Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas(MOIL/21-22/ET-73 dt.11.10.2021) | 11-10-2021 | 25-10-2021 | 25-10-2021 | 26-10-2021 | 03:30 PM | Active | View |
2. | WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF C CLASS FASTENERS-II MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-MOIL/CH/819/FastenerPart-II) | 10-10-2021 | 25-10-2021 | 25-10-2021 | 25-10-2021 | 04:30 PM | Active | View |
3. | Supply of Multi Axis Controller Joystick equivalent to V11(ELECT/MUN/ADGM/21-22/1063, Dated - 08.10.2021) | 09-10-2021 | 22-10-2021 | 22-10-2021 | 22-10-2021 | 04:30 PM | Active | View |
4. | PURCHASE OF 1200mm SWEEP CEILING FAN NOS.100, FOR BALAGHAT MINE(GT/TE/ELECT/AJGM/21-22/910) | 07-10-2021 | 13-10-2021 | 13-10-2021 | 13-10-2021 | 03:30 PM | Active | View |
5. | Fabrication of Butterfly Valve Diaphragm-3nos along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/907) | 06-10-2021 | 05-11-2021 | 05-11-2021 | 05-11-2021 | 04:30 PM | Active | View |
6. | Monthly Maintenance Contract for Cap Lamp and cap lamp racks of Munsar Mine for 118 Day(ELECT/MUN/ADGM/21-22/1030, Dated - 01.10.2021) | 06-10-2021 | 13-10-2021 | 13-10-2021 | 13-10-2021 | 03:30 PM | Active | View |
7. | Cleaning works, painting works and other miscellaneous preparatory works for Durga Stage Bhuvaneshwari Temple New 220 A Type Quarters colony Rantoli area ahead of Durga Pooja at Dongri Buzurg Mine(DB/CIVIL/21-22/1997) | 06-10-2021 | 07-10-2021 | 07-10-2021 | 07-10-2021 | 04:30 Pm | Active | View |
8. | Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/2092 DT 05.10.2021) | 05-10-2021 | 12-10-2021 | 12-10-2021 | 12-10-2021 | 04:30 PM | Active | View |
9. | Outsourcing of distribution Collection and Cleaning of cap lamps of Kandri Mines for a period of 3 months(KD/ELECT/ 21-22/2075) | 04-10-2021 | 18-10-2021 | 18-10-2021 | 18-10-2021 | 04:30 PM | Active | View |
10. | Cleaning and Collection Waste from Septic Tanks, Chambers in Camp Colony at Kandri Mine.(KD/PER/NIT/2021-22/2000) | 01-10-2021 | 15-10-2021 | 15-10-2021 | 15-10-2021 | 04:30 PM | Active | View |
11. | PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/SolTyre/21-22/845) | 30-09-2021 | 08-10-2021 | 08-10-2021 | 08-10-2021 | 04:30 PM | Active | View |
12. | Construction of foundation and Fabrication of new gear box of Ruby winder at Balaghat Mine(MOIL/21-22/ET/71) | 30-09-2021 | 20-10-2021 | 20-10-2021 | 20-10-2021 | 03:30 PM | Active | View |
13. | Providing and fixing supporting structures for solar panel at Directors Bungalow at MOIL, Nagpur(MOIL/21-22/ET/72) | 30-09-2021 | 20-10-2021 | 20-10-2021 | 20-10-2021 | 03:30 PM | Active | View |
14. | Annual repairs to camp quarters at Kandri Mine(MOIL/21-22/ET/69) | 30-09-2021 | 01-11-2021 | 01-11-2021 | 01-11-2021 | 03:30 PM | Active | View |
15. | Cleaning and collection of Garbage and cleaning of Drain at Kandri Mine.(KD/PERS/NIT/2021-22/ 1999) | 29-09-2021 | 15-10-2021 | 15-10-2021 | 15-10-2021 | 04:30 PM | Active | View |
16. | WEBSITE SINGLE/ PROPRIETORY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR 40 TON HYDRAULIC PRESS AND VIBRATING CUP MILL(PUR/MOIL/C-3/43/E-55/114-M Dt. 28/09/2021) | 29-09-2021 | 11-10-2021 | 11-10-2021 | 11-10-2021 | 03:30 PM | Active | View |
17. | PURCHASE OF SOLID TYRE 10.00X20-2nos.,MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD(Loader) MACHINE IN UNDERGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/Soltyre/21-22/840) | 28-09-2021 | 07-10-2021 | 07-10-2021 | 07-10-2021 | 04:30 PM | Active | View |
18. | Procurement of 3 Nos of Restricted Neutral Earthing at Chikla Mine for 1000KVA Transformer(CH/ELECT/21-22/949) | 28-09-2021 | 09-10-2021 | 09-10-2021 | 09-10-2021 | 04:30 PM | Active | View |
19. | Providing 6 mbps 1 is to 1 Internet Leased Line at Munsar Mine(AJGM/Group-III/SYS /NW/2021-22/2001) | 28-09-2021 | 05-10-2021 | 05-10-2021 | 05-10-2021 | 04:30 PM | Active | View |
20. | Handling of ore tolley work at Kandri Mine(KD/mines/NIT/21-22/1745 dated 26.09.2021) | 28-09-2021 | 11-10-2021 | 11-10-2021 | 11-10-2021 | 04:30 PM | Active | View |
21. | PURCHASE OF SPARES FOR EXIDE MAKE LED CAP LAMPS(PUR/MOIL/C-3/615/E-54/109-M Dt.23/09/2021) | 24-09-2021 | 13-10-2021 | 13-10-2021 | 13-10-2021 | 03:30 PM | Active | View |
22. | In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine.(Agent/GUM/PER/NIT/21-22/1231, 21/09/2021) | 23-09-2021 | 30-09-2021 | 30-09-2021 | 30-09-2021 | 04:30 PM | Active | View |
23. | Production of 25 percent Mn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/AGT/LT/2021-22/823 dt21.09.2021) | 21-09-2021 | 30-09-2021 | 30-09-2021 | 30-09-2021 | 04:30 PM | Active | View |
24. | Development and beatification of garden at New Medical Administrative Building at Gumgaon Mine.(MM/GUM/Civil/LT/21-22/1219 18.09.2021) | 20-09-2021 | 29-09-2021 | 29-09-2021 | 29-09-2021 | 04:30 PM | Active | View |
25. | Removal of Waste rock by mechanical means JCB Back loader at Chitaver near ch 12000 section at Ukwa Mine(AGT/Min/UK/LT/21-22/800 Date- 16.09.2021) | 20-09-2021 | 28-09-2021 | 28-09-2021 | 28-09-2021 | 04:30 PM | Active | View |
26. | Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months(CH/ELECT/21-22/903) | 18-09-2021 | 28-09-2021 | 28-09-2021 | 28-09-2021 | 04:30 PM | Active | View |
27. | Providing and fixing chainlink fencing and paving block floor at Diesel pump area at Dongri Buzurg Mine(DB/CIVIL/2021-22/1960 Date 16.09.2021) | 18-09-2021 | 24-09-2021 | 24-09-2021 | 24-09-2021 | 04:30 PM | Active | View |
28. | TENDER INVITING IN SINGLE BID SYSTEM FOR UNLOADING, LOADING, STACKING AND MATERIALS HANDLING FOR CHIKLA MINE STORE(PUR/MOIL/CH/MECH/21-22/902) | 18-09-2021 | 29-09-2021 | 29-09-2021 | 29-09-2021 | 04:30 PM | Active | View |
29. | Tender inviting in single bid system for the work of Security Guards for Diamond Drill Machine site at Chikla Mine(TE-898 DT-16092021) | 16-09-2021 | 24-09-2021 | 24-09-2021 | 24-09-2021 | 04:30 PM | Active | View |
30. | Procurement of AVA Alarms and miscellaneous items for Underground machines at Chikla Mine(CH/ELECT/21-22/901) | 16-09-2021 | 25-09-2021 | 25-09-2021 | 25-09-2021 | 04:30 PM | Active | View |
31. | OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/792) | 15-09-2021 | 16-09-2021 | 16-09-2021 | 16-09-2021 | 12:00 PM | Active | View |
32. | Purchase of Miscellaneous items, Welding , Emery Tape, White Chindi , Grinding Wheel etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/21-22/791) | 15-09-2021 | 07-10-2021 | 07-10-2021 | 07-10-2021 | 04:30 PM | Active | View |
33. | Loading Unloading Stacking of Various material at Dongri Buzurg Mine Store through Contractor Workers for the period of 10 Month in Two Bid(DB/Store Loading Unloading/21-22/893) | 15-09-2021 | 29-09-2021 | 29-09-2021 | 29-09-2021 | 04:30 PM | Active | View |
34. | Drilling of bore hole and fixing of casing pipe for lowering of electrical cable from surface to st level U/G(KD/Civil/NIT/21-22/1855 dated 13.09.2021) | 15-09-2021 | 24-09-2021 | 24-09-2021 | 24-09-2021 | 04:30 PM | Active | View |
35. | Dismantling of roof of the old staff quarter at Kandri MIne .(Dismantling of roof of the old staff quarter havin) | 15-09-2021 | 24-09-2021 | 24-09-2021 | 24-09-2021 | 04:30 PM | Active | View |
36. | Laying of HDPE pipeline (OD 280 mm) for high head slurry pump at D.B. Mine for monsoon dewatering work.(DB/MECH/21-22/879) | 13-09-2021 | 18-09-2021 | 18-09-2021 | 18-09-2021 | 04:30 PM | Active | View |
37. | TENDER ENQUIRY IN SINGLE BID SYSTEM FOR TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-419 DT.13092021) | 13-09-2021 | 20-09-2021 | 20-09-2021 | 20-09-2021 | 04:30 PM | Active | View |
38. | Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/771) | 11-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 04:30 PM | Active | View |
39. | Fabrication of 24Nos. of Wheel Axle Shaft Of G.B. car deployed in underground at Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/770) | 10-09-2021 | 24-09-2021 | 24-09-2021 | 24-09-2021 | 04:30 PM | Active | View |
40. | 10 Mbps Internet Lease Line MOIL LTD Ukwa Mine(BGT/SYS/INTERNET/2020-22/766) | 09-09-2021 | 20-09-2021 | 20-09-2021 | 20-09-2021 | 03:30 PM | Active | View |
41. | Annual repairs to camp quarters at Chikla Mine (MOIL/21-22/ET/65) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | View |
42. | Construction of retaining wall, floor and drainage system near new installed screening plant and construction of biomatric attendance room near pit office and BDC at Kandri Mine (MOIL/21-22/ET/66) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | View |
43. | Drilling of bore with installation of pump, laying pipeline network and construction of pump house for supply of drinking water for dry seperation unit and guest house at Munsar Mine. (MOIL/21-22/ET/67) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | View |
44. | Annual repairs to camp quarters at Tirodi Mine. (MOIL/21-22/ET/68) | 07-09-2021 | 06-10-2021 | 06-10-2021 | 06-10-2021 | 3:30 PM | Active | View |
45. | Repairing of 80MT Road Weighbridge operating at dongribuzurg mine (MOIL/DB/MECH/2021-2022/830) | 04-09-2021 | 15-09-2021 | 15-09-2021 | 15-09-2021 | 4:30 | Active | View |
46. | PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 800KVA, 3.3KV/433V TRANSFORMERS FOR BALAGHAT MINE (BGT/TE/ELECT/AJGM/21-22/736) | 03-09-2021 | 08-09-2021 | 08-09-2021 | 08-09-2021 | 3:30 PM | Active | View |
47. | Rehandling of Manganese Ore at Railway Siding at Dongri Buzurg Mine. (DB/Mining/2021-22/807 Date 08.08.2021) | 03-09-2021 | 08-09-2021 | 08-09-2021 | 08-09-2021 | 4:30 PM | Active | View |
48. | PROCUREMENT OF RESIN CAST 11 KV GRADE CT 60/5 A AS PER ANNEXURE A(PUR/MOIL/BEL/2021-22/1261) | 02-09-2021 | 10-09-2021 | 10-09-2021 | 10-09-2021 | 04:30 PM | Active | View |
49. | CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/21-22/732) | 01-09-2021 | 15-09-2021 | 15-09-2021 | 15-09-2021 | 04:30 PM | Active | View |
50. | Supply(PUR/MOIL/CH/C CLASS/Nut and Bolts/21-22/818) | 01-09-2021 | 04-10-2021 | 04-10-2021 | 04-10-2021 | 04:30 PM | Active | View |
51. | OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/731) | 01-09-2021 | 03-09-2021 | 03-09-2021 | 03-09-2021 | 03:30 PM | Active | View |
52. | Pushing and pulling of empty loaded tubs rock tubs in to from cage at pit top and and incline top and tipping the loaded tubs at OCF Gala tipping point(BEL/MIN/2021-22/1272) | 01-09-2021 | 07-09-2021 | 07-09-2021 | 07-09-2021 | 04:30 PM | Active | View |
53. | Purchase of black Gitti for UG concreting at Kandri Mine(KD/MINES/NIT/2021-22/ 1666) | 31-08-2021 | 15-09-2021 | 15-09-2021 | 15-09-2021 | 04:30 PM | Active | View |
54. | Complete Survey, estimation of 3D Subsidence parameter and 3D Numerical Modelling of Subsidence parameters at Beldongri Mine of MOIL over an area of 26.66 Ha. and 12.99 Ha(MOIL/21-22/ET/44) | 30-08-2021 | 30-09-2021 | 30-09-2021 | 30-09-2021 | 03:30 PM | Active | View |
55. | Cutting and cleaning of grass shrub Bushes at Officer Colony Babu line Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine(DB/CIVIL/21-22/1725 dt 26.08.2021) | 29-08-2021 | 07-09-2021 | 07-09-2021 | 07-09-2021 | 04:30 PM | Active | View |
56. | Providing and installation of tyre washer system at Chikla Mine(CIVIL/CH/T.E./21-22/1803) | 28-08-2021 | 13-09-2021 | 13-09-2021 | 13-09-2021 | 04:30 PM | Active | View |
57. | Production of 25 percentMn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/LT/AGT/21-22/717 DT. 26.08.2021) | 27-08-2021 | 02-09-2021 | 02-09-2021 | 02-09-2021 | 04:30 PM | Active | View |
58. | REQUEST FOR EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL EMM AND OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL EMM PLANT.(SMG/EMM-EOI/21-22/01) | 26-08-2021 | 15-11-2021 | 15-11-2021 | 15-11-2021 | 3:00 PM | Active | View |
59. | INSTALLATION OF ESE TYPE LIGHTING ARRESTOR FOR 33KV OUTDOOR SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/704) | 25-08-2021 | 31-08-2021 | 31-08-2021 | 31-08-2021 | 03:30 PM | Active | View |
60. | Repair of reduced Ore Shed at EMD Plant at DB Mine(DB/CIVIL/21-22/762 dt 21.08.2021) | 25-08-2021 | 31-08-2021 | 31-08-2021 | 31-08-2021 | 04:30 PM | Active | View |
61. | C clas tender(PUR/MOIL/CH/C CLASS/21-22/783 Dt. 23.08.2021) | 25-08-2021 | 25-09-2021 | 25-09-2021 | 25-09-2021 | 04:30 PM | Active | View |
62. | Collection of Garbage from camp colonies at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/664 DT. 13/08/2021) | 23-08-2021 | 30-08-2021 | 30-08-2021 | 30-08-2021 | 04:30 PM | Active | View |
63. | Cleaning of drain sewer line of camp colonies at Balaghat mine(CIVI/BGT/LT/AGT/21-22/669 DT. 17.08.2021) | 23-08-2021 | 30-08-2021 | 30-08-2021 | 30-08-2021 | 04:30 PM | Active | View |
64. | Cleaning and shorting of surplus underground ROM at Ch 10000 BDC Section of Ukwa Mine(AGT/Min/UK/LT/21-22/ 678 Date 21.08.202) | 23-08-2021 | 01-09-2021 | 01-09-2021 | 01-09-2021 | 04:30 PM | Active | View |
65. | 10 Mbps backup Internet Leased Line at BALAGHAT MINE(BGT/SYS/INTERNET/2021-22/677) | 21-08-2021 | 06-09-2021 | 06-09-2021 | 06-09-2021 | 03:30 PM | Active | View |
66. | Repairing of Grouser shoe of BEML Dozer no-4 operating AT DONGRI BUZURG MINE(DB/MECH/21-22/JGM(MEC)/744) | 20-08-2021 | 27-09-2021 | 27-09-2021 | 27-09-2021 | 04:30 PM | Active | View |
67. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR EIMCO ELECON MAKE SDL LHD UDM MACHINE(PUR/MOIL/C-5/ 27 /E- 53 / 90-M) | 20-08-2021 | 09-09-2021 | 09-09-2021 | 13-09-2021 | 03:30 PM | Active | View |
68. | Construction of Guard Room at Mine Manager Bungalow at Ukwa Mine(Civil/UK/LT/21-22/951 Date- 16.08.2021) | 19-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | View |
69. | Cleaning of accumulated sand form under ground at Kandri Mine(KD/mines/NIT/21-22/1530 dated 17.8.2021) | 18-08-2021 | 27-08-2021 | 27-08-2021 | 27-08-2021 | 04:30 PM | Active | View |
70. | Maintenance and Operation of water Supply Scheme at Ukwa Mine(CIVIL/UK/LT/21-22/943) | 17-08-2021 | 26-08-2021 | 26-08-2021 | 26-08-2021 | 04:30 PM | Active | View |
71. | PURCHASE OF C CLASS FASTENERS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-2 DT.16082021) | 17-08-2021 | 04-09-2021 | 04-09-2021 | 04-09-2021 | 04:30 PM | Active | View |
72. | PURCHASE OF C CLASS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-3 DT.17082021) | 17-08-2021 | 06-09-2021 | 06-09-2021 | 06-09-2021 | 04:30 PM | Active | View |
73. | PURCHASE OF C CLASS PIPE FITTINGS MATERIALS FOR KANDRI, MUNSAR, GUMGAON AND BELDONGRI MINE(TE-1 DT.16082021) | 17-08-2021 | 03-09-2021 | 03-09-2021 | 03-09-2021 | 04:30 PM | Active | View |
74. | Construction of Cycle stand near IInd vertical shaft premises at Chikla Mine(CIVIL/CH/T.E./21-22/1634) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | View |
75. | Purchasing of plants soil and fertilizer for new Afforestation for the year 2021 22 at Chikla Mine(CIVIL/CH/T.E./21-22/707) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | View |
76. | Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Chikla village in chikla mine(CIVIL/CH/T.E./21-22/702) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | View |
77. | Afforestation for the year 2021 22 at green belt jone thickness 7.5 M Width along lease boundary area at Sitasoangi village in Chikla mine(CIVIL/CH/T.E./21-22/704) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | View |
78. | Protection and Maintenance of plantation for New plantation 21 22 for three Months of security for plantation area green belt jone thickness 7.5 M Width along lease boundary area at Chikla Mine(CIVIL/CH/T.E./21-22/706) | 14-08-2021 | 28-08-2021 | 28-08-2021 | 28-08-2021 | 04:30 PM | Active | View |
79. | TENDER DOCUMENTS FOR LOWERING OF 3C X 240 SQMM. CU. CABLE FROM 12TH LEVEL TO 13.5TH LEVEL AND 3C X 95 SQMM. CU. CABLE FROM 12TH LEVEL TO 15TH LEVEL AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/651) | 13-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 03:30 PM | Active | View |
80. | Construction of Jaw Crusher Foundation in Nagara Plant at Ukwa Mine(AGT/CIVIL/UK/LT/21-22/632) | 12-08-2021 | 19-08-2021 | 19-08-2021 | 19-08-2021 | 04:30 PM | Active | View |
81. | Waterproofing by means of laying torch shield on roof of old B and C type quarters at Kandri Mine.(KAN/CIVIL/NIT/21-22/1459 DT 10.08.2021) | 10-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 04:30 PM | Active | View |
82. | Drilling of bore and fixing of Casing pipe for lowering electrical cable from surface to I st level of U/g for operating machinery at Kandri Mine.(KAN/CIVIL/NIT/21-22/1458 DT 10.08.2021) | 10-08-2021 | 20-08-2021 | 20-08-2021 | 30-11--0001 | 04:30 PM | Active | View |
83. | Maintenance of Various gardens at Kandri Mine.(KAN/CIVIL/NIT/21-22/1435 DT 08.08.2021) | 09-08-2021 | 17-08-2021 | 17-08-2021 | 17-08-2021 | 04:30 PM | Active | View |
84. | Operation of Pumps at Beldongri Mine(BL/MECH/21-22/ 1095) | 09-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 04:30 PM | Active | View |
85. | Major Repairing of Tata Cummins Engine B5.9 180 20 model of Tata 4018 Trailer Moil Ltd Balaghat mine.(AGENT/BGT/MECH/MG/21-22/622) | 09-08-2021 | 27-08-2021 | 27-08-2021 | 27-08-2021 | 04:30 PM | Active | View |
86. | PROCUREMENT OF OF CARRYING, IMPACT AND RETURN ROLLERS FOR CONVEYOR BELTS AT IMB PLANT OF BALAGHAT MINE.(PUR/MOIL/BGT/IMB/ROL/21-22/624) | 09-08-2021 | 18-08-2021 | 18-08-2021 | 18-08-2021 | 04:30 PM | Active | View |
87. | PROCUREMENT OF COLD VULCANIZING SOLUTION AND HARDENER FOR CONVEYOR BELTS JOINING WORKS AT IMB PLANT BALAGHAT MINE.(PUR/MOIL/BGT/IMB/SOL/21-22/623) | 09-08-2021 | 20-08-2021 | 20-08-2021 | 20-08-2021 | 04:30 PM | Active | View |
88. | FABRICATION OF GRIZZLY SEGEMENTS 8 NOS FOR IMB PLNAT AT DONGRI BUZURG MINE(DB/MECH/21-22/660) | 08-08-2021 | 02-09-2021 | 02-09-2021 | 02-09-2021 | 04:30 PM | Active | View |
89. | Jigging washing and collection of reject ore from IMB Plant at Dongri Buzurg Mine(DB/SUR/21-22/1520) | 07-08-2021 | 14-08-2021 | 14-08-2021 | 14-08-2021 | 03:30 PM | Active | View |
90. | Repairing Bucket Assy-6 nos of PC 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/21-22/JGM(MECH)/642) | 03-08-2021 | 27-08-2021 | 27-08-2021 | 27-08-2021 | 04:30 PM | Active | View |
91. | Procurement of four numbers of SIEMENS Simatic ET 200SP Interface Modules for Chikla Mine(CH/ELECT/21-22/646) | 03-08-2021 | 14-09-2021 | 14-09-2021 | 14-09-2021 | 04:30 PM | Active | View |
92. | Replacement of 6 mm/8mm/10 mm thick liner plates at 14.5 level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WIN/21-22/601) | 02-08-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | View |
93. | Fabrication of 2 Nos of Vertical Brake Tie Rod for Holmes shaft Skip Winder at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/602) | 02-08-2021 | 23-08-2021 | 23-08-2021 | 23-08-2021 | 04:30 PM | Active | View |
94. | Construction of first floor at new Medical Administrative Building along with site development work at MOIL Nagpur(MOIL/21-22/ET/57) | 02-08-2021 | 03-09-2021 | 03-09-2021 | 03-09-2021 | 03:30 PM | Active | View |
95. | Construction of D.G.Set, Chimney foundation, switch and breaker room and shed over D.G.set at Balaghat Mine(MOIL/21-22/ET/56) | 02-08-2021 | 01-09-2021 | 01-09-2021 | 01-09-2021 | 03:30 PM | Active | View |
96. | Laying of HDPE pipeline (OD-280 mm) for high head slurry pump at D.B.Mine for monsoon dewatering(MOIL/DB/MECH/2021-2022/628) | 31-07-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | View |
97. | Supply of front caliper brake liners for BEML make BH60M dumper no 1 and no 2 Operating at Dongri Buzurg Mine(MOIL/PUR/DB/MECH/2021-2022/629) | 31-07-2021 | 10-08-2021 | 10-08-2021 | 10-08-2021 | 04:30 PM | Active | View |
98. | e-procurement of ERW Steel Pipe(PUR/MOIL/C-1/197/WE-07/ET/64) | 31-07-2021 | 06-08-2021 | 06-08-2021 | 06-08-2021 | 03:30 PM | Active | View |
99. | PURCHASE OF MISCELANEOUS ITEMS, WELDING ACCESSORIES , EMERY TAPE, WHITE CHINDI, GRINDING WHEEL ETC FOR GR-I BALAGHAT MINE(PUR/MOIL/BGT/ C CLASS/21-22/590) | 29-07-2021 | 19-08-2021 | 19-08-2021 | 19-08-2021 | 04:30 PM | Active | View |
100. | Fabrication of Hose Fittings required in Underground at Balaghat Mine(AGT/BGT/MECH/HOSE FITTINGS/21-22/562) | 28-07-2021 | 18-08-2021 | 18-08-2021 | 18-08-2021 | 04:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |