निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Purchase of M.S.LANCING PIPE - 24 MT(WE-137 e-tender No.MOIL/18-19/ET-430, Dt.30.01.19) | 30-01-2019 | 11-03-2019 | 11-03-2019 | 12-03-2019 | 03:30 PM | Active | और देखें |
2. | Railing and Transportation of ore at Balaghat Mine(MOIL/18-19/ET/421) | 29-01-2019 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
3. | Railing and Transportation of ore at Dongri Buzurg Mine(MOIL/18-19/ET/422) | 29-01-2019 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
4. | Railing and Transportation of ore at Chikla Mine(MOIL/18-19/ET/423) | 29-01-2019 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
5. | Underground Horizontal development at 370 Level and 470 Level from 2nd Vertical section at Chikla Mine(MOIL/18-19/ET/417) | 25-01-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
6. | Obtaining Environment Clearance of mining lease below 5 Hectare of Sitapatore, Bharweli and Tirodi Mine(MOIL/18-19/ET/402) | 25-01-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
7. | Underground Horizontal and Vertical development at 470 Level of Chikla Vertical section at Chikla Mine(MOIL/18-19/ET/403) | 25-01-2019 | 25-02-2019 | 25-02-2019 | 25-02-2019 | 03:30 PM | Active | और देखें |
8. | PURCHASE OF LABORATORY CHEMICALS(PUR/MOIL/C-3/43/E-64/1969-M Dt. 23/01/2019) | 23-01-2019 | 13-02-2019 | 13-02-2019 | 13-02-2019 | 03:30 PM | Active | और देखें |
9. | Security guard for diamond drilling site at Chikla Mine( MOIL/18-19/ET/405) | 22-01-2019 | 21-02-2019 | 21-02-2019 | 21-02-2019 | 03:30 PM | Active | और देखें |
10. | Picking and collection of 3rd grade and LGHS ore from diluted ROM at South Pit North side at Tirodi Mine(MOIL/18-19/ET/404) | 22-01-2019 | 21-02-2019 | 21-02-2019 | 21-02-2019 | 03:30 PM | Active | और देखें |
11. | Ore tolley breaking work at CH22 Ukwa Mine(16/Mining/UM/18-19/2229) | 22-01-2019 | 05-02-2019 | 05-02-2019 | 05-02-2019 | 04:30 PM | Active | और देखें |
12. | Underground transportation of tubs at 1750Level Vertical shaft Ukwa Mine( 16/Mining/UM/18-19/2232) | 22-01-2019 | 05-02-2019 | 05-02-2019 | 05-02-2019 | 04:30 PM | Active | और देखें |
13. | Underground transportation of tubs at 1850Level Vertical shaft Ukwa Mine(16/Mining/UM/18-19/2235) | 22-01-2019 | 05-02-2019 | 05-02-2019 | 05-02-2019 | 04:30 PM | Active | और देखें |
14. | Purchase of Oil and Lubricants - 28 Items (Only Through e-procurement)(WE-117 DT.22/01/2019 (ET-419 AND ET-420)) | 22-01-2019 | 12-02-2019 | 12-02-2019 | 13-02-2019 | 03:30 PM | Active | और देखें |
15. | Trench cutting in ore stacks at Beldongri Mine(MOIL/18-19/ET/418) | 22-01-2019 | 22-02-2019 | 22-02-2019 | 22-02-2019 | 03:30 PM | Active | और देखें |
16. | Drilling of bore holes at Kesari camp, Sitasaongi of Chikla mine.(TE/MECH/19-20/7600003237/561 date 16/01/2019) | 21-01-2019 | 28-01-2019 | 28-01-2019 | 28-01-2019 | 03:30 PM | Active | और देखें |
17. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE(Lumpy) AND 300 MT FINES AT CHIKLA MINE(TE-24 Dt.21012019) | 21-01-2019 | 28-01-2019 | 28-01-2019 | 28-01-2019 | 04:30 PM | Active | और देखें |
18. | Providing, supplying, installation and commissioning of 33KV Outdoor type Vaccum Circuit Breaker with control panel at supply end for the feeder for proposed Vertical Shaft at Gumgaon Mine(MOIL/18-19/ET/401) | 21-01-2019 | 20-02-2019 | 20-02-2019 | 20-02-2019 | 03:30 PM | Active | और देखें |
19. | Inset Lighting Work at Various levels of Underground in vertical shaft of Munsar Mine(ELECT/MUN/ADGM/18-19/719) | 19-01-2019 | 28-01-2019 | 28-01-2019 | 28-01-2019 | 03:30 PM | Active | और देखें |
20. | Construction of retaining wall l at Jamrapani siding in end portion area at Tirodi Mine( TRD/CIVIL/2018-19/3273-A) | 19-01-2019 | 29-01-2019 | 29-01-2019 | 29-01-2019 | 03:30 PM | Active | और देखें |
21. | Flourscent Jackets( PUR-MOIL-C-1-190-E-63 dt. 19-01-2019) | 19-01-2019 | 11-02-2019 | 11-02-2019 | 11-02-2019 | 03:30 PM | Active | और देखें |
22. | Removal of Garbage cleaning of Drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/18-19/2169 Date 17-1-2019) | 17-01-2019 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 04:30 PM | Active | और देखें |
23. | Safety Belts(PUR-MOIL-C-1-190-E-62 Dt. 17.01.2019) | 17-01-2019 | 06-02-2019 | 06-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
24. | Purchase of SODIUM CARBONATE - 24 MT(WE-132 e-tender No.MOIL/18-19/ET-416, Dt.17.01.19) | 17-01-2019 | 14-02-2019 | 14-02-2019 | 15-02-2019 | 03:30 PM | Active | और देखें |
25. | Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine(WE-129 e-tender No.MOIL/18-19/ET-415, Dt.17.01.19) | 17-01-2019 | 14-02-2019 | 14-02-2019 | 15-02-2019 | 03:30 PM | Active | और देखें |
26. | Purchase of SODIUM CARBONATE - 24 MT(WE-132 e-tender No.MOIL/18-19/ET-416, Dt.17.01.19) | 17-01-2019 | 14-02-2019 | 14-02-2019 | 15-02-2019 | 03:30 PM | Active | और देखें |
27. | Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine(WE-129 e-tender No.MOIL/18-19/ET-415, Dt.17.01.19) | 17-01-2019 | 14-02-2019 | 14-02-2019 | 15-02-2019 | 03:30 PM | Active | और देखें |
28. | Purchase of Cement Injection Pump Sets for Various Mines - 11 Nos (2 Lots) (Only Through e-procurement)( WE-116 DT.16/01/2019 (MOIL/18-19/ET/406)) | 16-01-2019 | 11-02-2019 | 11-02-2019 | 12-02-2019 | 03:30 PM | Active | और देखें |
29. | Purchase of Anchorage Testing Machines for various Mines - 4 Nos. (2 Lots) (Only Through e-procurement)(WE-133 DT.16/01/2019 (MOIL/18-19/ET/407)) | 16-01-2019 | 11-02-2019 | 11-02-2019 | 12-02-2019 | 03:30 PM | Active | और देखें |
30. | CONCRETING 25m3 OF FAN DRIFT (WINZE) AT CH-2830 OF CHIKLA MINE( TE-23 Dt.15012019) | 15-01-2019 | 22-01-2019 | 22-01-2019 | 22-01-2019 | 04:30 PM | Active | और देखें |
31. | Con of Guard Room at Mine Manager Premises at Balaghat Mine.(Civil/BGT/T.E./2018-19/22) | 15-01-2019 | 24-01-2019 | 24-01-2019 | 24-01-2019 | 04:30 PM | Active | और देखें |
32. | Renovation of Gymnasium at west court premises MOIL Nagpur.(MOIL/18-19/ET/377) | 15-01-2019 | 04-02-2019 | 04-02-2019 | 04-02-2019 | 03:30 PM | Active | और देखें |
33. | ADDITIONAL PILLAR OF RCC AT CHIKLA-B SECTION OF CHIKLA MINE(TE-22 Dt.14012019) | 14-01-2019 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 04:30 PM | Active | और देखें |
34. | Purchase of Rear Dumpers with operation and maintenance spares (excluding tyres and tubes, oil and lubricants only) for Dongri Buzurg Mine(M.S) - 3 Nos.(2 Lots) (Only Through e-procurement)(WE-130 DT.14/01/2019 (MOIL/18-19/ET/400)) | 14-01-2019 | 05-02-2019 | 05-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
35. | Purchase of Remote Controlled, Light Weight, Electro-Hydraulic Drill Cum Loading Equipment with CAMC for Underground Mining Application at Balaghat Mine(M.P) - 1 No.(2 Lots) (Only Through e-procurement)(WE-128 DT.14/01/2019 (MOIL/18-19/ET/399)) | 14-01-2019 | 05-02-2019 | 05-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
36. | Construction of shed for Rectifier transformer in EMD plant( EMD/C/HO/18-19/422 DT 08/01/2019) | 12-01-2019 | 19-01-2019 | 19-01-2019 | 19-01-2019 | 04:30 PM | Active | और देखें |
37. | Explosives and Accessories - e-reverse auction(PUR/MOIL/C-6/214/WE/126 (MOIL/18-19//ET/396)) | 11-01-2019 | 31-01-2019 | 31-01-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
38. | Purchase of Electrically Operated Submersible Polder Pump - 4 Sets (2 Lots) (2 Sets each for Balaghat and Gumgaon Mine) (Only Through e-procurement)(WE-115 DT.10/01/2019 (MOIL/18-19/ET/398)) | 10-01-2019 | 07-02-2019 | 07-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
39. | Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine, Tata Hitachi EX-1200V Excavator and ZX-220LC Excavator and BEML make BE-700 Excavator( WE-127 e-tender No.MOIL/18-19/ET-397, Dt.10.01.19) | 10-01-2019 | 07-02-2019 | 07-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
40. | Comprehensive technical study for Slope Stability, Drilling and Blasting and Subsidence of Satuk Opencast mine over an area 5.62 HA. of MOIL Ltd., Nagpur(MOIL/18-19/ET/388) | 09-01-2019 | 23-01-2019 | 23-01-2019 | 23-01-2019 | 03:30 PM | Active | और देखें |
41. | Purchase of Incremental Encoder of Hubner Baumer for Balaghat Mine(BGT/Elect./TE/18-19/1316) | 09-01-2019 | 25-01-2019 | 25-01-2019 | 25-01-2019 | 03:30 PM | Active | और देखें |
42. | Providing and fixing barbed wire fencing to protect the saplings planted near D-dump area at Tirodi Mine(MOIL/18-19/ET/387) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
43. | Maintenance of Garden at Kandri Mine(MOIL/18-19/ET/381) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
44. | Drilling of borewell and installation hand pumps at different villages of district Balaghat (M.P.) and District Bhandara and Nagpur in (M.S.) under CSR for year 2018-2019(MOIL/18-19/ET/383) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
45. | Construction of substation building at 50-52 section at Tirodi Mine(MOIL/18-19/ET/392) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
46. | Maintenance of water filtration plant and operation and mainetnence of water supply scheme for new A type quarters at Tirodi Mine(MOIL/18-19/ET/382) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
47. | Painting to plant structure of Integreted Manganese Benificiation plant IMB, at Balaghat Mine(MOIL/18-19/ET/389) | 09-01-2019 | 08-02-2019 | 08-02-2019 | 08-02-2019 | 03:30 PM | Active | और देखें |
48. | Purchase of Crawler Mounted Side Dump Loader for Munsar Mine - 1 No.(2 Lots)(Only Through e-procurement)(WE-125 DT.07/01/2019 (MOIL/18-19/ET/395)) | 08-01-2019 | 04-02-2019 | 04-02-2019 | 05-02-2019 | 03:30 PM | Active | और देखें |
49. | Purchase of Load Haul Dump Machines along with all the spares (except oil and lubricants) required for operation and maintenance of offered equipment for 2000 Hours of operation for various mines - 3 Nos. (4 Lots)(Only Through e-procurement)(WE-124 DT.07/ | 08-01-2019 | 05-02-2019 | 05-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
50. | Supply of Timber (as per Annexure C Enclosed) (27 Lots)(Only Through e-procurement)( WE-118 DT.07/01/2019 (MOIL/18-19/ET/393)) | 08-01-2019 | 05-02-2019 | 05-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
51. | Purchase of Flange Mounted 37KW Sq Cage IM of Lakshmi Hydraulic Pvt Ltd(TE/18-19/1317) | 07-01-2019 | 25-01-2019 | 25-01-2019 | 25-01-2019 | 04:00 PM | Active | और देखें |
52. | Erection of new HT Overhead line from Gadhaghat 2nd Vertical substation to proposed Gadhaghat Ventilation Fan at Chikla Mine(MOIL/18-19/ET/385) | 07-01-2019 | 06-02-2019 | 06-02-2019 | 06-02-2019 | 03:30 PM | Active | और देखें |
53. | Hiring of equipments for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/18-19/ET/391) | 07-01-2019 | 07-02-2019 | 07-02-2019 | 07-02-2019 | 03:30 PM | Active | और देखें |
54. | Removal of Underground sub grade mineral reject and handling the same by mechanical means at Ukwa Mine(MOIL/18-19/ET/390) | 07-01-2019 | 07-02-2019 | 07-02-2019 | 07-02-2019 | 03:30 PM | Active | और देखें |
55. | Operation of dump screen to recover BGL-523 at Balaghat Mine(Mining/BGT/18-19/5831 Date 03.01.2019) | 04-01-2019 | 10-01-2019 | 10-01-2019 | 10-01-2019 | 04:30 PM | Active | और देखें |
56. | Procurement, Installation and Commissioning of HT VCB Panel, LT ACB Panel and transformer for operation of proposed 250 HP Ventilation fan at Gadhaghat of Chikla Mine(MOIL/18-19/ET/384) | 04-01-2019 | 04-02-2019 | 04-02-2019 | 04-02-2019 | 03:30 PM | Active | और देखें |
57. | PURCHASE OF MISCELLENEOUS ITEMS C CLASS AS PER ANNEXURE IV(MOIL/EMD/CH/ASDGM/2018-19/540) | 02-01-2019 | 11-01-2019 | 11-01-2019 | 12-01-2019 | 03:30 PM | Active | और देखें |
58. | Purchase of Miscellaneous Items C Class as per Annx III For emd plant.(MOIL/EMD/CH/ASDGM/2018-19/539) | 02-01-2019 | 11-01-2019 | 11-01-2019 | 12-01-2019 | 03:30 PM | Active | और देखें |
59. | Strength and heightning of Compound wall of MM bunglow at Balaghat Mine(BGT/CIVIL/18-19/18 DATE 31.12.2018) | 01-01-2019 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
60. | Fixing of chain link fencing with concertina coil fencing at Balaghat mine.(BGT/CIVIL/18-19/17 DATE 31.12.2018) | 01-01-2019 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
61. | Const of Guard room at Agent Bunglow premises Balaghat Mine(BGT/CIVIL/18-19/19 DATE 31.12.2018) | 01-01-2019 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
62. | Underground Development work at Kandri Mine(MOIL/18-19/ET/386) | 01-01-2019 | 14-01-2019 | 14-01-2019 | 14-01-2019 | 03:30 PM | Active | और देखें |
63. | Underground concreting at 1750 Level at Ukwa Mine(MOIL/18-19/ET/378) | 01-01-2019 | 04-02-2019 | 04-02-2019 | 04-02-2019 | 03:30 PM | Active | और देखें |
64. | Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/18-19/ET/376) | 01-01-2019 | 01-02-2019 | 01-02-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
65. | Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine( MOIL/18-19/ET/380) | 01-01-2019 | 01-02-2019 | 01-02-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
66. | Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine(MOIL/18-19/ET/379) | 01-01-2019 | 01-02-2019 | 01-02-2019 | 01-02-2019 | 03:30 PM | Active | और देखें |
67. | Additional excavation in Mangeniferous rock between Ch.33 to Ch.35 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/374) | 31-12-2018 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 03:30 PM | Active | और देखें |
68. | Picking and collection of 20 percent SM Grade ore CHL 535 from cleaning of sub-grade mineral reject from ROM at Magazine Dump West side section of Chikla Mine(MOIL/18-19/ET/375) | 31-12-2018 | 31-01-2019 | 31-01-2019 | 31-01-2019 | 03:30 PM | Active | और देखें |
69. | Transportation of sand from Kalaphata Ghat to Beldongri Mine(MOIL/18-19/ET/373) | 31-12-2018 | 11-02-2019 | 11-02-2019 | 11-02-2019 | 03:30 PM | Active | और देखें |
70. | WASHING OF BOTTOM EMD AT EMD PLANT DONGRI BUZURG MINE(MOIL/EMD/CH/SDGM/18-19/527) | 29-12-2018 | 08-01-2019 | 08-01-2019 | 09-01-2019 | 10:30 AM | Active | और देखें |
71. | Recovery of Reduced ore and EMD powder(MOIL/EMD/CH/SDGM/18-19/528) | 29-12-2018 | 08-01-2019 | 08-01-2019 | 09-01-2019 | 10:30 AM | Active | और देखें |
72. | Supply, Fabrication, Erection, Installation and Commissioning of belt Conveyor Charging System at Ferro Manganese Plant, Balaghat Mine.(MOIL/18-19/ET/364) | 27-12-2018 | 25-01-2019 | 25-01-2019 | 25-01-2019 | 03:30 PM | Active | और देखें |
73. | Removal of waste rock in the H W benches from Ch.39 to Ch.50 and handling the same by mechanized means at Dongri Buzurg Mine( MOIL/18-19/ET/369) | 27-12-2018 | 28-01-2019 | 28-01-2019 | 28-01-2019 | 03:30 PM | Active | और देखें |
74. | Construction of stone pitching and RCC Ramp for Diesel Pump at Munsar Mine( MUN/CIVIL/NIT/18-19/144 DT 25.12.2018) | 25-12-2018 | 05-01-2019 | 05-01-2019 | 05-01-2019 | 04:30 PM | Active | और देखें |
75. | Hiring of Excavator for cleaning of fines pond Niagara plant at Ukwa Mine( 16/Mining/UM/18-19/1991) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
76. | Drilling of Borehole with casing pipe at Ukwa camp Ukwa Mine(16/Civil/UM/18-19/1981 Date 23-12-2018) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
77. | Recovery of 1.5 mm Chilly grade ore from fines of mobile screening plant through trammel at Ukwa Mine(16/Mining/UM/18-19/1987) | 24-12-2018 | 09-01-2019 | 09-01-2019 | 09-01-2019 | 04:30 PM | Active | और देखें |
78. | Providing, Fabrication, Erection and Commissioning of 6 Nos Charging bins at Ferro Manganese Plant, Balaghat mine(MOIL/18-19/ET/355) | 24-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
79. | FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/18-19/1244 dtd 21.12.2018) | 22-12-2018 | 04-01-2019 | 04-01-2019 | 04-01-2019 | 04:30 PM | Active | और देखें |
80. | Upgradation and renovation of 20 A type quarters at Munsar Mine(MOIL/18-19/ET/370) | 21-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
81. | A Construction of boundry wall at FMP B Construction of Re wall on hilly side of FMP, C) Construction of drain network at FMP at Balaghat Mine( MOIL/18-19/ET/360) | 21-12-2018 | 21-01-2019 | 21-01-2019 | 21-01-2019 | 03:30 PM | Active | और देखें |
82. | A New administrative building B Office for ferrow manganese plant C Vocational training center and D Gradute trainees hostel at Balaghat Mine(MOIL/18-19/ET/359) | 21-12-2018 | 28-02-2019 | 28-02-2019 | 28-02-2019 | 03:30 PM | Active | और देखें |
83. | Providing ,Supplying and erection of 11KV D.P. Structure Near 50-52 Substation Tirodi Mine.(TRD/ELE/18-19/7400002555/3088) | 20-12-2018 | 28-12-2018 | 28-12-2018 | 28-12-2018 | 03:30 PM | Active | और देखें |
84. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FUEL DISPENSING AND CONSUMPTION MONITORING SYSTEM AT DONGRI BUZURG MINE.(PUR/MOIL/C-5/23/E-59/854-M Dt. 20/12/2018) | 20-12-2018 | 11-01-2019 | 11-01-2019 | 11-01-2019 | 03:30 PM | Active | और देखें |
85. | Repairing and Relining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/354) | 20-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | और देखें |
86. | Purchase of HYDRATED LIME POWDER- 60 MT(WE-122 e-tender No.MOIL/18-19/ET-372, Dt.19.12.18) | 19-12-2018 | 16-01-2019 | 16-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
87. | PURCHASE OF GEAR MOTOR FOR TIPPLER AT MUNSAR MINE(ASDGM(Mines)/GrpIII/18-19/662) | 19-12-2018 | 02-01-2019 | 02-01-2019 | 02-01-2019 | 03:30 PM | Active | और देखें |
88. | PURCHASE OF ADOBE ACROBAT PRO LATEST VER(PUR/MOIL/C-4/138/E-60/860-M Dt. 19/12/2018) | 19-12-2018 | 07-01-2019 | 07-01-2019 | 07-01-2019 | 03:30 PM | Active | और देखें |
89. | Construction of drain in village Tighai Distt Nagpur under CSR(MOIL/18-19/ET/365) | 19-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
90. | Construction of cement concrete approch road and toilet block at Fetri under CSR(MOIL/18-19/ET/366) | 19-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
91. | Purchase of SULPHURIC ACID with Transportation-250 MT(WE-120 e-tender No.MOIL/18-19/ET-371, Dt.19.12.18) | 19-12-2018 | 09-01-2019 | 09-01-2019 | 10-01-2019 | 03:30 PM | Active | और देखें |
92. | Collection of fines from different areas at Kandri Mine(MOIL/18-19/ET/363) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
93. | Underground concreting work RCC for stope preparation at 70 Level, -30 Level and -230 Level at Munsar Mine(MOIL/18-19/ET/362) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
94. | Horizontal development at -70 Level of Chikla B incline section of Chikla Mine(MOIL/18-19/ET/361) | 17-12-2018 | 17-01-2019 | 17-01-2019 | 17-01-2019 | 03:30 PM | Active | और देखें |
95. | Extra excavation in Mangeniferous rock at pluse 160 Level of Chikla B section of Chikla Mine(MOIL/18-19/ET/368) | 17-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
96. | Loading AND transportation of Mill Tailing from Malajkhand mine of M s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/18-19/ET/367) | 17-12-2018 | 18-01-2019 | 18-01-2019 | 18-01-2019 | 03:30 PM | Active | और देखें |
97. | Cleaning of Spillage Material Under and Around all the Equipment at I.M.B Plant at Balaghat Mine( MOIL/18-19/ET/353) | 17-12-2018 | 16-01-2019 | 16-01-2019 | 16-01-2019 | 03:30 PM | Active | और देखें |
98. | Electrical heating system for electrolyte, in place of steam boiler heating system at new 500MT EMD Plant at Dongri Buzurg(MOIL/18-19/ET/352) | 15-12-2018 | 15-01-2019 | 15-01-2019 | 15-01-2019 | 03:30 PM | Active | और देखें |
99. | Excavation, Cutting and Dressing Works towards development of approach road near Second Vertical Shaft at Munsar Mine.( MUN/CIVIL/NIT/18-19/134 Date 11.12.2018) | 14-12-2018 | 17-12-2018 | 17-12-2018 | 17-12-2018 | 04:30 PM | Active | और देखें |
100. | PURCHASE OFGEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/18-19/1191 Dt. 10.12.2018) | 14-12-2018 | 26-12-2018 | 26-12-2018 | 26-12-2018 | 04:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |