निविदाएं संग्रह
क्रमांक | शीर्षक | अंक प्रारंभ दिनांक | अंक अंतिम तिथी | प्रस्तुत करने की अंतिम तिथि | खुलने की तिथि | खुलने का समय | स्थिति | और देखें |
---|---|---|---|---|---|---|---|---|
1. | Trench cutting in ore stacks for sampling at Tirodi Mine | 01-06-2013 | 11-06-2013 | 11-06-2013 | 11-06-2013 | 3:00PM | Active | और देखें |
2. | Recovery of 4th grade small ore by washing and picking from East of D dump at Tirodi Mine | 01-06-2013 | 11-06-2013 | 11-06-2013 | 11-06-2013 | 3:00PM | Active | और देखें |
3. | Purchase of TCT Drill Rods | 01-06-2013 | 10-07-2013 | 11-07-2013 | 11-07-2013 | 3:30PM | Active | और देखें |
4. | PURCHASE OF HDPE PIPES, BENDS AND PIPE ENDS (PUR/MOIL/C-1/199/WE-13) | 01-06-2013 | 29-07-2013 | 30-07-2013 | 30-07-2013 | 3.30 PM | Active | और देखें |
5. | NEW FLAT BOTTOM RAILWAY RAILS, 90 LBS 45 KG MTRS | 31-05-2013 | 08-07-2013 | 09-07-2013 | 09-07-2013 | 3.30 PM | Active | और देखें |
6. | PROVIDING AND APPLYING DISTEMPERING IN WEST COURT HOUSE | 30-05-2013 | 06-06-2013 | 07-06-2013 | 07-06-2013 | 3.00 PM | Active | और देखें |
7. | PURCHASE OF SPARES FOR HYDRAULIC FILTER PRESS | 30-05-2013 | 20-06-2013 | 21-06-2013 | 21-06-2013 | 3.30 PM | Active | और देखें |
8. | PURCHASE OF OLDHAM 102 TYPE MAKE CAP LAMP ETC | 29-05-2013 | 13-06-2013 | 14-06-2013 | 14-06-2013 | 3.00 PM | Active | और देखें |
9. | PURCHASE OF SEAL KIT FOR HYDRAULIC CYLINDER | 28-05-2013 | 16-06-2013 | 17-06-2013 | 17-06-2013 | 3.00 PM | Active | और देखें |
10. | Recovery of LGHS Lumpy Ore from North dump at Tirodi Mine | 27-05-2013 | 05-06-2013 | 05-06-2013 | 05-06-2013 | 3.00 pm | Active | और देखें |
11. | REMOVAL OF WASTE DUMP AND HANDLING, TIRODI MINE | 27-05-2013 | 05-06-2013 | 05-06-2013 | 05-06-2013 | 3.00 PM | Active | और देखें |
12. | PURCHASE OF PEARL COKE | 27-05-2013 | 27-06-2013 | 04-07-2013 | 04-07-2013 | 3:30PM | Active | और देखें |
13. | PURCHASE OF MULTIFILAMENT FILTER CLOTH | 24-05-2013 | 13-06-2013 | 14-06-2013 | 14-06-2013 | 3:30PM | Active | और देखें |
14. | Providing and Planting 4000 No. Tree Plantation in MSRPF compus at Hingna Nagpur. | 23-05-2013 | 29-05-2013 | 30-05-2013 | 30-05-2013 | 3:30PM | Active | और देखें |
15. | HUTCH DRAIN CLEANING OF JIG SECTION OF OCF AT BALAGHAT MINE | 23-05-2013 | 31-05-2013 | 31-05-2013 | 31-05-2013 | 3:00PM | Active | और देखें |
16. | Recovery of SM Grade ore from North Side of Viraswami dump at Tirodi Mine. | 22-05-2013 | 31-05-2013 | 31-05-2013 | 31-05-2013 | 3:00PM | Active | और देखें |
17. | Breaking, sizing and sorting of lumpy ore, S. M. Gr. 25 per Mn MSL-447 at Munsar Mine | 21-05-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 4:30 PM | Active | और देखें |
18. | Screening, picking, collection and stacking of 25 per Mn small ore MSL-498 through trommel at Munsar Mine from Pandadia Dump. | 21-05-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 4:30PM | Active | और देखें |
19. | Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine | 20-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:00PM | Active | और देखें |
20. | Purchase of Cement 43 Grade OPC Equivalent PPC conforming to IS specifications with latest amendment | 20-05-2013 | 20-06-2013 | 27-06-2013 | 27-06-2013 | 3:30PM | Active | और देखें |
21. | Transportation of sand from Kalaphata Ghat of MOIL situated on Pench river at Kandri Mine | 17-05-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 3:00PM | Active | और देखें |
22. | Construction of Sump near Guest House, East Court, MOIL, Nagpur | 17-05-2013 | 24-05-2013 | 27-05-2013 | 27-05-2013 | 3:30PM | Active | और देखें |
23. | PURCHASE OF MEASURING POCKET AND LAUNDER ASSEMBLY, 2 SETS. | 17-05-2013 | 27-06-2013 | 28-06-2013 | 28-06-2013 | 3:30PM | Active | और देखें |
24. | Picking and collection of UK-4445 and UKL-448 from Hanging wall dump from Ch.6800 to Ch.8600 at Ukwa Mine | 16-05-2013 | 22-05-2013 | 22-05-2013 | 22-05-2013 | 3:00PM | Active | और देखें |
25. | Cleaning of surplus ROM of OC development to recover Ferro grade and LGHS ore at Gudma Section of Ukwa Mine | 16-05-2013 | 24-05-2013 | 24-05-2013 | 24-05-2013 | 3:00PM | Active | और देखें |
26. | Underground development at 70 ft L and 170 ft L at Munsar Mine | 16-05-2013 | 14-06-2013 | 17-06-2013 | 17-06-2013 | 3:00PM | Active | और देखें |
27. | Transportation of sand from kanhan River to Sand stowing plant at Gumgaon Mine | 15-05-2013 | 21-05-2013 | 22-05-2013 | 22-05-2013 | 3:00 PM | Active | और देखें |
28. | Painting and allied works on third floor MOIL Bhawan at Nagpur | 15-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30PM | Active | और देखें |
29. | Construction of 02 sets Toilet block near BDC and Workshop at Kandri Mine. | 14-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30pm | Active | और देखें |
30. | Construction of shed near Pit office of Vertical shaft at Kandri Mine. | 14-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30pm | Active | और देखें |
31. | Construction of 02 Nos Vehicle shed near work shop at Kandri Mine. | 14-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30pm | Active | और देखें |
32. | Construction of drain septic tank, soak pits, chambers at Kaichi camps at Munsar Mine. | 14-05-2013 | 27-05-2013 | 28-05-2013 | 28-05-2013 | 3:30pm | Active | और देखें |
33. | Hiring of MIn 1000 KVA, 415V, DG SET for Balaghat Mine | 13-05-2013 | 30-05-2013 | 30-05-2013 | 30-05-2013 | 3:00PM | Active | और देखें |
34. | Collection of Mn fines from different sorting areas at Munsar Mine | 11-05-2013 | 16-05-2013 | 17-05-2013 | 17-05-2013 | 4:00PM | Active | और देखें |
35. | Water proofing treatment to RCC Roof slab of vehical garage Bungalow No. 1 MOIL Nagpur | 10-05-2013 | 22-05-2013 | 23-05-2013 | 23-05-2013 | 3:30PM | Active | और देखें |
36. | Providing and constraction of water drain for the quarters near Hospital Upper camp Chikla Mine. | 10-05-2013 | 22-05-2013 | 23-05-2013 | 23-05-2013 | 3:30PM | Active | और देखें |
37. | Providing New gate along with Name Board for Z.P. Girls School Katol Road Nagpur, Under MOIL CSR | 09-05-2013 | 18-05-2013 | 20-05-2013 | 20-05-2013 | 3:30PM | Active | और देखें |
38. | Water proofing treatment by Dr.Fixit torch shield roll over Manglore tiled roof atTirodi Mine | 09-05-2013 | 22-05-2013 | 23-05-2013 | 23-05-2013 | 3:30PM | Active | और देखें |
39. | Drilling of 2 Nos. Borewells at Tirodi Mine | 09-05-2013 | 22-05-2013 | 23-05-2013 | 23-05-2013 | 3:30PM | Active | और देखें |
40. | PURCHASE OF SULPHURIC ACID | 09-05-2013 | 30-05-2013 | 31-05-2013 | 31-05-2013 | 3:30PM | Active | और देखें |
41. | Cleaning of Surplus ROM at Sitapatore and Sukli Mine | 08-05-2013 | 17-05-2013 | 17-05-2013 | 17-05-2013 | 3:00PM | Active | और देखें |
42. | Recovery of 25 percent SM Grade lumpy and small ore from Jhiriya dump by off the pit working at Dongri Buzurg Mine | 08-05-2013 | 17-05-2013 | 17-05-2013 | 17-05-2013 | 3:00PM | Active | और देखें |
43. | PURCHASE OF CHAIN PULLEY BLOCK ASSEMBLY, 11 NOS. CAP. 3 TONNES, 4 NOS. AND CAP. 5 TONNES, 7 NOS. | 06-05-2013 | 02-06-2013 | 03-06-2013 | 03-06-2013 | 3:30PM | Active | और देखें |
44. | Removal of old waste rock and handling the same by mech. means at Munsar Mine | 03-05-2013 | 09-05-2013 | 10-05-2013 | 10-05-2013 | 3:00 PM | Active | और देखें |
45. | Loading and Unloading steel section, cement bags and other materials with stacking at Balaghat Mine | 02-05-2013 | 10-05-2013 | 10-05-2013 | 10-05-2013 | 3:00PM | Active | और देखें |
46. | PURCHASE OF 1.10 KW UNBALANCE VIBRATOR MOTOR, MAKE ELEKTROMAG JOEST VIBRATION PVT. LTD., 2 NOS. | 02-05-2013 | 30-05-2013 | 31-05-2013 | 31-05-2013 | 3:30PM | Active | और देखें |
47. | PURCHASE OF 3.3 KV, SOFT STARTER PANEL FCMA TECHNOLOGY BASED SUITABLE FOR OPERATION OF 422 HP CENTRIFUGAL WATER PUMP SET, 1 NO. | 02-05-2013 | 30-05-2013 | 31-05-2013 | 31-05-2013 | 3:30PM | Active | और देखें |
48. | CORRIGENDUM - PURCHASE OF 3.3 KV SOFT STARTER PANEL ETC | 02-05-2013 | 16-06-2013 | 17-06-2013 | 17-06-2013 | 3.30 PM | Active | और देखें |
49. | PURCHASE OF RUBBER TUB BUFFER. | 01-05-2013 | 21-05-2013 | 22-05-2013 | 22-05-2013 | 3:30PM | Active | और देखें |
50. | Geo Technical Investigation works for proposed 2nd Shaft at Gumgaon, Munsar, Chikla Ukwa Mine | 29-04-2013 | 07-05-2013 | 08-05-2013 | 08-05-2013 | 3:30PM | Active | और देखें |
51. | Reduction of Manganese ore on conversion basis at EMD Plant, Dongri Buzurg Mine | 29-04-2013 | 27-05-2013 | 27-05-2013 | 27-05-2013 | 3:30PM | Active | और देखें |
52. | Equipping Platform and Ladders for providing manway at Production Shaft at Balaghat Mine. | 27-04-2013 | 27-05-2013 | 27-05-2013 | 27-05-2013 | 3:30PM | Active | और देखें |
53. | PURCHASE OF SAFETY HELMETS ISI MARK AND DGMS APPROVED. | 26-04-2013 | 16-05-2013 | 17-05-2013 | 17-05-2013 | 3:30PM | Active | और देखें |
54. | Drilling of Borwells at Chikla Mine | 25-04-2013 | 29-04-2013 | 30-04-2013 | 30-04-2013 | 3:30PM | Active | और देखें |
55. | Construction of Nagar Bhawan Community hall at Village Khapa Tah- Saoner Distt- Nagpur. Under MOIL CSR | 25-04-2013 | 13-05-2013 | 15-05-2013 | 15-05-2013 | 3:30PM | Active | और देखें |
56. | PURCHASE OF SAFETY CANVAS BOOTS DUCKBACK BRAND WITH ISI MARK AND DGMS APPROVED. | 25-04-2013 | 16-05-2013 | 17-05-2013 | 17-05-2013 | 3:30PM | Active | और देखें |
57. | Recovery of LGHS lumpy ore from North Magazine dump at Tirodi Mine | 23-04-2013 | 03-05-2013 | 03-05-2013 | 03-05-2013 | 3:00PM | Active | और देखें |
58. | FRVE HEADER BAR FOR ANODES, 231 NOS. AND FRVE HEADER BAR FOR CATHODES WITH WOODEN WEDGE, 238 NOS. | 23-04-2013 | 28-05-2013 | 29-05-2013 | 29-05-2013 | 3:30PM | Active | और देखें |
59. | Picking and collection of UK-4445 and UKL-448 | 22-04-2013 | 02-05-2013 | 02-05-2013 | 02-05-2013 | 3:00 PM | Active | और देखें |
60. | Recovery of BGL-462 | 20-04-2013 | 20-05-2013 | 21-05-2013 | 21-05-2013 | 3:00PM | Active | और देखें |
61. | PURCHASE OF COTTON HAND GLOVES | 18-04-2013 | 07-05-2013 | 08-05-2013 | 08-05-2013 | 3:30PM | Active | और देखें |
62. | PURCHASE OF BEML MAKE ENGINE FOR BEML MAKE BE-700 HYDRAULIC EXCAVATOR, 1 NO. | 16-04-2013 | 07-05-2013 | 08-05-2013 | 08-05-2013 | 3:30 PM | Active | और देखें |
63. | Laying of Pipe line for water supply scheme from Awalajari to Suraksha Mandir via. Shankar tekri at Balaghat Mine. | 16-04-2013 | 25-04-2013 | 26-04-2013 | 26-04-2013 | 3:30PM | Active | और देखें |
64. | PURCHASE OF CLT 754 TRANSMISSION ASSEMBLY WITHOUT PTO FOR BEML MAKE BH35-2 DUMPER, 1 NO. | 16-04-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 3:30PM | Active | और देखें |
65. | Picking and collection of UK-4445 and UKL-448 | 15-04-2013 | 17-05-2013 | 17-04-2013 | 17-04-2013 | 3:00 | Active | और देखें |
66. | Picking and Collection of UKL-448 from the FW Dump at Ch. 6800 at Ukwa Mine | 15-04-2013 | 17-04-2013 | 17-04-2013 | 17-04-2013 | 3:00pm | Active | और देखें |
67. | Transportation of sand at Munsar, Kandri and Beldogri Mine | 15-04-2013 | 14-05-2013 | 15-05-2013 | 15-05-2013 | 3:00 PM | Active | और देखें |
68. | PURCHASE OF MULTI FUNCTION PRINTER, 8 NOS. AND COLOR LASER PRINTER, 1 NO. | 15-04-2013 | 09-05-2013 | 10-05-2013 | 10-05-2013 | 3:30 pm | Active | और देखें |
69. | PURCHASE OF LINE MATRIX PRINTERS, 5 NOS. | 15-04-2013 | 09-05-2013 | 10-05-2013 | 10-05-2013 | 3:30pm | Active | और देखें |
70. | Construction of Toilet at Ch-10800, Ch-11600. Magazine and Security check post at Ukwa Mine | 12-04-2013 | 25-04-2013 | 26-04-2013 | 26-04-2013 | 3:30PM | Active | और देखें |
71. | PURCHASE OF CUMMINS MAKE ENGINE SUITABLE FOR BH35 2, DUMPER BEML MAKE, 1 NO. | 12-04-2013 | 05-05-2013 | 06-05-2013 | 06-05-2013 | 3:30PM | Active | और देखें |
72. | 80 V 443 AH Lead Acid Traction Batteries - 19 Sets - Only through e-procurement | 12-04-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 3:30PM | Active | और देखें |
73. | Picking and Collection of ore from dump,reject,dilute ROM at Munsar Mine | 08-04-2013 | 15-04-2013 | 16-04-2013 | 16-04-2013 | 3:00 PM | Active | और देखें |
74. | Designing and printing of Annual Report s Deluxe Version in English, Hindi and Marathi , Shareholder version in English, translation of text from English to Hindi and Marathi and handling charges | 06-04-2013 | 26-04-2013 | 26-04-2013 | 01-05-2013 | 12:00PM | Active | और देखें |
75. | Construction of Boundary wall around Mine Magazine at Munsar Mine. | 05-04-2013 | 15-04-2013 | 16-04-2013 | 16-04-2013 | 3:30 PM | Active | और देखें |
76. | Exploratory core drilling of NQ size 47mm. core Diameter. at Nandapuri of MOIL Ltd. | 05-04-2013 | 20-04-2013 | 20-04-2013 | 20-04-2013 | 3:00PM | Active | और देखें |
77. | PURCHASE TERMINAL CONNECTOR | 05-04-2013 | 30-04-2013 | 01-05-2013 | 01-05-2013 | 3:30 PM | Active | और देखें |
78. | Picking and collection of ore from dumps, Rejects, Diluated rom at Gumgaon Mine | 04-04-2013 | 04-05-2013 | 06-05-2013 | 06-05-2013 | 3:00 PM | Active | और देखें |
79. | Handling of Boulders and Cleaning of grizzly at Bunker of IMB plant at Dongri Buzurg Mine | 03-04-2013 | 12-04-2013 | 12-04-2013 | 12-04-2013 | 3:00 PM | Active | और देखें |
80. | Landscaping and designing and making mural for developing and beautification of Ambazari Hill Top Nagpur Under CSR | 02-04-2013 | 09-04-2013 | 10-04-2013 | 10-04-2013 | 3:30 PM | Active | और देखें |
81. | PURCHASE OF SAFETY RUBBER ANKLE BOOTS FOR MINERS. | 01-04-2013 | 21-04-2013 | 22-04-2013 | 22-04-2013 | 3:30PM | Active | और देखें |
82. | PURCHASE OF SAFETY GUMBOOTS RUBBER and PVC | 01-04-2013 | 21-04-2013 | 22-04-2013 | 22-04-2013 | 3:30PM | Active | और देखें |
83. | Construction of drain septic tank, soak pits, chambers at Kaichi camps at Munsar Mine. | 30-03-2013 | 09-04-2013 | 10-04-2013 | 10-04-2013 | 3:30PM | Active | और देखें |
84. | TRANSPORTATION OF COAL | 28-03-2013 | 28-04-2013 | 29-04-2013 | 29-04-2013 | 3:30PM | Active | और देखें |
85. | PURCHASE OF ELECTRICAL MEASURING INSTRUMENTS. | 28-03-2013 | 16-04-2013 | 17-04-2013 | 17-04-2013 | 3:30PM | Active | और देखें |
86. | Construction of Administrative Building at Munsar Mine and Gumgaon Mine. | 28-03-2013 | 16-04-2013 | 18-04-2013 | 18-04-2013 | 3:30PM | Active | और देखें |
87. | PURCHASE OF SIEMENS MAKE 850 AMPS D.C. DRIVE MODULE FOR DOUBLE DRUM CAGE WINDER, 1 NO. | 26-03-2013 | 30-04-2013 | 01-05-2013 | 01-05-2013 | 3:30pm | Active | और देखें |
88. | Construction of New Workshop Building near 6th level at Balaghat Mine | 26-03-2013 | 16-04-2013 | 18-04-2013 | 18-04-2013 | 3:30pm | Active | और देखें |
89. | PURCHASE OF KIRLOSKAR MAKE 10 HP, 80 VOLTS, D.C. TRACTION MOTOR FOR 4 T BATTERY LOCOMOTIVES, 4 NOS. | 26-03-2013 | 25-04-2013 | 26-04-2013 | 26-04-2013 | 3:30PM | Active | और देखें |
90. | PURCHASE OF BENN MAKE 10 HP, 80 VOLTS, D.C. TRACTION MOTOR FOR 4 T BATTERY LOCOMOTIVES, 6 NOS. | 26-03-2013 | 23-05-2013 | 24-05-2013 | 24-05-2013 | 3:30PM | Active | और देखें |
91. | PURCHASE OF 188 KW 250 HP 1500 RPM D.C. MOTOR FOR DOUBLE DRUM CAGE WINDER, 1 NO. | 26-03-2013 | 28-05-2013 | 29-05-2013 | 29-05-2013 | 3:30pm | Active | और देखें |
92. | Corrigendum - PURCHASE OF 188 KW 250 HP 1500 RPM D.C. MOTOR FOR DOUBLE DRUM CAGE WINDER, 1 NO. | 26-03-2013 | 28-05-2013 | 14-06-2013 | 14-06-2013 | 3:30pm | Active | और देखें |
93. | Underground Development work at -270 feet L at Chikla Mine | 25-03-2013 | 26-03-2013 | 26-03-2013 | 26-03-2013 | 3:30PM | Active | और देखें |
94. | TRANSPORTATION OF COAL | 22-03-2013 | 21-04-2013 | 22-04-2013 | 22-04-2013 | 3:30PM | Active | और देखें |
95. | Renovation work at Gymnasium Hall Police line Balaghat Under MOIL CSR | 21-03-2013 | 04-04-2013 | 05-04-2013 | 05-04-2013 | 3:30PM | Active | और देखें |
96. | PURCHASE OF LCD PROJECTOR, MAKE-PANASONIC, MODEL- PT-LB1, 1 NO. | 20-03-2013 | 04-04-2013 | 05-04-2013 | 05-04-2013 | 3:30PM | Active | और देखें |
97. | SUPPLY OF BLACK GITTI FOR UG CONCRETING WORK AT UKWA MINE | 16-03-2013 | 25-03-2013 | 25-03-2013 | 25-03-2013 | 3:00PM | Active | और देखें |
98. | PURCHASE OF LABORATORY CHEMICALS | 15-03-2013 | 31-03-2013 | 01-04-2013 | 01-04-2013 | 3:30PM | Active | और देखें |
99. | PURCHASE OF RIDGID MAKE HEAVY DUTY STRAIGHT PIPE WRENCHES. | 15-03-2013 | 04-04-2013 | 05-04-2013 | 05-04-2013 | 3:30PM | Active | और देखें |
100. | PURCHASE OF ELECTRIC EXHAUST FAN 450 MM SWEEP IN METAL BODY WALL MOUNTING TYPE, 50 NOS | 14-03-2013 | 04-04-2013 | 05-04-2013 | 05-04-2013 | 3:30PM | Active | और देखें |