Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Purchase of Grinding Wheels(WE-70 dt.01.12.2020 (e-Tender no.MOIL/20-21/ET/227) | 02-12-2020 | 23-12-2020 | 23-12-2020 | 24-12-2020 | 03:30 PM | Active | View |
2. | Purchase of Shot Firing Cable(WE-58 dt.01.12.2020 (e-Tender no.MOIL/20-21/ET/233) | 02-12-2020 | 23-12-2020 | 23-12-2020 | 24-12-2020 | 03:30 PM | Active | View |
3. | OPERATION OF PUMPS FOR DRINKING WATER SUPPLY IN CAMP AREA AND OFFICER COLONY AT KANDRI MINE.(KD/Civil/20-21/3542 Dt2.12.2020) | 02-12-2020 | 09-12-2020 | 09-12-2020 | 09-12-2020 | 04:30 PM | Active | View |
4. | Purchase of Handheld XRF Machine for Head office, Nagpur(M.S) - 2 Nos. (1 Lot) (Only Through e-procurement)(WE-72 DT.02/12/2020 (ET-239)) | 02-12-2020 | 28-12-2020 | 28-12-2020 | 29-12-2020 | 03:30 PM | Active | View |
5. | Outsourcing skilled manpower for electrical maintenance work at sitapatore mine.(MOIL/HO/ELEC/2020/47 DATE 16/06/2020) | 01-12-2020 | 12-12-2020 | 12-12-2020 | 12-12-2020 | 03:30 PM | Active | View |
6. | Repairing of Idler Assy-2 nos of Tata Hitachi 450-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1121) | 01-12-2020 | 04-01-2021 | 04-01-2021 | 04-01-2021 | 04:30 PM | Active | View |
7. | Purchase of Steel Braided Hose-4 Items.(MOIL/20-21/ET-228 DT.01.12.2020) | 01-12-2020 | 29-12-2020 | 29-12-2020 | 30-12-2020 | 03:30 PM | Active | View |
8. | Laying of GI Pipe Line 6 inch and 4 in underground at Chikla Mine(TE-13 DT.30112020) | 30-11-2020 | 12-12-2020 | 12-12-2020 | 12-12-2020 | 03:30 PM | Active | View |
9. | CLEANING , SCREENING OF FERRO GRADE KD-4543 FROM SUBGRADE MINERAL REJECT FROM UNDERGROUND AT KANDRI MINE(KAN/MIN/AGT/NIT/20-21/3447 DT 24.11.2020) | 27-11-2020 | 04-12-2020 | 04-12-2020 | 04-12-2020 | 04:30 PM | Active | View |
10. | Making and Supplying of Stemming material Mud Plug used for Blasting / fragmentation in U/G at various working levels at Balaghat Mine(MOIL/20-21/ET/217) | 27-11-2020 | 28-12-2020 | 28-12-2020 | 28-12-2020 | 03:30 PM | Active | View |
11. | Pushing and unloading of tubs in underground and surface at vertical section and Ch.10800 section of Ukwa Mine(MOIL/20-21/ET/216) | 27-11-2020 | 28-12-2020 | 28-12-2020 | 28-12-2020 | 03:30 PM | Active | View |
12. | e-Procurement of Iron Pan and Ore Cleaning Hammer(PUR/MOIL/C-1/196/WE-76/ET/226) | 27-11-2020 | 21-12-2020 | 21-12-2020 | 22-12-2020 | 03:30 PM | Active | View |
13. | Tubeless Tyre Size 205 55 R16 10 Nos.(PUR/MOIL/C-13/18/E-31/363-M) | 26-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 03:30 PM | Active | View |
14. | Purchase of Hose Fittings for Rock Drill and Air Leg Machines.(MOIL/20-21/ET-225 dt.25.11.2020) | 25-11-2020 | 16-12-2020 | 16-12-2020 | 17-12-2020 | 03:30 PM | Active | View |
15. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SULLAIR COMPRESSOR.(PUR/MOIL/C-5/73/E-29 /352-M Dt. 25/11/2020) | 25-11-2020 | 14-12-2020 | 14-12-2020 | 14-12-2020 | 03:30 PM | Active | View |
16. | Purchase of Pneumatic Tyre, Tube and Flaps and Solid Tyres(WE-35 dt.24.11.2020 (e-Tender no.MOIL/20-21/ET/224) | 24-11-2020 | 22-12-2020 | 22-12-2020 | 23-12-2020 | 03:30 PM | Active | View |
17. | Picking and collection of Ferro Grade and SM Grade ore TD-4505, TDL-439 and TDL-499 from South Staff Quarter dump of Tirodi Mine(MOIL/20-21/ET/214) | 24-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | View |
18. | Recovery of Ferro grade TD-4505 and SM Grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine(MOIL/20-21/ET/213) | 24-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | View |
19. | Picking and collection of 3rd Grade and LGHS ore from diluted ROM at South Pit North side of Tirodi Mine(MOIL/20-21/ET/215) | 24-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | View |
20. | DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/20-21/JGM(MECH)/1075) | 23-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 04:30 PM | Active | View |
21. | Pushing of tubs from SDL faces at Gumgaon Mine(MOIL/20-21/ET/210) | 23-11-2020 | 23-12-2020 | 23-12-2020 | 23-12-2020 | 03:30 PM | Active | View |
22. | Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/20-21/ET/211) | 23-11-2020 | 23-12-2020 | 23-12-2020 | 23-12-2020 | 03:30 PM | Active | View |
23. | Sinking of winzes from plus 60 Level to -70 Level at zero deposit of Chikla B section at Chikla Mine(MOIL/20-21/ET/212) | 23-11-2020 | 23-12-2020 | 23-12-2020 | 23-12-2020 | 03:30 PM | Active | View |
24. | Purchase of G. I. Core Boxes(WE-67 dt.23.11.2020 (e-Tender no.MOIL/20-21/ET/223) | 23-11-2020 | 18-12-2020 | 18-12-2020 | 19-12-2020 | 03:30 PM | Active | View |
25. | e-Procurement of Rubber Tub Buffer(PUR/MOIL/C-12/13/WE-68/ET/222) | 21-11-2020 | 21-12-2020 | 21-12-2020 | 22-12-2020 | 03:30 PM | Active | View |
26. | PURCHASE OF DENSITY MEASUREMENT KIT(PUR/MOIL/C-12/23/E-30/356-M DT.20.11.2020) | 20-11-2020 | 09-12-2020 | 09-12-2020 | 09-12-2020 | 03:30 PM | Active | View |
27. | Transportation of Sand from Bawanthadi River lease to Chikla Mine(MOIL/20-21/ET/209) | 20-11-2020 | 21-12-2020 | 21-12-2020 | 21-12-2020 | 03:30 PM | Active | View |
28. | Removal of waste rock in F W H W and manganiferous rock from Ch-52 to Ch-60 at Dongri Buzurg Mine(MOIL/20-21/ET/218) | 20-11-2020 | 24-12-2020 | 24-12-2020 | 24-12-2020 | 03:30 PM | Active | View |
29. | Concreting by using Pre Cast Slabs at Gumgaon Mine(MOIL/20-21/ET/208) | 20-11-2020 | 21-12-2020 | 21-12-2020 | 21-12-2020 | 03:30 PM | Active | View |
30. | Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/20-21/ET/207) | 20-11-2020 | 01-12-2020 | 01-12-2020 | 01-12-2020 | 03:30 PM | Active | View |
31. | e-Procurement of Butterfly Valves(PUR/MOIL/C-1/202/WE-71/ET/221) | 19-11-2020 | 08-12-2020 | 08-12-2020 | 09-12-2020 | 03:30 PM | Active | View |
32. | PURCHASE OF SPARES FOR AUTOMATED DIESEL DISPENSING ASSY MAKE HECTRONIC FOR DONGRI BUZURG MINE(DB/MECH/20-21/MECH/1056) | 18-11-2020 | 08-12-2020 | 08-12-2020 | 08-12-2020 | 04:30 PM | Active | View |
33. | CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRIBUZURG MINE(DB/MECH/IMB/20-21/1057) | 17-11-2020 | 21-11-2020 | 21-11-2020 | 21-11-2020 | 04:30 PM | Active | View |
34. | Purchase of Motors various types - 32 Lots.(Only Through e-procurement)(WE-41 DT.17/11/2020 (ET/220)) | 17-11-2020 | 09-12-2020 | 09-12-2020 | 10-12-2020 | 03:30 PM | Active | View |
35. | Regular clearing of main bunker ore flow in IMB plant at Dongri Buzurg Mine(DB/MECH/IMB/20-21 /1055) | 16-11-2020 | 21-11-2020 | 21-11-2020 | 21-11-2020 | 04:30 PM | Active | View |
36. | Repairing of Sprocket Assy of Tata Hitachi 450-2 and Tata Hitachi 1200-2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/1042) | 14-11-2020 | 28-12-2020 | 28-12-2020 | 28-12-2020 | 04:30 PM | Active | View |
37. | Design, Manufacture and supply plumber block-1Set for pinion Shaft of Production shaft winder at Balaghat Mine(AGENT/BGT/MECH/20-21/869) | 14-11-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 04:30 PM | Active | View |
38. | Painting of various structures of Winding Engine Installations , Waste Rock bunker and spillage bunker(AGT/BGT/MECH/WINDER/20-21/871) | 14-11-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 04:30 PM | Active | View |
39. | Repairs to BDC shed and development of surrounding area by excavation and filling at Kandri Mine.(KD/CIVIL/NIT/20-21/3326 DT 13.11.2020) | 14-11-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 04:30 PM | Active | View |
40. | Hiring of Diesel Jeep for the period of three months at Balaghat Mine(AGT/BGT/MECH/JEEP/20-21/867) | 13-11-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 04:30 PM | Active | View |
41. | Procurement of Ceiling Fans 1200MM for residential Camp, Dongri Buzurg Mine(DB/ELECT/20-21/832 DATED 19.09.2020) | 13-11-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 04:30 PM | Active | View |
42. | Tender invited in single bid system for Proposal for the providing, designing, fabrication, installation, and commissioning of Motorized Gate for mine workshop at Chikal Mine(TE/CH/MECH/20-21/14) | 13-11-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | View |
43. | Procurement of 4 Nos Brake Tie rods for Production shaft Winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/ 870) | 13-11-2020 | 04-12-2020 | 04-12-2020 | 04-12-2020 | 04:30 PM | Active | View |
44. | Procurement of 3 nos Tie rods for Holmes shaft Skip Winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/860) | 12-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 04:30 PM | Active | View |
45. | Purchase Of MF Drill Rods 10nos and 57 mm Button Bits 2nos for Cable Bolting Operation through UDM - 601 at Chikla Mine(TE-12 DT.12112020) | 12-11-2020 | 02-12-2020 | 02-12-2020 | 02-12-2020 | 04:30 PM | Active | View |
46. | Breaking of Metal and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/20-21/ET/190) | 12-11-2020 | 11-12-2020 | 11-12-2020 | 11-12-2020 | 03:30 PM | Active | View |
47. | Procurement of 55Nos. 2V Lead Acid batteries for substation of Balaghat Mine(BGT/ELECT/20-21/849) | 11-11-2020 | 03-12-2020 | 03-12-2020 | 03-12-2020 | 04:30 PM | Active | View |
48. | e Procurement of White Metal R. C. Tandem(PUR/MOIL/C-1/192/WE-69/ET/206) | 11-11-2020 | 17-12-2020 | 17-12-2020 | 18-12-2020 | 03:30 PM | Active | View |
49. | Providing and Installation of Driver Fatigue Monitoring Systems in Dumpers Operating at Dongri Buzurg Mine | 10-11-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 4:30 pm | Active | View |
50. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR FORKLIFT MAKE VOLTAS FOR DONGRI BUZURG MINE | 10-11-2020 | 01-12-2020 | 01-12-2020 | 01-12-2020 | 4:30 pm | Active | View |
51. | Repairing of toilet of Master bed room at Mine Manager Bunglow at Balaghat Mine | 10-11-2020 | 17-11-2020 | 17-11-2020 | 17-11-2020 | 4:30 pm | Active | View |
52. | WEBSITE SINGLE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HYDRAULIC MOBILE CRANE OPERATING AT DONGRI BUZURG MINE | 10-11-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 4:30 pm | Active | View |
53. | Repairing of Bhatera Pipe line at Balaghat Mine(CIVIL/BGT/T.E./2020-21/840 DT. 06.11.2020) | 10-11-2020 | 17-11-2020 | 17-11-2020 | 17-11-2020 | 04:30 PM | Active | View |
54. | Loading of Metal (plus25 mm to minus50mm) into trucks at Ferro Manganese Plant, Balaghat Mine(MOIL/20-21/ET/189) | 10-11-2020 | 08-12-2020 | 08-12-2020 | 08-12-2020 | 03:30 PM | Active | View |
55. | Fabrication and supply of complete ID FAN BLOWER ASSEMBLY with Motor for Boiler Scrubber at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET-205 dt.10.11.2020) | 10-11-2020 | 03-12-2020 | 03-12-2020 | 04-12-2020 | 03:30 PM | Active | View |
56. | Providing 6 mbps 1 is to 1 Internet Leased Line at Gumgaon Mine(ADGM/Grp-III/SYS/NW/20-21/1354) | 09-11-2020 | 17-11-2020 | 17-11-2020 | 17-11-2020 | 03:30 PM | Active | View |
57. | Repairing of AC of TATA HITACHI 1200-1 AND TATA HITACHI 450-2 AT DONGRI BUZURG MINE(DB/MECH/20-21/JGM(MECH)/986) | 09-11-2020 | 25-11-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | View |
58. | Purchase of Cross Bit 57MM Dia suitable for Cable Bolting Machine.(MOIL/20-21/ET-204 dt.07.11.2020) | 07-11-2020 | 08-12-2020 | 08-12-2020 | 09-12-2020 | 03:30 PM | Active | View |
59. | Automation of Pumping Operation at Kandri Mine(MOIL/20-21/ET/188) | 07-11-2020 | 07-12-2020 | 07-12-2020 | 07-12-2020 | 03:30 PM | Active | View |
60. | Procurement of 11KV Aluminum Arial Air bunch XLPE Cable of 70Sqmm for EMD Plant, Dongri Buzurg Mine.(DB/ELECT/20-21/1026) | 06-11-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 04:30 PM | Active | View |
61. | Purchase of Cable Bolting Accessories For cable Bolting machine.(MOIL/20-21/ET-203) | 05-11-2020 | 26-11-2020 | 26-11-2020 | 27-11-2020 | 03:30 PM | Active | View |
62. | Loading Transportation and Unloading of Manganese Ore Rom(Bel/Min/NIT/20-21/1707) | 04-11-2020 | 13-11-2020 | 13-11-2020 | 13-11-2020 | 04:30 PM | Active | View |
63. | PROCUREMENT OF 2 NOS. ELECTRICALLY OPERATED MONO BLOCK PUMP FOR 15TH LEVEL UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/PUMP/20-21/817) | 04-11-2020 | 25-11-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | View |
64. | PURCHASE OF C.S. WHEEL ASSEMBLY WITH COVER FOR 4MT GB CAR IN UNDERGROUND LEVELS AT BALAGHAT MINE(PUR/MOIL/BGT/CS WHEEL /20-21/818) | 04-11-2020 | 25-11-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | View |
65. | PURCHASE OF ELECTRICALLY OPERATED HORIZONTAL SUBMERSIBLE PUMP FOR BALAGHAT MINE(PUR/MOIL/BGT/PUMP/20-21/819) | 04-11-2020 | 25-04-2020 | 25-11-2020 | 25-11-2020 | 04:30 PM | Active | View |
66. | Loading Transportation and Unloading of Manganese Ore Rom(Bel/Min/NIT/20-21/1707) | 04-11-2020 | 13-11-2020 | 13-11-2020 | 13-11-2020 | 04:30 PM | Active | View |
67. | Engagement of thr Consultant for Implementation of digitization projects for improvement in various processes in the Company(MOIL/20-21/ET/191) | 04-11-2020 | 18-12-2020 | 18-12-2020 | 18-12-2020 | 03:30 PM | Active | View |
68. | e-procurement of Tub Coupling Chain and Pins(PUR/MOIL/C-12/6/WE-66/ET/201) | 04-11-2020 | 23-11-2020 | 23-11-2020 | 24-11-2020 | 03:30 PM | Active | View |
69. | Automation of Pumping Operation at MOIL Bhawan, CMD Bungalow, CMS and Staff Quarters(MOIL/20-21/ET/187) | 04-11-2020 | 03-12-2020 | 03-12-2020 | 03-12-2020 | 03:30 PM | Active | View |
70. | House Keeping Works in Mine office Building ,Mine Manager Bungalow, Rest House in Ukwa Mine(AGT/CIVIL/UK/LT/20-21/803) | 03-11-2020 | 10-11-2020 | 10-11-2020 | 10-11-2020 | 04:00 PM | Active | View |
71. | CLEANING OF SPILLAGE ORE AND FINES FROM VARIOUS PLACES OF IMB PLANT AT DONGRI BUZURG MINE(DB/MECH/IMB/20-21/978) | 27-10-2020 | 04-11-2020 | 04-11-2020 | 04-11-2020 | 04:30 PM | Active | View |
72. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-26/315-M Dt. 27/10/2020) | 27-10-2020 | 18-11-2020 | 18-11-2020 | 18-11-2020 | 03:30 PM | Active | View |
73. | Trench cutting in ore stacks at Beldongri Mine(MOIL/20-21/ET/186) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | View |
74. | Pushing and unloading of tubs in Underground and surface at Ch.5000 1850 L of Ukwa Mine(MOIL/20-21/ET/184) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | View |
75. | Removal of accumulated pebbles near sand stowing plants at Chikla Mine(MOIL/20-21/ET/185) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | View |
76. | Underground concreting at -1850 L -1750 L and -1650 L of Ukwa Mine(MOIL/20-21/ET/183) | 26-10-2020 | 26-11-2020 | 26-11-2020 | 26-11-2020 | 03:30 PM | Active | View |
77. | CLEANING AND SCREENING OF FERRO GRADE KD-4543 FROM SUBGRADE MINERAL AND REJECT AT KANDRI MINE(KAN/MIN/AGT/NIT/20-21/3121 DT 23.10.2020) | 24-10-2020 | 31-10-2020 | 31-10-2020 | 31-10-2020 | 04:30 PM | Active | View |
78. | ERECTION OF 11KV OVERHEAD LINE FROM MINE WORKSHOP TO EMD PLANT(DB/ELECT/20-21/961) | 23-10-2020 | 13-11-2020 | 13-11-2020 | 13-11-2020 | 04:30 PM | Active | View |
79. | Picking and collection of material to recover Ferro Grade KD-2272 ore from subgrade mineral rejects at Kandri Mine(MOIL/20-21/ET/182) | 23-10-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | View |
80. | Picking and collection of 20 percent SM grade ore CHL-535 from cleaning of sub grade mineral reject from ROM at 320 L North-West section at Chikla Mine(MOIL/20-21/ET/192) | 23-10-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | View |
81. | Cleaning of surplus underground ROM at Kandri Mine(MOIL/20-21/ET/181) | 23-10-2020 | 23-11-2020 | 23-11-2020 | 23-11-2020 | 03:30 PM | Active | View |
82. | Construction of Toilet Block beside Road Weigh Bridge at Munsar Mine(Munsar/Civil/NIT/20-21/154 Date 20.10.2020) | 22-10-2020 | 30-10-2020 | 30-10-2020 | 30-10-2020 | 04:30 PM | Active | View |
83. | Making and Supplying of stemming sticks material used for blasting in undergound at working levels at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/761 DT. 21.10.2020) | 22-10-2020 | 02-11-2020 | 02-11-2020 | 02-11-2020 | 04:30 PM | Active | View |
84. | DGPS Survey in the ML areas of MOIL Limited in Tirodi Mine of Madhya Pradesh State(MOIL/20-21/ET/136) | 21-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | View |
85. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES.(PUR/MOIL/C-5/46/E-28/313-M Dt. 21/10/2020) | 21-10-2020 | 11-11-2020 | 11-11-2020 | 11-11-2020 | 03:30 PM | Active | View |
86. | Construction of Electrical Panel Room for forced sand stowing in underground at Munsar Mine(Munsar/Civil/NIT/20-21/150 Date 20.10.2020) | 21-10-2020 | 30-10-2020 | 30-10-2020 | 30-10-2020 | 04:30 PM | Active | View |
87. | Providing, Supplying, Installation and Commissioning of Siemens/ABB/Equivalent Make, Standby DC Drive with PLC System for Skip Winder at Gumgaon Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement)(WE-44 DT.21/10/2020 (ET/199)) | 21-10-2020 | 12-11-2020 | 12-11-2020 | 13-11-2020 | 03:30 PM | Active | View |
88. | Purchase of Pneumatic Rock Drill Machines and Pusher Leg - 20 Nos.each(4 Lots.) for Various Mines (Only through e-procurement)(WE-45 DT.21/10/2020 (ET/200)) | 21-10-2020 | 12-11-2020 | 12-11-2020 | 13-11-2020 | 03:30 PM | Active | View |
89. | Maintenance and operation of water supply scheme at Gumgaon Mine(MOIL/20-21/ET/153) | 20-10-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 03:30 PM | Active | View |
90. | Maintenance of gardens at various places at Gumgaon Mine.(MOIL/20-21/ET/168) | 20-10-2020 | 24-11-2020 | 24-11-2020 | 24-11-2020 | 03:30 PM | Active | View |
91. | Construction of cement concrete approch road up to crusher for second vertical shaft at Chikla Mine and Construction of RCC approch road and platform, drainage system and settling tank near crushing and screening plant at Chikla Mine(MOIL/20-21/ET/169) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | View |
92. | Washing picking and collection of material from 5 No. dumps of Sitapatore Mine(MOIL/20-21/ET/178) | 20-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | View |
93. | Annual repairs to camp quarters at Balaghat Mine.(MOIL/20-21/ET/170) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | View |
94. | Cleaning of ROM recovered from 5 No. Pit of Sitapatore Sukli Mine(MOIL/20-21/ET/179) | 20-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | View |
95. | Construction of compound wall between second vertical shaft and adjacent officer colony including allied development works around second vertical shaft at Munsar Mine.(MOIL/20-21/ET/171) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | View |
96. | Cleaning of ROM recovered from ROM Pit No.6 at Sitapatore Mine(MOIL/20-21/ET/180) | 20-10-2020 | 20-11-2020 | 20-11-2020 | 20-11-2020 | 03:30 PM | Active | View |
97. | Construction of cement concrete approch road up to crusher for second vertical shaft at Chikla Mine and Construction of RCC approch road and platform, drainage system and settling tank near crushing and screening plant at Chikla Mine(MOIL/20-21/ET/169) | 20-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | View |
98. | MISCELLENEOUS ITEMS C CLASS AS PER ANNEX C FOR EMD PLANT,DB MINE(MOIL/EMD/CH/AJGM/20-21/949) | 19-10-2020 | 11-11-2020 | 11-11-2020 | 11-11-2020 | 04:00 PM | Active | View |
99. | Recovery of Ferro grade TD-4505 and SM Grade ore TDL-439 and TDL-499 from North Magazine Dump at Tirodi Mine(MOIL/20-21/ET/177) | 19-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | View |
100. | Washing Picking and collection of material from East side of A dump at Tirodi Mine(MOIL/20-21/ET/175) | 19-10-2020 | 19-11-2020 | 19-11-2020 | 19-11-2020 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |