1. Picking and Collection of Material from Contaminated Low Grade ROM at South West Part-I Side of the Quarry through mobile crusher at Dongri Buzurg Mine(CGM(PR)/R-DUMP/34/DB/17-18/24) 20-09-2017 26-09-2017 26-09-2017 26-09-2017 03:30 PM Active और देखें
2. Picking and Collection of Material from Contaminated Low Grade ROM at South West Part-III Side of the Quarry through mobile crusher at Dongri Buzurg Mine(CGM(PR)/R-DUMP/33/DB/17-18/23) 20-09-2017 26-09-2017 26-09-2017 26-09-2017 03:30 PM Active और देखें
3. Picking and Collection of Matl. from Contaminated Low Grade ROM at South Part of the Quarry through mobile crusher at Dongri Buzurg Mine Picking and Collection of Matl. from Contaminated Low Grade ROM at South Part of the Quarry through mobile crusher at 20-09-2017 26-09-2017 26-09-2017 26-09-2017 03:30 PM Active और देखें
4. Picking and Collection of Material from Contaminated Low Grade ROM at South West Part-II Side of the Quarry through mobile crusher at Dongri Buzurg Mine(CGM(PR)/R-DUMP/32/DB/17-18/22) 20-09-2017 26-09-2017 26-09-2017 26-09-2017 03:30 PM Active और देखें
5. Picking and collection of material to recover SM Grade Ore from Bhurki Dump area of Munsar Mine(CGM(PR)/R-DUMP/27/MUN/17-18/19) 19-09-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
6. Cleaning of Surplus U/G ROM at Munsar Mine(CGM(PR)/CL-ROM/28/MUN/17-18/20) 19-09-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
7. Picking and collection of material to recover SM grade Ore from 220L Dump Area at Munsar Mine(CGM(PR)/R-DUMP/24/MUN/17-18/18) 19-09-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
8. Making and fixing of conferance table for Conferance hall at Munsar Mine(CIVIL/MUN/AGENT/17-18/2293 DATE 18.09.2017) 19-09-2017 26-09-2017 26-09-2017 26-09-2017 04:30 PM Active और देखें
9. Removal of Garbage cleaning of drains and septic tank etc. at camp qr. at Ukwa Mine(16/Civil/UM/17-18/1210) 19-09-2017 04-10-2017 04-10-2017 04-10-2017 04:30 PM Active और देखें
10. Purchase of LED Based Miners Safety Cap Lamp Assembly with Charging Rack and Spares(WE-58 DT.19/09/2017(e-Tender no.MOIL/17-18/ET/224)) 19-09-2017 18-10-2017 18-10-2017 18-10-2017 03:30 PM Active और देखें
11. Washing, picking and collection of matl. from 6 No. old dump at Sitapatore Mine(CGM(PR)/RDUMP/30/SITA/17-18/15) 18-09-2017 22-09-2017 22-09-2017 22-09-2017 03:30 PM Active और देखें
12. Picking and collection of matl. from contaminated low grade ROM at Western Side of Fagni Dump at Dongri Buzurg Mine(CGM(PR)/R-DUMP/25/DB/17-18/17) 18-09-2017 22-09-2017 22-09-2017 22-09-2017 03:30 PM Active और देखें
13. Picking and collection of matl. from contaminated low grade ROM Western Side at Dongri Buzurg Mine(CGM(PR)/R-DUMP/26/DB/17-18/16) 18-09-2017 22-09-2017 22-09-2017 22-09-2017 03:30 PM Active और देखें
14. Cleaning of ROM recovered from Pit No. 6 at Sitapatore Mine(CGM(PR)/RDUMP/29/SITA/17-18/14) 18-09-2017 22-09-2017 22-09-2017 22-09-2017 03:30 PM Active और देखें
15. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HYDRAULIC FILTER PRESS(PUR/MOIL/C-11/17/E-32/551-M Dt. 18-09-2017) 18-09-2017 09-10-2017 09-10-2017 09-10-2017 03:30 PM Active और देखें
16. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PP MULTIFILAMENT FILTER CLOTH(PUR/MOIL/C-11/16/E-30/543-M Dt. 16-09-2017) 16-09-2017 09-10-2017 09-10-2017 09-10-2017 03:30 PM Active और देखें
17. X ray Films and processing materials(E-31 dt.15/09/2017) 15-09-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
18. Purchase of Battery Locomotives, Capacity 3 Ton - 1 No. for Chikla Mine (Only Through e-procurement)(WE-43 DT.15/09/2017, eTENDER NO.MOIL/17-18/ET/222) 15-09-2017 09-10-2017 09-10-2017 09-10-2017 03:30 PM Active और देखें
19. Purchase of L.T. Induction Motor - 28 Nos. (Lot No.1 to Lot No. 25) for Various Mines (Only Through e-procurement)(WE-72 DT.15/09/2017, eTENDER NO.MOIL/17-18/ET/223) 15-09-2017 10-10-2017 10-10-2017 10-10-2017 03:30 PM Active और देखें
20. Purchase of Cable Bolting Machine for Various Mines - 7 Nos. (Only Through e-procurement)(WE-52 DT.15/09/2017, eTENDER NO.MOIL/17-18/ET/220) 15-09-2017 12-10-2017 12-10-2017 12-10-2017 03:30 PM Active और देखें
21. Purchase of 3.3 KV, Soft Starter Panel (FCMA Technology Based) Suitable for Operation of 300 HP Centrifugal Water Pump Set- 2 Nos. for Balaghat Mine (Only Through e-procurement)(WE-57 DT.15/09/2017, eTENDER NO.MOIL/17-18/ET/221) 15-09-2017 12-10-2017 12-10-2017 12-10-2017 03:30 PM Active और देखें
22. PURCHASE OF VEHICLE BATTERIES(WE-71 DT.14.09.2017(e-Tender No.MOIL/17-18/ET/219)) 14-09-2017 04-10-2017 04-10-2017 04-10-2017 03:30 PM Active और देखें
23. RECASTING OF 6 NOS TERMINAL CONNECTOR OF FERRO MANGANESE PLANT, MOIL BALAGHAT MINE(MOIL/BGT/FMP/17-18/276 Date 14.09.2017) 14-09-2017 23-10-2017 23-10-2017 23-10-2017 04:30 PM Active और देखें
24. PURCHASE OF LONG DELAY ELECTRIC DETONATOR(PUR/MOIL/C-6/214/E-29/504-M DT.13.09.2017) 13-09-2017 27-09-2017 27-09-2017 27-09-2017 03:30 PM Active और देखें
25. Purchase of STEAM COAL with Transportation -1050 MT(WE-59 e-tender No.MOIL/17-18/ET-218, Dt.13.09.2017) 13-09-2017 12-10-2017 12-10-2017 12-10-2017 03:00 PM Active और देखें
26. Purchase of M.S. LANCING PIPE - 22 MT(WE-70 e-tender No.MOIL/17-18/ET-217, Dt.13.09.2017) 13-09-2017 12-10-2017 12-10-2017 12-10-2017 03:30 PM Active और देखें
27. Supply, installation, commissioning of OFC wired LAN connectivity to FERRO MANGANESE Plant, Agent office, weighbridge, Mine Hospital from Admin building at Balaghat Mine(BG/SYSTEM/NETWORK/2017-18/303) 12-09-2017 19-09-2017 19-09-2017 19-09-2017 04:00 PM Active और देखें
28. Laying of 3C x 240 sq mm copper cable from substation to third level pump house of vs of ukwa Mine.(UK/Ele/2017-18/300) 12-09-2017 25-09-2017 25-09-2017 25-09-2017 04:30 PM Active और देखें
29. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR LHD AND SDL.(PUR/MOIL/C-5/27/E-27/513-M Dt. 12/09/2017) 12-09-2017 04-10-2017 04-10-2017 04-10-2017 03:30 PM Active और देखें
30. Recovery of Ferro Manganese Metal from Runner Material.at Ferro Manganese Plant Balaghat Mine.(BGT/FMP/T.E./2017-18/274 Date 12.09.2017) 12-09-2017 09-10-2017 09-10-2017 09-10-2017 04:30 PM Active और देखें
31. Replacement of old damaged Steel Doors and Windows with New Steel Doors and Window for Camp Quarter at Balaghat Mine.(Civil/BGT/T.E./2017-18/3917) 11-09-2017 18-09-2017 18-09-2017 18-09-2017 04:30 PM Active और देखें
32. PURCHASE OF SHORT FIRING CABLE(PUR/MOIL/C-3/30/E-28/516-M DT.08.09.2017) 09-09-2017 27-09-2017 27-09-2017 27-09-2017 03:30 PM Active और देखें
33. Pushing and unloading of ROM and rock tubs in U/G at Gumgaon mine(GM(M)-III/55/PUSHING/G/27) 08-09-2017 15-09-2017 15-09-2017 15-09-2017 03:30 PM Active और देखें
34. CLEANING OF SURPLUS U/G ROM AT BELDONGRI MINE(CGM(PR)/CL-ROM/22/BEL/17-18/13) 08-09-2017 15-09-2017 15-09-2017 15-09-2017 03:30 PM Active और देखें
35. Fabrication of Steel orepasses and manway for Balaghat mine(AGENT/BGT/MECH/17-18/3877) 08-09-2017 18-09-2017 18-09-2017 18-09-2017 04:30 PM Active और देखें
36. purchase of Electrical Operated Winch Capacity- 1 Ton for Various Mines - 7 Nos. (LOT No.1 and 2) (Only Through e-procurement)(WE-51 DT.08/09/2017, eTENDER NO.MOIL/17-18/ET/215) 08-09-2017 06-10-2017 06-10-2017 06-10-2017 03:30 PM Active और देखें
37. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PUMP SPARES - MATHER and PLATT(PUR/MOIL/C-11/126/E-26/476-M Dt. 08-09-2017) 08-09-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
38. Purchase of Hydraulic Rock Breaker attachment for Excavator at Dongri Buzurg Mine - 1 No. (Only Through e-procurement)(WE-68 DT.08/09/2017, eTENDER NO.MOIL/17-18/ET/214) 08-09-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
39. Collection of Canteen food items and drinks and carrying it to scattered section of Open Cast and Underground Chikla Mine for serving it to Employees(MOIL/17-18/ET/204) 08-09-2017 09-10-2017 09-10-2017 09-10-2017 03:30 PM Active और देखें
40. purchase of TRANSFORMER OIL - 8190 Ltrs.(39 Oil Barrels) (Only Through e-procurement)(WE-69 DT.08/09/2017, eTENDER NO.MOIL/17-18/ET/216) 08-09-2017 10-10-2017 10-10-2017 10-10-2017 03:30 PM Active और देखें
41. Hiring of taxi services on official duties at MOIL Limited(MOIL/17-18/ET/206) 08-09-2017 10-10-2017 10-10-2017 10-10-2017 03:30 PM Active और देखें
42. Operation of dump screen at Balaghat Mine(MOIL/17-18/ET/207) 08-09-2017 16-10-2017 16-10-2017 16-10-2017 03:30 PM Active और देखें
43. Providing a standby winder control system for vertical shaft winder of Munsar and Chikla mine and new drive and signalling system for Kandri mine(MOIL/17-18/ET/205) 08-09-2017 12-10-2017 12-10-2017 12-10-2017 03:30 PM Active और देखें
44. purchase of Crawler Mounted Composite DTH Hammer Drilling Machine - 2 Nos. (1 No.each for Tirodi and Sitapatore Mine(M.P))(WE-53 DT.07/09/2017, eTENDER NO.MOIL/17-18/ET/212) 07-09-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
45. purchase of L.T.Panel Various Types - 29 Nos. (Lot No. 1 to Lot No.18 ) (Only Through e-procurement)(WE-23 DT.07/09/2017, eTENDER NO.MOIL/17-18/ET/213) 07-09-2017 11-10-2017 11-10-2017 11-10-2017 03:30 PM Active और देखें
46. Enhancement of Skip Hoisting Capacity of Holmes Shaft Winder at Balaghat Mine(MOIL/17-18/ET/202) 07-09-2017 13-10-2017 13-10-2017 13-10-2017 03:30 PM Active और देखें
47. Outsourcing of Industrial Pumping Operation at UG level and OC of Kandri Mine(MOIL/17-18/ET/203) 07-09-2017 13-10-2017 13-10-2017 13-10-2017 03:30 PM Active और देखें
48. PURCHASE OF BENLEC (BEN ELECTRIC PVT LTD) MAKE D.C.TRACTION MOTORS VARIOUS TYPE - 12 NOS. (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/75/E-11/296-M DT.06/09/2017) 06-09-2017 27-09-2017 27-09-2017 27-09-2017 03:30 PM Active और देखें
49. PURCHASE OF ELECTROMAG MAKE, 1.10 KW, 1430 RPM, TYPE-U16X UNBALANCED MOTORS - 3 NOS. FOR VIBRATOR FEEDER OF IMB PLANT, BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/75/E-17/339-M DT.06.09.2017) 06-09-2017 27-09-2017 27-09-2017 27-09-2017 03:30 PM Active और देखें
50. PURCHASE OF ELECTRO MAGNETIC INDUSTRIES MAKE 3 HP, 960RPM MOTORS - 2 NOS. FOR VIBRATOR FEEDER OF IMB PLANT, BALAGHAT MINE (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/75/E-18/340-M DT.06.09.2017) 06-09-2017 04-10-2017 04-10-2017 04-10-2017 03:30 PM Active और देखें
51. PURCHASE OF VENNENZETTI MAKE, UNBALANCED MOTORS - 2 NOS., FOR LINEAR, MOTION VIBRATORS OF IMB PLANT, BALAGHAT MINE(M.P) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/75/E-16/338-M DT.06.09.2017) 06-09-2017 04-10-2017 04-10-2017 04-10-2017 03:30 PM Active और देखें
52. Purchase of 3 Ph 125 Kvar Capacitors(BGT/TE/Elect/17-18/3745 Date 01.09.20167) 05-09-2017 25-09-2017 25-09-2017 25-09-2017 04:00 PM Active और देखें
53. Purchase of STEAM COAL with transportation for EMD Plant, Dongri Buzurg Mine-M.S.(WE-67 e-tender No.MOIL/17-18/ET-211, Dt.05.09.2017) 05-09-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
54. Design, fabrication, supply, erection and commissioning of conveyor belt system and Bunker with other allied works for Dry Density Separation Plant at Munsar Mine(MOIL/17-18/ET/201) 05-09-2017 05-10-2017 05-10-2017 05-10-2017 03:30 PM Active और देखें
55. Purchase of Drilling Accessories for DI-500 Drilling Machine(WE-65 e-tender No.MOIL/17-18/ET-210, Dt.05.09.2017) 05-09-2017 05-10-2017 05-10-2017 05-10-2017 03:30 PM Active और देखें
56. Drilling 57 mm dia. Drill holes for installing cable bolts in Manganiferous rock between Ch.1800 to Ch.1920 at -370 ft Level at Chikla Mine(MOIL/17-18/ET/199) 04-09-2017 05-10-2017 05-10-2017 05-10-2017 03:30 pm Active और देखें
57. Trench cutting in ore stack for sampling at Dongri Buzurg Mine(MOIL/17-18/ET/200) 04-09-2017 05-10-2017 05-10-2017 05-10-2017 03:30 pm Active और देखें
58. Purchase of Diamond Drill Bits and Reaming Shells(WE-66 DT.31.08.2017(e-Tender No.MOIL/17-18/ET/209)) 01-09-2017 27-09-2017 27-09-2017 27-09-2017 03:30 PM Active और देखें
59. Trench cutting in ore stack for sampling at Tirodi Mine(MOIL/17-18/ET/197) 01-09-2017 03-10-2017 03-10-2017 03-10-2017 03:30 PM Active और देखें
60. Cleaning of Underground ROM sorting at Beldongri Mine(MOIL/17-18/ET/196) 01-09-2017 03-10-2017 03-10-2017 03-10-2017 03:30 PM Active और देखें
61. Drilling 57 mm dia. Drill holes for installing cable bolts in Manganiferous rock at -200 ft Level and -300 ft Level at Gumgaon Mine(MOIL/17-18/ET/198) 01-09-2017 03-10-2017 03-10-2017 03-10-2017 03:30 PM Active और देखें
62. Making of steaming sticks (Mud Plug) used for blasting at Gumgaon Mine.(GUM/M/HO/Agent/17-18/ 1414 dt 30/08/2017) 31-08-2017 15-09-2017 15-09-2017 15-09-2017 04:30 PM Active और देखें
63. UPKEEPING, HOUSEKEEPING CONTRACT FOR CLEANING OF MOIL BHAVAN, CMD BUNGLOW, CMS PREMISES, GUEST HOUSE, ANNEX BUILDING, TRANSIT HOUSE, GOLDEN JUBILEE HALL, BADMINTON HALL, GYMNASIUM ETC. AT EAST COURT AND WEST COURT PREMISES OF MOIL LIMITED, NAGPUR 31-08-2017 03-10-2017 03-10-2017 03-10-2017 3:30 PM Active और देखें
64. Hiring of Hydraulic Rock Breaker with hydraulic excavator for LGHS production at Dongri Buzurg Mine(MOIL/17-18/ET/208) 30-08-2017 19-09-2017 19-09-2017 19-09-2017 03:30 PM Active और देखें
65. Purchase of 5 Pair 0.63 mm PIFJ Armored Telephone Cables for Balaghat Mine(BGT/TE/Elect/2017-18/3548 Date 24.08.2017) 30-08-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
66. Purchase of Field Card of Siemens Make 6RA 70 DC Drive for Balaghat Mine(BGT/TE/Elect/2017-18/3503 Date 21.08.2017) 30-08-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
67. Purchase of Earth Leakage Relay for Balaghat Mine(BGT/TE/Elect/2017-18/3549 Date 24.08.2017) 30-08-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
68. Cleaning of surplus ROM of O/C Development UK-4445 and UKL-448 SM Grade at Chitawar section of Ukwa Mine(MOIL/17-18/ET/195) 30-08-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
69. Picking and collection of material from contaminated low grade ROM near South West part 3 side of quarry at Dongri Buzurg Mine(MOIL/17-18/ET/194) 30-08-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
70. Underground Exploratory Development from 148 MRL to 118 MRL at Beldongri Mine Under R and D(MOIL/17-18/ET/193) 30-08-2017 29-09-2017 29-09-2017 29-09-2017 03:30 PM Active और देखें
71. Excavation/stripping in magniferous rock at -200 Level at Gumgaon Mine(GM(M)/II/Exca/Gum/17-18/25) 29-08-2017 06-09-2017 06-09-2017 06-09-2017 03:30 PM Active और देखें
72. Cap Lamp Maintenance of Gumgaon Mine for 3 Months(GM/Elect/TE/17-18/1412,Dated - 28.08.2017) 29-08-2017 11-09-2017 11-09-2017 11-09-2017 03:30 PM Active और देखें
73. REPAIRING AND MAKING 150 HP AND 170 HP PUMP FOUNDATION 28-08-2017 05-09-2017 05-09-2017 05-09-2017 04:30 PM Active और देखें
74. PICKING AND COLLECTION OF MATL. FROM OCF EAST SIDE DUMP AREA OF MUNSAR MINE(CGM(PR)/R-DUMP/15/MUN/17-18/12) 28-08-2017 05-09-2017 05-09-2017 05-09-2017 03:30 PM Active और देखें
75. PICKING AND COLLECTION OF MATL. FROM OCF (SOUTH SIDE) DUMP AREA OF MUNSAR MINE(CGM(PR)/R-DUMP/14/MUN/17-18/11) 28-08-2017 05-09-2017 05-09-2017 05-09-2017 03:30 PM Active और देखें
76. PICKING AND COLLECTION OF MATL. FROM 220 FT. L EAST SIDE DUMP AREA OF MUNSAR MINE(CGM(PR)/R-DUMP/13/MUN/17-18/10) 28-08-2017 05-09-2017 05-09-2017 05-09-2017 03:30 PM Active और देखें
77. Hiring of Architect and structural consultant services for construction of New Training centre at Munsar Mine(MOIL/17-18/ET/ 143) 28-08-2017 03-10-2017 03-10-2017 03-10-2017 03:30 PM Active और देखें
78. Hiring of Architect and structural consultant services for construction of Water supply scheme at Gumgaon Mine.(MOIL/17-18/ET/ 145) 25-08-2017 28-09-2017 28-09-2017 28-09-2017 03:30 PM Active और देखें
79. Picking, collection and cleaning of 20 per Mn ore from various dump at Beldongri Mine(CGM(Prod)/43/BEL/17-18/25) 24-08-2017 29-08-2017 29-08-2017 29-08-2017 03:30 PM Active और देखें
80. Hiring of Architect for construction of various infrastructure at Kandri Mine.(MOIL/17-18/ET/130) 24-08-2017 28-09-2017 28-09-2017 28-09-2017 03:30 PM Active और देखें
81. WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SEAL KIT FOR HYDRAULIC CYLINDER(PUR/MOIL/C-11/118/E-25/437-M dt. 21/08/2017) 23-08-2017 20-09-2017 20-09-2017 20-09-2017 3:30 PM Active और देखें
82. Pneumatic Tyre Tube and Flaps and Solid Tyres(PUR/MOIL/C-13/18/WE-8 (MOIL/17-18/ET/192)) 23-08-2017 21-09-2017 21-09-2017 21-09-2017 03:30 PM Active और देखें
83. CLEANING OF SURPLUS UG ROM AT MUNSAR MINE(CGM(PR)/CL-ROM/19/MUN/17-18/7) 22-08-2017 28-08-2017 28-08-2017 28-08-2017 03:30 PM Active और देखें
84. Picking and collection of material from OCF (South Side) dump area of Munsar Mine(CGM(PR)/R-DUMP/17/MUN/17-18/6) 22-08-2017 28-08-2017 28-08-2017 28-08-2017 03:30 PM Active और देखें
85. UPGRADATION OF 586 MT OF (DB-1111) ORE BY WASHING AT DONGRI BUZURG MINE(CGM(PR)/R-DUMP/54/DB/17-18/9) 22-08-2017 29-08-2017 29-08-2017 29-08-2017 03:30 PM Active और देखें
86. Washing, picking and collection of material to recover Ferro Grade KD-2272 ore from dumps at Kandri Mine(CGM(PR)/R-DUMP/18/KAN/17-18/8) 22-08-2017 29-08-2017 29-08-2017 29-08-2017 03:30 PM Active और देखें
87. PURCHASE OF MANWINDING STEEL WIRE ROPE(WE-37 DT.22.08.2017(e-Tender No.MOIL/17-18/ET/191)) 22-08-2017 08-09-2017 08-09-2017 08-09-2017 03:30 PM Active और देखें
88. Modification work in existing 100 Ton Bunker of Vertical Shaft-I(UK/Mech/17-18/985 Dated 14/08/2017) 21-08-2017 30-08-2017 30-08-2017 30-08-2017 04:30 PM Active और देखें
89. Maintenance, Distribution and Collection of Cap Lamps at Gumgaon Mine(MOIL/17-18/ET/182) 21-08-2017 20-09-2017 20-09-2017 20-09-2017 03:30 PM Active और देखें
90. Water Supply Scheme for new A type colony at Munsar Mine(MOIL/17-18/ET/ 131) 21-08-2017 17-10-2017 17-10-2017 17-10-2017 03:30 PM Active और देखें
91. Purchase of Electro-Hydraulic Crawler Mounted, Single Boomer Drill Machine, Quantity - 2 Nos. for Chikla and Gumgaon Mine (Only Through e-procurement)(WE-40 DT.19/08/2017, eTENDER NO.MOIL/17-18/ET/189) 19-08-2017 21-09-2017 21-09-2017 21-09-2017 03:30 PM Active और देखें
92. Const of program Stage Near Durga Chowk at Ukwa Mine(MOIL/17-18/ET/138) 19-08-2017 21-09-2017 21-09-2017 21-09-2017 03:30 PM Active और देखें
93. Purchase of Crawler Mounted Hydrostatic Coring Drilling Rig - 1 No. (Only Through e-procurement)(WE-41 DT.19/08/2017, eTENDER NO.MOIL/17-18/ET/190) 19-08-2017 25-09-2017 25-09-2017 25-09-2017 03:30 PM Active और देखें
94. Strengthening, alteration and retrofitting of existing foundation for mounting higher capacity motor and gear box for Skip Winder holmes Shaft at Balaghat Mine (Civil Work)(Civil/BGT/T.E./17-18/3391-B) 18-08-2017 23-08-2017 23-08-2017 23-08-2017 04:30 PM Active और देखें
95. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTILATION FAN.(PUR/MOIL/C-5/32/E-12/305-M dt. 18/08/2017) 18-08-2017 11-09-2017 11-09-2017 11-09-2017 03:30 PM Active और देखें
96. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR RD-60 DRILL MACHINE and RD-395 WATER PUMP.(PUR/MOIL/C-5/49/E-07/266-M dt. 18/08/2017) 18-08-2017 11-09-2017 11-09-2017 11-09-2017 03:30 PM Active और देखें
97. Sinking of winzes from 60 ft Level to -70 ft Level of Chikla B Section at Chikla Mine(MOIL/17-18/ET/180) 18-08-2017 19-09-2017 19-09-2017 19-09-2017 03:30 PM Active और देखें
98. Fabrication of Steel Ore-passes and Manways for various Underground Mines(MOIL/17-18/ET/181) 18-08-2017 19-09-2017 19-09-2017 19-09-2017 03:30 PM Active और देखें
99. Sinking of new fan drift and allied development at Chikla Mine(MOIL/17-18/ET/179) 18-08-2017 19-09-2017 19-09-2017 19-09-2017 03:30 PM Active और देखें
100. Purchase of Assorted Size HT/LT Power Cables(WE-24 DT.18/08/2017(e-Tender No.MOIL/17-18/ET/187)) 18-08-2017 21-09-2017 21-09-2017 21-09-2017 03:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें