निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Renovation and mass renovation works for Awlajhari, Tavejhari and Bodha Pumping Station towards Water Supply Scheme at Balaghat Mine(MOIL/17-18/ET/298) | 14-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
2. | Development and beautification of New Colony Garden, Balaghat Mine.(MOIL/17-18/ET/296) | 14-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
3. | Purchase of PEARL COKE with Transportation - 3360 MT(WE-80 e-tender No.MOIL/17-18/ET-338, Dt.14.11.17) | 14-11-2017 | 05-12-2017 | 05-12-2017 | 05-12-2017 | 03:30 PM | Active | और देखें |
4. | Construction of Medical Administrative Building at Nagpur(MOIL/17-18/ET/ 323) | 14-11-2017 | 14-12-2017 | 14-12-2017 | 14-12-2017 | 03:30 PM | Active | और देखें |
5. | Transportation of sand from Kalaphata Ghat to Kandri, Munsar and Beldongri Mine(MOIL/17-18/ET/329) | 14-11-2017 | 15-12-2017 | 15-12-2017 | 15-12-2017 | 03:30 PM | Active | और देखें |
6. | Supplying Providing Fixing of Electronic Boom barrier at Entry point of Kandri Mines(Agent-MH/TENDER/17-18/2353) | 13-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 04:30 PM | Active | और देखें |
7. | Purchase of Oil and Lubricants - 29 items (Only Through e-procurement)(WE-60 DT.13/11/2017 (MOIL/17-18/ET/336-337) | 13-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
8. | PURCHASE OF STEEL WIRE ROPE-USHA MARTIN MAKE(PUR/MOIL/C-3/23/E-47/781-M DT.10.11.2017) | 10-11-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
9. | Picking and collection of material from contaminated low grade ROM at South West Part-3 of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/325) | 10-11-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
10. | Picking and collection of material from contaminated low grade ROM at South West Part-2 side of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/324) | 10-11-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
11. | Purchase of Cross Bit, 57mm dia suitable for ATLAS COPCO Make Cable Bolting Machine.(WE-105 e-tender No.MOIL/17-18/ET-330, Dt.10.11.17) | 10-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | और देखें |
12. | Shifting of 3 phase 3 wire existing 11 KV HT overhead line from CH no 49 MRL 345 CH no 49, MRL 353 CH no 52, MRL 356 to CH no 49,MRL 345 CH no 53, MRL 348-CH no 52, MRL 356 at Dongri Buzurg Mine(MOIL/17-18/ET/313) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
13. | Erection of 11KV HT Overhead line from Chikla B New substation to Gadhaghat Substation (2nd Vertical Shaft) of Chikla Mine(MOIL/17-18/ET/314) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
14. | Erection of new 11KV HT Overhead line from 50-52 substation to south bed mine substation at Tirodi Mine(MOIL/17-18/ET/315) | 10-11-2017 | 04-12-2017 | 04-12-2017 | 04-12-2017 | 03:30 PM | Active | और देखें |
15. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3 TON AND 4 TON BATTERY-DIESEL LOCO FROM OVIS EQUIPMENTS PVT. LTD., HYDERABAD(PUR/MOIL/C-5/27/E-08/267-M Dt. 08/11/2017) | 08-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 03:30 PM | Active | और देखें |
16. | Automation of underground Pumping Operation at Chikla Mine(MOIL/17-18/ET/288) | 08-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 03:30 PM | Active | और देखें |
17. | Loading and transportation of Mill tailing from Malajkhand Mine of M/s Hindustan Copper Limited to Ukwa Mine for stowing(MOIL/17-18/ET/295) | 08-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
18. | Picking and collection of material from contaminated low grade ROM at South West Part-I of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/319) | 07-11-2017 | 16-11-2017 | 16-11-2017 | 16-11-2017 | 03:30 PM | Active | और देखें |
19. | Picking and collection of material from contaminated low grade ROM at South Part of the quarry at Dongri Buzurg Mine(MOIL/17-18/ET/320) | 07-11-2017 | 16-11-2017 | 16-11-2017 | 16-11-2017 | 03:30 PM | Active | और देखें |
20. | Screening sorting and stacking of jigged ferro manganese metal Ferro Manganese Plant Balaghat Mine(BGT/FM/TE/2017-18/338 Date 06.11.2017) | 07-11-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 04:30 PM | Active | और देखें |
21. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR RD-60 DRILL MACHINE AND RD-395 WATER PUMP(PUR/MOIL/C-5/28/E-10/293-M Dt. 07/11/2017) | 07-11-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | और देखें |
22. | Sinking of Winzes (Manually) from 70ft Level to 30ft Level at Munsar Mine(MOIL/17-18/ET/301) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
23. | Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/17-18/ET/297) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
24. | Extra excavation in Manganiferous rock at 5th Level (Western side of -470 ft L) of vertical section at Chikla Mine(MOIL/17-18/ET/299) | 07-11-2017 | 07-12-2017 | 07-12-2017 | 07-12-2017 | 03:30 PM | Active | और देखें |
25. | PURCHASE OF INDUSTRIAL SAFETY SHOES AND PVC HALF GUM BOOT(PUR/MOIL/C-11/109/E-45/772-M Dt. 06-11-2017) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
26. | PURCHASE OF HYDRATED LIME POWDER-15MT(PUR/MOIL/C-11/34/E-46/774-M Dt. 06-11-2017) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
27. | Annual Rate Contract for supply of Cement Capsules - 430397 Nos.((WE-104 dt.06.11.2017(e-Tender No.MOIL/17-18/ET/322) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
28. | 11KV Overhead line for Chikla B new substation at Chikla Mine(MOIL/17-18/ET/289) | 06-11-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
29. | Breaking of metal into the size of (plus)25mm to (minus)50mm, sorting, filling, in forma, stacking and screening with (plus)25mm size screen of left out material at Ferro Manganese Plant Balaghat Mine(MOIL/17-18/ET/291) | 06-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 03:30 PM | Active | और देखें |
30. | Loading of broken metal of size- (plus) 25 mm to (minus) 50 mm by filling in 1 MT Jumbo bag, into trucks, manually and its proper packing, sealling, tagging, stiching as per requirement at Ferro Manganese Plant, Balaghat Mine(MOIL/17-18/ET/292) | 06-11-2017 | 06-12-2017 | 06-12-2017 | 06-12-2017 | 03:30 PM | Active | और देखें |
31. | Providing and fixing of Interlocking Paving Blocks for pathway parking infront of New Rest House Balaghat Mine.(MOIL/2017-18/ET/276) | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
32. | Renovation of Rajiv Gandhi Recreational Hall at Balaghat Mine.(MOIL/2017-18/ET/281) | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
33. | Notice Inviting Tender for Development Landscaping and Beautification works comprising of laying of paver blocks pathway plantation works and horticultural works for newly renovated and modernized Mine Hospital Building at Balaghat Mine.(MOIL/2017-18/ET/2 | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
34. | Construction of Compound Wall around Water Filtration Plant at Balaghat Mine.(MOIL/2017-18/ET/267) | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
35. | Construction of Boundary Wall at Government School Bherveli, Tirodi and Ghubadghondi Distt Balaghat Under CSR(MOIL/17-18/ET/ 287) | 02-11-2017 | 29-11-2017 | 29-11-2017 | 29-11-2017 | 03:30 PM | Active | और देखें |
36. | Annual Repair to Camp Quarters at Balaghat Mine(MOIL/2017-18/ET/278) | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
37. | Construction of Sewage Treatment Plant for ongoing new 120 A Type Quarters at Balaghat Mine.(MOIL/2017-18/ET/280) | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
38. | Renovation of Underground Managers Bungalow at Balaghat Mine(MOIL/2017-18/ET/277) | 02-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
39. | Purchase of D.G.Set for Various Mines - 4 Sets. (Lot No.1 to 4) (Only Through e-procurement)(WE-102 DT.01/11/2017, eTENDER NO.MOIL/17-18/ET/318) | 01-11-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
40. | Purchase of MS Welding Electrodes(WE-103 DT.31.10.2017 (e-TenderNo.MOIL/17-18/ET/317) | 31-10-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
41. | PURCHASE OF SAFETY HELMETS FROM MSE FIRMS ONLY(PUR-MOIL-C-1-189-E-44 dt.30/10/2017) | 31-10-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
42. | Purchase of Pre-Stressed Steel Wire Rope( WE-99 DT.31.10.2017(e-Tender no.MOIL/17-18/ET/316) | 31-10-2017 | 23-11-2017 | 23-11-2017 | 23-11-2017 | 03:30 PM | Active | और देखें |
43. | Making of stemming material (Mud plug) used for Blasting at Kandri Mine(MOIL/17-18/ET/262) | 28-10-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
44. | Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/17-18/ET/260) | 28-10-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
45. | Removing of loose waste rock at 1850 level Ukwa Mine(A and SrDyGM(M)/Mining/UM/17-18/1519) | 28-10-2017 | 11-11-2017 | 11-11-2017 | 11-11-2017 | 04:30 PM | Active | और देखें |
46. | Company Calaender (PUR-MOIL-C-12-26-E-43 dt.27/10/2017) | 28-10-2017 | 15-11-2017 | 15-11-2017 | 15-11-2017 | 03:30 PM | Active | और देखें |
47. | Repairing of Track Chain assembly, Roller and Idler assembly of BEML make BE 220 Hydraulic Excavator of Balaghat Mine(AGENT/BGT/MECH/17-18/379 dtd 25.10.2017) | 27-10-2017 | 07-11-2017 | 07-11-2017 | 07-11-2017 | 04:30 PM | Active | और देखें |
48. | PURCHASE OF CAP LAMP SPARES FOR EXIDE MAKE LED CAP LAMPS(PUR/MOIL/C-3/615/E-42/731-M DT.27/10/2017) | 27-10-2017 | 10-11-2017 | 10-11-2017 | 10-11-2017 | 03:30 PM | Active | और देखें |
49. | Maintenance, Distribution and Collection of Cap Lamps at Beldongri Mine through outsourcing(MOIL/17-18/ET/261) | 27-10-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
50. | Construction of Cement Concrete Roads at Kandri Mine(MOIL/17-18/ET/ 251) | 27-10-2017 | 27-11-2017 | 27-11-2017 | 27-11-2017 | 03:30 PM | Active | और देखें |
51. | Loading of slag in to trucks at Ferro Manganese Plant, Balaghat Mine(MOIL/17-18/ET/259) | 25-10-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
52. | Breaking of slag and other associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/17-18/ET/258) | 25-10-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
53. | Drilling of 115 mm dia. holes for Opencast development at Dongri Buzurg Mine(MOIL/17-18/ET/257) | 25-10-2017 | 24-11-2017 | 24-11-2017 | 24-11-2017 | 03:30 PM | Active | और देखें |
54. | DESIGNING, ENGINEERING, SUPPLYING, PROVIDING INSTALLATION, COMMISSIONING AND TESTING OF 2X1000KVA, 11KV/433V INDOOR SUBSTATION FOR VERTICAL SHAFT PROJECT OF CHIKLA MINE(DESIGNING ENGINEERING SUPPLYING PROVIDING INST) | 25-10-2017 | 23-11-2017 | 23-11-2017 | 23-11-2017 | 03:30 PM | Active | और देखें |
55. | Purchase of all in one, Integrated Solar LED Street Lighting System(WE-76 DT.24/10/2017(e-Tender No.MOIL/17-18/ET/253)) | 25-10-2017 | 08-12-2017 | 08-12-2017 | 08-12-2017 | 03:30 PM | Active | और देखें |
56. | Purchase of Crawler mounted, Diesel Engine operated hydraulic Excavator with Backhoe Rock Bucket having bucket capacity min.0.90 Cu.M. - 1 No. (2 Lots) for Munsar Mine (Only Through e-procurement)(WE-55 DT.24/10/2017, eTENDER NO.MOIL/17-18/ET/266) | 24-10-2017 | 21-11-2017 | 21-11-2017 | 21-11-2017 | 03:30 PM | Active | और देखें |
57. | purchase of HT VCB Panels - 8 Sets. (LOT No.1 to 7) (Only Through e-procurement)(WE-74 DT.24/10/2017, eTENDER NO.MOIL/17-18/ET/263 | 24-10-2017 | 22-11-2017 | 22-11-2017 | 22-11-2017 | 03:30 PM | Active | और देखें |
58. | Construction of Boundary wall by Precast Pre stressed Concrete Panels at Beldongri Mine(MOIL/17-18/ET/250) | 21-10-2017 | 23-11-2017 | 23-11-2017 | 23-11-2017 | 03:30 PM | Active | और देखें |
59. | Outsourcing of Canteen Vendors for distribution of tea and snacks for Mine Canteen at Balaghat(MOIL/17-18/ET/255) | 19-10-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
60. | Maintenance, Distribution and Collection of Cap Lamps at Chikla Mine through outsourcing(MOIL/17-18/ET/256) | 19-10-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
61. | Shifting of 11kV overhead line feeding power to Ch 9500 passing through the solar power plant site at Ukwa Mine.(Uk/elect/17-18/1469 dt 17.10.2017) | 18-10-2017 | 06-11-2017 | 06-11-2017 | 06-11-2017 | 04:30 PM | Active | और देखें |
62. | Construction of Residential Quarter at Munsar, Kandri, Gumgaon Mine of MOIL (A,B,C and D type)(MOIL/17-18/ET/249) | 18-10-2017 | 30-11-2017 | 30-11-2017 | 30-11-2017 | 03:30 PM | Active | और देखें |
63. | Purchase of 400 KW, 440 V, 3 Phase, AC Drive for Balaghat Mine (Only Through e-procurement)(WE-101 DT.17/10/2017, eTENDER NO.MOIL/17-18/ET/265) | 17-10-2017 | 10-11-2017 | 10-11-2017 | 10-11-2017 | 03:30 PM | Active | और देखें |
64. | purchase of Total Station with accessories and Comprehensive AMC - 7 Sets. (Only Through e-procurement)(WE-75 DT.17/10/2017, eTENDER NO.MOIL/17-18/ET/264) | 17-10-2017 | 11-12-2017 | 11-12-2017 | 11-12-2017 | 03:30 PM | Active | और देखें |
65. | Replacement of old damaged doors with new steel doors at camp quarters at Chikla Mine.(TE/CH/CIVIL/17-18/2025 dated 14/09/2017) | 13-10-2017 | 23-10-2017 | 23-10-2017 | 23-10-2017 | 03:30 PM | Active | और देखें |
66. | Laying of 6 Inch and 4 Inch G I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine(AGT/BGT/MECH/PIPE/17-18/343 dtd 12.10.2017) | 13-10-2017 | 26-10-2017 | 26-10-2017 | 26-10-2017 | 04:30 PM | Active | और देखें |
67. | Security Guard for diamond drilling site at Chikla Mine.(TE/CH/CIVIL/17-18/260 dated 07/10/2017) | 11-10-2017 | 16-10-2017 | 16-10-2017 | 16-10-2017 | 03:30 PM | Active | और देखें |
68. | Purchase of 9 Mtr. Mobile Lighting Tower with KE 5 KVA Generator Set - 3 Nos. for Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-100 DT.11/10/2017, eTENDER NO.MOIL/17-18/ET/252) | 11-10-2017 | 13-11-2017 | 13-11-2017 | 13-11-2017 | 03:30 PM | Active | और देखें |
69. | purchase of Electrically Operated Centrifugal Pumps for Various Mines - 18 Nos. (10 Lots) (Only Through e-procurement)(WE-54 DT.10/10/2017, eTENDER NO.MOIL/17-18/ET/244) | 10-10-2017 | 07-11-2017 | 07-11-2017 | 07-11-2017 | 03:30 PM | Active | और देखें |
70. | Purchase of Flexible Trailing Copper Conductor Cable(WE-98 DT.09.10.201 (e-Tender No.MOIL/17-18/ET/248)) | 10-10-2017 | 27-10-2017 | 27-10-2017 | 27-10-2017 | 03:30 PM | Active | और देखें |
71. | Purchase of Tipper - 6 Nos. for Various Mines (Only Through e-procurement)(WE-56 DT.10/10/2017, eTENDER NO.MOIL/17-18/ET/243) | 10-10-2017 | 17-11-2017 | 17-11-2017 | 17-11-2017 | 03:30 PM | Active | और देखें |
72. | sec. guard(BGT/Dia. Drill./Sec./T.E./17-18/4657) | 09-10-2017 | 16-10-2017 | 16-10-2017 | 16-10-2017 | 04:30 PM | Active | और देखें |
73. | PURCHASE OF SPARES FOR ATLAS COPCO MAKE PRISMA 4S HAMMER(PUR/MOIL/C-5/8/E-13/311-M Dt. 09/10/2017) | 09-10-2017 | 30-10-2017 | 30-10-2017 | 30-10-2017 | 03:30 PM | Active | और देखें |
74. | For Purchase of Valveless DTH Hammers and Bits for ICM 260 Drilling Machine.(WE-97 e-tender No.MOIL/17-18/ET-247, Dt.09.10.2017) | 09-10-2017 | 08-11-2017 | 08-11-2017 | 08-11-2017 | 03:30 PM | Active | और देखें |
75. | CLEANING OF SURPLUS U/G ROM AT BELDONGRI MINE(CGM(PR)/CL-ROM/35/BEL/17-18/26) | 07-10-2017 | 16-10-2017 | 16-10-2017 | 16-10-2017 | 03:30 PM | Active | और देखें |
76. | Replacement of old damage steel doors with new Steel doors at camp quarter at Tirodi Mine(TRD/Civil/A/2017-18/1695) | 07-10-2017 | 12-10-2017 | 12-10-2017 | 12-10-2017 | 04:00 PM | Active | और देखें |
77. | Picking and collection of material from contaminated low grade ROM near South side of quarry at Dongri Buzurg Mine(MOIL/17-18/ET/237) | 07-10-2017 | 06-11-2017 | 06-11-2017 | 06-11-2017 | 03:30 PM | Active | और देखें |
78. | Picking and collection of material from contaminated low grade ROM near South side (part-1) of quarry at Dongri Buzurg Mine(MOIL/17-18/ET/238) | 07-10-2017 | 06-11-2017 | 06-11-2017 | 06-11-2017 | 03:30 PM | Active | और देखें |
79. | Cleaning of surplus underground ROM at Munsar Mine(MOIL/17-18/ET/239) | 07-10-2017 | 06-11-2017 | 06-11-2017 | 06-11-2017 | 03:30 PM | Active | और देखें |
80. | Removal of spillage material accumulated during hoisting of skip from 15th Level of production shaft at Balaghat Mine(MOIL/17-18/ET/236) | 07-10-2017 | 06-11-2017 | 06-11-2017 | 06-11-2017 | 03:30 PM | Active | और देखें |
81. | e-procurement of G.I.Pipes of assorted sizes(WE-81,ET-246 Dt.06/10/2017) | 06-10-2017 | 02-11-2017 | 02-11-2017 | 02-11-2017 | 03:30 PM | Active | और देखें |
82. | HDPE Pipes,Bends and Ends(WE-82,ET-245 dt.4/10/2017) | 05-10-2017 | 24-10-2017 | 24-10-2017 | 24-10-2017 | 03:30 PM | Active | और देखें |
83. | Crushing and Mixing of Manganese Ore Samples(CL/17-18/CRUSHING/25) | 05-10-2017 | 12-10-2017 | 12-10-2017 | 12-10-2017 | 03:30 PM | Active | और देखें |
84. | Providing, Supplying, installation and Commissioning of 2 x 4.5 KWp Solar Power Trees at MOIL Bhawan, Nagpur(MOIL/17-18/ET/228) | 05-10-2017 | 20-11-2017 | 20-11-2017 | 20-11-2017 | 03:30 PM | Active | और देखें |
85. | PURCHASE OF RADIAL TUBELESS TYRE FOR TOYOTA INNOVA MODEL CAR(PUR/MOIL/C-13/18/E-39/643-M DT.04.10.2017) | 04-10-2017 | 11-10-2017 | 11-10-2017 | 11-10-2017 | 03:30 PM | Active | और देखें |
86. | Purchase of Dolomite with Transportation - 3300 MT(WE-79 e-tender No.MOIL/17-18/ET-242, Dt.04.10.2017) | 04-10-2017 | 25-10-2017 | 25-10-2017 | 25-10-2017 | 03:30 PM | Active | और देखें |
87. | Purchase of Carbon Electrode Paste with Transportation - 192 MT(WE-78 e-tender No.MOIL/17-18/ET-241, Dt.04.10.2017) | 04-10-2017 | 31-10-2017 | 31-10-2017 | 31-10-2017 | 03:30 PM | Active | और देखें |
88. | Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/17-18/ET/235) | 04-10-2017 | 03-11-2017 | 03-11-2017 | 03-11-2017 | 03:30 PM | Active | और देखें |
89. | Collection of fines different areas at Kandri Mine(MOIL/17-18/ET/240) | 04-10-2017 | 03-11-2017 | 03-11-2017 | 03-11-2017 | 03:30 PM | Active | और देखें |
90. | Picking and collection of SM Grade ore from 220 ft Level and OCF dumps at Munsar Mine(MOIL/17-18/ET/233) | 04-10-2017 | 03-11-2017 | 03-11-2017 | 03-11-2017 | 03:30 PM | Active | और देखें |
91. | Picking and collection of material LGHS small 25 MnGML464 and 30 Mn (GML-233) at Gumgaon Mine(MOIL/17-18/ET/232) | 30-09-2017 | 30-10-2017 | 30-10-2017 | 30-10-2017 | 03:30 PM | Active | और देखें |
92. | Removal of waste rock and handling the dump ROM from various old dumps at North and South area by mechanized means at Kandri Mine(MOIL/17-18/ET/229) | 30-09-2017 | 30-10-2017 | 30-10-2017 | 30-10-2017 | 03:30 PM | Active | और देखें |
93. | Picking and collection of SM Grade ore from 220 Level and 135 Level dump at Munsar Mine(MOIL/17-18/ET/231) | 30-09-2017 | 31-10-2017 | 31-10-2017 | 31-10-2017 | 03:30 PM | Active | और देखें |
94. | Hiring of Architect and structural consultant for construction of Medical administrative wing at Ukwa Mine.(Civil /HO/17-18/UK/ 56 Dt 25/09/2017) | 29-09-2017 | 12-10-2017 | 12-10-2017 | 12-10-2017 | 03:30 PM | Active | और देखें |
95. | Picking and collection of material from contaminated low grade ROM near South West part 2 side of quarry at Dongri Buzurg Mine(MOIL/17-18/ET/230) | 29-09-2017 | 30-10-2017 | 30-10-2017 | 30-10-2017 | 03:30 PM | Active | और देखें |
96. | Outsourcing of Industrial Pumping Operation in Underground Vertical Shaft of Munsar Mine(MOIL/17-18/ET/227) | 29-09-2017 | 27-10-2017 | 27-10-2017 | 27-10-2017 | 03:30 PM | Active | और देखें |
97. | Removal of waste dump and handling the same by mechanized means at Ukwa Mine(MOIL/17-18/ET/226) | 28-09-2017 | 27-10-2017 | 27-10-2017 | 27-10-2017 | 03:30 PM | Active | और देखें |
98. | Removal of waste rock and Manganiferous rock at Chitawar section Ch.(-) 100 to (-) 1600 and handling the same by mechanized means at Ukwa Mine(MOIL/17-18/ET/225) | 28-09-2017 | 27-10-2017 | 27-10-2017 | 27-10-2017 | 03:30 PM | Active | और देखें |
99. | Extra excavation in magniferous rock at 5th Level of vertical section at Chikla Mine(GM(M)/II/63/CH/17-18/26) | 27-09-2017 | 06-10-2017 | 06-10-2017 | 06-09-2017 | 03:30 PM | Active | और देखें |
100. | Extra excavation in magniferous rock at 5th Level of vertical section at Chikla Mine(GM(M)/II/63/CH/17-18/26) | 27-09-2017 | 06-10-2017 | 06-10-2017 | 06-10-2017 | 03:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |