winder of Balaghat Mine(AGT/BGT/MECH/22-23/1277) | 07-01-2023 | 31-01-2023 | 31-01-2023 | 31-01-2023 | 04:30 PM | Active | और देखें |
63. | Construction of Retaining Wall and related foundation works for 30TPH Crushing and Screening Plant at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2022-23/1121 Dt 05.01.2023) | 07-01-2023 | 12-01-2023 | 12-01-2023 | 12-01-2023 | 04:30 PM | Active | और देखें |
64. | Outsourcing of Operation and General Maintenance of Industrial Pumps in Underground levels of Balaghat Mine for a period of 10 days(AGT/BGT/MECH/PUMP/22-23/1260) | 05-01-2023 | 10-01-2023 | 10-01-2023 | 10-01-2023 | 04:30 PM | Active | और देखें |
65. | Supply, equipping and installation of a 3 x 20MVA, 132KV substation and construction of substation building with an OandM contract for 5 years period at Balaghat Mine(MOIL/22-23/ET/80) | 05-01-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 03:30 PM | Active | और देखें |
66. | Hiring of Hyd. Excavator with Rock breaker arrangement for excavating the Outcrop ore at Surface between Ch67 64 of South Section of Mine areas of Balaghat Mine(AGT/BGT/MECH/HIRING/22-23/1249) | 03-01-2023 | 09-01-2023 | 09-01-2023 | 09-01-2023 | 04:30 PM | Active | और देखें |
67. | Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/22-23/ET-89 DT.03.01.2023) | 03-01-2023 | 23-01-2023 | 23-01-2023 | 24-01-2023 | 03:30 PM | Active | और देखें |
68. | Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/22-23/1243) | 02-01-2023 | 19-01-2023 | 19-01-2023 | 19-01-2023 | 04:30 PM | Active | और देखें |
69. | INSTALLATION OF BIO TOILET INSIDE UNDERGROUND AT GUMGAON MINE(Agent/GUM/Civil/LT/22-23/1799 06.12.2022) | 31-12-2022 | 10-01-2023 | 10-01-2023 | 10-01-2023 | 04:30 PM | Active | और देखें |
70. | Removal of garbage, cleaning of septic tank and drain at camp area of Tirodi Mine(TRD/CIVIL/22-23/1193 DATE 16/12/2022) | 30-12-2022 | 04-01-2023 | 04-01-2023 | 04-01-2023 | 04:00 PM | Active | और देखें |
71. | INSTALLATION OF BIO TOILET INSIDE UNDERGROUND AT GUMGAON MINE(Agent/GUM/Civil/LT/22-23/2002 29/12/2023) | 30-12-2022 | 10-01-2023 | 10-01-2023 | 10-01-2023 | 04:30 PM | Active | और देखें |
72. | Transportation of ROM Rock Clean Ore tubs from underground and BDC at Kandri Mine(KD/MINES/NIT/2022-23/2791) | 30-12-2022 | 10-01-2023 | 10-01-2023 | 10-01-2023 | 04:30 PM | Active | और देखें |
73. | Security Guards for Diamond Drilling Site at Balaghat Mine(CIVIL/BGT/LT/AGT/2022-23/1221 dt.25.12.2022) | 28-12-2022 | 05-01-2023 | 05-01-2023 | 05-01-2023 | 04:30 PM | Active | और देखें |
74. | Repair ,waterproofing and miscellaneous work at MOIL Bhawan , Nagpur(MOIL/22-23/ET/66) | 26-12-2022 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 03:30 PM | Active | और देखें |
75. | Civil modification Renovation and Maintenance Repair works at various Companies Premises Corporate Office MOIL Nagpur.(Annual Maintenance work)(MOIL/22-23/ET/68) | 26-12-2022 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 03:30 PM | Active | और देखें |
76. | Construction of Room, Sitting galary and playground at Central School Premises, Balaghat under MOIL CSR(MOIL/22-23/ET/77) | 26-12-2022 | 30-01-2023 | 30-01-2023 | 30-01-2023 | 03:30 PM | Active | और देखें |
77. | Construction of Precast Boundary wall in Girls Hostel premises of Government Polytechnic college Balaghat under MOIL CSR(MOIL/22-23/ET/78) | 26-12-2022 | 30-01-2023 | 30-01-2023 | 30-01-2023 | 03:30 PM | Active | और देखें |
78. | Construction of New RCC drain from security check post to weigh bridge side at Ukwa Mine(MOIL/22-23/ET/79) | 26-12-2022 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 03:30 PM | Active | और देखें |
79. | Construction of Panel Room, Evasee and Allied Infrastructure for North and South Ventilation Shaft at Balaghat Mine.(MOIL/22-23/ET/76) | 26-12-2022 | 25-01-2023 | 25-01-2023 | 25-01-2023 | 03:30 PM | Active | और देखें |
80. | Providing and supplying of Hume Pipe of 600 mm diameter for approach of sand Ghat on Kanhan River at Gumgaon Mine(Agent/GUM/Civil/LT/22-23/1926 17/12/2022) | 23-12-2022 | 02-01-2023 | 02-01-2023 | 02-01-2023 | 04:30 PM | Active | और देखें |
81. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PRINTING OF COMPANY CALENDAR(PUR/MOIL/C-12/26/E-20/244-M Dt. 23/12/2022) | 23-12-2022 | 30-12-2022 | 30-12-2022 | 30-12-2022 | 03:30 PM | Active | और देखें |
82. | Construction of Compound wall at Babu Line colony at Balaghat Mine(CIVIL/BGT/LT/AGT/1216 2022-23 dt 23.12.2022) | 23-12-2022 | 29-12-2022 | 29-12-2022 | 29-12-2022 | 04:30 PM | Active | और देखें |
83. | Security Guards for Sandwik DE-710 Diamond Drilling Site at Balaghat Mine(CIVIL/BGT/LT/AGT/2022-23/1164 Dt.23.12.2022) | 23-12-2022 | 29-12-2022 | 29-12-2022 | 29-12-2022 | 04:30 PM | Active | और देखें |
84. | Outsourcing Works for Housekeeping, Cooking and allied works for Guest House of Dongribuzurg Mine(DB/PERS/NIT/TE/2022-23/2791 Date 21.12.22) | 22-12-2022 | 31-12-2022 | 31-12-2022 | 31-12-2022 | 04:30 PM | Active | और देखें |
85. | Supply of Spares for Indus Rock Tool Breaker fitted in Komatasu make Hydraulic Excavator-PC450-2 operating at Dongri Buzurg Mine.(DB/MECH/22-23/JGM(MECH)/1069) | 21-12-2022 | 27-12-2022 | 27-12-2022 | 27-12-2022 | 04:30 PM | Active | और देखें |
86. | Providing and Supplying of stone dust for underground stowing work at Gumgaon Mine(Agent/GUM/Civil/LT/22-23/1907 20/12/2022) | 20-12-2022 | 29-12-2022 | 29-12-2022 | 29-12-2022 | 04:30 PM | Active | और देखें |
87. | Miscellaneous Civil Works for preparation of upcoming safety week at Tirodi Mine(TRD/CIVIL/22-23/1968 DT 15/12/2022) | 16-12-2022 | 22-12-2022 | 22-12-2022 | 22-12-2022 | 04:30 PM | Active | और देखें |
88. | REPLACEMENT OF 5MVA POWER TRANSFORMER WITH 2.5MVA TRANSFORMER AT 33KV OUTDOOR SUBSTATION(BGT/TE/ELECT/AJGM/22-23/1191) | 15-12-2022 | 26-12-2022 | 26-12-2022 | 26-12-2022 | 03:30 PM | Active | और देखें |
89. | Purchase of rotating assembly of DSM 80 36, SRUA 201 of Kirlosker Pump of IMB plant DB mine.(DB/TE/IMB/22-23/10007281/893 Dt. 10.11.2022) | 14-12-2022 | 20-12-2022 | 20-12-2022 | 20-12-2022 | 04:30 PM | Active | और देखें |
90. | Hiring of Hyd. Excavator with Rock breaker arrangement for excavating the Outcrop ore at Surface between Ch-67-64 of South Section of Mine areas of Balaghat Mine.(AGT/BGT/MECH/HIRING/22-23/1181) | 14-12-2022 | 20-12-2022 | 20-12-2022 | 20-12-2022 | 04:30 PM | Active | और देखें |
91. | ntenance of Various Gardens of Dongribuzurg Mine for a period of 03 Months.(DB/CIVIL/NIT/TE/2022-23/2620 Date 13.12.2022) | 14-12-2022 | 20-12-2022 | 20-12-2022 | 20-12-2022 | 04:30 PM | Active | और देखें |
92. | POWER SUPPLY TO UNDERGROUND 13.5TH LEVEL MACHINERY SUCH AS LHD AND UDM AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/22-23/1185) | 14-12-2022 | 23-12-2022 | 23-12-2022 | 23-12-2022 | 03:30 PM | Active | और देखें |
93. | Tub Transportation at Kandri Mine(KD/MINES/NIT/2022-23/2588) | 13-12-2022 | 19-12-2022 | 19-12-2022 | 19-12-2022 | 04:30 PM | Active | और देखें |
94. | Fabrication and Casting of Bucket Tooth point of Tata 1200-1and2 Hydraulic Excavators operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1135) | 13-12-2022 | 24-12-2022 | 24-12-2022 | 24-12-2022 | 04:30 PM | Active | और देखें |
95. | Providing Supplying Fixing and installation of Iron and Wooden Cable Clamp in Shaft at Balaghat Mine(ELECT/BGT/AJGM/22-23/1170) | 13-12-2022 | 21-12-2022 | 21-12-2022 | 21-12-2022 | 03:30 PM | Active | और देखें |
96. | PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR TRANSFORMERS(BGT/TE/ELECT/AJGM/22-23/1171) | 13-12-2022 | 22-12-2022 | 22-12-2022 | 22-12-2022 | 03:30 PM | Active | और देखें |
97. | Repairing and construction of Boundary wall of Manegaon Magzine Balaghat Mine(CIVIL/BGT/LT/AGT/2022-23/1165 dt 11.12.2022) | 13-12-2022 | 20-12-2022 | 20-12-2022 | 20-12-2022 | 04:30 PM | Active | और देखें |
98. | Repairing of Track Roller of Tata 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1019) | 12-12-2022 | 23-12-2022 | 23-12-2022 | 23-12-2022 | 04:30 PM | Active | और देखें |
99. | PURCHASE OF HIGH PRESSURE MULTISTAGE WATER PUMP SET WITH ACCESSORIES FROM PROPRIETARY OEM AUTHORISED DEALER MAKE KSB QTY 2 NOS(MOIL/EMD/CH/ADGM/22-23/1023) | 12-12-2022 | 24-12-2022 | 24-12-2022 | 24-12-2022 | 04:30 PM | Active | और देखें |
100. | PURCHASE OF VARIOUS CAPITAL ITEMS AS PER ANNEXURE A FOR EMD PLANT(MOIL/EMD/CH/ADGM/22-23/1024) | 12-12-2022 | 27-12-2022 | 27-12-2022 | 27-12-2022 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2025) वर्ष के निविदाएं देखें |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(205) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |