निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Loading and unloading of explosives for blasting at Tirodi Mine (GR.II/GM(M)/CONT/L and U EXP/19/TRD/2014-15/12) | 10-09-2014 | 19-09-2014 | 19-09-2014 | 19-09-2014 | 3:00 PM | Active | और देखें |
2. | Making of steaming,making and supply of mud plug of required size and quality at Gumgaon Mine excluding material cost. (Agent, Dy. GM (Mines)/Gr-III/GUM/Mining/14-15/808) | 08-09-2014 | 15-09-2014 | 16-09-2014 | 16-09-2014 | 4:30 PM | Active | और देखें |
3. | WEBSITE PROPRIETORY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHERS (PUR/MOIL/C-5/30/E-68/1250-M) | 06-09-2014 | 28-09-2014 | 29-09-2014 | 29-09-2014 | 3:30 pm | Active | और देखें |
4. | Annual Repair to Camp Quarters at Ukwa Mine. (CIVIL/HO/14-15/BGT/43 Dt- 05/09/2014) | 05-09-2014 | 15-09-2014 | 16-09-2014 | 16-09-2014 | 3:30 PM | Active | और देखें |
5. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STEEL BELLOW (PUR/MOIL/C-5/23/E-51/1236-M) | 05-09-2014 | 25-09-2014 | 26-09-2014 | 26-09-2014 | 3:30 PM | Active | और देखें |
6. | Picking and collection of SM grade 25 per. Mn ore (KDL-446) from dump through off the pit mining at Kandri Mine (GM(M)-III/CONT/28/DUMP/KAN/2014-15/27) | 03-09-2014 | 10-09-2014 | 11-09-2014 | 11-09-2014 | 3:00 PM | Active | और देखें |
7. | Renovation of Camp Quarters at Imlitekra and Hirapur Camp at Balaghat Mine. (CIVIL/HO/14-15/BGT/42 Dt- 03/09/2014) | 03-09-2014 | 11-09-2014 | 12-09-2014 | 12-09-2014 | 3:30 PM | Active | और देखें |
8. | WEBSITE PROPRIETORY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT MAKE WATER PUMP (PUR/MOIL/C-5/28/E-66/1211-M) | 02-09-2014 | 16-09-2014 | 17-09-2014 | 17-09-2014 | 3:30 PM | Active | और देखें |
9. | Construction of Tar Road ,retarring to approach road industrial and Township at Balaghat Mine. ( CIVIL/HO/14-15 /BGT/40 Dt-30/08/2014 ) | 30-08-2014 | 18-09-2014 | 19-09-2014 | 19-09-2014 | 3:30 PM | Active | और देखें |
10. | Pushing and unloading of ROM and rock tubs on surface at Beldongri Mine (GM(M)-III/CONT/Pushing-Tub/25/BEL/2014-15/26) | 28-08-2014 | 04-09-2014 | 05-09-2014 | 05-09-2014 | 3:00 PM | Active | और देखें |
11. | Mucking of Ore/Rock from Dorp raise at Munsar Mine (MUN/MIN/GM(M)III/Agent/14-15/746) | 28-08-2014 | 03-09-2014 | 05-09-2014 | 05-09-2014 | 4:30 PM | Active | और देखें |
12. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR BATTERY OPERATED LOCOMOTIVES (PUR/MOIL/C-5/44/E-64/1182-M) | 28-08-2014 | 18-09-2014 | 19-09-2014 | 19-09-2014 | 3:30 PM | Active | और देखें |
13. | WEBSITE PROPRIETORY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR AIR WINCH (PUR/MOIL/C-5/46/E-65/1183-M) | 28-08-2014 | 16-09-2014 | 17-09-2014 | 17-09-2014 | 3:30 PM | Active | और देखें |
14. | WE-43 Dt.28/08/2014 for Manwinding Steel Wire Rope. (WE-43 Dt.28/08/2014 (e-Tender No.MOIL/14-15/ET/35)) | 28-08-2014 | 23-09-2014 | 30-09-2014 | 30-09-2014 | 3:30 pm | Active | और देखें |
15. | PICKING AND COLLECTION OF UK-4445 AND UKL-448 FROM DUMPS AT GUDMA F/W AREA AT UKWA MINE (Gr.-I/GM(S AND E)/CONT/R-DUMP/13/UK/14-15/21) | 27-08-2014 | 03-09-2014 | 03-09-2014 | 03-09-2014 | 3:00 PM | Active | और देखें |
16. | Cleaning of Surplus ROM of O/C development to recover ferro Grade and LGHS Ore of Gudma Section of Ukwa Mine (Gr.-I/GM(S and E)/CONT/CL-ROM/28/UK/14-15/23) | 27-08-2014 | 03-09-2014 | 03-09-2014 | 03-09-2014 | 3:00 PM | Active | और देखें |
17. | Cleaning of Surplus ROM of O/c Development UK-4445 and UKL-448 Chitawar Section at Ukwa Mine (Gr.-I/GM(S and E)/CONT/CL-ROM/27/UK/14-15/22) | 27-08-2014 | 03-09-2014 | 03-09-2014 | 03-09-2014 | 3:00 PM | Active | और देखें |
18. | PICKING AND COLLECTION OF UK-4445 AND UKL-448 FROM DUMPS AT GUDMA F/W AREA AT UKWA MINE (Gr.-I/GM(S AND E)/CONT/R-DUMP/13/UK/14-15/21) | 27-08-2014 | 03-09-2014 | 03-09-2014 | 03-09-2014 | 3:00 PM | Active | और देखें |
19. | Cleaning of Surplus ROM of O/C development to recover ferro Grade and LGHS Ore of Gudma Section of Ukwa Mine (Gr.-I/GM(S and E)/CONT/CL-ROM/28/UK/14-15/23) | 27-08-2014 | 03-09-2014 | 03-09-2014 | 03-09-2014 | 3:00 PM | Active | और देखें |
20. | Cleaning of Surplus ROM of O/c Development UK-4445 and UKL-448 Chitawar Section at Ukwa Mine (Gr.-I/GM(S and E)/CONT/CL-ROM/27/UK/14-15/22) | 27-08-2014 | 03-09-2014 | 03-09-2014 | 03-09-2014 | 3:00 PM | Active | और देखें |
21. | Loading Unloading and transportation of hutch by mech. means at Balaghat Mine (Gr.-I/GM(S AND E)/CONT/LOADING/51/BGT/2014-15/20) | 27-08-2014 | 04-09-2014 | 04-09-2014 | 04-09-2014 | 3:00 PM | Active | और देखें |
22. | WEBSITE PROPRIETORY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DIAMOND DRILL MACHINE R.D. 60 (PUR/MOIL/C-5/49/E-63/1177-M) | 27-08-2014 | 14-09-2014 | 15-09-2014 | 15-09-2014 | 3:30 PM | Active | और देखें |
23. | PURCHASE OF WHEEL AND AXLE ASSEMBLY OF MINE TUB - 3 ITEMS (PUR/MOIL/12/14/WE-42/ET-34) | 27-08-2014 | 30-09-2014 | 09-10-2014 | 09-10-2014 | 3:30 PM | Active | और देखें |
24. | Loading of Slag at Ferro Manganese Plant, Balaghat Mine (Sr. Dy. G M (Mech)/FMP/14-15/02) | 26-08-2014 | 15-09-2014 | 17-09-2014 | 17-09-2014 | 3:30 PM | Active | और देखें |
25. | Pre Stressed Steel Wire Rope 44.2 MT (WE-41 Dt.26/08/14 (e-Tender No.MOIL/14-15/ET/33)) | 26-08-2014 | 23-09-2014 | 29-09-2014 | 29-09-2014 | 3:30 PM | Active | और देखें |
26. | Maintenance of plantation road divider from Anjuman sq. To MSEB Sq at Katol Road Nagpur Under MOIL CSR (CIVIL/HO/14-15/HO/ CSR/41 Dt- 20/08/2014) | 21-08-2014 | 27-08-2014 | 28-08-2014 | 28-08-2014 | 3:30 PM | Active | और देखें |
27. | PURCHASE OF FD FAN IMPELLER WITH HUB AND CASING (MAKE M/S CETHAR LIMITED, TIRUCHIRAPALLI, TAMILNADU), 1 NO. (AS PER ANNEXURE - A ENCLOSED) (PUR/MOIL/C-4/302/E-59/1141-M DT.20/08/2014) | 21-08-2014 | 09-09-2014 | 10-09-2014 | 10-09-2014 | 3:30 PM | Active | और देखें |
28. | PURCHASE OF OVERCOAT (KHAKI) WOOLEN AND RAINCOAT (RUBBER). (PUR/MOIL/C-12/15/E-60/1124-M) | 21-08-2014 | 11-09-2014 | 12-09-2014 | 12-09-2014 | 3:30 PM | Active | और देखें |
29. | Construction of RCC Wall with raft for existing old drain and sealing mouth of gateway at 2nd level at Balaghat Mine. (CIVIL/HO/14-15/BGT/39 Dated 18 /08/2014) | 19-08-2014 | 27-08-2014 | 28-08-2014 | 28-08-2014 | 3:30 PM | Active | और देखें |
30. | PURCHASE OF PRINTER CARTRIDGE FOR EPSON-FX-2175 PRINTER AND LIPI 6605 LINE MATRIX PRINTER. (PUR/MOIL/C-12/3/E-61/1125-M ) | 19-08-2014 | 09-09-2014 | 10-09-2014 | 10-09-2014 | 3:30 PM | Active | और देखें |
31. | Construction of foundation of Chimney and D.G. Set and construction of Panel room at Balaghat Mine. (CIVIL/HO/14-15/BGT/ 37 Dt- 13/08/2014) | 14-08-2014 | 21-08-2014 | 22-08-2014 | 22-08-2014 | 3:30 PM | Active | और देखें |
32. | Construction of foundation of Chimney and D.G. Set and Panel room at Ukwa Mine. (CIVIL/HO/14-15/UK/ 38 Dt- 13/08/2014) | 14-08-2014 | 21-08-2014 | 22-08-2014 | 22-08-2014 | 3:30 PM | Active | और देखें |
33. | PURCHASE OF HESSIAN CLOTH MADE FROM JUTE. (PUR/MOIL/C-1/231/E-55/1089-M ) | 14-08-2014 | 04-09-2014 | 05-09-2014 | 05-09-2014 | 3:30 PM | Active | और देखें |
34. | Exploratory core drilling of NQ size (47 mm, core diameter) at Nagpur District Prospecting License areas of MOIL Limited. (GM(Tech)/Tend/Expl/Core Drilling/PL/14-15/167) | 14-08-2014 | 15-09-2014 | 16-09-2014 | 16-09-2014 | 3:30 PM | Active | और देखें |
35. | PURCHASE OF LEATHER SHOES FOR SECURITY GUARDS PREFERABLY MILITARY PATTERN OR EQUIVALENT. (PUR/MOIL/C-1/185/E-56/1090-M ) | 14-08-2014 | 16-09-2014 | 17-09-2014 | 17-09-2014 | 3:30 PM | Active | और देखें |
36. | Annual repair to camp quarters at Dongri Buzurg Mine. (CIVIL/HO/14-15/DB/ 34 Dt- 12/08/2014) | 13-08-2014 | 26-08-2014 | 27-08-2014 | 27-08-2014 | 3:30 PM | Active | और देखें |
37. | Construction of Retaining wall along the road near Fagni dump at Dongri Buzurg Mine. (CIVIL/HO/14-15/DB/ 35 Dt- 12/08/2014) | 13-08-2014 | 26-08-2014 | 27-08-2014 | 27-08-2014 | 3:30 PM | Active | और देखें |
38. | Construction of Hume pipe culvert near Old weight bridge at Dongri Buzurg Mine. (CIVIL/HO/14-15/DB/ 36 Dt- 12/08/2014) | 13-08-2014 | 26-08-2014 | 27-08-2014 | 27-08-2014 | 3:30 PM | Active | और देखें |
39. | TITANIUM ANODE PLATES - 100 NOS. (Only Through e-procurement) (WE-37 DT.13/08/2014, e-TENDER NO.MOIL/14-15/ET/31) | 13-08-2014 | 16-09-2014 | 24-09-2014 | 24-09-2014 | 3:30 PM | Active | और देखें |
40. | ELECTRICALLY OPERATED SCREW AIR COMPRESSOR, CAPACITY APPROX. 200 CFM - 1 NO. (Only Through e-procurement) (WE-38 DT.13/08/2014, e-TENDER NO.MOIL/14-15/ET/32) | 13-08-2014 | 19-09-2014 | 26-09-2014 | 26-09-2014 | 3:30 PM | Active | और देखें |
41. | Transportation of sand from Balaghat Mine to Ukwa Mine (A and Sr Dy GM (M)/Mining/UM/14-15/1392) | 12-08-2014 | 25-08-2014 | 25-08-2014 | 25-08-2014 | 4:30 PM | Active | और देखें |
42. | Picking and collection of SM grade 25 per Mn ore (KDL-446) from dump through off the pit mining at Kandri Mine (GM(M)-III/CONT/28/DUMP/KAN/2014-15/25) | 12-08-2014 | 18-08-2014 | 19-08-2014 | 19-08-2014 | 3:00 pm | Active | और देखें |
43. | PURCHASE OF GYM EQUIPMENTS (PUR/MOIL/C-4/301/E-54/1070-M DT.08/08/2014) | 08-08-2014 | 21-08-2014 | 22-08-2014 | 22-08-2014 | 3:30 PM | Active | और देखें |
44. | Construction of Flexible pavement at Industrial premises at Gumgaon Mine (Civil/HO/14-15/GUM/33 Dt07/08/2014) | 08-08-2014 | 26-08-2014 | 28-08-2014 | 28-08-2014 | 3:30 PM | Active | और देखें |
45. | PURCHASE OF SALINE (PUR/MOIL/C-10/35/E-53/1040-M) | 08-08-2014 | 24-08-2014 | 25-08-2014 | 25-08-2014 | 3:30 PM | Active | और देखें |
46. | PURCHASE OF VACCINE (PUR/MOIL/C-10/35/E-52/1039-M ) | 08-08-2014 | 24-08-2014 | 25-08-2014 | 25-08-2014 | 3:30 pm | Active | और देखें |
47. | Renovation of Guest house and allied work required for Guest house at Tirodi Mine. (Civil/HO/14-15/TRD/32 Dt 07/08/2014) | 07-08-2014 | 26-08-2014 | 28-08-2014 | 28-08-2014 | 3:30 PM | Active | और देखें |
48. | Supply of black gitti for concreting at Gumgaon mine (GM(M)-III/CONT/29/Gitti/GUM/2014-15/23) | 07-08-2014 | 13-08-2014 | 14-09-2014 | 14-08-2014 | 3:00 PM | Active | और देखें |
49. | Concrete lining of west side shaft inset at -300 level at Gumgaon Mine (GM(M)-III/CONT/UG-DEV/30/GUM/2014-15/24) | 07-08-2014 | 13-08-2014 | 14-08-2014 | 14-08-2014 | 3:00 PM | Active | और देखें |
50. | Transportation of sand from Balaghat Mine to Ukwa Mine (Gr.-I/GM(S AND E)/CONT/SAND/54/UK/2014-15/19) | 04-08-2014 | 13-08-2014 | 13-08-2014 | 13-08-2014 | 3:00 PM | Active | और देखें |
51. | Cleaning of tram line at 12th Level North U/G Section at Balaghat Mine. (Agent DGM(M)/Mining/BGT/14-15/3879 Date. 28-07-14) | 02-08-2014 | 06-08-2014 | 06-08-2014 | 06-08-2014 | 4:30 PM | Active | और देखें |
52. | PURCHASE OF SPARES FOR TATA HITACHI ZAXIS 450H HYDRAULIC EXCAVATOR (PUR/MOIL/C-5/4/E-50/1005-M ) | 01-08-2014 | 12-08-2014 | 13-08-2014 | 13-08-2014 | 3:30 PM | Active | और देखें |
53. | REMOVAL OF WASTE DUMP AND HANDLING THE SAME BY MECHANISED MEANS AT CHIKLA MINE (Gr.II/GM(M)/CONT/OCD/15/CH/2014-15/11) | 01-08-2014 | 01-09-2014 | 02-09-2014 | 02-09-2014 | 3:00 PM | Active | और देखें |
54. | Maintenance of garden at MOIL training center at Munsar Mine. (Mun/C/HO/Agent/14-15) | 31-07-2014 | 08-08-2014 | 08-08-2014 | 08-08-2014 | 4:30 PM | Active | और देखें |
55. | Construction of Car Garage ( 2 Block of 4 Nos) in officers colony at Kandri Mine. (CIVIL/HO/14-15/KAN/31 Dt- 31/07/2014) | 31-07-2014 | 13-08-2014 | 14-08-2014 | 14-08-2014 | 3:30 PM | Active | और देखें |
56. | SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SDL AND LHD (PUR/MOIL/C-5/27/E-49/1003-M) | 31-07-2014 | 17-08-2014 | 18-08-2014 | 18-08-2014 | 3:30 PM | Active | और देखें |
57. | Breaking of Slag and other associated works at FMP, Balaghat Mine as per tender documents and as per scope of work. (Dy. G M (Mech)/FMP/2014-15/01) | 28-07-2014 | 20-08-2014 | 21-08-2014 | 21-08-2014 | 3:30 PM | Active | और देखें |
58. | Providing and Fixing fencing with RCC poles and Barbed wire to the plantation area at Chikla Mine, of MOIL Limited. (GM(S and E)/Affore./14-15/92) | 25-07-2014 | 02-08-2014 | 02-08-2014 | 02-08-2014 | 3:00 PM | Active | और देखें |
59. | Plantation programme of planting 5000 Nos. of plants at Chikla mine (GM(S and E)/Affore./14-15/91) | 25-07-2014 | 02-08-2014 | 02-08-2014 | 02-08-2014 | 3:00 PM | Active | और देखें |
60. | EMPLOYEES MOTIVATION SURVEY FOR MOIL LIMITED ( MOIL/HR/MoU/EMS/2014-15/01 ) | 24-07-2014 | 13-08-2014 | 13-08-2014 | 13-08-2014 | 4:00 PM | Active | और देखें |
61. | Plantation program of planting 5000 Nos. of plants at Dongri Buzurg Mine of MOIL Limited. (GM(S and E)/Affore./14-15/90) | 24-07-2014 | 02-08-2014 | 02-08-2014 | 02-08-2014 | 3:00 pm | Active | और देखें |
62. | Cleaning of surplus underground ROM at Beldongri Mine (GM(M)-III/CONT/03/CL-UG-ROM/BEL/2014-15/22) | 24-07-2014 | 25-08-2014 | 26-08-2014 | 26-08-2014 | 3:00 PM | Active | और देखें |
63. | In house maintenance of rest house at Gumgaon Mine (17/CIVIL/14-15/ GUM/1124 Date- 21/07/2014) | 23-07-2014 | 30-07-2014 | 31-07-2014 | 31-07-2014 | 3:30 PM | Active | और देखें |
64. | Fabrication of overhead platform for EOT Crane II and III at EMD Plant Dongri Buzurg Mine. (CIVIL/HO/14-15/DB/30 Dt- 22/07/2014) | 23-07-2014 | 05-08-2014 | 06-08-2014 | 06-08-2014 | 3:30 PM | Active | और देखें |
65. | Replacement of old damaged rotten G.I. sheet of neutralization section EMD Plant at Dongri Buzurg. Mine. (CIVIL/HO/14-15/DB/29 Dt- 22/07/2014) | 23-07-2014 | 05-08-2014 | 06-08-2014 | 06-08-2014 | 3:30 PM | Active | और देखें |
66. | construction of pump house near substation behind office and ukwa camp (16/Civil/UM/14-15/1217) | 22-07-2014 | 02-08-2014 | 02-08-2014 | 02-08-2014 | 4:30 pm | Active | और देखें |
67. | Picking and collection of Ferro Grade ore (MS-2472) and SM grade ore (MSL-447) from boulder dump at Munsar Mine (GM(M)-III/CONT/22/R-DUMP/MUN/2014-15/21) | 22-07-2014 | 30-08-2014 | 31-07-2014 | 31-07-2014 | 3:00 PM | Active | और देखें |
68. | PURCHASE OF PVC HELIFLEX SUCTION HOSE PIPE, GREEN COLOUR 20 MM. (PUR/MOIL/C-1/200/E-48/943-M ) | 21-07-2014 | 12-08-2014 | 13-08-2014 | 13-08-2014 | 3:30 PM | Active | और देखें |
69. | Breaking sizing and sorting of lumpy ore rock pieces from reject of vibrating screen plant trommel and rejected ROM to produce S. M. Grade 25 per Mn lump (MSL-447) ore at Munsar Mine (GM(M)-III/CONT/19/R-DUMP/MUN/2014-15/20) | 21-07-2014 | 27-07-2014 | 28-07-2014 | 28-07-2014 | 3:00 PM | Active | और देखें |
70. | Construction of RCC Wall with raft for existing old drain and sealing mouth of gateway at 2nd level at Balaghat Mine. (Civil//HO/14-15/BGT/28 Dt-18/07/2014) | 21-07-2014 | 28-07-2014 | 30-07-2014 | 30-07-2014 | 3:30 PM | Active | और देखें |
71. | Pushing and unloading of ROM and rock tubs on surface at Beldongri Mine (GM(M)-III/CONT/Pushing Tub/25/BEL/2014-15/18) | 18-07-2014 | 24-07-2014 | 25-07-2014 | 25-07-2014 | 3:00 PM | Active | और देखें |
72. | WEBSITE LIMITED TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF HIGH SPEED VALVELESS HAMMER AND 115 MM BUTTON BITS (PUR/MOIL/C-5/14/E-46/879-M) | 18-07-2014 | 05-08-2014 | 06-08-2014 | 06-08-2014 | 3:30 PM | Active | और देखें |
73. | Removal of waste rock and Manganiferrous rock and handling the same by mechanzied means at New Satuk section of Beldongri Mine. (GM(M)-III/CONT/OCD/45/BEL/2014-15/19) | 18-07-2014 | 18-08-2014 | 19-08-2014 | 19-08-2014 | 3:00 PM | Active | और देखें |
74. | PURCHASE OF RIBBED, TRANSPARENT P.V.C. FLEXIBLE PIPE - 12 MM (HARD QUALITY). (PUR/MOIL/C-1/200/E-47/917-M ) | 17-07-2014 | 07-08-2014 | 08-08-2014 | 08-08-2014 | 3:30 pm | Active | और देखें |
75. | Loading Unloading of steel and various material with stacking at NOS at Kandri Mine (KAN/NOS/A and DGM(M)/14-15/1304) | 17-07-2014 | 18-07-2014 | 18-07-2014 | 18-07-2014 | 4:30 pm | Active | और देखें |
76. | PICKING AND COLLECTION OF UKL-471 AT UKWA MINE (Gr.-I/GM(S and E)/CONT/R-DUMP/16/UK/14-15/18) | 16-07-2014 | 24-07-2014 | 24-07-2014 | 24-07-2014 | 3:00 PM | Active | और देखें |
77. | RATE CONTRACT FOR ONE YEAR FOR SUPPLY OF COMPRESSED OXYGEN GAS AND DISSOLVED ACETYLENE GAS (Only Through e-procurement) (WE-27 DT.16.07.2014, e-TENDER NO.MOIL/14-15/ET/30) | 16-07-2014 | 31-07-2014 | 06-08-2014 | 06-08-2014 | 3:30 PM | Active | और देखें |
78. | Removal of waste rock and Magniferrous rock and handling the same by mechanized means at Old Satuk section of Beldongri Mine (GM(M)-III/CONT/01/OCD/OLD-SATUK/BEL/2014-15/17) | 14-07-2014 | 11-08-2014 | 12-08-2014 | 12-08-2014 | 3:00 PM | Active | और देखें |
79. | RECOVERY OF SM GRADE BGL-462 25 PER CENT MN. CONTENT ORE FROM THE DUMP AT BALAGHAT MINE (Gr.-I/GM(S and E)/CONT/R-DUMP/15/BGT/2014-15/17) | 14-07-2014 | 13-08-2014 | 13-08-2014 | 13-08-2014 | 3:00 PM | Active | और देखें |
80. | PURCHASE OF SPARES FOR AIR LINE LUBRICATOR ASSY. (PUR/MOIL/C-11/128/E-42/832-M) | 14-07-2014 | 31-07-2014 | 01-08-2014 | 01-08-2014 | 3:30 PM | Active | और देखें |
81. | PURCHASE OF SINGLE SOLENOID VALVE AND SOLENOID COIL (PUR/MOIL/C-11/131/E-43/835-M) | 14-07-2014 | 29-07-2014 | 30-07-2014 | 30-07-2014 | 3:30 PM | Active | और देखें |
82. | PURCHASE OF SPARES OF BLOWER (PUR/MOIL/C-11/151/E-44/836-M) | 14-07-2014 | 29-07-2014 | 30-07-2014 | 30-07-2014 | 3:30 PM | Active | और देखें |
83. | Annual Repairs to Camp Quarters at Balaghat Mine (CIVIL/HO/14-15/H/27 Dt-10/07/2014) | 11-07-2014 | 24-07-2014 | 25-07-2014 | 25-07-2014 | 3:30 pm | Active | और देखें |
84. | PURCHASE OF MILD STEEL RUBBER LINED CELL TANKS - 4 NOS. (AS PER ANNEXURE - A ENCLOSED). (PUR/MOIL/C-4/108/E-45/839-M) | 11-07-2014 | 05-08-2014 | 06-08-2014 | 06-08-2014 | 3:30 pm | Active | और देखें |
85. | Const. of Tar Road Retarring to approach Road industrial and Township at Balaghat Mine (CIVIL/HO/14-15/BGT/23 DT-10/07/2014) | 11-07-2014 | 12-08-2014 | 19-08-2014 | 19-08-2014 | 3:30 pm | Active | और देखें |
86. | e-procurement of Tramline Accessories -8 items (WE-26 Dt.11/07/14 e -Tender No. MOIL/14-15/ET-29) | 11-07-2014 | 12-08-2014 | 19-08-2014 | 19-08-2014 | 3:30 pm | Active | और देखें |
87. | Underground concreting work at minus 250L and minus 350L at Kandri Mine (GM(M)-III/CONT/15/UG-Concret/KAN/2014-15/15) | 10-07-2014 | 07-08-2014 | 08-08-2014 | 08-08-2014 | 3:00 PM | Active | और देखें |
88. | Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine (GM(M)-III/CONT/23/Pushing Tubs/GUM/2014-15/16) | 09-07-2014 | 15-07-2014 | 16-07-2014 | 16-07-2014 | 3:30 PM | Active | और देखें |
89. | PURCHASE OF SYRINGE, NEEDLE, IV SET ETC. (PUR/MOIL/C-10/35/E-41/791-M) | 09-07-2014 | 24-07-2014 | 25-07-2014 | 25-07-2014 | 3:30 PM | Active | और देखें |
90. | e-procurement of Conveyor Belts -6 items (WE-22 Dt.08/07/14 e -Tender No. MOIL/14-15/ET-28) | 08-07-2014 | 07-08-2014 | 14-08-2014 | 14-08-2014 | 3:30 PM | Active | और देखें |
91. | Reduction of Manganese Ore on Conversion Basis for EMD Plant, Dongri Buzurg Mine. ( E-Tender/EMD/RO/01 ) | 05-07-2014 | 15-07-2014 | 15-07-2014 | 15-07-2014 | 3:30 PM | Active | और देखें |
92. | LEAD CATHODE PLATES - 150 NOS. (Only Through e-procurement) (WE-25 DT.02/07/2014, e-TENDER NO.MOIL/14-15/ET/27) | 03-07-2014 | 06-08-2014 | 12-08-2014 | 12-08-2014 | 3:30 PM | Active | और देखें |
93. | Picking and collection of SM grade ore (MSl-447 and MSL-498) at various dumps at Munsar Mine (GM(M)-III/CONT/18/R-DUMP/MUN/2014-15/14) | 02-07-2014 | 08-07-2014 | 09-07-2014 | 09-07-2014 | 3:00 pm | Active | और देखें |
94. | Underground Development work at 370 feet Level of vertical section at Chikla Mine (GR.-II/GM(M)/CONT/UG-DEV/1/CH/2014-15/10) | 02-07-2014 | 11-07-2014 | 11-07-2014 | 11-07-2014 | 3:00 PM | Active | और देखें |
95. | Supply of black gitti for concreting at Kandri Mine (GM(M)-III/CONT/17/GITTI/KAN/2014-15/13) | 01-07-2014 | 08-07-2014 | 09-07-2014 | 09-07-2014 | 3:00 PM | Active | और देखें |
96. | Annual repairing to camp colony at Gumgaon Mine (CIVIL/HO/14-15/GUM/24 Dt-01/07/2014) | 01-07-2014 | 15-07-2014 | 16-07-2014 | 16-07-2014 | 3:30 PM | Active | और देखें |
97. | Drilling of 03 No. bore holes for sand stowing plant at 2650Ch at Munsar Mine (CIVIL/HO/14-15/MUN/25 Dt- 01/07/2014) | 01-07-2014 | 15-07-2014 | 16-07-2014 | 16-07-2014 | 3:30 PM | Active | और देखें |
98. | White wash / colour wash and distempering to Residential quarters at Dongri Buzurg. Mine. (CIVIL/HO/14-15/DB/26 Dt- 30/06/2014) | 01-07-2014 | 17-08-2014 | 18-07-2014 | 18-07-2014 | 3:30 PM | Active | और देखें |
99. | Construction of Temporary Pump house and foundation at O/C with pipeline at Kandri Mine (Kan/C/ADGM(M)/14-15/46 Dt- 30/06/2014) | 30-06-2014 | 06-07-2014 | 07-07-2014 | 07-07-2014 | 4:30 PM | Active | और देखें |
100. | Cleaning of Surface drains U/G Sump and Misc. repair work at Kandri Mine (Kan/C/ADGM(M)/14-15/47 Dt-30/06/2014) | 30-06-2014 | 06-07-2014 | 07-07-2014 | 07-07-2014 | 4:30 PM | Active | और देखें |
निविदाएं अधिक जानकारी |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
(2024) वर्ष के निविदाएं देखें |
(2023) वर्ष के निविदाएं देखें |
(2022) वर्ष के निविदाएं देखें |
(2021) वर्ष के निविदाएं देखें |
(2020) वर्ष के निविदाएं देखें |
(2019) वर्ष के निविदाएं देखें |
(2018) वर्ष के निविदाएं देखें |
(2017) वर्ष के निविदाएं देखें |
(2016) वर्ष के निविदाएं देखें |
(2015) वर्ष के निविदाएं देखें |
(2014) वर्ष के निविदाएं देखें |
(2013) वर्ष के निविदाएं देखें |
(2012) वर्ष के निविदाएं देखें |
(24) वर्ष के निविदाएं देखें |
पूर्ण निविदा पुरालेख देखें |
सभी मॉयल निविदाएं देखें |