Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. PURCHASE OF 4 INCH GI FLANGES FOR BALAGHAT MINE.(PUR/BGT/Flanges/23-24/1681) 19-01-2024 31-01-2024 31-01-2024 31-01-2024 04:30 PM Active View
2. Retrofitting Works towards strengthening of foundation of Old Cell Bay Building of EMD Plant, Dongribuzug Mine.(DB/EMD/CIVIL/NIT/TE/23-24/3072 16.01.2024) 19-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
3. Diversion i.e. Separate Lane for Two Wheelers in front of Workshop Premises at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/3071 Dt 16.01.2024) 19-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
4. Repairing Works towards modification and renovation of Old Toilet Block inside Workshop Premises at Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/3102 19.01.24) 19-01-2024 27-01-2024 27-01-2024 27-01-2024 04:30 PM Active View
5. Slab Works for temporary sheeting portion of Store Building of Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/3101 19.01.24) 19-01-2024 27-01-2024 27-01-2024 27-01-2024 04:30 PM Active View
6. Procurement of 385 Cu. Mtrs. of Dissolved Acetylene Gas Cylinders for the Balaghat Mine.(PUR/BGT/DA-CYL/23-24/1674) 18-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
7. Transportation and Unloading of tubs into 2nd tippler at surface.(Gum/Min/2024-25/3486, Date 17.01.2025) 18-01-2024 28-01-2024 28-01-2024 28-01-2024 04:30 PM Active View
8. Installation of Smoke Detector and Fire Alarm System at Chikla Mine.(AGENT/GR-II/ELECT/23-24/1481) 17-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
9. Concreting 13.50 level South section at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1663 DT. 17.01.2024) 17-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
10. Repairing and Rewinding of 75HP Motor and 50HP submersible pump set of Gumgaon Mine(GUM/ELECT/23-24/2667 DT 17.01.2024) 17-01-2024 05-02-2024 05-02-2024 05-02-2024 04:30 PM Active View
11. Filling and Spreading of waste rock at 7th level north at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1662 DT. 16.01.2024) 17-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
12. Reparing of Interface module and replacement of Profibus cable(AGENT/GR-III/ELECT/23-24/1581, 16/01/2024) 17-01-2024 30-01-2024 30-01-2024 31-01-2024 04:30 PM Active View
13. Repair of Siemens PLC CPU DIGITAL OUTPUT MODULE and Power Supply(AGENT/GR-III/ELECT/23-24/1580, 16/01/2024) 17-01-2024 30-01-2024 30-01-2024 31-01-2024 04:30 PM Active View
14. Picking and Collection of 20 per Mn SM Grade ore Mineral Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1664 DT. 17.01.2024) 17-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
15. Fabrication of Roof Bolts for underground use Chikla Mine.(CH/MECH/2324/76-28726/719/1472) 16-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
16. Hiring of Rock Breaker with Loader for Breaking the outcrop ore at opencast at 100L of Chikla Mine.(CH/MECH/2324/76-28994/706/1476) 16-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
17. Undreground Sand Cleaning works at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1660 Dt. 15.01.2024) 16-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
18. Handling Loading and Unloading of Genral ROM at 7 TH Level North(MINING/BGT/LT/AGT/2023-24/1661 Dt. 16.01.2024) 16-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
19. PURCHASES OF FLOAT MAJOR COMPONENTS (SPARES) FOR KOMASTU PC450 EXCAVATOR(T. E. No. PUR/MOIL/C-5/9 /E-5/186-M,Dt.16/01/2024) 16-01-2024 06-02-2024 06-02-2024 06-02-2024 03:30 PM Active View
20. Drilling of Bore Hole 110mm - 4Nos. (140 Mtrs.) for laying of power cable at 12th and 13.5th level and for ventilation circuit at 21 cross cut of 12th level.(AGT/MECH/B-HOLE/23-24/1630) 15-01-2024 30-01-2024 30-01-2024 30-01-2024 04:30 PM Active View
21. Repairing of Worn Our Wheels-65Nos. of G.B. Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/GB-CAR/23-24/1631) 15-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
22. Preparation of Comprehensive Hydrogeological Report for renewal of existing ground water at Chikla Mine.(Geology/CH/CGWA/TE/23-24/1475 Date-14.01.2024) 15-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
23. Ourchase of Gas welding accessories for Munsar mine(PUR/MOIL/AGTGRIII/MS/2324/1558) 15-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
24. Hiring of Consultant for Design Engineering Services for proposed construction of Guest House at Ukwa Mine.(AGT/CIVIL/UK/LT/24-25/1643 Dt.15.01.2024) 15-01-2024 22-01-2024 22-01-2024 22-01-2024 04:30 PM Active View
25. Road side painting, cleaning and other works for upcoming functions at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/1615) 12-01-2024 17-01-2024 17-01-2024 17-01-2024 04:30 PM Active View
26. PURCHASE OF MISCELLANEOUS ITEM AND HARD FACING ELECTRODES FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/MISC/23-24/1617) 12-01-2024 29-01-2024 29-01-2024 29-01-2024 04:30 PM Active View
27. PURCHASE OF COTTON WASTE, NYLON ROPE AND MANILA ROPE FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/CW/23-24/1616) 12-01-2024 29-01-2024 29-01-2024 29-01-2024 04:30 PM Active View
28. PURCHASE OF CONVEYOR BELT 550 WIDTH FOR IMB PLANT OF DONGRIBUZURG MINE(PUR/DB/MECH/2023-2024/1463) 12-01-2024 02-02-2024 02-02-2024 02-02-2024 04:30 PM Active View
29. Removal of pebbles genrated during sand stowing at Balaghat Mine(MIN/BGT/LT/AGT/2023-24/1620 Date12.01.2024) 12-01-2024 19-01-2024 19-01-2024 19-01-2024 04:30 PM Active View
30. Fabrication of ore measuring frames of size 16cft x 50Nos.(DB/MECH/23-24/3019) 12-01-2024 07-02-2024 07-02-2024 07-02-2024 04:30 PM Active View
31. OPERATION AND MAINTENANCE OF SOLID WASTE PLANT AT MUNSAR MINE(AGT/MUN/CIVIL/NIT/23-24/2331 DT 10/01/2024) 12-01-2024 19-01-2024 19-01-2024 19-01-2024 04:30 PM Active View
32. Drilling of 57 mm diameter of holes for cabel bolt in various levels of U/G at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1606 Dt. 10.01.2024) 11-01-2024 17-01-2024 17-01-2024 17-01-2024 04:30 PM Active View
33. Road side painting, cleaning and other works for upcoming functions at Balaghat Mine.(CIVIL/BGT/LT/2023-24/1607 Dt. 10.01.2024) 11-01-2024 16-01-2024 16-01-2024 16-01-2024 04:30 PM Active View
34. Sorting of surplus ROM Underground sections for grade UK4570 and UKL448 from Ch 5000 of Ukwa Mine.(AGT/MINING/UK/LT/24-25/1614 dt.11.01.2024) 11-01-2024 18-01-2024 18-01-2024 18-01-2024 04:30 PM Active View
35. Transportation of Unloading of ROM AND Rock tubs from Vertical Shaft Top to OCF AND return of empty tubs supply to U G for recirculation at Beldongri Mine.(AGT/MINE/BEL/2023-24/ 1523 Dt.05.01.2024) 10-01-2024 17-01-2024 17-01-2024 17-01-2024 05:30 PM Active View
36. Drain Excavation at 13.50 Level (North) at Balaghat Mine(MIN/BGT/LT/AGT/2023-24/1590 Date 08.01.2024) 10-01-2024 15-01-2024 15-01-2024 15-01-2024 04:30 PM Active View
37. Collection of primary and secondary data regarding ground water development and filling of CGWA NOC renewal application for Chikhla Mine.(GEOLOGY/CH/CGWA/TE/23-24/1457 DATE-09.01.2024) 10-01-2024 16-01-2024 16-01-2024 16-01-2024 04:30 PM Active View
38. Laying of 4 GI Vertical Pipeline for Dewatering at 2nd Vertical Shaft of Ukwa Mine.(AJGM/UK/MECH/2023-24/1601) 10-01-2024 17-01-2024 17-01-2024 17-01-2024 04:30 PM Active View
39. Forest NOC Processing charges for Mining Lease of Village Tawejhari and Village(MIN/BGT/LT/AGT/2023-24/1600 Date) 10-01-2024 16-01-2024 16-01-2024 16-01-2024 04:30 PM Active View
40. Cleaning of JIG tank at OCF JIG(MINING/BGT/LT/AGT/2023-24/1591 Date 08.01.2024) 10-01-2024 15-01-2024 15-01-2024 15-01-2024 04:30 PM Active View
41. Replacement of rotten and damaged mild steel chequered sheet at filtration area at EMD Plant DB Mine(MOIL/DB/EMD/ADGM/23-24/1434) 08-01-2024 20-01-2024 20-01-2024 20-01-2024 04:30 PM Active View
42. Driling of Muck generation hole at 1150 Level 2nd vertical Shaft at Ukwa Mine.(AGT/MINING/UK/LT/24-25/1589 Dt.08.01.2023) 08-01-2024 15-01-2024 15-01-2024 15-01-2024 04:30 PM Active View
43. Applications for empanelment of firms for conducting Transaction Auditing for two years extendable to three years.(MOIL/I. Audit/2023-24/ETA/01) 06-01-2024 29-01-2024 29-01-2024 29-01-2024 02:00 PM Active View
44. FRP Lining of Concrete electrolytic cells of new cell bay at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1397) 06-01-2024 16-01-2024 16-01-2024 16-01-2024 04:30 PM Active View
45. Purchase of Water Sprinkler C.F. Pump DSM 65/20 for BEML WS28-2,3 of Dongri Buzurg Mine from Manufacturer/ Authorized Dealer/Supplier(T.E.No. PUR/MOIL/DB/2023-24/1439) 06-01-2024 23-01-2024 23-01-2024 23-01-2024 04:30 PM Active View
46. Purchase of AVTEC 6610M Transmission filters for BEML make BH60 M dumpers.(T.E.No. PUR/MOIL/DB/2023-24/1440) 06-01-2024 23-01-2024 23-01-2024 23-01-2024 04:30 PM Active View
47. Proposal for Procurement of PVC Gumboots of Various sizes.(Mining/CH/T.E./23-24/1409) 05-01-2024 10-01-2024 10-01-2024 10-01-2024 04:30 PM Active View
48. Painting to Boundary wall of Mine Manager Bungalow at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1563 DT.04.01.2023) 05-01-2024 09-01-2024 09-01-2024 09-01-2024 04:30 PM Active View
49. Repairing of road by spreading of filling material at approach road of Nagra Plant to Magzine Building at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1564 dt.04.01.2023) 05-01-2024 09-01-2024 09-01-2024 09-01-2024 04:30 PM Active View
50. Outsourcing the work of making, collecting canteen items and serving it in UG, BDC, Workshop and Admin building of Kandri Mine.(KD/MINES/NIT/23-24/3553) 04-01-2024 24-01-2024 24-01-2024 24-01-2024 04:30 PM Active View
51. PROVIDING SUPPLYING LAYING OF 3CX35SQMM ALUMINIUM CONDUCTOR XLPE CABLE AND ERRECTING OF IN-LINE OVERHEAD POLE FOR POWER SUPPLY ARRANGEMENT OF MINE MAGAZINE AT GUMGAON MINE(GUM/ELECT/23-24/2540 DT 03.01.2024) 04-01-2024 25-01-2024 25-01-2024 25-01-2024 04:30 PM Active View
52. PROCUREMENT OF SPARES FOR LOAD HAUL DUMP LOADER- LHD MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/LHD/23-24/1543) 03-01-2024 15-01-2024 15-01-2024 15-01-2024 04:30 PM Active View
53. PURCHASE OF SPARE OF 422HP KIRLOSKAR MAKE CENTRIFUGAL PUMP MODEL-RKB-125/3OK, 13STG AT BALAGHAT MINE(PUR/MOIL/BGT/LHD/23-24/1544) 03-01-2024 17-01-2024 17-01-2024 17-01-2024 04:30 PM Active View
54. Hiring of Tipper for Transportation Ore From 2nd Vertical to Niagra plant at Ukwa mine(AJGM/UK/MECH/2023-24/1541) 03-01-2024 09-01-2024 09-01-2024 09-01-2024 04:30 PM Active View
55. Procurement of Spares For Tata Motors Ltd.Tippers of Ukwa Mine.(AJGM/UK/MECH/2023-24/1542) 03-01-2024 09-01-2024 09-01-2024 09-01-2024 04:30 PM Active View
56. Procurement of NBC/SKF/Timken/FAG/NTN Make bearings for IMB Plant of Balaghat Mine.(PUR/BGT/IMB-BRG/23-24/1545) 03-01-2024 17-01-2024 17-01-2024 17-01-2024 04:30 PM Active View
57. Laying and Fixing of G.I Pipe Line,4 and 6 at Haulage Road in Underground at Ukwa Mine.(AJGM/UK/MECH/2023-24/1550) 03-01-2024 09-01-2024 09-01-2024 09-01-2024 04:30 PM Active View
58. Rest House Maintenance of Tirodi Mine(TRD/Pers/23-24/1471 DATED 17/12/2023) 03-01-2024 10-01-2024 10-01-2024 10-01-2024 04:00 PM Active View
59. POWER SUPPLY TO NEW LHD AT 8TH LEVEL UNDERGROUND(BGT/TE/ELECT/AJGM/23-24/1554) 03-01-2024 11-01-2024 11-01-2024 11-01-2024 03:30 PM Active View
60. Providing and fixing of innuguration stone at Munsar Mine(LT/CIVIL/MUN/HO-AGT/24-25/1410) 03-01-2024 10-01-2024 10-01-2024 10-01-2024 04:00 PM Active View
61. Purchase of rollers and coupling for conveyor belt system of Ferro Manganese Plant Balaghat Mine(TE/MOIL/FMP/MECH/23-24/431 Date 01/01/2024) 01-01-2024 08-01-2024 08-01-2024 08-01-2024 04:30 PM Active View
62. Procurement of FEPL spares of Cap lamps for Ukwa Mine(UK/ELECT/2023-24/1521) 01-01-2024 08-01-2024 08-01-2024 08-01-2024 04:30 PM Active View
63. Providing supplying and repairing of PC SCADA software applications for controlling winder processes at Munsar Mine(AGT/MUN/ELECTR/NIT/23-24/1511 DT 01/01/2024) 01-01-2024 10-01-2024 10-01-2024 10-01-2024 04:30 PM Active View
64. Purchase and installation of MFP Monochrome (Ink Tank) Printer at MOIL Ltd., Balaghat Mine.(MM/BG/SYS/PUR/PRN/23-24/433) 30-12-2023 05-01-2024 05-01-2024 05-01-2024 04:00 PM Active View
65. Repairing of Track Roller of Tata 1200-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/23-24/ 1398) 29-12-2023 20-01-2024 20-01-2024 20-01-2024 04:30 PM Active View
66. Overhauling of Hydraulic Pump and Charging Pump of LHD Machine of Balaghat Mine(AGT/MECH/LHD-PUMP/23-24/1514) 28-12-2023 12-01-2024 12-01-2024 12-01-2024 04:30 PM Active View
67. Repairing of complete final drive planetary gear assembly of LHD machine of Balaghat Mine.(AGT/MECH/FD-LHD/23-24/1513) 28-12-2023 05-01-2024 05-01-2024 05-01-2024 04:30 PM Active View
68. PURCHASE OF PIPE-FITTINGS AND ACCESSORIES FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/PIPE-FITT/23-24/1515) 28-12-2023 16-01-2024 16-01-2024 16-01-2024 04:30 PM Active View
69. PURCHASE OF DTH HAMMER AND BUTTON BITS FOR WAGON DRILL MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/DTH/23-24/1512) 28-12-2023 19-01-2024 19-01-2024 19-01-2024 04:30 PM Active View
70. Proposal for RCC work to establish Chute and Manways for preparation of Stopes at minus 370 ft L.(Mining/CH/T.E./23-24/1385) 28-12-2023 03-01-2024 03-01-2024 03-01-2024 04:30 PM Active View
71. Drilling and reflushing of Bore holes at Chikla Mine.(Mining/CH/T.E./23-24/1386) 28-12-2023 03-01-2024 03-01-2024 03-01-2024 04:30 PM Active View
72. Painting work to Industrial Buildings for Safety Week function at Chikla Mine.(CH/Civil/NIT/23-24/1382 Date-26.12.2023) 27-12-2023 02-01-2024 02-01-2024 02-01-2024 04:30 PM Active View
73. Repair of SIEMENS PLC CPU 315-2 PN/DP DIGITAL OUTPUT MODULE ET 200S 8 CH. and Power Supply 6.2A/24V DC of Kandri Mine(AGENT/GR-III/ELECT/23-24/1460, 20/12/2023) 25-12-2023 05-01-2024 05-01-2024 06-01-2024 04:30 PM Active View
74. Purchase of electrode blower motor with complete auxiliaries as per mentioned tech specifications(TE/MOIL/FMP/ELECT/23-24/412) 25-12-2023 04-01-2024 04-01-2024 04-01-2024 04:30 PM Active View
75. Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGT/BGT/MECH/IMB/23-24/1499) 23-12-2023 29-12-2023 29-12-2023 29-12-2023 04:30 PM Active View
76. PURCHASE OF BRASS BRAZING ROD OF SIZE-1/8 FOR BALAGHAT MINE.(PUR/MOIL/BRAZ-ROD/23-24/1496) 23-12-2023 12-01-2024 12-01-2024 12-01-2024 04:30 PM Active View
77. PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/BGT/IMB/SOL/23-24/1494) 23-12-2023 16-01-2024 16-01-2023 16-01-2023 04:30 PM Active View
78. PURCHASE OF MS NUT OF SIZE M-20X2.5X25MM FOR ROOF BOLT SUPPORT SYSTEM OF BALAGHAT MINE.(PUR/MOIL/BGT/M-20/23-24/1495) 23-12-2023 12-01-2024 12-01-2024 12-01-2024 04:30 PM Active View
79. PURCHASE OF MS NUT OF SIZE M-20X2.5X25MM FOR ROOF BOLT SUPPORT SYSTEM OF BALAGHAT MINE.(PUR/MOIL/BGT/M-20/23-24/1495) 23-12-2023 12-01-2024 12-01-2024 12-01-2024 04:30 PM Active View
80. NDT of Vital Components of Holmes Shaft Cage Winder, Holmes Shaft Skip Winder and Production Shaft Winder of Balaghat Mine.(AGT/BGT/MECH/NDT/23-24/1497) 23-12-2023 11-01-2023 11-01-2023 11-01-2023 04:30 PM Active View
81. Painting of various structures of Winding Engine Installations, Waste Rock bunker and spillage bunker of Balaghat Mine.(AGT/BGT/PAINT/23-24/1498) 23-12-2023 29-12-2023 29-12-2023 29-12-2023 04:30 PM Active View
82. Underground sand stowing/Bottom Ash operation at Ukwa Mine(1750 Level).(AGT/MINING/UK/LT/23-24/1462 DT.23.12.2023) 23-12-2023 29-12-2023 29-12-2023 29-12-2023 04:30 PM Active View
83. Drilling of Muck generation hole at 950 Level 2nd vertical Shaft at Ukwa Mine.(AGT/MINING/UK/LT/23-24/1461 dT.23.12.2023) 23-12-2023 29-12-2023 29-12-2023 29-12-2023 04:30 PM Active View
84. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PRINTING OF COMPANY CALENDAR(PUR/MOIL/C-12/26/E-4/169-M) 22-12-2023 29-12-2023 29-12-2023 29-12-2023 03:30 PM Active View
85. Construction of Weigh Bridge Foundation along with Office Building at Ukwa Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/90) 22-12-2023 29-01-2024 29-01-2024 29-01-2024 04:00 PM Active View
86. Annual Repairs to camp Quarters at Gumgaon Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/89) 22-12-2023 22-01-2024 22-01-2024 22-01-2024 04:00 PM Active View
87. Construction of weigh Bridge and room at Ferro Manganese plant (FMP) at Balaghat.(MOIL/MOIL LIMITED/CMC/23-24/ET/87) 22-12-2023 22-01-2024 22-01-2024 22-01-2024 04:00 PM Active View
88. Construction / Renovation of old Transit House at west Court Nagpur (HO).(MOIL/MOIL LIMITED/CMC/23-24/ET/88) 22-12-2023 31-01-2024 31-01-2024 31-01-2024 04:00 PM Active View
89. Annual Maintenance Contract for replacement of Boiler tubes and General Inspection of FBC Boiler at EMD plant(MOIL/DB/EMD/ADGM/23-24/1337) 21-12-2023 30-12-2023 30-12-2023 30-12-2023 04:30 PM Active View
90. EOI DOCUMENT FOR EMPANELMENT OF ONLINE MEDICINE CHAINS FOR PAN INDIA SUPPLY OF MEDICINES TO OUR EMPLOYEES, FOR A PERIOD OF 3 (THREE) YEARS(EOI/MOIL/CMC/MED/2023/01) 21-12-2023 06-02-2024 06-02-2024 06-02-2024 04:00 PM Active View
91. Purchase of Nut-Bolt various size for Chikla Mine.(CH/MECH/23-24/1-9118/550/1312) 19-12-2023 26-12-2023 26-12-2023 26-12-2023 04:30 PM Active View
92. Purchase of spares of Terex Make Backhoe loader of Chikla mine.(CH/MECH/23-24/1-9195/1238) 19-12-2023 26-12-2023 26-12-2023 26-12-2023 04:30 PM Active View
93. Preparation of Leaching Batches and Cleaning of Leaching vessel at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1257) 18-12-2023 26-12-2023 26-12-2023 26-12-2023 04:30 PM Active View
94. Removal of filter press and leaching vessel sludge at Leaching section of EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1258) 18-12-2023 26-12-2023 26-12-2023 26-12-2023 04:30 PM Active View
95. Drilling of one Borehole and installation of submersible pump with starter panel for drinking water supply at Kalaphata sand ghat premises Kandri Mine(CIVIL/KD/TE/23-24/3408) 18-12-2023 30-12-2023 30-12-2023 30-12-2023 04:30 PM Active View
96. Desilting and cleaning of sump and surrounding area of sump at 300L.(Agent/Gum/Min/23-24/1448, date 18.12.2023) 18-12-2023 27-12-2023 27-12-2023 27-12-2023 04:30 PM Active View
97. Strengthening of main girders frame of different floors of IMB plant of Balaghat Mine.(AGT/MECH/IMB/23-24/1466) 16-12-2023 22-12-2023 22-12-2023 22-12-2023 04:30 PM Active View
98. Replacement of axle shaft bearings and Fabrication of New axle shaft for 4MT Battery locomotives of Balaghat Mine.(AGT/MECH/B-LOCO/23-24/1465) 16-12-2023 22-12-2023 22-12-2023 22-12-2023 04:30 PM Active View
99. Construction Cement Concrete Road at Chakhdehi village, Dist. Mandala(M.P.)(MOIL/MOIL LIMITED/CMC/23-24/ET/80) 16-12-2023 23-01-2024 23-01-2024 23-01-2024 04:00 PM Active View
100. Painting Works, allied civil works and Plumbing Works for Ravindranath Tagore Public School, Dongri Buzurg Mine.(MOIL/MOIL LIMITED/CMC/23-24/ET/79) 16-12-2023 23-01-2024 23-01-2024 23-01-2024 04:00 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.