Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Proposal for sorting of Surplus Underground ROM for grade UKL448 at Ch10000 of Ukwa Mine(AGT/Min/UK/LT/2023-24/275 Date- 18.05.2023) | 18-05-2023 | 25-05-2023 | 25-05-2023 | 25-05-2023 | 04:30 PM | Active | View |
2. | Purchase of High Speed Diesel (HSD)(E-1 DT.18.05.2023) | 18-05-2023 | 05-06-2023 | 05-06-2023 | 05-06-2023 | 03:30 PM | Active | View |
3. | Fabrication of new Grizzly sigments at IMB Plant of DB Mine(DB/IMB/23-24/206 Dated 13.05.2023) | 16-05-2023 | 29-05-2023 | 29-05-2023 | 29-05-2023 | 04:00 PM | Active | View |
4. | Removal of Garbage, Cleaning Colony at Munsar Mine of Septic Tanks and Drains from Kalnchi Wahitola and Chargoan at Munsar(PER/MS/23-24/204, 11.05.2023) | 16-05-2023 | 24-05-2023 | 24-05-2023 | 24-05-2023 | 04:30 PM | Active | View |
5. | Major Overhauling of Maxflow make multistage Pump 150HP of Balaghat Mine.(AGENT/BGT/MECH/PUMP/23-24/244) | 15-05-2023 | 24-05-2023 | 24-05-2023 | 24-05-2023 | 04:30 PM | Active | View |
6. | Fabrication of Pump spares by pattern making, casting and machining work for 300HP Multistage Pump of Balaghat Mine.(AGENT/BGT/MECH/PUMP/23-24/245) | 15-05-2023 | 24-05-2023 | 24-05-2023 | 24-05-2023 | 04:30 PM | Active | View |
7. | Replacement of Liner Plate 8/10mm of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/23-24/246) | 15-05-2023 | 30-05-2023 | 30-05-2023 | 30-05-2023 | 04:30 PM | Active | View |
8. | Cleaning of Underground Sumps and Underground drains under the Monsoon preparatory works at Munsar Mine(MUN/TENDER/23-24/458) | 15-05-2023 | 23-05-2023 | 23-05-2023 | 23-05-2023 | 04:30 PM | Active | View |
9. | Providing PVC Polythene Sheets to Mangalore Tiled Roofing to camp Quarters and tarpaulin sheets over Bungalows including various miscellaneous repair works and retiling at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/243 DT.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
10. | RCC roof repairs of camp quarters at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/240 dt.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
11. | RCC roof repairs of 6th level substation Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/242 dt.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
12. | Construction of Drain near Block no. 2 at KC Colony at Balaghat Mine(CIVIL/BGT/LT/AGT/2023-24/241 DT.14.05.2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
13. | Opening of LHDs chute and pushing of loaded tubs 36 CFT from X cut to haulage road and empty tubs from haulage road to LHDs X cut face Manually in 300L(Agent/Gum/Min/23-24/259, Dt 15/05/2023) | 15-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
14. | Construction of RCC Ramp on both side of Weigh Bridge at Kalaphata Sand ghat.(KAN/CIVIL/NIT/23-24/404 DT 12.05.2023) | 13-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
15. | Loading unloading and spreading of filling at 70Level Chikla B Section at Chikla Mine.(MINING/CH/T.E./23-24/148) | 13-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
16. | In House Maintenance of Rest House Mine Manager Bungalow Canteen and Recreation Hall at Gumgaon Mine(AGT/GUM/PER/LT/23-24/ 321 DT 11/05/2023) | 12-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
17. | Providing and Laying RCC Hume pipe sever line from new A type quarters colony up to STP at Gumgaon Mine(AGT/GUM/CIVIL/LT/23-24/ 320 DT 11/05/2023) | 12-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
18. | Laying and Lowering of 3C x 240Sqmm 1.1KV PVDWA Copper Cable at Gumgaon Mine(GUM/ELECT/23-24/342 DT 12/05/2023) | 12-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
19. | PURCHASE OF STATION BATTERY SET 2 VOLT / 100AH (PLANT CELL) FOR 6TH LEVEL SURFACE SUBATION FOR BALAGHAT MINE.(BGT/TE/ELECT/AJGM/23-24/232) | 12-05-2023 | 18-05-2023 | 18-05-2023 | 18-05-2023 | 03:30 PM | Active | View |
20. | Purchase of Couplings and V Belt Pulley for IMB Plant of DB Mine(DB/TE/IMBP/23-24/10007776/1992) | 12-05-2023 | 26-05-2023 | 26-05-2023 | 26-05-2023 | 04:00 PM | Active | View |
21. | The Manual collection of sand from Pench River Bank to sand stock yard at Kalaphata Ghat(Munsar/MINES/NIT/2023-24) | 12-05-2023 | 19-05-2023 | 19-05-2023 | 19-05-2023 | 04:30 PM | Active | View |
22. | Proposal for cleaning and painting of 1st and 2nd crushing and screening plant at Chikla mine.(TE/CH/MECH/23-24/76-25502/161 date 6/5/2023) | 10-05-2023 | 18-05-2023 | 18-05-2023 | 18-05-2023 | 03:30 PM | Active | View |
23. | The Manual collection of sand from Pench River Bank to sand stock yard at Kalaphata Ghat(KD/MINES/NIT/2023-24/371) | 09-05-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 04:30 PM | Active | View |
24. | Proposal for Additional excavation in Magniferrous rock at 1150 L 1050 L AND 950 LEVEL AT 2ND VERTICAL SHAFT AT UKWA MINE(AGT/MIN/UK/LT/2023-24/191) | 09-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
25. | Proposal for Drain excavation and concreting at 1150 level at 2nd vertical shaft at Ukwa Mine(AGT/MIN/UK/LT/ 2023-24/192 Date - 08.05.2023) | 09-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
26. | Fabrication of steel Manways 1.5 X 0.84 M for Chikle Mine.(TE/CH/MECH/GEN/2023/181/149 date 03.05.2023) | 08-05-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 03:30 PM | Active | View |
27. | RCC roof repair of Camp quarters at Chikla Mine.(Civil/CH/TE/23-24/147 Date-02.05.2023) | 08-05-2023 | 22-05-2023 | 22-05-2023 | 22-05-2023 | 04:30 PM | Active | View |
28. | Retiling and roof repair including laying opolythene sheet over roof of camp quarters and industrial buildings at chikla M(Civil/CH/TE/23-24/144 Date-02.05.2023) | 06-05-2023 | 20-05-2023 | 20-05-2023 | 20-05-2023 | 04:30 PM | Active | View |
29. | PROCUREMENT OF COLD VULCANIZING SOLUTION and HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/MOIL/BGT/IMB/SOL/23-24/177) | 05-05-2023 | 26-05-2023 | 26-05-2023 | 26-05-2023 | 04:30 PM | Active | View |
30. | PURCHASE OF SPARE OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG AT BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/178) | 05-05-2023 | 12-05-2023 | 12-05-2023 | 12-05-2023 | 04:30 PM | Active | View |
31. | PURCHASE OF HIGHER GRADE CONCAVE-2NOS. and MANTLE-2NOS. (Gr-MNS-10) FOR CONE CRUSHER UNIT OF PILOT PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/PP-CC/23-24/176) | 05-05-2023 | 19-05-2023 | 19-05-2023 | 19-05-2023 | 04:30 PM | Active | View |
32. | Formation of base foundation for installation of chock in underground faces.(Agent/Gum/Min/23-24/200, Dt 05/05/2023) | 05-05-2023 | 12-05-2023 | 12-05-2023 | 12-05-2023 | 04:30 PM | Active | View |
33. | Excavation and filling rehandling work at 15th level main Haulage road of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/154 dt.02.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | View |
34. | Filling spreading of waste rock at 10th level of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/153 dt.03.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | View |
35. | RCC work at 13.5 level north in extension areas of X-cut 29 and Haulage road of 13.5 Level North section of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/155 dt.03.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | View |
36. | Drilling of 57mm dia hole for cable bolting at 12th level north section of Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/151 dt.02.05.2023) | 03-05-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | View |
37. | Drilling of 57mm dia hole for cable bolting at 12th level north section of Balaghat Mine.(MINING/BGT/LT/AGT/2023-24/151 dt.02.05.2023) | 02-05-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | View |
38. | Laying of 60lbs Tramline at 10th level Holmes Shaft orepass and Production Shaft of Balaghat Mine(MINING/BGT/LT/AGT/2022-23/152 dt.02.05.2023) | 02-05-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | View |
39. | RCC work at 15 level main Haulage road of Balaghat Mine.(MINING/BGT/LT/AGT/2022-23/150 dt.02.05.2023) | 02-05-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | View |
40. | Desilting and cleaning of sump and surrounding of area of sump at 13L(Agent/Gum/Min/23-24/168, Dt 29/04/2023) | 01-05-2023 | 08-05-2023 | 08-05-2023 | 08-05-2023 | 04:30 PM | Active | View |
41. | Construction of Foundation and Shed for mounting and installation of 2 Nos 500kVA DG Set for EMD Plant, Dongribuzurg Mine.(DB/CIVIL/EMD/NIT/2023-24/317 28.04.2023) | 29-04-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | View |
42. | Painting to Plant Structures of Electromagnetic Dioxide, EMD Plant of Dongribuzurg Mine(DB/EMD/CIVIL/NIT/2023-24/316 28.04.23) | 29-04-2023 | 09-05-2023 | 09-05-2023 | 09-05-2023 | 04:30 PM | Active | View |
43. | Replacement of VCB Sprouts of 11KV ABB Make VCB Panels of Main Hill Substation of Chikla Mine(CH/ELECT/23-24/138) | 29-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 04:30 PM | Active | View |
44. | Provision of Alternate Power Supply to 4L Underground at Chikla Mine(CH/ELECT/23-24/137) | 29-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 04:30 PM | Active | View |
45. | Hiring of backhoe cum loader for handling of subgrade ore(Agent/Gum/Min/23-24/156, Dt 28/04/2023) | 28-04-2023 | 05-05-2023 | 05-05-2023 | 05-05-2023 | 04:30 PM | Active | View |
46. | MAJOR REPAIRING OF BUCKET OF TATA 450 HYD EXCAVATOR TIRODI MINE(PREFFERED THOSE WHO HAD DONE SIMILAR TYPE OF WORK IN LAST THREE YEARS)(TRD/MECH/2022-23/1698 DATE 31.03.2023) | 28-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 03:30 PM | Active | View |
47. | Hiring of Tipper for 2nd vertical shaft at Ukwa Mine(MOIL/UK01/MECH/GEN/2023/117/90) | 25-04-2023 | 08-05-2023 | 08-05-2023 | 08-05-2023 | 04:30 PM | Active | View |
48. | Construction of Barricade wall with Gate in Chitawer Section at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/79 Date- 17.04.2023) | 25-04-2023 | 04-05-2023 | 04-05-2023 | 04-05-2023 | 04:30 PM | Active | View |
49. | Operation and maintenance of Purification Vessel on trial basis at EMD Plant, DB Mine.(MOIL/DB/EMD/ADGM/23-24/82) | 21-04-2023 | 06-05-2023 | 06-05-2023 | 06-05-2023 | 04:30 PM | Active | View |
50. | Concreting work for offsetting of manway wall at -350L stope Kandri Mine(KD/MINES/NIT/2023-24/158) | 19-04-2023 | 25-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | View |
51. | Cutting and Levelling of waste Material near 12000 section at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/80 Date- 17.04.2023) | 19-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
52. | Drilling of Borewells at 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/57 Date- 10.04.2023) | 18-04-2023 | 29-04-2023 | 29-04-2023 | 29-04-2023 | 04:30 PM | Active | View |
53. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF LEATHER SHOES MAKE - BATA, MODEL - REMO(PUR/MOIL/C-1/26/E-26/360-M) | 18-04-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
54. | Spreading Moorum for Repair to roads from Mine Magazine to 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/55 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
55. | Exterior Painting and white washing in Mine Premises at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/54 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
56. | Levelling cleaning of entire Premises of 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/58 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
57. | Land scaping and Beautification works in 2nd vertical shaft at Ukwa Mine(AGT/CIVIL/UK/LT/2023-24/56 Date- 10.04.2023) | 18-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
58. | Renewal of Sanitation Line including making Septic Tanks, Inspection Chambers to streamline sanitation system of Syndicate Camp Colony of Dongribuzurg Mine(DB/CIVIL/NIT/TE/2023-24/55 15.04.2023) | 17-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | View |
59. | PROVIDING, SUPPLYING, FIXING AND INSTALLATION OF CABLE CLAMP FOR 3Cx120SQMM 11KV XLPE CABLE IN SHAFT(BGT/TE/ELECT/AJGM/23-24/71) | 13-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 03:30 PM | Active | View |
60. | Extension of street light at mine siding at Gumgaon Mine(GUM/ELECT/23-24/78 DT 11.04.2023) | 12-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 04:30 PM | Active | View |
61. | SUPPLY OF SPARES FOR FLAME PROOF MAKE CAPLAMP FOR GUMGAON MINE(PUR/GUM/ELECT/23-24/85 Dt 11.04.2023) | 12-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | View |
62. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all Winders for one year at Balaghat Mine(AGENT/BGT/MECH/WINDER/23-24/48) | 12-04-2023 | 27-04-2023 | 27-04-2023 | 27-04-2023 | 04:30 PM | Active | View |
63. | CLEANING OF ACCUMULATED SAND FROM -50L AND -150L AT KANDRI MINE(KD/MINES/NIT/2023-24/114) | 12-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | View |
64. | Repairing/Fabrication of both Tap hole spout during shutdown for furnace relining work of Ferro Manganese Plant, Balaghat Mine(MOIL/FMP/AGT/MECH/23-24/19 dt.11.04.2023) | 12-04-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 04:30 PM | Active | View |
65. | RCC OF WALL AND ROOF IN 7 NO CROSS CUT AT -450LEVEL UNDERGROUND IN KANDRI MINE(KD/MINES/NIT/2023-24/117) | 12-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | View |
66. | Requirement of Manpower for collection of canteen food items and serving it to Mine employees at Chikla Mine.(Civil/CH/TE/23-24/30 Date-12.04.2023) | 12-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 04:30 PM | Active | View |
67. | RCC work at 13.5 Level north in extension areas of x-cut 29 at 13.5 Level north section of Balaghat mine(MINING/BGT/LT/AGT/2023-24/61 Dt.12.04.2023) | 12-04-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:30 PM | Active | View |
68. | Insulation and painting of air cooler duct installed at New Administrative building at Balaghat Mine.(CIVIL/BGT/LT/AGT/2023-24/62 Dt.12.04.2023) | 12-04-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:30 PM | Active | View |
69. | Replacement/fabrication of Furnace shell plate of 6 MVA Submerged Arc Furnace around Tap Holes of Ferro Manganese Plant, Balaghat Mine.(MOIL/FMP/AGT/MECH/23-24/11 dt.09.04.23) | 12-04-2023 | 25-04-2023 | 25-04-2023 | 25-04-2023 | 04:30 PM | Active | View |
70. | Repairing of Dump Body of 7Nos. of Tippers Utility box body of Eicher LCV deployed at Balaghat Mine.(AGT/BGT/MECH/TIPPER/23-24/43) | 11-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | View |
71. | PURCHASE OF Complete Rotary Element-1set for 132KW Mather and Platt Make pump Model SCP 200-390-HA installed at IMB plant of BALAGHAT MINE.(PUR/MOIL/BGT/PUMP/23-24/42) | 11-04-2023 | 26-04-2023 | 26-04-2023 | 26-04-2023 | 04:30 PM | Active | View |
72. | Drilling of Bore Hole of 110mm Dia.-4Nos of 6mts each For Installation of Electro Mechanical Multi Point Bore Extensometer and 2Nos. of 30mtrs each at 11th Level of Balaghat Mine(AGT/BGT/MECH/B-HOLE/23-24/41) | 11-04-2023 | 26-04-2023 | 26-04-2023 | 26-04-2023 | 04:30 PM | Active | View |
73. | Hiring of backhoe cum loader for handling of subgrade ore.(Agent/Gum/Min/23-24/36, Dt 08/04/2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:35 PM | Active | View |
74. | Transportation and unloading of tubs into tippler at surface.(Agent/Gum/Min/23-24/35, Date-08.04.2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | View |
75. | for Pushing of tubs from LHD faces in 300L at Gumgaon Mine.(Agent/Gum/Min/23-24/37, Dt 08/04/2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:40 PM | Active | View |
76. | Operation of vibratory screen installed at surface in Gumgaon Mine.(Agent/Gum/Min/23-24/38 Dt 08/04/2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:45 PM | Active | View |
77. | for Cleaning of silt accumulated in drain, haulage road and sump of 200L and 300L(Agent/Gum/Min/23-24/39, Dt 08.04.2023) | 11-04-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 05:00 PM | Active | View |
78. | Fabrication of Rack and Pinion Gear set 30Nos.,Sleeves-20Nos. and Piston-20Nos. of Actuator assembly of butterfly valve of air pulsating Jig of IMB plant at Balaghat(AGT/BGT/MECH/IMB/23-24/32) | 10-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:30 PM | Active | View |
79. | Fabrication of 1.5Mtrs Dia. X 2.4Mtrs Height Steel Manways-12 sets for underground at Balaghat Mine(AGT/BGT/MECH/Man-way/23-24/33) | 10-04-2023 | 24-04-2023 | 24-04-2023 | 24-04-2023 | 04:00 PM | Active | View |
80. | PURCHASE OF HIGHER GRADE CONCAVE-1No. and MANTLE-1NO. (Gr-MNS-04) FOR CONE CRUSHER UNIT OF PILOT PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/PP-CC/23-24/31) | 08-04-2023 | 28-04-2023 | 28-04-2023 | 28-04-2023 | 04:30 PM | Active | View |
81. | CABLE BOLTING OPERATION IN -450 LEVE UNDERGROUND AT KANDRI MINE(KD/MINES/NIT/2023-24/57) | 08-04-2023 | 17-04-2023 | 17-04-2023 | 17-04-2023 | 04:30 PM | Active | View |
82. | Minor Repairing and Testing of Transmission Assy. of LT WL-9020 Wheel loader of Balaghat Mine.(AGT/BGT/MECH/MG/23-24/22) | 06-04-2023 | 13-04-2023 | 13-04-2023 | 13-04-2023 | 04:30 PM | Active | View |
83. | Repair of existing khosala compressor house building and water proofing of Electrical substation at First vertical shaft premises at Chikla Mine.(Civil/CH/TE/23-24/04 Date-01.04.2023) | 06-04-2023 | 20-04-2023 | 20-04-2023 | 20-04-2023 | 04:30 PM | Active | View |
84. | Fabrication of Grizzly segments for IMB Plant of DB mine.(DB/IMB/22-23/76-24622/03 Date 01/04/2023) | 04-04-2023 | 11-04-2023 | 11-04-2023 | 11-04-2023 | 03:30 PM | Active | View |
85. | Hiring of Hyd. Excavator with Rock breaker arrangement for excavating the Outcrop ore at Surface between Ch-63-58.50 of South Section of Mine areas of Balaghat Mine.(AGT/BGT/MECH/HIRING/23-24/09) | 04-04-2023 | 13-04-2023 | 13-04-2023 | 13-04-2023 | 04:30 PM | Active | View |
86. | Fabrication of pinion Gear and idler gear set for Tub Tippler of Material Handling Plant at Chikla.(TE/CH/MECH/22-23/76-24186/1494 Date 30/03/2023) | 03-04-2023 | 10-04-2023 | 10-04-2023 | 10-04-2023 | 03:30 PM | Active | View |
87. | NDT of vital components of winder of Chikla Mine.(TE/CH/MECH/22-23/76-24560/1495 DATE 30/03/2023) | 03-04-2023 | 10-04-2023 | 10-04-2023 | 10-04-2023 | 03:30 PM | Active | View |
88. | Proposal for supply of unskilled labour for loading and unloading of various materials.(STORE/CH/T.E./22-23/1473) | 01-04-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:00 PM | Active | View |
89. | Supply of brake liners for BEML make BH60M dumpers Operating at Dongri Buzurg Mine(PUR/DB/MECH/2022-23/1478) | 31-03-2023 | 18-04-2023 | 18-04-2023 | 18-04-2023 | 04:30 PM | Active | View |
90. | Supply of front caliper brake liners for BEML make BH60M dumper no-5 and no-6 Operating at Dongri Buzurg Mine(PUR/DB/MECH/2022-23/1479) | 31-03-2023 | 19-04-2023 | 19-04-2023 | 19-04-2023 | 04:30 PM | Active | View |
91. | Shifting of 3phase 5wire LT Overhead Line from construction site of of new WBM road at Gumgaon Mine(GUM/ELECT/22-23/3050 DT 30/03/2023) | 30-03-2023 | 12-04-2023 | 12-04-2023 | 12-04-2023 | 04:30 PM | Active | View |
92. | SHIFTING AND INSTALLATION OF ROAD WEIGHBRIDGE FROM TIRODI(MP) TO KALAPHATA SAND LEASE AREA (MAHARASHTRA)(Agent/Gr-III/Mech/22-23/3720) | 29-03-2023 | 07-04-2023 | 07-04-2023 | 07-04-2023 | 04:30 PM | Active | View |
93. | Construction of retaining wall for Bunker near Vertical Shaft at Gumgaon Mine.(MOIL/23-24/ET/2) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
94. | Providing and fixing chain link fencing along Parsoda old open Cast pit (325 MRL) at Parsoda Mine.(MOIL/23-24/ET/10) | 29-03-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 03:30 PM | Active | View |
95. | Construction of Settling tank and drain near crushing plant bunker, second vertical Shaft at chikla Mine.(MOIL/23-24/ET/12) | 29-03-2023 | 15-05-2023 | 15-05-2023 | 15-05-2023 | 03:30 PM | Active | View |
96. | Landscaping and Beautification works at C type officers colony quarters at Ukwa mine.(MOIL/23-24/ET/5) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
97. | Fabrication, Installation and commissioning of water tight Doors at -270 feet Level CH 1580, -70 feet level CH 1700 and -470 feet level CH 1800 at Chikla Mine.(MOIL/23-24/ET/6) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
98. | Miscellaneous Civil Works at EMD Plant and Administrative Building at Dongri Buzurg Mine.(MOIL/23-24/ET/7) | 29-03-2023 | 10-05-2023 | 10-05-2023 | 10-05-2023 | 03:30 PM | Active | View |
99. | Tub Pushing work in different levels of Balaghat mine(MINING/BGT/LT/AGT/2022-23/1675 dt.28.03.2023) | 28-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
100. | Filling Spreading of Waste rock at production shaft of 10th level at Balaghat Mine(MINING/BGT/LT/AGT/2022-23/1674 DT28.03.2023) | 28-03-2023 | 04-04-2023 | 04-04-2023 | 04-04-2023 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |