निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Providing and Fixing of Overhead PVC Water Tank in KC Colony and Officer Colony Balaghat Mine.(Civil/BGT/T.E./2017-18/6634) | 13-01-2018 | 18-01-2018 | 18-01-2018 | 18-01-2018 | 04:30 PM | Active | और देखें |
2. | Erection of 11 KV DP Structure at Tirodi Mine ( North 6 no. road Crossing)( Tirodi/Elect/Agt/17-18/2697) | 13-01-2018 | 20-01-2018 | 20-01-2018 | 20-01-2018 | 04:00 PM | Active | और देखें |
3. | Construction of foundation and Platform for Mobile crusher plant at Munsar Mine.(MUN/CIVIL/17-18/73 DT 09.01.2018) | 12-01-2018 | 17-01-2018 | 17-01-2018 | 17-01-2018 | 03:30 PM | Active | और देखें |
4. | Removing of old doors and windows of Old quarters of Balapur camp at Dongri Buzurg Mine.(DB/Civil/HO/17-18/3015 DT 11/01/2018) | 12-01-2018 | 18-01-2018 | 18-01-2018 | 18-01-2018 | 4:30 PM | Active | और देखें |
5. | Picking and collection of material from contaminated low grade ROM near water tank site at Dongri Buzurg Mine(MOIL/17-18/ET/409) | 12-01-2018 | 12-02-2018 | 12-02-2018 | 12-02-2018 | 03:30 PM | Active | और देखें |
6. | Housekeeping inside the house premises of IMB Plant at Balaghat Mine(MOIL/17-18/ET/401) | 12-01-2018 | 12-02-2018 | 12-02-2018 | 12-02-2018 | 03:30 PM | Active | और देखें |
7. | Recovery of Ferro Grade and LGHS ore from North dump at Tirodi Mine(MOIL/17-18/ET/408) | 12-01-2018 | 12-02-2018 | 12-02-2018 | 12-02-2018 | 03:30 PM | Active | और देखें |
8. | Drilling of (02 Nos) BoreHoles to meet the Drinking Water requirement at Kandri Mine(MOIL/17-18/ET/ 294) | 11-01-2018 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | और देखें |
9. | Providing Synthetic Turf at Badminton Court, West Court, Nagpur(MOIL/17-18/ET/404) | 11-01-2018 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | और देखें |
10. | Hiring of Hydrologist and structural design consultant services for water supply scheme at Ukwa Mine.(MOIL/17-18/ET/308) | 11-01-2018 | 30-01-2018 | 30-01-2018 | 30-01-2018 | 03:30 PM | Active | और देखें |
11. | Construction of 33 kv Substation building with allied works at Munsar Mine(CIVIL/17-18/ET/381) | 11-01-2018 | 15-02-2018 | 15-02-2018 | 15-02-2018 | 03:30 PM | Active | और देखें |
12. | Construction of GSR for sand stowing plant at Munsar Mine(CIVIL/17-18/ET/380) | 11-01-2018 | 15-02-2018 | 15-02-2018 | 15-02-2018 | 03:30 PM | Active | और देखें |
13. | Construction of Union Office Building at Kandri Mine(MOIL/17-18/ET/ 405) | 11-01-2018 | 12-02-2018 | 12-02-2018 | 12-02-2018 | 03:30 PM | Active | और देखें |
14. | Maintenance of Garden at different location of Munsar Mine(CIVIL/17-18/ET/306) | 11-01-2018 | 15-02-2018 | 15-02-2018 | 15-02-2018 | 03:30 PM | Active | और देखें |
15. | Drilling of 3 nos bore holes for drinking water at Munsar Mine(CIVIL/17-18/ET/303) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
16. | Construction of drinkng water pumps room 4 nos different locations of Munsar Mine(CIVIL/17-18/ET/305) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
17. | Construction of Bion toilets for Gents 5 nos and ladies 3 nos at various places of Munsar Mine( CIVIL/17-18/ET/304) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
18. | In House Maintenance of Rest House at Gumgaon Mine(MOIL/17-18/ET/285) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
19. | Providing and laying PU (Polyurethane) concrete flooring for workshop at Gumgaon Mine( MOIL/17-18/ET/272) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
20. | Construction of Sewage Treatment Plant at Tirodi Mine(MOIL/17-18/ET/270) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
21. | TUB WHEEL AND AXLE(PUR-MOIL-C-12-14--WE-215 dt.11/01/2018) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
22. | Providing and fixing of 2 nos mechanical gate arrangement at entrance gate of Munsar Mine(MOIL/17-18/ET/284) | 11-01-2018 | 16-02-2018 | 16-02-2018 | 16-02-2018 | 03:30 PM | Active | और देखें |
23. | Construction of Brick Wall below beam of lease boundary of NH7 in order to ensure security at Kandri Mine(MOIL/17-18/ET/ 300) | 11-01-2018 | 20-02-2018 | 20-02-2018 | 20-02-2018 | 03:30 PM | Active | और देखें |
24. | Providing and Laying Hume Pipe line along Railway siding at Kandri Mine(MOIL/17-18/ET/ 268) | 11-01-2018 | 20-02-2018 | 20-02-2018 | 20-02-2018 | 03:30 PM | Active | और देखें |
25. | Construction of Sand Stowing Plant with RCC Water Tank ESR at Kandri Mine(MOIL/17-18/ET/ 302) | 11-01-2018 | 20-02-2018 | 20-02-2018 | 20-02-2018 | 03:30 PM | Active | और देखें |
26. | Construction of Decentralized Sewage Treatment Plant MOIL Ukwa Mine(MOIL/17-18/ET/312) | 11-01-2018 | 23-02-2018 | 23-02-2018 | 23-02-2018 | 03:30 PM | Active | और देखें |
27. | Construction of social club cum welfare center and Canteen building at Munsar Mine(CIVIL/17-18/ET/382) | 10-01-2018 | 15-02-2018 | 15-02-2018 | 15-02-2018 | 03:30 PM | Active | और देखें |
28. | Construction of Ore sample preparation room at Munsar Mine(CIVIL/17-18/ET/386) | 10-01-2018 | 14-02-2018 | 14-02-2018 | 14-02-2018 | 03:30 PM | Active | और देखें |
29. | Paving block flooring work of camp colonies at Munsar Mine(CIVIL/17-18/ET/383) | 10-01-2018 | 12-02-2018 | 12-02-2018 | 12-02-2018 | 03:30 PM | Active | और देखें |
30. | Construction of Amenities for waste development and land fill facilities at Munsar Mine(CIVIL/17-18/ET/384) | 10-01-2018 | 14-02-2018 | 14-02-2018 | 14-02-2018 | 03:30 PM | Active | और देखें |
31. | Construction and laying of safety amenities for Mine Magazine at Munsar Mine(CIVIL/17-18/ET/387) | 10-01-2018 | 14-02-2018 | 14-02-2018 | 14-02-2018 | 03:30 PM | Active | और देखें |
32. | G I Wire Netting and s S screen cloth(PUR-MOIl-C-1-203-ET-413 dt.09/01/2018) | 10-01-2018 | 14-02-2018 | 14-02-2018 | 14-02-2018 | 03:30 PM | Active | और देखें |
33. | Construction of Cement concrete road and drain and retaining wall at industrial premises at Munsar Mine(CIVIL/17-18/ET/385) | 10-01-2018 | 22-02-2018 | 22-02-2018 | 22-02-2018 | 03:30 PM | Active | और देखें |
34. | Loading unloading and transportation of tubs at crushing and screening plant surface at Chikla Mine(MOIL/17-18/ET/395) | 09-01-2018 | 09-02-2018 | 09-02-2018 | 09-02-2018 | 03:30 PM | Active | और देखें |
35. | Sinking of ore pass and its allied work at Kandri Mine(MOIL/17-18/ET/396) | 09-01-2018 | 09-02-2018 | 09-02-2018 | 09-02-2018 | 03:30 PM | Active | और देखें |
36. | Dust Mask,Ear Plug ,Ear Muff(PUR-MOIL-C-1-190-ET-412 dt. 09/01/2018) | 09-01-2018 | 14-02-2018 | 14-02-2018 | 14-02-2018 | 03:30 PM | Active | और देखें |
37. | PURCHASE OF 350W LED FITTINGS( TE/PUR/MOIL/CH/477) | 08-01-2018 | 13-01-2018 | 13-01-2018 | 13-01-2018 | 03:30 PM | Active | और देखें |
38. | Making artificial granules for filling in underground under R and D work at Munsar Mine.(MUN/CIVIL/R and D/17-18/70 dt.07.01.2018) | 08-01-2018 | 15-01-2018 | 15-01-2018 | 15-01-2018 | 03:30 PM | Active | और देखें |
39. | Purchase of Hose Fittings for Rock Drill and Air Leg Machines(WE-208 e-tender No.MOIL/17-18/ET-410, Dt.08.01.18) | 08-01-2018 | 02-02-2018 | 02-02-2018 | 02-02-2018 | 03:30 PM | Active | और देखें |
40. | Recovery of SM Grd. BGL 523 25 Percent Mn content ore from old dump material at Balaghat Mine( MOIL/17-18/ET/392) | 08-01-2018 | 08-02-2018 | 08-02-2018 | 08-02-2018 | 03:30 PM | Active | और देखें |
41. | Underground development and allied work at 300 Level and 400 Level at Gumgaon Mine(MOIL/17-18/ET/391) | 08-01-2018 | 08-02-2018 | 08-02-2018 | 08-02-2018 | 03:30 PM | Active | और देखें |
42. | Cotton Hand Gloves(PUR-MOIL-C-1-190-WE-205 dt.08-01-2018) | 08-01-2018 | 14-02-2018 | 14-02-2018 | 14-02-2018 | 03:30 PM | Active | और देखें |
43. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-60/1006-M Dt. 06-01-2018) | 06-01-2018 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | और देखें |
44. | Additional excavation in manganiferous rock at 300 Level at Gumgaon Mine(MOIL/17-18/ET/399) | 06-01-2018 | 06-02-2018 | 06-02-2018 | 06-02-2018 | 03:30 PM | Active | और देखें |
45. | Picking and collection of material from North dump at Tirodi Mine(MOIL/17-18/ET/373) | 06-01-2018 | 05-02-2018 | 05-02-2018 | 05-02-2018 | 03:30 PM | Active | और देखें |
46. | INNER HARNESS for safety helmets(PUR-MOIL-C-1-190-E-61 dt.06/01/2018) | 06-01-2018 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
47. | Watering of loose filled surface along with compacting with Vibratory roller to remaining portion of siding at Kandri mine(Kan/Civil/NIT/17-18/3005 Date 05/01/2018) | 05-01-2018 | 15-01-2018 | 15-01-2018 | 15-01-2018 | 04:30 PM | Active | और देखें |
48. | FLUORESCENT JACKETS.(PUR-MOIl-C-1-190-E-58 dt.05/01/2018) | 05-01-2018 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | और देखें |
49. | SAFETY BELT(PUR-MOIL-C-1-190-E-59 dt.05/01/2018) | 05-01-2018 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
50. | Breaking of Steam Coal at Ferro Manganese Plant(BGT/FMP/TE/2017-18/384 Date 03.01.2018) | 04-01-2018 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 04:30 PM | Active | और देखें |
51. | Loading and unloading of explosive for blasting at Tirodi Mine(MOIL/17-18/ET/370) | 04-01-2018 | 02-02-2018 | 02-02-2018 | 02-02-2018 | 03:30 PM | Active | और देखें |
52. | Trench cutting in ore stacks at Beldongri Mine(MOIL/17-18/ET/371) | 04-01-2018 | 02-02-2018 | 02-02-2018 | 02-02-2018 | 03:30 PM | Active | और देखें |
53. | Providing Polymers based Lining with Acid refractory Bricks in Electrolytic cells at EMD Plant, Dongri Buzurg Mine( MOIL/17-18/ET/402) | 03-01-2018 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
54. | Rubber Tub Buffer(PUR-MOIL-C-12-13-E-57 dt. 03/01/2018) | 03-01-2018 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
55. | WEBSITE SINGLE-ROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR GREAVES MAKE ENGINE-500 KVA D.G. SET.(PUR/MOIL/C-5/47/E-56/983-M Dt. 03/01/2018) | 03-01-2018 | 24-01-2018 | 24-01-2018 | 24-01-2018 | 03:30 PM | Active | और देखें |
56. | White metal R.C. Tandem(PUR-MOIL-C-1-192-E-55 dt.02-01-2018) | 02-01-2018 | 19-01-2018 | 19-01-2018 | 19-01-2018 | 03:30 PM | Active | और देखें |
57. | Recovery of SM Grd. (BGL-462) 25 Percent Mn content ore from old dump material at Balaghat Mine(MOIL/17-18/ET/372) | 02-01-2018 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
58. | e-procurement of SULPHURIC ACID - 150 MT(WE-207 e-tender No.MOIL/17-18/ET-406, Dt.02.01.18) | 02-01-2018 | 24-01-2018 | 24-01-2018 | 24-01-2018 | 03:30 PM | Active | और देखें |
59. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 7.5 T HOIST - ELITE MAKE.(PUR/MOIL/C-5/23/E-14/980-M Dt. 02/01/2018) | 02-01-2018 | 24-01-2018 | 24-01-2018 | 24-01-2018 | 03:30 PM | Active | और देखें |
60. | Carrying and fixing of ore pass and manway segment at 1750L of Ukwa Mine(16/Mining/UM/17-18/2080) | 01-01-2018 | 15-01-2018 | 15-01-2018 | 15-01-2018 | 04:30 PM | Active | और देखें |
61. | Purchase of Sand for Sand Stowing Plant at Balaghat Mine( MOIL/17-18/ET/398) | 01-01-2018 | 15-01-2018 | 15-01-2018 | 15-01-2018 | 03:30 PM | Active | और देखें |
62. | Picking and collection of material from 6 No. old dump at Sitapatore Mine(MOIL/17-18/ET/367) | 01-01-2018 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
63. | Cleaning of O/C ROM sorting at New Satuk section at Beldongri Mine(MOIL/17-18/ET/366) | 01-01-2018 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
64. | Supply of Black Gitti for concreting work at Gumgaon Mine( MOIL/17-18/ET/368) | 01-01-2018 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
65. | Shifting of 33kV Overhead Line for installation of Solar Panels at Balaghat Mine.(MOIL/TE/Elect/2017-18/6341 Date 26.12.2017) | 29-12-2017 | 18-01-2018 | 18-01-2018 | 18-01-2018 | 04:30 PM | Active | और देखें |
66. | Rate Contract for one year for supply of Compressed Oxygen Gas and Diss. Acetylene Gas Cylinders.(WE-206 e-tender No.MOIL/17-18/ET-403, Dt.29.12.17) | 29-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
67. | Picking, collection and cleaning of 20 percent mineralized ore from ROM Mix dump particles at Beldongri Mine(MOIL/17-18/ET/365) | 29-12-2017 | 30-01-2018 | 30-01-2018 | 30-01-2018 | 03:30 PM | Active | और देखें |
68. | Picking and collection of UKL 471 20 percent SM grade of Mn. Ore from Ch.6800 to 9500 at F W dump area at Ukwa Mine (MOIL/17-18/ET/362) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | और देखें |
69. | Picking and collection of material from East side of A dump at Tirodi Mine (MOIL/17-18/ET/364) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | और देखें |
70. | Washing picking and collection of material from off the pit area at Tirodi Mine (MOIL/17-18/ET/363) | 28-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 3:30 PM | Active | और देखें |
71. | New bay for 2500KVA 33KV/11KV outdoor transformer at 33KV substation at Balaghat Mine(MOIL/17-18/ET/369) | 22-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
72. | Supply of Timber (Only Through e-procurement)(WE-200 DT.22/12/2017, eTENDER NO.MOIL/17-18/ET/388) | 22-12-2017 | 29-01-2018 | 29-01-2018 | 29-01-2018 | 03:30 PM | Active | और देखें |
73. | Drilling of 115 mm dia. holes for Opencast development at Dongri Buzurg Mine(MOIL/17-18/ET/374) | 21-12-2017 | 31-01-2018 | 31-01-2018 | 31-01-2018 | 03:30 PM | Active | और देखें |
74. | Cleaning , maintenance, watch and ward and operation pump of Sewage treatment plant Kandri mine(Kan/Civil/NIT/17-18/2813 Date 19/12/2017) | 20-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 04:30 PM | Active | और देखें |
75. | WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF LIQUID LEVEL LIMITER (MOBRAY CONTROL)(PUR/MOIL/C-11/7/E-54/930-M Dt. 19-12-2017) | 19-12-2017 | 22-01-2018 | 22-01-2018 | 22-01-2018 | 03:30 PM | Active | और देखें |
76. | Construction of Boundary wall by Precast Pre stressed Concrete Panels at Chikla Mine(MOIL/17-18/ET/361) | 18-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
77. | PURCHASE OF PORTABLE MAGAZINE(PUR/MOIL/C-6/214/E-52/900-M DT.16/12/2017) | 16-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | और देखें |
78. | LED street lighting from Mine office to Wahitola camp colony, Munsar Mine(MOIL/17-18/ET/346) | 16-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
79. | Stability Test along with designing and Preparation of drawing and detailed cost Estimation for modification work required Strengthening of Head Gear structure of Vertical Shaft at Kandri Mine(A-III/KAN/17-18/2748) | 16-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 04:30 PM | Active | और देखें |
80. | Construction of Boundary wall at Goverment school Adarsh Vidalaya Munsar under CSR(MOIL/17-18/ET/360) | 15-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
81. | Construction of Classrooms in RNT School Ukwa Under CSR(MOIL/17-18/ET/ 359) | 14-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
82. | Providing, Installing, and Commissioning of Hydraullic power pack with cylinders for Vertical shaft 100 ton Bunker at Ukwa Mine(UK/Mech/17-18/1891 Dated 03/12/2017) | 13-12-2017 | 26-12-2017 | 26-12-2017 | 26-12-2017 | 04:30 pm | Active | और देखें |
83. | Providing and fixing of wooden support (Cleats) for cable laid in underground through vertical shaft at Kandri Mine(MOIL/17-18/ET/349) | 13-12-2017 | 12-01-2018 | 12-01-2018 | 12-01-2018 | 03:30 PM | Active | और देखें |
84. | Monitoring and operation of 33KV substation at Balaghat Mine (MOIL/17-18/ET/347) | 12-12-2017 | 10-01-2017 | 10-01-2017 | 10-01-2017 | 03:30 PM | Active | और देखें |
85. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE. (PUR/MOIL/C-5/58/E-41/896-M Dt. 12/12/2017) | 12-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | और देखें |
86. | Monitoring and operation of 33KV substation at Balaghat Mine(MOIL/17-18/ET/347) | 12-12-2017 | 10-01-2018 | 10-01-2018 | 10-01-2018 | 03:30 PM | Active | और देखें |
87. | Hiring of Front End Loader 1 No. and Tipper (10 MT)- 2 Nos. at Dongri Buzurg Mine(MOIL/17-18/ET/355) | 12-12-2017 | 11-01-2018 | 11-01-2018 | 11-01-2018 | 03:30 PM | Active | और देखें |
88. | Collecting and removing of Ash from Boiler house to ash dump area at EMD plant, Dongri Buzurg Mine(MOIL/17-18/ET/350) | 11-12-2017 | 29-12-2017 | 29-12-2017 | 29-12-2017 | 03:30 PM | Active | और देखें |
89. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR WIPRO MAKE HYDRAULIC SYSTEM FOR ASHOK LEYLAND TIPPER.(PUR/MOIL/C-5/23/E-48/835-M Dt. 11/12/2017) | 11-12-2017 | 03-01-2018 | 03-01-2018 | 03-01-2018 | 03:30 PM | Active | और देखें |
90. | Monitoring of Environment Parameters at MOIL Mines Plants AND Sand Lease under Water Act 1974 AND Air Act 1981 and Noise Survey(MOIL/17-18/ET/344) | 11-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
91. | Underground Drivage for Electrical Sub-station at 13.5 Ft. L at Balaghat Mine(MOIL/17-18/ET/354) | 11-12-2017 | 11-01-2018 | 11-01-2018 | 11-01-2018 | 03:30 PM | Active | और देखें |
92. | Repairing and servicing of Actuators of Butterfly Valve of IMB Plant at Balaghat Mine(AGT/BGT/MECH/IMB/17-18/451 DTD 07.12.2017) | 09-12-2017 | 19-12-2017 | 19-12-2017 | 19-12-2017 | 04:30 PM | Active | और देखें |
93. | Replacement of CT and PT metering unit and associated work for HT Service connection of Kandri Mine( MOIL/17-18/ET/351) | 09-12-2017 | 26-12-2017 | 26-12-2017 | 26-12-2017 | 03:30 PM | Active | और देखें |
94. | Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine(MOIL/17-18/ET/345) | 09-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
95. | Drilling 57mm diameter holes a premining support for installing cable bolt in Mangeneferrous rock in between CH-15 to CH-7 of 12 L North at Balaghat Mine(AGT/BGT/MECH/CB/17-18/450 dtd 07.12.2017) | 08-12-2017 | 14-12-2017 | 14-12-2017 | 14-12-2017 | 04:30 PM | Active | और देखें |
96. | Underground Development at -350 Level at Kandri Mine(MOIL/17-18/ET/353) | 08-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
97. | Consultancy Services for Preparation Of Design, Drawings and Detail Estimate for construction Of Material Handling Systems and Crushing and Screening Plants etc. at Chikla and Kandri Mine(MOIL/17-18/ET/352) | 08-12-2017 | 08-01-2018 | 08-01-2018 | 08-01-2018 | 03:30 PM | Active | और देखें |
98. | Picking and Collection of Mn. Ore from 6 no. Old Dump at SitaPatore Mine(SS/MINE/HO/2017-18/2411) | 07-12-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
99. | Hiring of Architect for rendering Architectural and Design Engineering Services for Proposed Construction of Residences for Directors Sr Executives at West Court Compound , Nagpur(MOIL/17-18/ET/ 341) | 06-12-2017 | 22-12-2017 | 22-12-2017 | 22-12-2017 | 03:30 PM | Active | और देखें |
100. | purchase of Video Conferencing solution - 1 No. (4 Lots) (Only Through e-procurement)(WE-201 DT.04/12/2017, eTENDER NO.MOIL/17-18/ET/357) | 04-12-2017 | 02-01-2018 | 02-01-2018 | 02-01-2018 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |