निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Hiring of Machinery for loading unloading transportation of waste from Chitawer section to Nagara Plant at Section Ukwa Mine(AGT/Min/UK/LT/21-22/192) | 15-05-2021 | 21-05-2021 | 21-05-2021 | 21-05-2021 | 04:30 PM | Active | और देखें |
2. | Supplying and Installation of Portable Toilet for deployed ladies workers in BDC/OCF Section at Gumgaon Mine.(GUM/Civil/NIT/21-22/217 13.05.2021) | 14-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 04:30 PM | Active | और देखें |
3. | CAPLAMP MAINTENANCE, DISTRIBUTION AND COLLECTION FROM 18MAY 2021ONWARDS FOR 118 DAYS AT MANSAR MINE(ELECT/MUN/ADGM/21-22/157, Dated 03.05.2021) | 12-05-2021 | 15-05-2021 | 15-05-2021 | 15-05-2021 | 05:00 PM | Active | और देखें |
4. | Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-50/17-M DT.10/05/2021) | 11-05-2021 | 24-05-2021 | 24-05-2021 | 24-05-2021 | 03:30 PM | Active | और देखें |
5. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT MAKE PUMP MODEL PUMP 10/12BLF, 132 KW.(PUR/MOIL/C-5/28/E- 48/ 14 -M Dt. 11/05/2021) | 11-05-2021 | 02-06-2021 | 02-06-2021 | 02-06-2021 | 03:30 PM | Active | और देखें |
6. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPARATION PLANT(PUR/MOIL/C-5/23/E- 46/ 12 -M Dt. 07/05/2021) | 07-05-2021 | 31-05-2021 | 31-05-2021 | 31-05-2021 | 03:30 PM | Active | और देखें |
7. | Structural Design consultancy for construction of screening plant for Pebble handling at Sand stowing Plant(Jt.GM/CH/MECH/TE/2021-22/192) | 06-05-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
8. | Purchase and Installation of Digital Water Flow Meters with telemetry system for Munsar Mine(MS/GEO/NIT/2021-22/141 Date 02.05.2021) | 03-05-2021 | 17-05-2021 | 17-05-2021 | 17-05-2021 | 04:30 PM | Active | और देखें |
9. | Purchase and Installation of Digital Water Flow Meters with telemetry system for Parsoda Mine(PS/GEO/NIT/2021-22/142 Date 02.05.2021) | 03-05-2021 | 17-05-2021 | 17-05-2021 | 17-05-2021 | 04:30 PM | Active | और देखें |
10. | Procurement of Hydraulic Power Pack and Hydraulic Cylinders for Pit Bottom Buffer of production shaft at Balaghat Mine.(PUR/MOIL/BGT/WINDER/21-22/141) | 03-05-2021 | 18-05-2021 | 18-05-2021 | 18-05-2021 | 04:30 PM | Active | और देखें |
11. | Dismantling, shifting and reassembling of 20Nos. of Joplin jig assembly from old site to New OCF Shed constructed along the Ferro Plant of Balaghat Mine.(AGT/BGT/MECH/OCF/21-22/139) | 01-05-2021 | 17-05-2021 | 17-05-2021 | 17-05-2021 | 04:30 PM | Active | और देखें |
12. | Regular cleaning/ unblocking of main bunker ore flow in IMB Plant at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/164) | 01-05-2021 | 04-05-2021 | 04-05-2021 | 04-05-2021 | 04:30 PM | Active | और देखें |
13. | OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/124) | 28-04-2021 | 01-05-2021 | 01-05-2021 | 01-05-2021 | 03:30 PM | Active | और देखें |
14. | Erection of 11KV Overhead Line from Mine Pit Substation to Aggregate Crusher Plant.(DB/ELECT/21-22/163) | 28-04-2021 | 06-05-2021 | 06-05-2021 | 06-05-2021 | 04:30 PM | Active | और देखें |
15. | Replacement of IBR Riser Tubes of FBC Boiler at EMD Plant, Dongri Buzurg Mine(MOIL/EMD/DB/AJGM/2021-22/159) | 27-04-2021 | 03-05-2021 | 03-05-2021 | 03-05-2021 | 04:30 PM | Active | और देखें |
16. | Empanelment of Consultant Advisor for Identification of Domestic and Overseas assets for partial or total acquisition(MOIL/21-22/ET/20) | 27-04-2021 | 27-05-2021 | 27-05-2021 | 27-05-2021 | 03:30 PM | Active | और देखें |
17. | Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from South side A dump at Tirodi Mine(MOIL/21-22/ET/24) | 26-04-2021 | 26-05-2021 | 26-05-2021 | 26-05-2021 | 03:30 PM | Active | और देखें |
18. | Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/21-22/ET/25) | 26-04-2021 | 26-05-2021 | 26-05-2021 | 26-05-2021 | 03:30 PM | Active | और देखें |
19. | Underground exploratory drivage at -130 Level of Munsar Mine(MOIL/21-22/ET/23) | 26-04-2021 | 26-05-2021 | 26-05-2021 | 26-05-2021 | 03:30 PM | Active | और देखें |
20. | Cleaning and collection waste from septic tanks, chambers in camp colony at Kandri Mine(KD/PER/NIT/2021-22/214) | 24-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 04:30 PM | Active | और देखें |
21. | Cleaning and collection of Garbage and cleaning of Drains at Kandri Mine(KD/PER/NIT/2021-22/218) | 24-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 04:30 PM | Active | और देखें |
22. | Cleaning maintenance and up keeping of Rest House at Kandri Mine(KD/PER/NIT/2021-22/216) | 24-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 04:30 PM | Active | और देखें |
23. | Hiring of Machinery for loading(AGT/Min/UK/LT/21-22/94) | 21-04-2021 | 01-05-2021 | 01-05-2021 | 01-05-2021 | 04:30 PM | Active | और देखें |
24. | Development cutting and levelling of Hill rock portion for consrtuction of WTP ESR for construction of new water supply schme at Ukwa Mine(Civil/UK/LT/21-22/153 Date- 19.04.2021) | 21-04-2021 | 01-05-2021 | 01-05-2021 | 01-05-2021 | 04:30 PM | Active | और देखें |
25. | Handling and Despatch of ore from Tirodi and Sitapatore Mines for the period of two month(MOIL/21-22/ET/22) | 20-04-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
26. | Removal of burnt LT and HT panel and shifting it to the required location.(AGT/BGT/IMB PLANT/21-22/60) | 19-04-2021 | 27-04-2021 | 27-04-2021 | 27-04-2021 | 04:30 PM | Active | और देखें |
27. | labor assistant for material shifting during replacement of heavy assembly or repairing work in underground machineries like SDL, LHD, battery locomotive and Jumbo machines deployed in underground at Balaghat Mine(AGENT/BGT/MECH/WS/21-22/90) | 19-04-2021 | 27-04-2021 | 27-04-2021 | 27-04-2021 | 04:30 PM | Active | और देखें |
28. | Operation of vibrating screen to screen sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/12) | 19-04-2021 | 19-05-2021 | 19-05-2021 | 19-05-2021 | 03:30 PM | Active | और देखें |
29. | Drilling 57 mm dia. drill holes for installing cable bolt in Manganiferous rock at 11 Level 12 Level and 13 Levels of underground at Balaghat Mine(MOIL/21-22/ET/13) | 19-04-2021 | 19-05-2021 | 19-05-2021 | 19-05-2021 | 03:30 PM | Active | और देखें |
30. | Removal of spillage from the bottom of production shaft at 15th Level and bottom of Holmes shaft at 16.5th Level at Balaghat Mine(MOIL/21-22/ET/14) | 19-04-2021 | 19-05-2021 | 19-05-2021 | 19-05-2021 | 03:30 PM | Active | और देखें |
31. | Picking and collection of 20 percent Mn. SM Grade Ore BGL-564 from sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/15) | 19-04-2021 | 21-05-2021 | 21-05-2021 | 21-05-2021 | 03:30 PM | Active | और देखें |
32. | Repairing of three row concertina coil fencing and lease boundary on Manegaon magazine side at Balaghat mine(CIVI/BGT/LT/AGT/21-22/72 DATE 15.04.2021) | 16-04-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 04:30 PM | Active | और देखें |
33. | Providing and supplying of black gitti for underground concreating at Balaghat Mine(MIN/BGT/AGT/LT/21-22/73 DATE 15.04.2021) | 16-04-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 04:30 PM | Active | और देखें |
34. | Underground Development at 13.5th Level South section at Balaghat Mine(MOIL/21-22/ET/10) | 15-04-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
35. | Underground Development at -370 Level and -470 Level of Vertical Section at Chikla Mine(MOIL/21-22/ET/9) | 15-04-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
36. | Extra excavation and RCC for sub-station at -450 Level and loco battery charging station at -450 Level and -550 Level of Kandri Mine(MOIL/21-22/ET/11) | 15-04-2021 | 12-05-2021 | 12-05-2021 | 12-05-2021 | 03:30 PM | Active | और देखें |
37. | Pushing and Pulling of empty / loaded tubs / rock tubs in to / from cage at pit top and tipping the loaded tubs / rock tubs at OCF Gala / tipping point(BEL/MIN/2021-22/108) | 13-04-2021 | 19-04-2021 | 19-04-2021 | 19-04-2021 | 04:30 PM | Active | और देखें |
38. | Removal of burnt cable and retrieving partially burnt cable for providing supply to equipment of IMB Plant(AGT/BGT/IMB PLANT/20-21/1379) | 10-04-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 04:30 PM | Active | और देखें |
39. | Loading Transportation and Unloading of Manganese Ore ROM at Beldongri Mine(BEL/MIN/2021-22/73) | 09-04-2021 | 15-04-2021 | 15-04-2021 | 15-04-2021 | 04:30 PM | Active | और देखें |
40. | Large Diameter drilling at Old Satak section at Beldongri Mine(BEL/MIN/2021-22/69) | 09-04-2021 | 15-04-2021 | 15-04-2021 | 15-04-2021 | 04:00 PM | Active | और देखें |
41. | Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from east side of South Staff Quarter dump at Tirodi Mine(MOIL/20-21/ET/327) | 09-04-2021 | 10-05-2021 | 10-05-2021 | 10-05-2021 | 03:30 PM | Active | और देखें |
42. | Cleaning of Underground ROM at Beldongri Mine(MOIL/20-21/ET/326) | 09-04-2021 | 10-05-2021 | 10-05-2021 | 10-05-2021 | 03:30 PM | Active | और देखें |
43. | Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Jawahar vertical shaft at Chikla Mine(MOIL/20-21/ET/329) | 09-04-2021 | 10-05-2021 | 10-05-2021 | 10-05-2021 | 03:30 PM | Active | और देखें |
44. | GENERAL DAILY MAINT OF HEMMS AND LVS (TATA1200 HYD EXC, BD155 DOZER, DUMPERS, DRILL MC ICM 260, LV ETC.(DB/MECH/21-22/JGM(MECH)/21) | 08-04-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 04:30 PM | Active | और देखें |
45. | Underground Development work at -450 Level of Kandri Mine(MOIL/20-21/ET/325) | 07-04-2021 | 07-05-2021 | 07-05-2021 | 07-05-2021 | 03:30 PM | Active | और देखें |
46. | Removal of waste rock and magniferous rock and handling the same by mechanized means from Pit No.6 at Sitapatore Mine(MOIL/20-21/ET/324) | 07-04-2021 | 07-05-2021 | 07-05-2021 | 07-05-2021 | 03:30 PM | Active | और देखें |
47. | Hiring of Hydraulic Rock Breaker suitable for Hydraulic Excavator of 45 Ton Class for Primary and Secondary Breaking of rock along with providing manpower for Operation an Maintenance of associated departmental Excavator at Dongri Buzurg Mine for the(MOIL/20-21/ET/328) | 06-04-2021 | 05-05-2021 | 05-05-2021 | 05-05-2021 | 03:30 PM | Active | और देखें |
48. | LOWERING AND LAYING OF 100 PAIR TELEPHONE CABLE IN HOME SHAFT WINDER FROM SURFACE TO 12th LEVEL UNDERGROUND OF BALAGHAT MINE(BGT/TE/ELECT/AGENT/21-22/03) | 05-04-2021 | 09-04-2021 | 09-04-2021 | 09-04-2021 | 03:30 PM | Active | और देखें |
49. | TENDER DOCUMENTS FOR REPAIRS TO JIG PANEL AND PROVISION FOR POWER SUPPLY TO INDIVIDUAL MOTOR OF JIG AT BALAGHAT MINE(BGT/TE/ELECT/AGENT/21-22/02) | 05-04-2021 | 09-04-2021 | 09-04-2021 | 09-04-2021 | 03:30 PM | Active | और देखें |
50. | Repairing of Mechanical Dust Collector (MDC) , Providing and replacement of IBR blow down piping and suction strainers, air pre-heater repairing etc., for F.B.C. Boiler at EMD Plant(MOIL/EMD/CH/ADGM/2020-21/06) | 05-04-2021 | 13-04-2021 | 13-04-2021 | 13-04-2021 | 04:30 PM | Active | और देखें |
51. | Removal of Garbage and cleaning of drain at camp areaTirodi Mine(TRD/CIVIL/20-21/09 DT- 29/03/2021) | 03-04-2021 | 10-04-2021 | 10-04-2021 | 10-04-2021 | 03:30 PM | Active | और देखें |
52. | Purchasing of Digital Water Flow Meter with Telemetry System for Kandri Mine(KD/GEO/NIT/2021-22/2) | 03-04-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 04:30 PM | Active | और देखें |
53. | Removal of Spillage from the bottom of Conveyor belt structure and Bottom of the shaft at 15th Level Loading station Holmes Shaft(AGT/BGT/MECH/WINDER/21-22/01) | 02-04-2021 | 12-04-2021 | 12-04-2021 | 12-04-2021 | 04:30 PM | Active | और देखें |
54. | OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KAN/CIVIL/NIT/21-22/5240 DT 02.04.2021) | 02-04-2021 | 07-04-2021 | 07-04-2021 | 07-04-2021 | 04:30 PM | Active | और देखें |
55. | WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF FDAO 60 GEAR OIL AND GREASE FOR CATERPILLAR MAKE (60 T) 773 E DUMPER(PUR/MOIL/C-5/10/E- 44/ 585 -M Dt.31/03/2021) | 01-04-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
56. | TENDER DOCUMENTS FOR LAYING OF 3C X 120SQMM 11KV XLPE CABLE FROM PRODUCTION SHAFT SUBSTATION TO 8TH LEVEL UNDERGROUND FOR FEEDING SUPPLY TO UNDERGROUND 13.5TH LEVEL, 3.3KV/433 SUBSTATION OF PRODUCTION SHAFT AT BALAGHAT MINE 2 LENGTHS(BGT/TE/ELECT/AJGM/20-21/1397) | 01-04-2021 | 08-04-2021 | 08-04-2021 | 08-04-2021 | 03:30 PM | Active | और देखें |
57. | Civil Interior and allied works for new Board Room at 3rd floor East west wing at MOIL BHAWAN, Nagpur.(MOIL/21-22/ET/16) | 31-03-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
58. | Manual removal of sludge from S.K. Tank of IMB Plant at Balaghat Mine for the period of 5 Months(AGT/BGT/IMB PLANT/20-21/1388) | 30-03-2021 | 09-04-2021 | 09-04-2021 | 09-04-2021 | 04:30 PM | Active | और देखें |
59. | PURCHASE OF EXPLOSIVES AND ACCESSORIES.(WE-111(ET-21) DT.30/03/2021) | 30-03-2021 | 21-04-2021 | 21-04-2021 | 22-04-2021 | 03:30 PM | Active | और देखें |
60. | ET 6 for Rehabilitation of Integrated Manganese Ore Beneficiation Plant at Balaghat Mine.(MOIL/21-22/ET/6) | 30-03-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 03:30 PM | Active | और देखें |
61. | Impact assessment study for CSR project of MOIL Limited.(MOIL/21-22/ET/7) | 30-03-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
62. | construction of tipper loading platform beside vertical shaft at Gumgaon Mine.(MOIL/21-22/ET/8) | 30-03-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
63. | Maintenance of various gardens at Balaghat Mine.(MOIL/21-22/ET/1) | 25-03-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 03:30 PM | Active | और देखें |
64. | Operation of pumps for drinking water supply in different colonies at Kandri Mine.(MOIL/21-22/ET/3) | 25-03-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 03:30 PM | Active | और देखें |
65. | ET4 for Construction of Mine lease boundary wall in pre cast pre stressed columns and panels with concertina coil at Ukwa Mine.(MOIL/21-22/ET/4) | 25-03-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
66. | Maintenance and operation of water supply scheme at Balaghat Mine(MOIL/21-22/ET/2) | 25-03-2021 | 30-04-2021 | 30-04-2021 | 30-04-2021 | 03:30 PM | Active | और देखें |
67. | ET5 for Construction of Retaining wall behind 1st vertical shaft to crushing and screening plant at Chikla Mine.(MOIL/21-22/ET/5) | 25-03-2021 | 26-04-2021 | 26-04-2021 | 26-04-2021 | 03:30 PM | Active | और देखें |
68. | PURCHASE OF INVERTER AND 150AH TUBULAR BATTERIES FOR KANDRI MINE(PUR/KD/ELECT/20-21/5164) | 24-03-2021 | 23-04-2021 | 23-04-2021 | 23-04-2021 | 04:30 PM | Active | और देखें |
69. | Purchasing of Digital Water Flow Meter with Telemetry System at Chikla Mine(TE-26 Dt.21032021) | 22-03-2021 | 30-03-2021 | 30-03-2021 | 30-03-2021 | 04:30 PM | Active | और देखें |
70. | Operation and Maintenance of New Electrolytic cells at EMD Plant(MOIL/EMD/CH/AJGM/20-21/1556) | 22-03-2021 | 03-04-2021 | 03-04-2021 | 03-04-2021 | 04:30 PM | Active | और देखें |
71. | Desigining, Engineering, Supplying, Installation, Commissioning and testing of 2 X 1600KVA, 11KV/415V Indoor Substation for second vertical Shaft at Ukwa Mine(MOIL/20-21/ET/312) | 22-03-2021 | 22-04-2021 | 22-04-2021 | 22-04-2021 | 03:30 PM | Active | और देखें |
72. | Purchase of digital water flow meter with telemetry for dongri buzurg mine(MOIL/DB/20-21/1552 Dt 20/03/2021) | 21-03-2021 | 30-03-2021 | 30-03-2021 | 30-03-2021 | 04:30 PM | Active | और देखें |
73. | Renovation of old toilet of EMD Plant at Dongri Buzurg Mine(DB/CIVIL/20-21/3432) | 20-03-2021 | 25-03-2021 | 25-03-2021 | 25-03-2021 | 04:30 PM | Active | और देखें |
74. | PROCUREMENT OF NEOPRENE RUBBER BELLOWS FOR AIR PULSATING JIGS MOIL LTD BALAGHAT MINE.(PUR/MOIL/BGT/IMB/RUBBER BELLOWS/20-21/1355) | 20-03-2021 | 31-03-2021 | 31-03-2021 | 31-03-2021 | 04:30 PM | Active | और देखें |
75. | Fixing of FRP sheet roofing at cell bay section of EMD Plant at Dongri Buzurg Mine(DB/CIVIL/20-21/1529) | 20-03-2021 | 25-03-2021 | 25-03-2021 | 25-03-2021 | 04:30 PM | Active | और देखें |
76. | Dismantling of old Mangalore tiled roof A type Quarters for site preparation of Medical Administrative Building at Munsar Mine(Munsar/Civil/NIT/2020-21/215 17.03.2021) | 19-03-2021 | 23-03-2021 | 23-03-2021 | 23-03-2021 | 04:30 PM | Active | और देखें |
77. | TWO BID SYSTEM FOR PURCHASE OF HORIZONTAL AND VERTICAL BRAKE TIE RODS FOR 250 HP WINDER AT MUNSAR MINE.(MUN/ENGG/TENDER/20-21/2133) | 17-03-2021 | 31-03-2021 | 31-03-2021 | 31-03-2021 | 04:30 PM | Active | और देखें |
78. | Repairs to be done in Interface card and control card of Existing 1200 Amps 6RA 80 Siemens make DC Drive of kandri mine(KD/ELECT/20-21/5103) | 17-03-2021 | 31-03-2021 | 31-03-2021 | 31-03-2021 | 04:30 PM | Active | और देखें |
79. | Modification in as built drawing of 40TPH crushing and screening plant for Munsar Mine.(MUN/ENGG/TENDER/20-21/2131, Dated - 15.03.2021) | 16-03-2021 | 30-03-2021 | 30-03-2021 | 30-03-2021 | 04:30 PM | Active | और देखें |
80. | Large Diameter drilling at old satak section at Beldongri Mine(Bel/Min/NIT/2020-21/2832) | 16-03-2021 | 24-03-2021 | 24-03-2021 | 24-03-2021 | 04:30 PM | Active | और देखें |
81. | Procurement of Motor and Brake Assembly of EOT Crane of Make Meeka Machinery Private Limited for EMD Plant, Dongri Buzurg Mine.(DB/EMD/ELECT/20-21/1505) | 13-03-2021 | 06-04-2021 | 06-04-2021 | 06-04-2021 | 04:30 PM | Active | और देखें |
82. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EPIROC MAKE ROCK BREAKER MODEL MB -1500(PUR/MOIL/C-5/70/E- 43/ 576 -M Dt.12/03/2021) | 12-03-2021 | 05-04-2021 | 05-04-2021 | 05-04-2021 | 03:30 PM | Active | और देखें |
83. | WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EPIROC MAKE ROCK BREAKER MODEL MB -1500(PUR/MOIL/C-5/70/E- 43/ 576 -M Dt.12/03/2021) | 12-03-2021 | 05-04-2021 | 05-04-2021 | 05-04-2021 | 03:30 PM | Active | और देखें |
84. | Outsourcing the work of Maintenance, distribution and collection of Cap Lamps at Beldongri Mine for the period of 5 months(BEL/ELEC/2021/2785) | 11-03-2021 | 22-03-2021 | 22-03-2021 | 22-03-2021 | 04:30 PM | Active | और देखें |
85. | PURCHASE OF AIR PLASMA CUTTING MACHIINE.(PUR/MOI/ /DB/2020-21/1508) | 11-03-2021 | 25-03-2021 | 25-03-2021 | 25-03-2021 | 04:30 PM | Active | और देखें |
86. | Daily Fuel (High speed Diesel) Filling in HEMMs at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/1507) | 11-03-2021 | 18-03-2021 | 18-03-2021 | 18-03-2021 | 04:30 PM | Active | और देखें |
87. | Collection of Garbage from camp colonies at Balaghat Mine(BGT/Civil/20-21/AGT/LT/1305 date 08.03.2021) | 09-03-2021 | 19-03-2021 | 19-03-2021 | 19-03-2021 | 04:30 PM | Active | और देखें |
88. | Removal of waste rock and handling the same by mechanized means in the F/W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/323) | 09-03-2021 | 16-04-2021 | 16-04-2021 | 16-04-2021 | 03:30 PM | Active | और देखें |
89. | Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/BGT/MECH/IMB/20-21/1294) | 08-03-2021 | 15-03-2021 | 15-03-2021 | 15-03-2021 | 04:30 PM | Active | और देखें |
90. | Fabrication of Butterfly Valve Diaphragm along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine(AGT/BGT/MECH/IMB/20-21/1295) | 08-03-2021 | 15-03-2021 | 15-03-2021 | 15-03-2021 | 04:30 PM | Active | और देखें |
91. | Providing and fixing of Effluent Treatment plant ETP at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/1279) | 06-03-2021 | 15-03-2021 | 15-03-2021 | 15-03-2021 | 04:30 PM | Active | और देखें |
92. | Procurement of 3 nos Tie rod for Holmes Shaft Cage winder at Balaghat Mine.(AGT/BGT/MECH/WINDER/20-21/1292) | 04-03-2021 | 26-03-2021 | 26-03-2021 | 26-03-2021 | 04:30 PM | Active | और देखें |
93. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all Winders at Balaghat Mine(AGT/BGT/MECH/WINDER/20-21/1291) | 04-03-2021 | 26-03-2021 | 26-03-2021 | 26-03-2021 | 04:30 PM | Active | और देखें |
94. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MEEKA MAKE EOT CRANE(PUR/MOIL/C-11/24/E-37 Dt. 04/03/2021) | 04-03-2021 | 26-03-2021 | 26-03-2021 | 26-03-2021 | 03:30 PM | Active | और देखें |
95. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF HYDRAULIC CYLINDER SEAL KIT AND SPARES(PUR/MOIL/C-11/118/E-40 Dt. 04/03/2021) | 04-03-2021 | 05-04-2021 | 05-04-2021 | 05-04-2021 | 03:30 PM | Active | और देखें |
96. | Comprehensive Annual Maintenance Contract (CAMC) of computer hardware and peripherals(ADGM/ Group-III /Sys /AMC/2020-21/4864) | 03-03-2021 | 12-03-2021 | 12-03-2021 | 12-03-2021 | 04:00 PM | Active | और देखें |
97. | Purchase of black Gitti for concreting at Kandri Mine(KD/MINES/NIT/2020-21/ 4764) | 03-03-2021 | 10-03-2021 | 10-03-2021 | 10-03-2021 | 03:30 PM | Active | और देखें |
98. | Tender enquiry inviting in single bid system for the NDT of cage suspension gears for both winders at Chikla mine.(TE-27 DT-03032021) | 03-03-2021 | 10-03-2021 | 10-03-2021 | 10-03-2021 | 03:30 PM | Active | और देखें |
99. | DAILY HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(MOIL/DB/MECH/2020-2021/1469) | 02-03-2021 | 09-03-2021 | 09-03-2021 | 09-03-2021 | 04:30 PM | Active | और देखें |
100. | Relining and Repair of 25 Nos. Electrolytic Cells including the supply of AR Bricks and other required materials at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/313) | 02-03-2021 | 31-03-2021 | 31-03-2021 | 31-03-2021 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |