Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Supply of Air Receiver Tank, Capacity 500 Liter 3 Nos. at Chikla Mine.(CH/MECH/23-24/1-9473/CAP/1535) | 27-01-2024 | 06-02-2024 | 06-02-2024 | 06-02-2024 | 04:30 PM | Active | View |
2. | Supply of Float Gear box for BC-3 600 mm Conveyor Belts 2 No. at Chikle Mine.(CH/MECH/23-24/1-9489/CAP/1534) | 27-01-2024 | 07-02-2024 | 07-02-2024 | 07-02-2024 | 04:30 PM | Active | View |
3. | Outsourcing manpower for the maintenance works of the OCF jig Machinery dump scr(MINING/BGT/LT/AGT/2023-24/1701 DT. 24.01.2024) | 25-01-2024 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
4. | Filling of Water Body near Sewage Treatment Plant, STP at New Chandmara Colony Dongribuzurg Mine.(DB/MINING/NIT/TE/23-24/ Dt 22.01.24) | 25-01-2024 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
5. | purchase of Donaldson Filters for FRD DCR201and2 for Dongri Buzurg Mine from Supplier.(DB/MECH/AGT/23-24/ 1526) | 24-01-2024 | 13-02-2024 | 13-02-2024 | 13-02-2024 | 04:30 PM | Active | View |
6. | Repair and Replacement to Connection of water supply to old A type Flat roof load bearing near hanuman mandir 32 NOS Qtr at Gumgaon Mine(MM/GUM/CIVIL/LT/23-24/2720 DT 24/01/2024) | 24-01-2024 | 30-01-2024 | 30-01-2024 | 30-01-2024 | 04:30 PM | Active | View |
7. | Purchase of Welding Accessories (Make ESAB) for D.B. Mine.(PUR/MOIL/DB/2023-24/1531) | 24-01-2024 | 13-02-2024 | 13-02-2024 | 13-02-2024 | 04:30 PM | Active | View |
8. | Preparatory works for Safety Week at Tirodi Mine.(TRD/CIVIL/2023-24/1640 DATED 15/01/2023) | 22-01-2024 | 27-01-2024 | 27-01-2024 | 27-01-2024 | 04:00 PM | Active | View |
9. | Miscellaneous repair works at 7 no pit surface level pit office and bottom pit rest shelter,Tirodi Mine(TRD/CIVIL/2023-24/1641 DATED 15/01/2023) | 22-01-2024 | 27-01-2024 | 27-01-2024 | 27-01-2024 | 04:00 PM | Active | View |
10. | Trench Cutting in Ore Stacks at Dongribuzurg Mine(DB/MINING/NIT/TE/23-24/3115 Dt 20.01.24) | 22-01-2024 | 30-01-2024 | 30-01-2024 | 30-01-2024 | 04:30 PM | Active | View |
11. | Stripping of EMD flakes, Removal of bottom EMD, Finished EMD screening and bagging, Loading of finished EMD at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1524) | 22-01-2024 | 30-01-2024 | 30-01-2024 | 30-01-2024 | 04:30 PM | Active | View |
12. | PROVIDING SUPPLYING AND INSTALLATION OF ESE LIGHTNING ARRESTOR AT TIRODI MINE(TRD/ELECT/2023-24/7/1690) | 22-01-2024 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 03:30 PM | Active | View |
13. | Preparatory civil works for upcoming visit and friendly cricket match of higher officials at Ukwa Mine.(AGT/CIVIL/UK/LT/24-25/1695 Dt.22.01.2024) | 22-01-2024 | 25-01-2024 | 25-01-2024 | 25-01-2024 | 04:30 PM | Active | View |
14. | Construction of Toilet Block for Principal cabin for existing school building at Ukwa Mine.(AGT/CIVIL/UK/LT/24-25/1696 DT.22.01.2024) | 22-01-2024 | 25-01-2024 | 25-01-2024 | 25-01-2024 | 04:30 PM | Active | View |
15. | Replacement of Old, Damaged and rusted corrugated GI Sheets for Recreational Hall cum Badminton Hall of Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/3108 Dt 20.01.2024) | 20-01-2024 | 27-01-2024 | 27-01-2024 | 27-01-2024 | 04:30 PM | Active | View |
16. | Cleaning of Grizzly in OTC of 300L and bunker near vertical shaft.(Agent/Gum/Min/23-24/1599, date 20.01.2024) | 20-01-2024 | 30-01-2024 | 30-01-2024 | 30-01-2024 | 04:30 PM | Active | View |
17. | PROCUREMENT OF CARRYING AND RETURN ROLLERS FOR CONVEYOR BELTS AT IMB PLANT AND PILOT PLANT OF BALAGHAT MINE.(PUR/BGT/IMB/ROLLER/23-24/1680) | 19-01-2024 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
18. | PURCHASE OF GI PIPES FOR BALAGHAT MINE.(PUR/MOIL/GI PIPES/23-24/1679) | 19-01-2024 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
19. | PURCHASE OF 4 INCH GI FLANGES FOR BALAGHAT MINE.(PUR/BGT/Flanges/23-24/1681) | 19-01-2024 | 31-01-2024 | 31-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
20. | Retrofitting Works towards strengthening of foundation of Old Cell Bay Building of EMD Plant, Dongribuzug Mine.(DB/EMD/CIVIL/NIT/TE/23-24/3072 16.01.2024) | 19-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
21. | Diversion i.e. Separate Lane for Two Wheelers in front of Workshop Premises at Dongribuzurg Mine.(DB/CIVIL/NIT/TE/2023-24/3071 Dt 16.01.2024) | 19-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
22. | Repairing Works towards modification and renovation of Old Toilet Block inside Workshop Premises at Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/3102 19.01.24) | 19-01-2024 | 27-01-2024 | 27-01-2024 | 27-01-2024 | 04:30 PM | Active | View |
23. | Slab Works for temporary sheeting portion of Store Building of Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/3101 19.01.24) | 19-01-2024 | 27-01-2024 | 27-01-2024 | 27-01-2024 | 04:30 PM | Active | View |
24. | Procurement of 385 Cu. Mtrs. of Dissolved Acetylene Gas Cylinders for the Balaghat Mine.(PUR/BGT/DA-CYL/23-24/1674) | 18-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
25. | Transportation and Unloading of tubs into 2nd tippler at surface.(Gum/Min/2024-25/3486, Date 17.01.2025) | 18-01-2024 | 28-01-2024 | 28-01-2024 | 28-01-2024 | 04:30 PM | Active | View |
26. | Installation of Smoke Detector and Fire Alarm System at Chikla Mine.(AGENT/GR-II/ELECT/23-24/1481) | 17-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
27. | Concreting 13.50 level South section at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1663 DT. 17.01.2024) | 17-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
28. | Repairing and Rewinding of 75HP Motor and 50HP submersible pump set of Gumgaon Mine(GUM/ELECT/23-24/2667 DT 17.01.2024) | 17-01-2024 | 05-02-2024 | 05-02-2024 | 05-02-2024 | 04:30 PM | Active | View |
29. | Filling and Spreading of waste rock at 7th level north at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1662 DT. 16.01.2024) | 17-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
30. | Reparing of Interface module and replacement of Profibus cable(AGENT/GR-III/ELECT/23-24/1581, 16/01/2024) | 17-01-2024 | 30-01-2024 | 30-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
31. | Repair of Siemens PLC CPU DIGITAL OUTPUT MODULE and Power Supply(AGENT/GR-III/ELECT/23-24/1580, 16/01/2024) | 17-01-2024 | 30-01-2024 | 30-01-2024 | 31-01-2024 | 04:30 PM | Active | View |
32. | Picking and Collection of 20 per Mn SM Grade ore Mineral Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1664 DT. 17.01.2024) | 17-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
33. | Fabrication of Roof Bolts for underground use Chikla Mine.(CH/MECH/2324/76-28726/719/1472) | 16-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
34. | Hiring of Rock Breaker with Loader for Breaking the outcrop ore at opencast at 100L of Chikla Mine.(CH/MECH/2324/76-28994/706/1476) | 16-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
35. | Undreground Sand Cleaning works at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1660 Dt. 15.01.2024) | 16-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
36. | Handling Loading and Unloading of Genral ROM at 7 TH Level North(MINING/BGT/LT/AGT/2023-24/1661 Dt. 16.01.2024) | 16-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
37. | PURCHASES OF FLOAT MAJOR COMPONENTS (SPARES) FOR KOMASTU PC450 EXCAVATOR(T. E. No. PUR/MOIL/C-5/9 /E-5/186-M,Dt.16/01/2024) | 16-01-2024 | 06-02-2024 | 06-02-2024 | 06-02-2024 | 03:30 PM | Active | View |
38. | Drilling of Bore Hole 110mm - 4Nos. (140 Mtrs.) for laying of power cable at 12th and 13.5th level and for ventilation circuit at 21 cross cut of 12th level.(AGT/MECH/B-HOLE/23-24/1630) | 15-01-2024 | 30-01-2024 | 30-01-2024 | 30-01-2024 | 04:30 PM | Active | View |
39. | Repairing of Worn Our Wheels-65Nos. of G.B. Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/GB-CAR/23-24/1631) | 15-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
40. | Preparation of Comprehensive Hydrogeological Report for renewal of existing ground water at Chikla Mine.(Geology/CH/CGWA/TE/23-24/1475 Date-14.01.2024) | 15-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
41. | Ourchase of Gas welding accessories for Munsar mine(PUR/MOIL/AGTGRIII/MS/2324/1558) | 15-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
42. | Hiring of Consultant for Design Engineering Services for proposed construction of Guest House at Ukwa Mine.(AGT/CIVIL/UK/LT/24-25/1643 Dt.15.01.2024) | 15-01-2024 | 22-01-2024 | 22-01-2024 | 22-01-2024 | 04:30 PM | Active | View |
43. | Road side painting, cleaning and other works for upcoming functions at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/1615) | 12-01-2024 | 17-01-2024 | 17-01-2024 | 17-01-2024 | 04:30 PM | Active | View |
44. | PURCHASE OF MISCELLANEOUS ITEM AND HARD FACING ELECTRODES FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/MISC/23-24/1617) | 12-01-2024 | 29-01-2024 | 29-01-2024 | 29-01-2024 | 04:30 PM | Active | View |
45. | PURCHASE OF COTTON WASTE, NYLON ROPE AND MANILA ROPE FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/CW/23-24/1616) | 12-01-2024 | 29-01-2024 | 29-01-2024 | 29-01-2024 | 04:30 PM | Active | View |
46. | PURCHASE OF CONVEYOR BELT 550 WIDTH FOR IMB PLANT OF DONGRIBUZURG MINE(PUR/DB/MECH/2023-2024/1463) | 12-01-2024 | 02-02-2024 | 02-02-2024 | 02-02-2024 | 04:30 PM | Active | View |
47. | Removal of pebbles genrated during sand stowing at Balaghat Mine(MIN/BGT/LT/AGT/2023-24/1620 Date12.01.2024) | 12-01-2024 | 19-01-2024 | 19-01-2024 | 19-01-2024 | 04:30 PM | Active | View |
48. | Fabrication of ore measuring frames of size 16cft x 50Nos.(DB/MECH/23-24/3019) | 12-01-2024 | 07-02-2024 | 07-02-2024 | 07-02-2024 | 04:30 PM | Active | View |
49. | OPERATION AND MAINTENANCE OF SOLID WASTE PLANT AT MUNSAR MINE(AGT/MUN/CIVIL/NIT/23-24/2331 DT 10/01/2024) | 12-01-2024 | 19-01-2024 | 19-01-2024 | 19-01-2024 | 04:30 PM | Active | View |
50. | Drilling of 57 mm diameter of holes for cabel bolt in various levels of U/G at Balaghat Mine(MINING/BGT/LT/AGT/2023-24/1606 Dt. 10.01.2024) | 11-01-2024 | 17-01-2024 | 17-01-2024 | 17-01-2024 | 04:30 PM | Active | View |
51. | Road side painting, cleaning and other works for upcoming functions at Balaghat Mine.(CIVIL/BGT/LT/2023-24/1607 Dt. 10.01.2024) | 11-01-2024 | 16-01-2024 | 16-01-2024 | 16-01-2024 | 04:30 PM | Active | View |
52. | Sorting of surplus ROM Underground sections for grade UK4570 and UKL448 from Ch 5000 of Ukwa Mine.(AGT/MINING/UK/LT/24-25/1614 dt.11.01.2024) | 11-01-2024 | 18-01-2024 | 18-01-2024 | 18-01-2024 | 04:30 PM | Active | View |
53. | Transportation of Unloading of ROM AND Rock tubs from Vertical Shaft Top to OCF AND return of empty tubs supply to U G for recirculation at Beldongri Mine.(AGT/MINE/BEL/2023-24/ 1523 Dt.05.01.2024) | 10-01-2024 | 17-01-2024 | 17-01-2024 | 17-01-2024 | 05:30 PM | Active | View |
54. | Drain Excavation at 13.50 Level (North) at Balaghat Mine(MIN/BGT/LT/AGT/2023-24/1590 Date 08.01.2024) | 10-01-2024 | 15-01-2024 | 15-01-2024 | 15-01-2024 | 04:30 PM | Active | View |
55. | Collection of primary and secondary data regarding ground water development and filling of CGWA NOC renewal application for Chikhla Mine.(GEOLOGY/CH/CGWA/TE/23-24/1457 DATE-09.01.2024) | 10-01-2024 | 16-01-2024 | 16-01-2024 | 16-01-2024 | 04:30 PM | Active | View |
56. | Laying of 4 GI Vertical Pipeline for Dewatering at 2nd Vertical Shaft of Ukwa Mine.(AJGM/UK/MECH/2023-24/1601) | 10-01-2024 | 17-01-2024 | 17-01-2024 | 17-01-2024 | 04:30 PM | Active | View |
57. | Forest NOC Processing charges for Mining Lease of Village Tawejhari and Village(MIN/BGT/LT/AGT/2023-24/1600 Date) | 10-01-2024 | 16-01-2024 | 16-01-2024 | 16-01-2024 | 04:30 PM | Active | View |
58. | Cleaning of JIG tank at OCF JIG(MINING/BGT/LT/AGT/2023-24/1591 Date 08.01.2024) | 10-01-2024 | 15-01-2024 | 15-01-2024 | 15-01-2024 | 04:30 PM | Active | View |
59. | Replacement of rotten and damaged mild steel chequered sheet at filtration area at EMD Plant DB Mine(MOIL/DB/EMD/ADGM/23-24/1434) | 08-01-2024 | 20-01-2024 | 20-01-2024 | 20-01-2024 | 04:30 PM | Active | View |
60. | Driling of Muck generation hole at 1150 Level 2nd vertical Shaft at Ukwa Mine.(AGT/MINING/UK/LT/24-25/1589 Dt.08.01.2023) | 08-01-2024 | 15-01-2024 | 15-01-2024 | 15-01-2024 | 04:30 PM | Active | View |
61. | Applications for empanelment of firms for conducting Transaction Auditing for two years extendable to three years.(MOIL/I. Audit/2023-24/ETA/01) | 06-01-2024 | 29-01-2024 | 29-01-2024 | 29-01-2024 | 02:00 PM | Active | View |
62. | FRP Lining of Concrete electrolytic cells of new cell bay at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/1397) | 06-01-2024 | 16-01-2024 | 16-01-2024 | 16-01-2024 | 04:30 PM | Active | View |
63. | Purchase of Water Sprinkler C.F. Pump DSM 65/20 for BEML WS28-2,3 of Dongri Buzurg Mine from Manufacturer/ Authorized Dealer/Supplier(T.E.No. PUR/MOIL/DB/2023-24/1439) | 06-01-2024 | 23-01-2024 | 23-01-2024 | 23-01-2024 | 04:30 PM | Active | View |
64. | Purchase of AVTEC 6610M Transmission filters for BEML make BH60 M dumpers.(T.E.No. PUR/MOIL/DB/2023-24/1440) | 06-01-2024 | 23-01-2024 | 23-01-2024 | 23-01-2024 | 04:30 PM | Active | View |
65. | Proposal for Procurement of PVC Gumboots of Various sizes.(Mining/CH/T.E./23-24/1409) | 05-01-2024 | 10-01-2024 | 10-01-2024 | 10-01-2024 | 04:30 PM | Active | View |
66. | Painting to Boundary wall of Mine Manager Bungalow at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1563 DT.04.01.2023) | 05-01-2024 | 09-01-2024 | 09-01-2024 | 09-01-2024 | 04:30 PM | Active | View |
67. | Repairing of road by spreading of filling material at approach road of Nagra Plant to Magzine Building at Ukwa Mine.(AGT/CIVIL/UK/LT/23-24/1564 dt.04.01.2023) | 05-01-2024 | 09-01-2024 | 09-01-2024 | 09-01-2024 | 04:30 PM | Active | View |
68. | Outsourcing the work of making, collecting canteen items and serving it in UG, BDC, Workshop and Admin building of Kandri Mine.(KD/MINES/NIT/23-24/3553) | 04-01-2024 | 24-01-2024 | 24-01-2024 | 24-01-2024 | 04:30 PM | Active | View |
69. | PROVIDING SUPPLYING LAYING OF 3CX35SQMM ALUMINIUM CONDUCTOR XLPE CABLE AND ERRECTING OF IN-LINE OVERHEAD POLE FOR POWER SUPPLY ARRANGEMENT OF MINE MAGAZINE AT GUMGAON MINE(GUM/ELECT/23-24/2540 DT 03.01.2024) | 04-01-2024 | 25-01-2024 | 25-01-2024 | 25-01-2024 | 04:30 PM | Active | View |
70. | PROCUREMENT OF SPARES FOR LOAD HAUL DUMP LOADER- LHD MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/LHD/23-24/1543) | 03-01-2024 | 15-01-2024 | 15-01-2024 | 15-01-2024 | 04:30 PM | Active | View |
71. | PURCHASE OF SPARE OF 422HP KIRLOSKAR MAKE CENTRIFUGAL PUMP MODEL-RKB-125/3OK, 13STG AT BALAGHAT MINE(PUR/MOIL/BGT/LHD/23-24/1544) | 03-01-2024 | 17-01-2024 | 17-01-2024 | 17-01-2024 | 04:30 PM | Active | View |
72. | Hiring of Tipper for Transportation Ore From 2nd Vertical to Niagra plant at Ukwa mine(AJGM/UK/MECH/2023-24/1541) | 03-01-2024 | 09-01-2024 | 09-01-2024 | 09-01-2024 | 04:30 PM | Active | View |
73. | Procurement of Spares For Tata Motors Ltd.Tippers of Ukwa Mine.(AJGM/UK/MECH/2023-24/1542) | 03-01-2024 | 09-01-2024 | 09-01-2024 | 09-01-2024 | 04:30 PM | Active | View |
74. | Procurement of NBC/SKF/Timken/FAG/NTN Make bearings for IMB Plant of Balaghat Mine.(PUR/BGT/IMB-BRG/23-24/1545) | 03-01-2024 | 17-01-2024 | 17-01-2024 | 17-01-2024 | 04:30 PM | Active | View |
75. | Laying and Fixing of G.I Pipe Line,4 and 6 at Haulage Road in Underground at Ukwa Mine.(AJGM/UK/MECH/2023-24/1550) | 03-01-2024 | 09-01-2024 | 09-01-2024 | 09-01-2024 | 04:30 PM | Active | View |
76. | Rest House Maintenance of Tirodi Mine(TRD/Pers/23-24/1471 DATED 17/12/2023) | 03-01-2024 | 10-01-2024 | 10-01-2024 | 10-01-2024 | 04:00 PM | Active | View |
77. | POWER SUPPLY TO NEW LHD AT 8TH LEVEL UNDERGROUND(BGT/TE/ELECT/AJGM/23-24/1554) | 03-01-2024 | 11-01-2024 | 11-01-2024 | 11-01-2024 | 03:30 PM | Active | View |
78. | Providing and fixing of innuguration stone at Munsar Mine(LT/CIVIL/MUN/HO-AGT/24-25/1410) | 03-01-2024 | 10-01-2024 | 10-01-2024 | 10-01-2024 | 04:00 PM | Active | View |
79. | Purchase of rollers and coupling for conveyor belt system of Ferro Manganese Plant Balaghat Mine(TE/MOIL/FMP/MECH/23-24/431 Date 01/01/2024) | 01-01-2024 | 08-01-2024 | 08-01-2024 | 08-01-2024 | 04:30 PM | Active | View |
80. | Procurement of FEPL spares of Cap lamps for Ukwa Mine(UK/ELECT/2023-24/1521) | 01-01-2024 | 08-01-2024 | 08-01-2024 | 08-01-2024 | 04:30 PM | Active | View |
81. | Providing supplying and repairing of PC SCADA software applications for controlling winder processes at Munsar Mine(AGT/MUN/ELECTR/NIT/23-24/1511 DT 01/01/2024) | 01-01-2024 | 10-01-2024 | 10-01-2024 | 10-01-2024 | 04:30 PM | Active | View |
82. | Purchase and installation of MFP Monochrome (Ink Tank) Printer at MOIL Ltd., Balaghat Mine.(MM/BG/SYS/PUR/PRN/23-24/433) | 30-12-2023 | 05-01-2024 | 05-01-2024 | 05-01-2024 | 04:00 PM | Active | View |
83. | Repairing of Track Roller of Tata 1200-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/23-24/ 1398) | 29-12-2023 | 20-01-2024 | 20-01-2024 | 20-01-2024 | 04:30 PM | Active | View |
84. | Overhauling of Hydraulic Pump and Charging Pump of LHD Machine of Balaghat Mine(AGT/MECH/LHD-PUMP/23-24/1514) | 28-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | View |
85. | Repairing of complete final drive planetary gear assembly of LHD machine of Balaghat Mine.(AGT/MECH/FD-LHD/23-24/1513) | 28-12-2023 | 05-01-2024 | 05-01-2024 | 05-01-2024 | 04:30 PM | Active | View |
86. | PURCHASE OF PIPE-FITTINGS AND ACCESSORIES FOR UNDERGROUND LEVELS OF BALAGHAT MINE.(PUR/MOIL/PIPE-FITT/23-24/1515) | 28-12-2023 | 16-01-2024 | 16-01-2024 | 16-01-2024 | 04:30 PM | Active | View |
87. | PURCHASE OF DTH HAMMER AND BUTTON BITS FOR WAGON DRILL MACHINE OF BALAGHAT MINE.(PUR/MOIL/BGT/DTH/23-24/1512) | 28-12-2023 | 19-01-2024 | 19-01-2024 | 19-01-2024 | 04:30 PM | Active | View |
88. | Proposal for RCC work to establish Chute and Manways for preparation of Stopes at minus 370 ft L.(Mining/CH/T.E./23-24/1385) | 28-12-2023 | 03-01-2024 | 03-01-2024 | 03-01-2024 | 04:30 PM | Active | View |
89. | Drilling and reflushing of Bore holes at Chikla Mine.(Mining/CH/T.E./23-24/1386) | 28-12-2023 | 03-01-2024 | 03-01-2024 | 03-01-2024 | 04:30 PM | Active | View |
90. | Painting work to Industrial Buildings for Safety Week function at Chikla Mine.(CH/Civil/NIT/23-24/1382 Date-26.12.2023) | 27-12-2023 | 02-01-2024 | 02-01-2024 | 02-01-2024 | 04:30 PM | Active | View |
91. | Repair of SIEMENS PLC CPU 315-2 PN/DP DIGITAL OUTPUT MODULE ET 200S 8 CH. and Power Supply 6.2A/24V DC of Kandri Mine(AGENT/GR-III/ELECT/23-24/1460, 20/12/2023) | 25-12-2023 | 05-01-2024 | 05-01-2024 | 06-01-2024 | 04:30 PM | Active | View |
92. | Purchase of electrode blower motor with complete auxiliaries as per mentioned tech specifications(TE/MOIL/FMP/ELECT/23-24/412) | 25-12-2023 | 04-01-2024 | 04-01-2024 | 04-01-2024 | 04:30 PM | Active | View |
93. | Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGT/BGT/MECH/IMB/23-24/1499) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | View |
94. | PURCHASE OF BRASS BRAZING ROD OF SIZE-1/8 FOR BALAGHAT MINE.(PUR/MOIL/BRAZ-ROD/23-24/1496) | 23-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | View |
95. | PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/BGT/IMB/SOL/23-24/1494) | 23-12-2023 | 16-01-2024 | 16-01-2023 | 16-01-2023 | 04:30 PM | Active | View |
96. | PURCHASE OF MS NUT OF SIZE M-20X2.5X25MM FOR ROOF BOLT SUPPORT SYSTEM OF BALAGHAT MINE.(PUR/MOIL/BGT/M-20/23-24/1495) | 23-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | View |
97. | PURCHASE OF MS NUT OF SIZE M-20X2.5X25MM FOR ROOF BOLT SUPPORT SYSTEM OF BALAGHAT MINE.(PUR/MOIL/BGT/M-20/23-24/1495) | 23-12-2023 | 12-01-2024 | 12-01-2024 | 12-01-2024 | 04:30 PM | Active | View |
98. | NDT of Vital Components of Holmes Shaft Cage Winder, Holmes Shaft Skip Winder and Production Shaft Winder of Balaghat Mine.(AGT/BGT/MECH/NDT/23-24/1497) | 23-12-2023 | 11-01-2023 | 11-01-2023 | 11-01-2023 | 04:30 PM | Active | View |
99. | Painting of various structures of Winding Engine Installations, Waste Rock bunker and spillage bunker of Balaghat Mine.(AGT/BGT/PAINT/23-24/1498) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | View |
100. | Underground sand stowing/Bottom Ash operation at Ukwa Mine(1750 Level).(AGT/MINING/UK/LT/23-24/1462 DT.23.12.2023) | 23-12-2023 | 29-12-2023 | 29-12-2023 | 29-12-2023 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |