Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. Providing 10 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(AJGM/Group-III/SYS/NW/ 2021-22/1311) 29-11-2021 06-12-2021 06-12-2021 06-12-2021 03:30 PM Active View
2. TENDER DOCUMENT FOR OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1099) 27-11-2021 30-11-2021 30-11-2021 30-11-2021 03:30 PM Active View
3. PURCHASE OF SUCTION END CASING- 2NOS. OF 240HP KIRLOSKAR MAKE CENTRIFUGAL PUMP. MODEL-RKB-125/3OK, 8STG 240 HP PUMP AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/21-22/1100) 27-11-2021 06-12-2021 06-12-2021 06-12-2021 04:30 PM Active View
4. PURCHASE OF CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(UR/MOIL/BGT/GB CAR/21-22/1098) 27-11-2021 03-12-2021 03-12-2021 03-12-2021 04:30 PM Active View
5. Purchase of Black gitti for UG concreting at Kandri Mine(KAN/MINES/NIT/21-22/2654 dt. 26.11.2021) 26-11-2021 03-12-2021 03-12-2021 03-12-2021 04:30 PM Active View
6. Laying of 6 and 4 G.I Pipe Lines for Compressed Air supply in underground levels at Balaghat Mine.(AGT/BGT/MECH/PIPE/21-22/1079) 23-11-2021 13-12-2021 13-12-2021 13-12-2021 04:30 PM Active View
7. Interior Renovation work for Gents Toilet in Main Administrative Building of Dongri Buzurg Mine.(DB/Civil/2021-22/2560 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
8. Widening of Entrance Gate including fixing of structural steel gate, concreting work and speed breakers for workshop premises at Dongri Buzurg Mine(DB/Civil/2021-22/2561 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
9. Construction of walkway platform for Railway Weigh Bridge including chain link fencing all around the building at Dongri Buzurg Mine.(DB/Civil/2021-22/2562 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
10. Minor repair works comprising of replacement of old worn out and damaged windows with three track aluminium sliding windows for C-Type quarters at Dongri Buzurg Mine.(DB/Civil/2021-22/2563 Date 22.11.2021) 23-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
11. Development and beautification of garden at New Medical Administrative building at Chikla Mine(CIVIL/CH/T.E./21-22/2811) 20-11-2021 06-12-2021 06-12-2021 06-12-2021 04:30 PM Active View
12. WEBSITE SINGLE/ PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR OVIS MAKES - 4 AND 3 TON BATTERYD/DIESEL OPERATED LOCOMOTIVES.(PUR/MOIL/C-5/44/E- 60/155 -M Dt.20/11/2021) 20-11-2021 13-12-2021 13-12-2021 13-12-2021 03:30 PM Active View
13. Cleaning of Workshop premises of Dongri Buzurg Mine.(DB/MECH/20-21/AGENT/1159) 19-11-2021 27-11-2021 27-11-2021 27-11-2021 04:30 PM Active View
14. Fabrication of Guide Rollers for Tub Tipplers at Chikla Mine.(TE/CH/MECH/21-22/19065/1146) 19-11-2021 24-11-2021 24-11-2021 24-11-2021 03:30 PM Active View
15. EXPRESSION OF INTEREST FOR THE TRANSFER OF TECHNOLOGY FOR PRODUCTION OF ELECTROLYTIC MANGANESE METAL (EMM) AND/ OR DESIGN AND CONSTRUCTION OF A NEW ELECTROLYTIC MANGANESE METAL (EMM) PLANT(SMG/EMM-EOI/21-22/01) 18-11-2021 18-01-2022 18-01-2022 18-01-2022 03:30 PM Active View
16. Purchase of PEARL COKE with Transportation - 6600 MT(MOIL/21-22/ET-83 dt.17.11.2021) 17-11-2021 07-12-2021 07-12-2021 08-12-2021 03:30 PM Active View
17. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/1047) 16-11-2021 18-11-2021 18-11-2021 18-11-2021 03:30 PM Active View
18. Providing and Supplying of Drive Sinamics G120 55KW Heavy Duty Power Module As per Annexure A(PUR/MOIL/2021-22/1890) 16-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
19. Fabrication of Hose Fittings required in Underground at Balaghat Mine.(AGT/BGT/MECH/HO-FIT/21-22/1042) 15-11-2021 30-11-2021 30-11-2021 30-11-2021 04:30 PM Active View
20. Cleaning of accumulated sand from UG50L and UG150L at Kandri Mine.(KD/MINES/NIT/2021-22/2520) 11-11-2021 22-11-2021 22-11-2021 22-11-2021 04:30 PM Active View
21. Purchase of Black Gitti for U/G concreting at Kandri Mine(KD/MINES/NIT/2021-22/2482) 10-11-2021 19-11-2021 19-11-2021 19-11-2021 04:30 PM Active View
22. Repairing of Worn Our Wheels 50nos.and Axle Shaft 30nos of GB Car Deployed in Underground Levels of Balaghat Mine.(AGT/BGT/MECH/GB-CAR/21-22/1032) 10-11-2021 18-11-2021 18-11-2021 18-11-2021 04:30 PM Active View
23. Fabrication of Hydraulic Power Pack with Intercooler Assy. for Secondary Brake/ Thruster Brake at Holmes Shaft Cage winder-350 HP. of Balaghat Mine.(AGT/BGT/MECH/WINDER/21-22/1031) 10-11-2021 15-11-2021 15-11-2021 15-11-2021 04:30 PM Active View
24. TENDER DOCUMENTS FOR INSTALLATION AND COMMISSIONING OF 11KV HT VCB PANEL 6TH LEVEL SURFACE SUBSTATION AT BALAGHAT MINE.(BGT/TE/ELECT/AJGM/21-22/1025) 09-11-2021 15-11-2021 15-11-2021 15-11-2021 03:30 PM Active View
25. PURCHASE ESE LIGHTING ARRESTOR FOR KANDRI MINE(PUR/KD/ELECT/21-22/ 2451) 08-11-2021 17-11-2021 17-11-2021 17-11-2021 04:30 PM Active View
26. Repairing of Centre Joint Assy of Tata Hitachi 1200 Hydraulic Excavator operating at Dongri Buzurg Mine Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1102) 04-11-2021 16-11-2021 16-11-2021 16-11-2021 04:30 PM Active View
27. Repairing of Bucket Cylinder of Tata 450-1 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1101) 04-11-2021 16-11-2021 16-11-2021 16-11-2021 04:30 PM Active View
28. Development, Beautification and Horticulture works towards landscaping works for new Medical Administrative Building at Dongri Buzurg Mine.(DB/CIVIL/21-22/2366 Date 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 12-11-2021 04:30 PM Active View
29. Cutting and cleaning of grass, shrubs Bushes from Residential Premises in Officers Colony, Syndicate Camp and Chandmara Colony at Dongri Buzurg Mine.(DB/CIVIL/21-22/2368 Date 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 12-11-2021 04:30 PM Active View
30. Carpentry Works, Repair to Furniture, Construction of Runner and Glass works for Mine Managers Cabin at Dongri Buzurg Mine(DB/CIVIL/21-22/2367 Dated 02.11.2021) 04-11-2021 12-11-2021 12-11-2021 16-11-2021 04:30 PM Active View
31. 15 NOS CHEMICAL EARTH PIT FOR DIFFERENT SURFACE SUBSTATION AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/994) 01-11-2021 08-11-2021 08-11-2021 08-12-2021 03:30 PM Active View
32. Major Repair of Gear Boxes of Ashok Leyland Tippers MP50-H-1266 and MP-50-H-1267 Operating at Balaghat Mine.(AGENT/BGT/MECH/TIPP/21-22/1007) 30-10-2021 08-11-2021 08-11-2021 08-11-2021 04:30 PM Active View
33. PURCHASE OF TOP AND BOTTOM ASSEMBLY 2Nos FOR DSM80 by 36 KIRLOSKAR MAKE 60HP PUMP FOR IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/21-22/MECH/1093) 30-10-2021 17-11-2021 17-11-2021 17-11-2021 04:30 PM Active View
34. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MAXFLOW PUMP.(PUR/MOIL/C-5/28 /E-59 /142-M Dt.30/10/2021) 30-10-2021 19-11-2021 19-11-2021 19-11-2021 03:30 PM Active View
35. Designing Supply Installation and Commissioning of Automatic Fire Detection and Suppression System in EIMCO ELECON Loader(AGENT and JGM/MINES/GRIII/1161) 29-10-2021 10-11-2021 10-11-2021 15-11-2021 04:30 PM Active View
36. Annual service maintenance contract for winder system installed at various mines for a period of two years.(MOIL/21-22/ET/79) 27-10-2021 26-11-2021 26-11-2021 26-11-2021 03:30 PM Active View
37. Supply of black Metal(Gitti) for Undergroung concreting work at munsar mine(Mun/Min/NIT/2021-22/1134) 27-10-2021 02-11-2021 02-11-2021 02-11-2021 04:30 PM Active View
38. Transportation Unloading of ROM Rock Tubs from Vertical Shaft to OCF Return of empty tubs to UG at Beldongri Mine(BEL/MIN/2021-22/1726) 25-10-2021 01-11-2021 01-11-2021 01-11-2021 04:30 PM Active View
39. Construction of parking shed at BDC OCF and Administrative building premises at Gumgaon Mine(MOIL/21-22/ET/74) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
40. Construction of boundry wall around Mine lease area at Tirodi and Sitapatore Mines(MOIL/21-22/ET/76) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
41. Construction of boundry wall Retaining wall and Drain near Ferro Manganese plant Office at Balaghat Mine(MOIL/21-22/ET/78) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
42. Construction of Pit office beside Vertical Shaft at Kandri Mines(MOIL/21-22/ET/80) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
43. Construction of 100000 Liters Capacity Circular Ground Service Reservoir near Sand Stowing Plant at Ukwa Mine(MOIL/21-22/ET/81) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
44. Construction of shed to preserve core boxes at Pani Mines GMDC Ltd Manganese project District Chhota Udepur of Gujrat State(MOIL/21-22/ET/75) 25-10-2021 12-11-2021 12-11-2021 12-11-2021 03:30 PM Active View
45. Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGENT/BGT/MECH/WIN/21-22/2915) 22-10-2021 11-11-2021 11-11-2021 11-11-2021 04:30 PM Active View
46. PURCHASE OF COMPLETE WHEEL AND AXLE ASSEMBLY WITH BEARING AND COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE.(PUR/MOIL/BGT/GB CAR/21-22/972) 21-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
47. Purchase of Hose Fittings for Rock Drill and Air Leg Machines(MOIL/21-22/ET-82,Dt.21/10/2021) 21-10-2021 11-11-2021 11-11-2021 12-11-2021 03:30 PM Active View
48. PURCHASE OF SPARES FOR ATLAS COPCO MAKE COMPRESSOR.(PUR/MOIL/C-5/40 /E-58 / 138-M Dt.20/10/2021) 20-10-2021 09-11-2021 09-11-2021 10-11-2021 03:30 PM Active View
49. PURCHASE OF HIGH PRESSURE MULTISTAGE WATER PUMP KSB MAKE QTY 2 NOS MOVI 32/6(MOIL/EMD/CH/AJGM/21-22/1013) 19-10-2021 09-11-2021 09-11-2021 09-11-2021 04:30 PM Active View
50. PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE(PUR/MOIL/BGT/Sol-Tyr/21-22/960) 18-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
51. PURCHASE OF SPARES FOR SIEMENS MAKE PLC PANEL OF WINDER FOR GUMGAON MINE (M.S).(PUR/MOIL/C-3/13/E-57/136-M Dt.18/10/2021) 18-10-2021 03-11-2021 03-11-2021 03-11-2021 03:30 PM Active View
52. Interior Renovation for Toilet adjacent to Conference Hall at Main Administrative Building of Dongribuzurg Mine(DB/CIVIl/2021-22/ Dated 15.10.2021) 16-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active View
53. PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73 /E- 56 / 132 -M ,Dt.16/10/2021) 16-10-2021 06-11-2021 06-11-2021 08-11-2021 03:30 PM Active View
54. Purchase of Site Mixed Emulsion (SME).(WE-9 Dt 16.10.2021(e-Tender NO.MOIL/21-22/ET/77)) 16-10-2021 25-10-2021 25-10-2021 26-10-2021 03:30 PM Active View
55. Interior Renovation works for Mine Managers Cabin at Dongri Buzurg Mine(DB/Civil/2021-22/ Dated 12.10.2021) 15-10-2021 19-10-2021 19-10-2021 19-10-2021 04:30 PM Active View
56. Providing and Installation of Tyre Washing System at Dongri Buzurg Mine(DB/CIVIL/2021-22/2095 Dated 12.10.2021) 15-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active View
57. Supply of Tools for Chikla and Dongri(PUR/MOIL/CH/820) 14-10-2021 11-11-2021 11-11-2021 11-11-2021 04:30 PM Active View
58. CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/21-22 /996) 13-10-2021 29-10-2021 29-10-2021 29-10-2021 04:30 PM Active View
59. Installation and commissioning of Automatic Fire Detection and Suppression System in Eimco Elecon Front End Wheel Loader Model AL520Z at Gumgaon Mine(AGENT/GM/MECH/21-22/1062) 13-10-2021 02-11-2021 02-11-2021 02-11-2021 04:30 PM Active View
60. Muffle Blasting work and ANFO filling work AT DONGRI BUZURG MINE(DB/Blasting /21-22/991) 12-10-2021 20-10-2021 20-10-2021 20-10-2021 04:30 PM Active View
61. Supply of Incremental Encoder(ELECT/MUN/ADGM/21-22/1072, Dated - 10.10.2021) 11-10-2021 23-10-2021 23-10-2021 23-10-2021 04:30 PM Active View
62. Grass Seed Plantation Program in waste dump benches stabilization of mine area for the Compliance of Condition stipulated in Environmental Clearance and as per guideline of Indian Bureau of Mine at Chikla Mine(CIVIL/CH/T.E./21-22/989) 11-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
63. Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas(MOIL/21-22/ET-73 dt.11.10.2021) 11-10-2021 25-10-2021 25-10-2021 26-10-2021 03:30 PM Active View
64. WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF C CLASS FASTENERS-II MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-MOIL/CH/819/FastenerPart-II) 10-10-2021 25-10-2021 25-10-2021 25-10-2021 04:30 PM Active View
65. Supply of Multi Axis Controller Joystick equivalent to V11(ELECT/MUN/ADGM/21-22/1063, Dated - 08.10.2021) 09-10-2021 22-10-2021 22-10-2021 22-10-2021 04:30 PM Active View
66. PURCHASE OF 1200mm SWEEP CEILING FAN NOS.100, FOR BALAGHAT MINE(GT/TE/ELECT/AJGM/21-22/910) 07-10-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active View
67. Fabrication of Butterfly Valve Diaphragm-3nos along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/907) 06-10-2021 05-11-2021 05-11-2021 05-11-2021 04:30 PM Active View
68. Monthly Maintenance Contract for Cap Lamp and cap lamp racks of Munsar Mine for 118 Day(ELECT/MUN/ADGM/21-22/1030, Dated - 01.10.2021) 06-10-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active View
69. Cleaning works, painting works and other miscellaneous preparatory works for Durga Stage Bhuvaneshwari Temple New 220 A Type Quarters colony Rantoli area ahead of Durga Pooja at Dongri Buzurg Mine(DB/CIVIL/21-22/1997) 06-10-2021 07-10-2021 07-10-2021 07-10-2021 04:30 Pm Active View
70. Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/2092 DT 05.10.2021) 05-10-2021 12-10-2021 12-10-2021 12-10-2021 04:30 PM Active View
71. Outsourcing of distribution Collection and Cleaning of cap lamps of Kandri Mines for a period of 3 months(KD/ELECT/ 21-22/2075) 04-10-2021 18-10-2021 18-10-2021 18-10-2021 04:30 PM Active View
72. Cleaning and Collection Waste from Septic Tanks, Chambers in Camp Colony at Kandri Mine.(KD/PER/NIT/2021-22/2000) 01-10-2021 15-10-2021 15-10-2021 15-10-2021 04:30 PM Active View
73. PURCHASE OF SOLID TYRE 10.00 X 20-4nos., MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD (Loader) MACHINE IN UNDREGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/SolTyre/21-22/845) 30-09-2021 08-10-2021 08-10-2021 08-10-2021 04:30 PM Active View
74. Construction of foundation and Fabrication of new gear box of Ruby winder at Balaghat Mine(MOIL/21-22/ET/71) 30-09-2021 20-10-2021 20-10-2021 20-10-2021 03:30 PM Active View
75. Providing and fixing supporting structures for solar panel at Directors Bungalow at MOIL, Nagpur(MOIL/21-22/ET/72) 30-09-2021 20-10-2021 20-10-2021 20-10-2021 03:30 PM Active View
76. Annual repairs to camp quarters at Kandri Mine(MOIL/21-22/ET/69) 30-09-2021 01-11-2021 01-11-2021 01-11-2021 03:30 PM Active View
77. Cleaning and collection of Garbage and cleaning of Drain at Kandri Mine.(KD/PERS/NIT/2021-22/ 1999) 29-09-2021 15-10-2021 15-10-2021 15-10-2021 04:30 PM Active View
78. WEBSITE SINGLE/ PROPRIETORY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR 40 TON HYDRAULIC PRESS AND VIBRATING CUP MILL(PUR/MOIL/C-3/43/E-55/114-M Dt. 28/09/2021) 29-09-2021 11-10-2021 11-10-2021 11-10-2021 03:30 PM Active View
79. PURCHASE OF SOLID TYRE 10.00X20-2nos.,MAKE TRIDENT BRAND-TRAXTER SUITABLE FOR LHD(Loader) MACHINE IN UNDERGROUND OF BALAGHAT MINE.(PUR/MOIL/BGT/Soltyre/21-22/840) 28-09-2021 07-10-2021 07-10-2021 07-10-2021 04:30 PM Active View
80. Procurement of 3 Nos of Restricted Neutral Earthing at Chikla Mine for 1000KVA Transformer(CH/ELECT/21-22/949) 28-09-2021 09-10-2021 09-10-2021 09-10-2021 04:30 PM Active View
81. Providing 6 mbps 1 is to 1 Internet Leased Line at Munsar Mine(AJGM/Group-III/SYS /NW/2021-22/2001) 28-09-2021 05-10-2021 05-10-2021 05-10-2021 04:30 PM Active View
82. Handling of ore tolley work at Kandri Mine(KD/mines/NIT/21-22/1745 dated 26.09.2021) 28-09-2021 11-10-2021 11-10-2021 11-10-2021 04:30 PM Active View
83. PURCHASE OF SPARES FOR EXIDE MAKE LED CAP LAMPS(PUR/MOIL/C-3/615/E-54/109-M Dt.23/09/2021) 24-09-2021 13-10-2021 13-10-2021 13-10-2021 03:30 PM Active View
84. In House Maintenance of Rest House, Canteen and Recreation Hall at Gumgaon Mine.(Agent/GUM/PER/NIT/21-22/1231, 21/09/2021) 23-09-2021 30-09-2021 30-09-2021 30-09-2021 04:30 PM Active View
85. Production of 25 percent Mn. SM Grade ore (BGL-523) from U/G old sub grade mineral rejects material at Balaghat Mine(MINING/BGT/AGT/LT/2021-22/823 dt21.09.2021) 21-09-2021 30-09-2021 30-09-2021 30-09-2021 04:30 PM Active View
86. Development and beatification of garden at New Medical Administrative Building at Gumgaon Mine.(MM/GUM/Civil/LT/21-22/1219 18.09.2021) 20-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active View
87. Removal of Waste rock by mechanical means JCB Back loader at Chitaver near ch 12000 section at Ukwa Mine(AGT/Min/UK/LT/21-22/800 Date- 16.09.2021) 20-09-2021 28-09-2021 28-09-2021 28-09-2021 04:30 PM Active View
88. Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months(CH/ELECT/21-22/903) 18-09-2021 28-09-2021 28-09-2021 28-09-2021 04:30 PM Active View
89. Providing and fixing chainlink fencing and paving block floor at Diesel pump area at Dongri Buzurg Mine(DB/CIVIL/2021-22/1960 Date 16.09.2021) 18-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
90. TENDER INVITING IN SINGLE BID SYSTEM FOR UNLOADING, LOADING, STACKING AND MATERIALS HANDLING FOR CHIKLA MINE STORE(PUR/MOIL/CH/MECH/21-22/902) 18-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active View
91. Tender inviting in single bid system for the work of Security Guards for Diamond Drill Machine site at Chikla Mine(TE-898 DT-16092021) 16-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
92. Procurement of AVA Alarms and miscellaneous items for Underground machines at Chikla Mine(CH/ELECT/21-22/901) 16-09-2021 25-09-2021 25-09-2021 25-09-2021 04:30 PM Active View
93. OUTSOURCING OF MAINTENANCE, DISTRIBUTION AND COLLECTION OF CAPLAMP FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/792) 15-09-2021 16-09-2021 16-09-2021 16-09-2021 12:00 PM Active View
94. Purchase of Miscellaneous items, Welding , Emery Tape, White Chindi , Grinding Wheel etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/21-22/791) 15-09-2021 07-10-2021 07-10-2021 07-10-2021 04:30 PM Active View
95. Loading Unloading Stacking of Various material at Dongri Buzurg Mine Store through Contractor Workers for the period of 10 Month in Two Bid(DB/Store Loading Unloading/21-22/893) 15-09-2021 29-09-2021 29-09-2021 29-09-2021 04:30 PM Active View
96. Drilling of bore hole and fixing of casing pipe for lowering of electrical cable from surface to st level U/G(KD/Civil/NIT/21-22/1855 dated 13.09.2021) 15-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
97. Dismantling of roof of the old staff quarter at Kandri MIne .(Dismantling of roof of the old staff quarter havin) 15-09-2021 24-09-2021 24-09-2021 24-09-2021 04:30 PM Active View
98. Laying of HDPE pipeline (OD 280 mm) for high head slurry pump at D.B. Mine for monsoon dewatering work.(DB/MECH/21-22/879) 13-09-2021 18-09-2021 18-09-2021 18-09-2021 04:30 PM Active View
99. TENDER ENQUIRY IN SINGLE BID SYSTEM FOR TRANSPORT OF EXPLOSIVE DETONATOR FROM PWD ROAD TO CHIKLA MINE MAGAZINE AT CHIKLA MINE(TE-419 DT.13092021) 13-09-2021 20-09-2021 20-09-2021 20-09-2021 04:30 PM Active View
100. Fabrication of Pneumatic Actuators Valves of Air Pulsating Jig for I.M.B Plant at Balaghat Mine.(AGT/BGT/MECH/IMB/21-22/771) 11-09-2021 06-10-2021 06-10-2021 06-10-2021 04:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.