1. Additional excavation in manganiferous rock for concreting of cross cut, manways and ore pass etc. in underground at Munsar Mine(MOIL/17-18/ET/31) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active और देखें
2. Underground concreting work at Balaghat Mine(MOIL/17-18/ET/29) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active और देखें
3. Picking and collection of material from 6 No. dumps at Sitapatore Mine(MOIL/17-18/ET/34) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active और देखें
4. Obtaining Environmental Clearance for enhancement in production capacity from 90,000 MTPA to 2,00,000 MTPA by underground method of mining of Gumgaon manganese mine over an area of 85.896 Hec(MOIL/17-18/ET/37) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active और देखें
5. Obtaining Environmental Clearance for enhancement in production capacity from 1,80,000 MTPA to 3,00,000 MTPA of Chikla manganese mine over an area of 150.65 Hec.(MOIL/17-18/ET/36) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active और देखें
6. Cleaning of surplus underground ROM at Munsar Mine(MOIL/17-18/ET/28) 05-05-2017 07-06-2017 07-06-2017 07-06-2017 03:30 PM Active और देखें
7. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(MOIL/17-18/ET/32) 05-05-2017 16-06-2017 16-06-2017 16-06-2017 03:30 PM Active और देखें
8. Interior Renovation Works for Integrated Manganese Plant I/C Office, adjoining Electrical Panel Control Room and Supervisors Room at Balaghat Mine.(Civil/BGT/TE/2017-18/742 Date 28.04.2017) 03-05-2017 08-05-2017 08-05-2017 08-05-2017 04:30 PM Active और देखें
9. Interior Renovation Works for Agent Bungalow at Balaghat Mine(Civil/BGT/TE/2017-18/736 Date 28.04.2017) 03-05-2017 08-05-2017 08-05-2017 08-05-2017 04:30 PM Active और देखें
10. Drilling of 2 Nos. Bore holes for Drinking Water supply at Kandri Mine(KAN/Civil/HO/MM/17-18/321 Date 02/05/2017) 03-05-2017 17-05-2017 17-05-2017 17-05-2017 03:30 PM Active और देखें
11. Picking and sorting of 3rd grade lump and 25 percent Sm grade lump from dump ROM at Kandri Mine(KAN/Mine/HO/Agent/17-18/314 Date 01.05.20) 03-05-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
12. Relining and Repairing of Electrolytic Cell tanks(MOIL/EMD/CH/ADGM/2017-18/1176) 02-05-2017 12-05-2017 12-05-2017 12-05-2017 04:30 PM Active और देखें
13. Purchase of Siemens make spares for Ukwa Mine(UK/ELECT/2017-18/193) 02-05-2017 17-05-2017 17-05-2017 17-05-2017 04:00 PM Active और देखें
14. Construction of a Water Tank (GSR) of 1.00 Lac Cumt. Capacity near Sand Stowing Plant at Kandri Mine(MOIL/ET/17-18/24) 02-05-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
15. Repair of Shed and replacement of old damaged sheets at rear side near Kitchen of Guest House at West Court, MOIL, Nagpur.(Civil /HO/17-18/HO /14 Dated 25/04/2017) 29-04-2017 17-05-2017 17-05-2017 17-05-2017 03:30 PM Active और देखें
16. STRUCTURE STABILITY TEST ALONG WITH DESIGNING AND PREPARATION OF DRAWING AND DETAILED ESTIMATION OF COST OF MODIFICATION WORKS REQUIRED FOR STRENGTHENING OF HEAD GEAR OF HOLMES SHAFT BALAGHAT MINE FOR CHANGING OF LOCKED COIL WINDING ROPE FROM 32 MM(/BGT/M 28-04-2017 10-05-2017 10-05-2017 10-05-2017 04:30 PM Active और देखें
17. Refilling and maintenance of fire equipment and fire extinguishers(SDGM(M)63/Fire Extinguisher/17-18/06 dt.27.4.2017) 28-04-2017 09-05-2017 09-05-2017 09-05-2017 03:00 PM Active और देखें
18. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Dongri buzurg Mine.(MOIL/17-18/ET/22) 26-04-2017 25-04-2017 25-04-2017 25-04-2017 03:30 PM Active और देखें
19. Recovery of dump fines (GMF-527) from dumps at Gumgaon Mine(Min/Gum/17-18/180 Date 25.04.2017) 26-04-2017 03-05-2017 03-05-2017 03-05-2017 04:30 PM Active और देखें
20. Providing and Applying white washing distempering and grass cleaning etc.(Agent/Civil/DB/2016-17/3525 Date 15 .03.2017) 26-04-2017 04-05-2017 04-05-2017 04-05-2017 04:30 PM Active और देखें
21. Construction of Boundary wall by Precast Pre stressed Concrete Panels at Ukwa Mine.(MOIL/17-18/ET/21) 26-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active और देखें
22. Construction of Boundary wall area at Gumgaon Mine(MOIL/17-18/ET/ 23) 26-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active और देखें
23. Recertification of Kandri, Chikla,Tirodi and Ukwa mines under OHSAS(SDGM(SE)/Re-Cert-OHSAS/17-18/05 dt.24-04-2017) 25-04-2017 08-05-2017 08-05-2017 08-05-2017 03:00 PM Active और देखें
24. Recertification of Kandri,Chikla Tirodi and Ukwa mines under OHSAS.(SDGM(SE)/Re-Cert-OHSAS/17-18/05 dt.24-04-2017) 25-04-2017 08-05-2017 08-05-2017 08-05-2017 03:00 PM Active और देखें
25. RETILING AND REROOFING OF CAMP QUARTERS AT KANDRI MINE(KAN/CIVIL/17-18/15 DT. 24.04.2017) 25-04-2017 03-05-2017 03-05-2017 03-05-2017 03:30 PM Active और देखें
26. Cleaning of Storm Water drains, U/G Sump and misc. repair at Kandri Mine. (KAN/CIVIL/17-18/16 DT 24.04.2017) 25-04-2017 03-05-2017 03-05-2017 03-05-2017 3:30 pm Active और देखें
27. Pushing and unloading of ROM rock tubs in underground and on surface AT GUMGAON MINE(Mining/Gum/17-18/154 Date 21.04.2017) 22-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active और देखें
28. Additional excavation in Maganeferous rock adjacent X cut no19 to X cut no 21 at 200 ft L at Gumgaon Mine.(Mining/Gum/17-18/155 Date 21.04.2017) 22-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active और देखें
29. Construction of lease boundary pillars at Gumgaon Mine (CIVIL/17-18/GUM/156 Date-21.04.2017) 22-04-2017 29-04-2017 29-04-2017 29-04-2017 4:30 pm Active और देखें
30. Construction of retaining wall near new Evasee fan house at Gumgaon Mine (CIVIL/17-18/GUM/157 Date-21.04.2017) 22-04-2017 29-04-2017 29-04-2017 29-04-2017 4:30 pm Active और देखें
31. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200L at Gumgaon Mine(Min/Gum/17-18/141 Date-20.04.2017) 21-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
32. Drilling of 57 mm dia drill holes for installing cable bolts in Magneferous rock at -200L at Gumgaon Mine(Min/Gum/17-18/141 Date-20.04.2017) 21-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
33. Trench cutting in ore stacks for sampling at Chikla Mine(Gr.II/GM(M)/CONT/Trench-cut/83/CH/2017-18/2) 21-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active और देखें
34. Strengthening and construction of RCC Side walls for Railway Siding at Balaghat Mine(MOIL/17-18/ET/14) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
35. Construction of Drain Motor garage Black smith Shop near workshop and construction of Shed and Cycle Stand near Vertical Shaft at Ukwa Mine.(MOIL/17-18/ET/13) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
36. Maintenance and Operation of Water Supply Scheme Dongri Bz. Mine(MOIL/17-18/ET/15) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
37. Construction of tar road from main PWD road to MOIL Rest house, MOIL gate no.1 to PWD road and mine and bungalow no.2 towards Jamrapani staff quarter at Tirodi Mine.(MOIL/17-18/ET/16) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
38. Construction of substation building at Dongri Bz. Mine(MOIL/17-18/ET/20) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
39. Construction of Railway Siding Platform at Chikla Mine(MOIL/17-18/ET/11) 21-04-2017 19-05-2017 19-05-2017 19-05-2017 03:30 PM Active और देखें
40. Renovation of Office of Electrical Department and Cap Lamp Room and construction of shed for storage purpose at 6 th level premises at Balaghat Mine.(Civil /HO/17-18/BGT /09 Dated 18/04/2017) 20-04-2017 18-05-2017 18-05-2017 18-05-2017 03:30 PM Active और देखें
41. Removal of waste rock and handling the same by mechanized means from Magazine dump at Gumgaon Mine(MOIL/17-18/ET/17) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active और देखें
42. Picking and collection of material from dumps at Munsar Mine(MOIL/17-18/ET/19) 20-04-2017 22-05-2017 22-05-2017 22-05-2017 03:30 PM Active और देखें
43. Removal of waste rock and magniferous rock and handling the same by mechanized means from Pit No.5 at Sitapatore Mine(MOIL/17-18/ET/18) 20-04-2017 25-05-2017 25-05-2017 25-05-2017 03:30 PM Active और देखें
44. Picking and Collection of Material from East Side of A Dump at Tirodi Mine(TRD/Mine/HO/2017-18/158) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
45. Picking and Collection of Material from Off The Pit area at Dump at Tirodi Mine(TRD/Mine/HO/2017-18/157) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
46. Picking and Collection of Material from North Dump at Tirodi Mine(TRD/Mine/HO/2017-18/156) 19-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
47. Providing and Laying epoxy flooring for Work Shop at Munsar Mine.(Mun/C/HO/Agent/17-18/64 dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active और देखें
48. Providing and Fitting PVC over head water tank at 20 No. A type Quarter in Wahitola at Munsar Mine.(Mun/C/HO/Agent/17-18/63 Dt 19/04/2017) 19-04-2017 28-04-2017 28-04-2017 28-04-2017 04:30 PM Active और देखें
49. PURCHASE OF HSD-3882 KL (AS PER ANNEXURE - A ENCLOSED).(E-3 DT.19.04.2017) 19-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
50. Cleaning of Surplus underground ROM at Munsar Mine.(Mun/Mine/HO/Agent/17-18/59 dt18/04/2017) 18-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active और देखें
51. Construction of Barbed wire fencing at near 6 No North Section Tirodi Mine.(TRD/Civil/A/2017-18/133) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 04:30 PM Active और देखें
52. Transportation of Sand for sand stowing at Balaghat Mine(Gr.-I/CGM(PR)/CONT/SAND/02/BGT/2017-18/02) 18-04-2017 26-04-2017 26-04-2017 26-04-2017 05:00 PM Active और देखें
53. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
54. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
55. Waterproofing Works by means of laying torchshield over roof of Administrative Building including allied civil works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/390 Date 13.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
56. Construction of RCC Water Sump beside Slime Pond and Fencing Works for the front garden of Integrated Manganese Beneficiation Plant, IMB Balaghat Mine(CIVIL/BGT/T.E./2017-18/387 Date 16.04.2017) 18-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
57. Replacement of old damaged and worn out steel doors and windows with new steel doors and windows for Camp Quarters of Balaghat Mine.(CIVIL/BGT/T.E./2017-18/304 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
58. Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine(CIVIL/BGT/T.E./2017-18/307 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
59. Repair to roof of labour and staff quarter of New Colony, F.M.Colony, Chikla Type Quarters, Imlitekra Camp, Hirapur Camp, Awlajhari Camp under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/298 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
60. Cleaning of surface drains under Monsoon Preparatory Works at Balaghat Mine(CIVIL/BGT/T.E./2017-18/301 Date 13.04.2017) 13-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
61. Trench cutting in ore Stacks at Beldongri Mine.(bel/trench cut/sampling/17-18/103) 13-04-2017 25-04-2017 25-04-2017 25-04-2017 04:30 PM Active और देखें
62. Annual Repair to camp quarters at Chikla Mine.(Civil /HO/17-18 /CH/01 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
63. Picking and sorting of SM grade ore from dumps at Kandri Mine(MOIL/17-18/ET/10) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
64. Construction of vehicle maintenance pit at work shop premises at Chikla Mine.(Civil /HO/17-18 /CH/02 Dated 12/04/2017) 13-04-2017 12-05-2017 12-05-2017 12-05-2017 03:30 PM Active और देखें
65. Disposal of Sludge at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/04) 13-04-2017 05-05-2017 04-05-2017 04-05-2017 03:30 PM Active और देखें
66. U/G Sump Cleaning of Ukwa Mine (i) Vertical shaft U/G Section (ii) Ch 50 U/G Section.(A and Sr DGM(M)/Civil/UM/17-18/72) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
67. Construction of OCF Shed at Beldongri Mine.(Bel/Civil//Mine/AGT/17-18/90) 12-04-2017 24-04-2017 24-04-2017 24-04-2017 04:30 PM Active और देखें
68. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
69. Maintenance and operation of water supply scheme at Ukwa Mine(A and Sr DGM(M)/Civil/UM/17-18/75) 12-04-2017 27-04-2017 27-04-2017 27-04-2017 04:30 PM Active और देखें
70. 550 H.P., 1000 RPM, LAMINATED YOKE, SHUNT WOUND, D.C. MOTOR-1 NO. (FOR DOUBLE DRUM WINDER OF BALAGHAT MINE) (AS PER ANNEXURE - C ENCLOSED)(Only Through e-procurement)(WE-123 DT.24/03/2017, eTENDER NO.MOIL/17-18/ET/5) 12-04-2017 28-04-2017 28-04-2017 28-04-2017 03:30 PM Active और देखें
71. Cleaning of Sump in Underground at Balaghat Mine.(Agent Dy DGM/Mining/BGT/17-18/52 Dt 03.04.2017) 11-04-2017 14-04-2017 14-04-2017 14-04-2017 04:30 PM Active और देखें
72. Providing and Supplying of On Road DC Motor Speed Controller (DC Chopper) 550Amps, (72 to 120) Volts probably Curtis make of model 1231C 7701 or equivalent to for Gumgaon mine ( GM/Elect/TE/17-18/52,Dtd - 10.04.2017 ) 11-04-2017 24-04-2017 24-04-2017 24-04-2017 3:30 PM Active और देखें
73. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active और देखें
74. Replacement of transfer chute liners bunker liners And chutes bunker repair at IMB plant Balaghat mine (BGT/MECH/IMBP/17-18/170) 10-04-2017 27-04-2017 27-04-2017 27-04-2017 4:30 PM Active और देखें
75. Replacement of existing 3 phase, 5 wire, LT Overhead Line erected from IMB plant to tale end pond at Dongri Buzurg Mine.(DB/ELECT/17-18/1085) 07-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active और देखें
76. Construction of gantry for U/G development waste rock disposal near BDC at Kandri Mine.(KAN/CIVIL/17-18/02 DT.05.04.2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active और देखें
77. Maintenance,watch ward of Garden in front of administrative building,Rest House, type B C quarters,M.M.Bungalow, Hospital,near Hanuman Mandir (Type A qtrs) garden at Kandri.(KAN/CIVIL/17-18/01 DT. 05/04/2017) 07-04-2017 15-04-2017 15-04-2017 15-04-2017 03:30 PM Active और देखें
78. Removal of accumulated Pebbles near sand stowing plants at Balaghat Mine(Gr.-I/CGM(PR)/CONT/PEBBLES/34/BGT/2017-18/01) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active और देखें
79. Pushing of tubs and unloading in Underground at Chikla Mine(Gr.II/CGM/CONT/TUB/81/CH/2017-18/1) 07-04-2017 18-04-2017 18-04-2017 18-04-2017 03:30 PM Active और देखें
80. PARAFFIN WAX(PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 02-05-2017 02-05-2017 02-05-2017 03:30 PM Active और देखें
81. PARAFFIN WAX (PUR/MOIL/C-11/5/WE-1 (MOIL/17-18/ET/9)) 07-04-2017 11-05-2017 11-05-2017 11-05-2017 3:30 PM Active और देखें
82. Replacement of conductor and cable of 3 phase, 3 wire, 11 KV HT Overhead Line from main electrical substation to IMB Plant at Dongri Buzurg Mine.(DB/ELECT/17-18/1084) 06-04-2017 11-04-2017 11-04-2017 11-04-2017 04:35 PM Active और देखें
83. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
84. Making of Road from Manoj Trivedi dump to 9 No. near Jamrapani development area at Tirodi Mine.(TRD/Civil/A/2016-17/3751A) 04-04-2017 12-04-2017 12-04-2017 12-04-2017 04:30 PM Active और देखें
85. Drilling of Bore holes with Submersible pump at Kesri Camp at Chikla mine(CH/CIVIL/16-17/1053 dated 25/03/2017) 04-04-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
86. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active और देखें
87. Transporting, Shifting of accumulated gitti at fill pass at Ch.3200 7th Level U/G to other cross cuts at Balaghat Mine(Agent Sr.DGM(M)/Mining/BGT/2016-17/8940 Dt 30.03.1) 03-04-2017 10-04-2017 10-04-2017 10-04-2017 04:00 PM Active और देखें
88. Miscellaneous Contract works namely Cleaning of Leaching Vessels Stripping of EMD Flakes and Removing Bottom of EMD at EMD Plant, Dongri Buzurg Mine(CGM (P and D)/EMD/17-18/03) 03-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active और देखें
89. Miscellaneous Contract works at EMD Plant, Dongri Buzurg Mine.(CGM (P and D)/EMD/17-18/02) 03-04-2017 24-04-2017 24-04-2017 24-04-2017 03:30 PM Active और देखें
90. Washing and Neutralization of Sludge at EMD Plant, Dongri Buzurg Mine.(CGM (P and D)/EMD/17-18/01) 01-04-2017 20-04-2017 20-04-2017 20-04-2017 03:30 PM Active और देखें
91. Cleaning of Sump at Ch. 9500 and Ch. 10800 U/G Section of Ukwa Mine(Gr.-I/CGM(PR)/CONT/UG-SUMP/35/UK/2016-17/17) 31-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
92. Cleaning of Sump at Ch. 9500 and Ch. 10800 U/G Section of Ukwa Mine(Gr.-I/CGM(PR)/CONT/UG-SUMP/35/UK/2016-17/17) 31-03-2017 10-04-2017 10-04-2017 10-04-2017 03:30 PM Active और देखें
93. Cleaning of surplus opencast ROM at Kandri Mine(GM(M)-III/CONT/ROM-CL/58/KAN/2016-17/56) 30-03-2017 07-04-2017 07-04-2017 07-04-2017 03:30 PM Active और देखें
94. Maintenance of Garden in Mine Office and Mine Manager Bungalow at Beldongri Mine(Bel/Mine/Civil/AGT/16-17/3468) 30-03-2017 05-04-2017 05-04-2017 05-04-2017 04:30 PM Active और देखें
95. Design and Detail Engineering ,supply Fabrication,Erection ang Commisioining,Testing of water softener at EMD PLANT Dongri Buzurg Mine(MOIL/EMD/CH/ADGM/2016-17/1063) 29-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें
96. Maintenance and operation of Water Filtration Plant and Water Supply Scheme at Tirodi Mine(TRD/Civil/A/2016-17/1045) 28-03-2017 07-04-2017 07-04-2017 07-04-2017 04:30 PM Active और देखें
97. Installation of LED Lights in place of Metal Halide Lamps at Badminton Court, West Court, MOIL Ltd. Nagpur(SDGM(E)/86/ HO/16-17/ 346) 24-03-2017 12-04-2017 12-04-2017 12-04-2017 03:30 PM Active और देखें
98. Supply of Drenging Submersible Pump With agitator and other attachment for Cleaning of underground Sump of Balaghat Mine (SDGM/BGT/MECH/PUMP/16-17/8750) 23-03-2017 30-03-2017 30-03-2017 30-03-2017 4:30 PM Active और देखें
99. purchase of Flexible Trailing Copper Conductor Cable 1200 Mtrs. (WE-122 (e-tender no. MOIL/17-18/ET/4)) 23-03-2017 19-04-2017 19-04-2017 19-04-2017 3:30 PM Active और देखें
100. Water Proofing to RCC Slabs Quarters/Repairs to roof of Labor and staff and executive quarter Ukwa ,Gudma and Prem Nagar camp at Ukwa Mine.(A and Sr DGM(M)/Civil/UM/16-17/3536) 22-03-2017 08-04-2017 08-04-2017 08-04-2017 04:30 PM Active और देखें

निविदाएं अधिक जानकारी

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

(2204) वर्ष के निविदाएं देखें
(2024) वर्ष के निविदाएं देखें
(2023) वर्ष के निविदाएं देखें
(2022) वर्ष के निविदाएं देखें
(2021) वर्ष के निविदाएं देखें
(2020) वर्ष के निविदाएं देखें
(2019) वर्ष के निविदाएं देखें
(2018) वर्ष के निविदाएं देखें
(2017) वर्ष के निविदाएं देखें
(2016) वर्ष के निविदाएं देखें
(2015) वर्ष के निविदाएं देखें
(2014) वर्ष के निविदाएं देखें
(2013) वर्ष के निविदाएं देखें
(2012) वर्ष के निविदाएं देखें
(24) वर्ष के निविदाएं देखें
पूर्ण निविदा पुरालेख देखें
सभी मॉयल निविदाएं देखें