निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Cleaning of ROM recovered from North side of 5 No. Pit and Pit No.6 at Sitapatore Sukli Mine(MOIL/21-22/ET/59) | 20-07-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 03:30 PM | Active | और देखें |
2. | Repairing of Bucket Assy 5.6 CuM--4 NOS of Tata Hitachi 1200-3Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MEC)/551) | 19-07-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 04:30 PM | Active | और देखें |
3. | Repairing of Bucket Assy of Tata Hitachi 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MEC)/550) | 19-07-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 04:30 PM | Active | और देखें |
4. | Renovation of Holmes Shaft by replacing Buntons, Ladders, Platform and Fencing from surface to 12th Level at Balaghat Mine(MOIL/21-22/ET/54) | 19-07-2021 | 19-08-2021 | 19-08-2021 | 19-08-2021 | 03:30 PM | Active | और देखें |
5. | Design , Manufacturing and supply of New Double Helical Gear 1 No for the pinion shaft of Production shaft winding engine at Balaghat Mine.(AGENT/BGT/MECH/PS/21-22/516) | 16-07-2021 | 05-08-2021 | 05-08-2021 | 05-08-2021 | 04:30 PM | Active | और देखें |
6. | Renovation of Production Shaft by replacing Guide Rails at Balaghat Mine(MOIL/21-22/ET/55) | 16-07-2021 | 16-08-2021 | 16-08-2021 | 16-08-2021 | 03:30 PM | Active | और देखें |
7. | Drilling of 1 No. Bore Hole for Drinking Water Supply to Camp quarters near Dump (OCF) at Beldongri Mine(Civil/Bel/2021-22/886) | 15-07-2021 | 21-07-2021 | 21-07-2021 | 21-07-2021 | 04:30 PM | Active | और देखें |
8. | e-procurement of Safety Helmet(PUR/MOIL/C-1/189/WE-05/ET/61) | 15-07-2021 | 16-08-2021 | 16-08-2021 | 17-08-2021 | 03:30 PM | Active | और देखें |
9. | PURCHASE OF ROTATING ASSEMBLY FOR KIRLOSKA60 HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/397) | 13-07-2021 | 05-08-2021 | 05-08-2021 | 05-08-2021 | 04:30 PM | Active | और देखें |
10. | Fabrication Casting and Machining of Brass impeller Set of 120HP Mather and Platt multistage pump at Balaghat Mine(AGENT/BGT/MECH/PUMP/21-22/496) | 13-07-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 04:30 PM | Active | और देखें |
11. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2021-22/487) | 12-07-2021 | 26-07-2021 | 26-07-2021 | 26-07-2021 | 04:00 PM | Active | और देखें |
12. | Comprehensive Annual Maintenance Contract of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2021-22/488) | 12-07-2021 | 26-07-2021 | 26-07-2021 | 26-07-2021 | 04:00 PM | Active | और देखें |
13. | Purchase of Pipefitting, Manila Rope, Nylon Rope , Packing etc. for Gr-I Balaghat Mine.(PUR/MOIL/BGT/C CLASS/21-22/471) | 10-07-2021 | 29-07-2021 | 29-07-2021 | 29-07-2021 | 04:30 PM | Active | और देखें |
14. | OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KAN/CIVIL/NIT/21-22/1077 DT 07.07.2021) | 09-07-2021 | 17-07-2021 | 17-07-2021 | 17-07-2021 | 04:30 PM | Active | और देखें |
15. | Purchase of Fasteners High Tension Bolts, Mild Steel Bolts, Wire Nails, Rose Nails, Teflon Tape ,M seal, Araldite , Holdite etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/21-22/470) | 09-07-2021 | 29-07-2021 | 29-07-2021 | 29-07-2021 | 04:30 PM | Active | और देखें |
16. | FABRICATION/PROCUREMENT OF PNEUMATIC CYLINDERS FOR HOLMES SHAFT 100 MT BUNKER GATE 2 NOS. AND FINGER GATE 2 NOS. OF ORE PASS AT BALAGHAT MINE.(PUR/MOIL/BGT/WINDER/21-22/465) | 08-07-2021 | 28-07-2021 | 28-07-2021 | 28-07-2021 | 04:30 PM | Active | और देखें |
17. | Interior and Exterior Painting works in Mine Manager Bungalow at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/434) | 07-07-2021 | 17-07-2021 | 17-07-2021 | 17-07-2021 | 04:30 PM | Active | और देखें |
18. | REGULAR CLEANING UNBLOCKING OF MAIN BUNCKER ORE FLOW IN IMB PLANT AT DONGI BUZURG MINE(DB/MECH/21-22/JGM(MECH)/483) | 05-07-2021 | 10-07-2021 | 10-07-2021 | 10-07-2021 | 04:30 PM | Active | और देखें |
19. | Cons of additional transformer room at Ukwa Mine(Civil/UK/LT/21-22/710 Date 03.07.2021) | 05-07-2021 | 14-07-2021 | 14-07-2021 | 14-07-2021 | 04:30 PM | Active | और देखें |
20. | OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR TWO MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/436) | 05-07-2021 | 12-07-2021 | 12-07-2021 | 12-07-2021 | 03:30 PM | Active | और देखें |
21. | Purchase of Black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2021-22/ 1046) | 05-07-2021 | 14-07-2021 | 14-07-2021 | 14-07-2021 | 04:30 PM | Active | और देखें |
22. | Operation and Maintenance of new cells at EMD Plant Dongri Buzurg Mine(MOIL/DB/EMD/AJGM/TE /21-22/442) | 29-06-2021 | 10-07-2021 | 10-07-2021 | 10-07-2021 | 04:30 PM | Active | और देखें |
23. | Cleaning of Crushing Plant ROM By sorting, sizing and stacking at Munsar Mine(Munsar/Mining/LT/2021-22/50 Date 29.06.2021) | 29-06-2021 | 06-07-2021 | 06-07-2021 | 06-07-2021 | 04:30 PM | Active | और देखें |
24. | Comprehensive Annual Maintenance Contract (CAMC) of 127 Nos. of Air-Conditioners of MOIL Ltd Nagpur(MOIL/21-22/ET/52) | 29-06-2021 | 28-07-2021 | 28-07-2021 | 28-07-2021 | 03:30 PM | Active | और देखें |
25. | Purchase of DOLOMITE with Transportation - 4000 MT(MOIL/21-22/ET-04 dt.28.06.2021) | 28-06-2021 | 07-07-2021 | 07-07-2021 | 08-07-2021 | 03:30 PM | Active | और देखें |
26. | Annual repairs to camp quarters at Gumgaon Mine.(MOIL/21-22/ET/28) | 28-06-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 03:30 PM | Active | और देखें |
27. | Engagement of Architect and design engineering firm for Construction of residential quarters at various Mines Phase IV(MOIL/21-22/ET/30) | 28-06-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 03:30 PM | Active | और देखें |
28. | Operation of Pumps for dewatering at both Satak open pit(BEL/MECH/21-22/708) | 25-06-2021 | 05-07-2021 | 05-07-2021 | 05-07-2021 | 04:30 PM | Active | और देखें |
29. | Manufacturing of New Input Pinion shaft 1 No. for the Gear Train Unit in Production shaft winding engine at Balaghat Mine(AGENT/BGT/MECH/PS /21-22/380) | 25-06-2021 | 15-07-2021 | 15-07-2021 | 15-07-2021 | 04:30 PM | Active | और देखें |
30. | Operation of Pumps at Beldongri Mine(BEL/MECH/21-22/699) | 24-06-2021 | 02-07-2021 | 02-07-2021 | 02-07-2021 | 04:30 PM | Active | और देखें |
31. | Underground vertical development from 13.5 Level to 15.00 Level at Balaghat Mine(MOIL/21-22/ET/48) | 23-06-2021 | 23-07-2021 | 23-07-2021 | 23-07-2021 | 03:30 PM | Active | और देखें |
32. | Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from east side of South Staff Quarter dump at Tirodi Mine(MOIL/21-22/ET/51) | 23-06-2021 | 08-07-2021 | 08-07-2021 | 08-07-2021 | 03:30 PM | Active | और देखें |
33. | Cleaning of Underground ROM at Beldongri Mine(MOIL/21-22/ET/47) | 23-06-2021 | 08-07-2021 | 08-07-2021 | 08-07-2021 | 03:30 PM | Active | और देखें |
34. | Transportation of sand from Kalaphata Ghat situated on Pench river to Munsar Kandri and Beldongri Mine(MOIL/21-22/ET/45) | 22-06-2021 | 22-07-2021 | 22-07-2021 | 22-07-2021 | 03:30 PM | Active | और देखें |
35. | Transportation of sand from Gondegaon Mine WCL to Munsar Kandri and Beldongri Mine(MOIL/21-22/ET/46) | 22-06-2021 | 22-07-2021 | 22-07-2021 | 22-07-2021 | 03:30 PM | Active | और देखें |
36. | R C C roof repairs to camp quarters at Chikla Mine(CIVIL/CH/T.E./21-22/1029) | 22-06-2021 | 03-07-0021 | 03-07-2021 | 03-07-2021 | 04:30 PM | Active | और देखें |
37. | Production of Aggregates and M-Sand from waste rock generated during development of hang wall portion from CH.25 to CH.42 by contractual means at Dongri Buzurg Mine to make the best out of waste(MOIL/21-22/ET/43) | 22-06-2021 | 27-07-2021 | 27-07-2021 | 27-07-2021 | 03:30 PM | Active | और देखें |
38. | Handling and dispatch of ore at Sitapatore Mine.TRD/Civil/2020-21/364 Dated 18/06/2021) | 19-06-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
39. | OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-2/355) | 18-06-2021 | 24-06-2021 | 24-06-2021 | 24-06-2021 | 03:30 PM | Active | और देखें |
40. | Repair RCC Roof of Labour and Staff Quarter(AGT/CIVIL/UK/LT/20-21/342) | 18-06-2021 | 26-06-2021 | 26-06-2021 | 26-06-2021 | 04:30 PM | Active | और देखें |
41. | Purchase of Oil and Lubricants - 29 Items. (Only Through e-procurement)(WE-85(ET-49_and_ET-50) dt.15.06.2021) | 16-06-2021 | 06-07-2021 | 06-07-2021 | 07-07-2021 | 03:30 Pm | Active | और देखें |
42. | Outsourcing of maintenance and repair of LT and HT Overhead lines of Chikla Mines for a period of 9 months.(CH/ELECT/21-22/374) | 15-06-2021 | 29-06-2021 | 29-06-2021 | 29-06-2021 | 04:30 PM | Active | और देखें |
43. | Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months.(CH/ELECT/21-22/372) | 14-06-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 04:30 PM | Active | और देखें |
44. | DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/21-22/JGM(MEC)/356) | 14-06-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 04:30 PM | Active | और देखें |
45. | Regular Cleaning/unblocking of main bunker ore flow in IMB Plant at Dongr Buzurg Mine.(DB/MECH/21-22/JGM(MEC)/376) | 14-06-2021 | 22-06-2021 | 22-06-2021 | 22-06-2021 | 04:30 PM | Active | और देखें |
46. | Cleaning of Underground Sumps and Underground Drains under Monsoon Preparatory Works at Munsar Mine.(Mun/Mining/LT/2021-22/373 Date 12.05.2021) | 14-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 04:30 PM | Active | और देखें |
47. | Limited tender inviting in single bid system for Housekeeping work at C and s plant at Chikla mine(CH/Agent/Mech/21-22/358) | 11-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
48. | Replacement of Liner Plate(8/10mmm) of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/21-22/315) | 09-06-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 PM | Active | और देखें |
49. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PARKER MAKE SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-51/31-M Dt. 09-06-2021) | 09-06-2021 | 30-06-2021 | 30-06-2021 | 30-06-2021 | 03:30 PM | Active | और देखें |
50. | Handling of ore by manual mean into the Tipper / Truck at Tirodi Mine.(MOIL/HO/MINE/2021/322 , DATED 04/6/2021) | 07-06-2021 | 15-06-2021 | 15-06-2021 | 15-06-2021 | 03:30 PM | Active | और देखें |
51. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Chikla Mine and Dongri Buzurg Mine.(CH/SYS/AMC/21-22/341) | 07-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 04:30 Pm | Active | और देखें |
52. | Handling of ore into wagaon / Trucks by mechanical means at Tirodi Mine.(MOIL/HO/MINE/2021/323, Dated 04/06/2021) | 07-06-2021 | 15-06-2021 | 15-06-2021 | 15-06-2021 | 03:30 PM | Active | और देखें |
53. | Retiling, roof repair including laying polythene sheet over roof of camp quarters and cleaning, deepening of surface drains in mine area at Dongri Buzurg Mine(DB/CIVIL/21-22/911) | 05-06-2021 | 12-06-2021 | 12-06-2021 | 12-06-2021 | 04:30 PM | Active | और देखें |
54. | Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mines(MOIL/21-22/ET/17) | 05-06-2021 | 05-07-2021 | 05-07-2021 | 05-07-2021 | 03:30 PM | Active | और देखें |
55. | Supply of brake liners for BEML make BH60M dumpers Operating at Dongri Buzurg Mine(PUR/DB/MECH/21-22/313) | 04-06-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 Pm | Active | और देखें |
56. | Purchase of spares for fitting of Vibro Ripper on PC450 Hydraulic Excavator.(MOIL/21-22/ET-42 Dt.03.06.2021) | 03-06-2021 | 24-06-2021 | 24-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
57. | Purchase of Rollers for Conveyor Belts at Dongri Buzurg Mine.(DB/PUR/JGM/AGT/2021-22/312) | 02-06-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 PM | Active | और देखें |
58. | Waterproofing to RCC Slab of old A Type AT Syndicate Camp Babu line area quarters at Dongri Buzurg Mine(DB/CIVIL/21-22/650 dt 29.05.2021) | 01-06-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
59. | MODIFCATION IN AS BUILT DRAWING OF 40 TPH CRUSHING AND SCREENING PLANT AT MUNSAR MINE.(MUN/ENGG/TENDER/21-22/262) | 01-06-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 04:30 PM | Active | और देखें |
60. | Operation of 240 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/314) | 31-05-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:30 PM | Active | और देखें |
61. | Retiling and roof repair including laying polythene sheet over of camp quarters and Industrial building at Chikla Mine(CIVIL/CH/T.E./21-22/767) | 31-05-2021 | 10-06-2021 | 10-06-2021 | 10-06-2021 | 04:30 PM | Active | और देखें |
62. | Repairing of 50 MT Road Weighing Bridge at MOIL Limited Dongri Buzurg Mine.(DB/MEC/21-22/JGM(MECH)/292) | 30-05-2021 | 16-06-2021 | 16-06-2021 | 16-06-2021 | 04:40 PM | Active | और देखें |
63. | Providing and Installation of DGMS approved Computerized Automatic Speed Indicator Cum Recorder (CASICR) for 550 HP winder at Production Shaft of Balaghat Mine(PUR/MOIL/BGT/WINDER/21-22/285) | 28-05-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 04:30 PM | Active | और देखें |
64. | Replacement of 6 mm thick liner plates at 15.5 th level loading station of Holmes shaft at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/286) | 28-05-2021 | 14-06-2021 | 14-06-2021 | 14-06-2021 | 04:30 PM | Active | और देखें |
65. | Handling and Despatch of ore for Munsar Mine(MOIL/21-22/ET/39) | 28-05-2021 | 28-06-2021 | 28-06-2021 | 28-06-2021 | 03:30 PM | Active | और देखें |
66. | Handling and Despatch of ore for Gumgaon Mine(MOIL/21-22/ET/40) | 28-05-2021 | 28-06-2021 | 28-06-2021 | 28-06-2021 | 03:30 PM | Active | और देखें |
67. | Handling and Despatch of ore for Kandri Mine(MOIL/21-22/ET/38) | 28-05-2021 | 28-06-2021 | 28-06-2021 | 28-06-2021 | 03:30 PM | Active | और देखें |
68. | Manpower to assistance pumping operation in 10800 CH 12000 at Ukwa Mine(UK/MECH/21-22/17771/310) | 27-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
69. | Cleaning of sump Ch 9500 sec and 108800 UG Section(AGT/Min/UK/LT/20-21/277) | 27-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
70. | Pattern making, casting, Machining and Dynamic balancing Of pump spares with complete fitting of 300Hp Kirloskar Pump of 10th Level Underground of Balaghat Mine.(AGT/BGT/MECH/PUMP/21-22/272) | 25-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
71. | Handling and Despatch of ore for Dongri Buzurg Mine(MOIL/21-22/ET/36) | 25-05-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
72. | Handling and Despatch of ore for Beldongri Mine(MOIL/21-22/ET/37) | 25-05-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
73. | Handling and Despatch of ore for Chikla Mine(MOIL/21-22/ET/35) | 25-05-2021 | 25-06-2021 | 25-06-2021 | 25-06-2021 | 03:30 PM | Active | और देखें |
74. | Providing PVC polythene sheet to manglore til(CIVI/BGT/LT/AGT/20-21/245 DT. 20.05.2021) | 25-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
75. | RCC roof repair water proofing work of camp quarters at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/246 DT.20.05.2021) | 25-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
76. | Laying of New 6 inch and 4 inch GI Pipeline for discharging Underground water and Supplying Compressed air from 13.5th level to 15th level at Second Outlet shaft of Balaghat Mine(AGT/BGT/MECH/WINDER/21-22/249) | 24-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
77. | Laying of G.I. pipeline with pumps from 3 lakh lit capacity Ground storage reservoir to Ferrow Manganese Plant at Balaghat Mine(MOIL/21-22/ET/29) | 24-05-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 03:30 PM | Active | और देखें |
78. | Providing and fixing profile sheet on roof of Boiler House at EMD plant at Dongri Buzurg Mine(MOIL/21-22/ET/31) | 24-05-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 03:30 PM | Active | और देखें |
79. | Manpower to assistance pumping operation in CH95 at Ukwa Mine(UK/TE/MECH/21-22/17270/309) | 24-05-2021 | 08-06-2021 | 08-06-2021 | 08-06-2021 | 04:30 PM | Active | और देखें |
80. | providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/Group-III/SYS/NW /2021-22/252) | 24-05-2021 | 01-06-2021 | 01-06-2021 | 01-06-2021 | 04:00 PM | Active | और देखें |
81. | Construction of cremation shed at village Gurha Beldaran, Tahsil Hiranagar, Dist Kathua, UT of Jammu and Kashmir, under CSR(MOIL/21-22/ET/26) | 24-05-2021 | 23-06-2021 | 23-06-2021 | 23-06-2021 | 03:30 PM | Active | और देखें |
82. | Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/533 DT 21.05.2021) | 22-05-2021 | 04-06-2021 | 04-06-2021 | 04-06-2021 | 04:30 PM | Active | और देखें |
83. | Handling and Despatch of ore for Tirodi Mine(MOIL/21-22/ET/33) | 22-05-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
84. | Handling and Despatch of ore for Balaghat Mine(MOIL/21-22/ET/32) | 22-05-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
85. | Handling and Despatch of ore for Sitapatore Mine(MOIL/21-22/ET/34) | 22-05-2021 | 21-06-2021 | 21-06-2021 | 21-06-2021 | 03:30 PM | Active | और देखें |
86. | Cleaning of Storm water drain in surface and underground sump under monsoon preparatory work at Kandri Mine(KAN/CIVIL/NIT/21-22/521 DT 19.05.2021) | 21-05-2021 | 28-05-2021 | 28-05-2021 | 28-05-2021 | 04:30 PM | Active | और देखें |
87. | False ceiling work of Transformer, Electric panel and Electrical store rooms of IMB Plant, Moil Ltd BGT mine(AGT/BGT/IMB PLANT/21-22/233) | 21-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
88. | Removal of Spillage from the bottom of Conveyor belt structure and Bottom of the shaft at 15.5th Level Loading station Holmes Shaft.(AGT/BGT/MECH/WINDER/21-22/248) | 21-05-2021 | 07-06-2021 | 07-06-2021 | 07-06-2021 | 04:30 PM | Active | और देखें |
89. | Cleaning of Surface Drains as monsoon preparatory work at Chikla Mine(CIVIL/CH/T.E./21-22/638) | 20-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
90. | REAIRING OF TRACK COMPONENTS OF SIDE DUMP LOADERS MACHINE AT MUNSAR MINE.(Agent and DGM (Mines)/GrpIII/2021-22/214) | 19-05-2021 | 07-06-2021 | 07-06-2021 | 07-06-2021 | 04:30 PM | Active | और देखें |
91. | Loading of Slag at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/19) | 19-05-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 03:30 PM | Active | और देखें |
92. | Breaking of Slag and Other Associated Works at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/18) | 19-05-2021 | 18-06-2021 | 18-06-2021 | 18-06-2021 | 03:30 PM | Active | और देखें |
93. | OUTSOURCING METER READING, PREPARATION OF ELECTRICITY RECOVERY LIST AND PROCESSING OF LOCAL DOCUMENMTATION OF ELECTRICAL DEPARTMENT FOR THE PERIOD 6 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/223) | 18-05-2021 | 25-05-2021 | 25-05-2021 | 25-05-2021 | 03:30 PM | Active | और देखें |
94. | WEB SITE TENDER ENQUIRY FOR PIPELINE FITTING OF 200 MM, WITH CLAMPS BY LOWERING AND COMPLETE INSTALLED WITH FLANGES WELDING AND COMPLETE PAINTING OF PIPELINE AT MUNSAR MINE.(MUN/ENGG/TENDER/20-21/213) | 17-05-2021 | 07-06-2021 | 07-06-2021 | 07-06-2021 | 04:30 PM | Active | और देखें |
95. | SELECTION OF ANNUAL REPORT CONSULTING SERVICE PROVIDER FOR MOIL LIMITED FOR THE FINANCIAL YEAR 2020-21(MOIL/21-22/ET/41) | 17-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 03:30 PM | Active | और देखें |
96. | Repair and construction of front Compound Wall of Mine Managers Bungalow at Gumgaon Mine.(Agent/GUM/Civil/NIT/21-22/228 14/05/2021) | 15-05-2021 | 22-05-2021 | 22-05-2021 | 22-05-2021 | 04:30 PM | Active | और देखें |
97. | Hiring of Machinery for loading unloading transportation of waste from Chitawer section to Nagara Plant at Section Ukwa Mine(AGT/Min/UK/LT/21-22/192) | 15-05-2021 | 21-05-2021 | 21-05-2021 | 21-05-2021 | 04:30 PM | Active | और देखें |
98. | Supplying and Installation of Portable Toilet for deployed ladies workers in BDC/OCF Section at Gumgaon Mine.(GUM/Civil/NIT/21-22/217 13.05.2021) | 14-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
99. | CAPLAMP MAINTENANCE, DISTRIBUTION AND COLLECTION FROM 18MAY 2021ONWARDS FOR 118 DAYS AT MANSAR MINE(ELECT/MUN/ADGM/21-22/157, Dated 03.05.2021) | 12-05-2021 | 15-05-2021 | 15-05-2021 | 15-05-2021 | 05:00 PM | Active | और देखें |
100. | Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-50/17-M DT.10/05/2021) | 11-05-2021 | 24-05-2021 | 24-05-2021 | 24-05-2021 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |