1. Cleaning of Underground ROM at Beldongri Mine(MOIL/21-22/ET/47) 23-06-2021 08-07-2021 08-07-2021 08-07-2021 03:30 PM Active View
2. Transportation of sand from Kalaphata Ghat situated on Pench river to Munsar Kandri and Beldongri Mine(MOIL/21-22/ET/45) 22-06-2021 22-07-2021 22-07-2021 22-07-2021 03:30 PM Active View
3. Transportation of sand from Gondegaon Mine WCL to Munsar Kandri and Beldongri Mine(MOIL/21-22/ET/46) 22-06-2021 22-07-2021 22-07-2021 22-07-2021 03:30 PM Active View
4. R C C roof repairs to camp quarters at Chikla Mine(CIVIL/CH/T.E./21-22/1029) 22-06-2021 03-07-0021 03-07-2021 03-07-2021 04:30 PM Active View
5. Production of Aggregates and M-Sand from waste rock generated during development of hang wall portion from CH.25 to CH.42 by contractual means at Dongri Buzurg Mine to make the best out of waste(MOIL/21-22/ET/43) 22-06-2021 27-07-2021 27-07-2021 27-07-2021 03:30 PM Active View
6. Handling and dispatch of ore at Sitapatore Mine.TRD/Civil/2020-21/364 Dated 18/06/2021) 19-06-2021 25-06-2021 25-06-2021 25-06-2021 03:30 PM Active View
7. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-2/355) 18-06-2021 24-06-2021 24-06-2021 24-06-2021 03:30 PM Active View
8. Repair RCC Roof of Labour and Staff Quarter(AGT/CIVIL/UK/LT/20-21/342) 18-06-2021 26-06-2021 26-06-2021 26-06-2021 04:30 PM Active View
9. Purchase of Oil and Lubricants - 29 Items. (Only Through e-procurement)(WE-85(ET-49_and_ET-50) dt.15.06.2021) 16-06-2021 06-07-2021 06-07-2021 07-07-2021 03:30 Pm Active View
10. Outsourcing of maintenance and repair of LT and HT Overhead lines of Chikla Mines for a period of 9 months.(CH/ELECT/21-22/374) 15-06-2021 29-06-2021 29-06-2021 29-06-2021 04:30 PM Active View
11. Outsourcing of distribution, Collection and Cleaning of cap lamps of Chikla Mines for a period of 3 months.(CH/ELECT/21-22/372) 14-06-2021 23-06-2021 23-06-2021 23-06-2021 04:30 PM Active View
12. DAILY (HIGH SPEED DIESEL FILLING IN HEMMS AT DONGRIBUZURG MINE(DB/MECH/21-22/JGM(MEC)/356) 14-06-2021 18-06-2021 18-06-2021 18-06-2021 04:30 PM Active View
13. Regular Cleaning/unblocking of main bunker ore flow in IMB Plant at Dongr Buzurg Mine.(DB/MECH/21-22/JGM(MEC)/376) 14-06-2021 22-06-2021 22-06-2021 22-06-2021 04:30 PM Active View
14. Cleaning of Underground Sumps and Underground Drains under Monsoon Preparatory Works at Munsar Mine.(Mun/Mining/LT/2021-22/373 Date 12.05.2021) 14-06-2021 21-06-2021 21-06-2021 21-06-2021 04:30 PM Active View
15. Limited tender inviting in single bid system for Housekeeping work at C and s plant at Chikla mine(CH/Agent/Mech/21-22/358) 11-06-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active View
16. Replacement of Liner Plate(8/10mmm) of Transfer chute, Bunkers and repair of Transfer chutes/Bunker at various location of IMB plant at Balaghat Mine(AGENT/BGT/MECH/IMB/21-22/315) 09-06-2021 16-06-2021 16-06-2021 16-06-2021 04:30 PM Active View
17. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PARKER MAKE SINGLE SOLENOID VALVE(PUR/MOIL/C-11/131/E-51/31-M Dt. 09-06-2021) 09-06-2021 30-06-2021 30-06-2021 30-06-2021 03:30 PM Active View
18. Handling of ore by manual mean into the Tipper / Truck at Tirodi Mine.(MOIL/HO/MINE/2021/322 , DATED 04/6/2021) 07-06-2021 15-06-2021 15-06-2021 15-06-2021 03:30 PM Active View
19. Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Chikla Mine and Dongri Buzurg Mine.(CH/SYS/AMC/21-22/341) 07-06-2021 21-06-2021 21-06-2021 21-06-2021 04:30 Pm Active View
20. Handling of ore into wagaon / Trucks by mechanical means at Tirodi Mine.(MOIL/HO/MINE/2021/323, Dated 04/06/2021) 07-06-2021 15-06-2021 15-06-2021 15-06-2021 03:30 PM Active View
21. Retiling, roof repair including laying polythene sheet over roof of camp quarters and cleaning, deepening of surface drains in mine area at Dongri Buzurg Mine(DB/CIVIL/21-22/911) 05-06-2021 12-06-2021 12-06-2021 12-06-2021 04:30 PM Active View
22. Fabrication of Steel Ore-Passes and Manways for Underground Mines i.e. Balaghat, Ukwa, Chikla, Beldongri, Munsar, Kandri and Gumgaon Mines(MOIL/21-22/ET/17) 05-06-2021 05-07-2021 05-07-2021 05-07-2021 03:30 PM Active View
23. Supply of brake liners for BEML make BH60M dumpers Operating at Dongri Buzurg Mine(PUR/DB/MECH/21-22/313) 04-06-2021 16-06-2021 16-06-2021 16-06-2021 04:30 Pm Active View
24. Purchase of spares for fitting of Vibro Ripper on PC450 Hydraulic Excavator.(MOIL/21-22/ET-42 Dt.03.06.2021) 03-06-2021 24-06-2021 24-06-2021 25-06-2021 03:30 PM Active View
25. Purchase of Rollers for Conveyor Belts at Dongri Buzurg Mine.(DB/PUR/JGM/AGT/2021-22/312) 02-06-2021 16-06-2021 16-06-2021 16-06-2021 04:30 PM Active View
26. Waterproofing to RCC Slab of old A Type AT Syndicate Camp Babu line area quarters at Dongri Buzurg Mine(DB/CIVIL/21-22/650 dt 29.05.2021) 01-06-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active View
27. MODIFCATION IN AS BUILT DRAWING OF 40 TPH CRUSHING AND SCREENING PLANT AT MUNSAR MINE.(MUN/ENGG/TENDER/21-22/262) 01-06-2021 21-06-2021 21-06-2021 21-06-2021 04:30 PM Active View
28. Operation of 240 HP Pumps and related work at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/314) 31-05-2021 16-06-2021 16-06-2021 16-06-2021 04:30 PM Active View
29. Retiling and roof repair including laying polythene sheet over of camp quarters and Industrial building at Chikla Mine(CIVIL/CH/T.E./21-22/767) 31-05-2021 10-06-2021 10-06-2021 10-06-2021 04:30 PM Active View
30. Repairing of 50 MT Road Weighing Bridge at MOIL Limited Dongri Buzurg Mine.(DB/MEC/21-22/JGM(MECH)/292) 30-05-2021 16-06-2021 16-06-2021 16-06-2021 04:40 PM Active View
31. Providing and Installation of DGMS approved Computerized Automatic Speed Indicator Cum Recorder (CASICR) for 550 HP winder at Production Shaft of Balaghat Mine(PUR/MOIL/BGT/WINDER/21-22/285) 28-05-2021 18-06-2021 18-06-2021 18-06-2021 04:30 PM Active View
32. Replacement of 6 mm thick liner plates at 15.5 th level loading station of Holmes shaft at Balaghat Mine(AGENT/BGT/MECH/WIN/21-22/286) 28-05-2021 14-06-2021 14-06-2021 14-06-2021 04:30 PM Active View
33. Handling and Despatch of ore for Munsar Mine(MOIL/21-22/ET/39) 28-05-2021 28-06-2021 28-06-2021 28-06-2021 03:30 PM Active View
34. Handling and Despatch of ore for Gumgaon Mine(MOIL/21-22/ET/40) 28-05-2021 28-06-2021 28-06-2021 28-06-2021 03:30 PM Active View
35. Handling and Despatch of ore for Kandri Mine(MOIL/21-22/ET/38) 28-05-2021 28-06-2021 28-06-2021 28-06-2021 03:30 PM Active View
36. Manpower to assistance pumping operation in 10800 CH 12000 at Ukwa Mine(UK/MECH/21-22/17771/310) 27-05-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active View
37. Cleaning of sump Ch 9500 sec and 108800 UG Section(AGT/Min/UK/LT/20-21/277) 27-05-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active View
38. Pattern making, casting, Machining and Dynamic balancing Of pump spares with complete fitting of 300Hp Kirloskar Pump of 10th Level Underground of Balaghat Mine.(AGT/BGT/MECH/PUMP/21-22/272) 25-05-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active View
39. Handling and Despatch of ore for Dongri Buzurg Mine(MOIL/21-22/ET/36) 25-05-2021 25-06-2021 25-06-2021 25-06-2021 03:30 PM Active View
40. Handling and Despatch of ore for Beldongri Mine(MOIL/21-22/ET/37) 25-05-2021 25-06-2021 25-06-2021 25-06-2021 03:30 PM Active View
41. Handling and Despatch of ore for Chikla Mine(MOIL/21-22/ET/35) 25-05-2021 25-06-2021 25-06-2021 25-06-2021 03:30 PM Active View
42. Providing PVC polythene sheet to manglore til(CIVI/BGT/LT/AGT/20-21/245 DT. 20.05.2021) 25-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active View
43. RCC roof repair water proofing work of camp quarters at Balaghat Mine(CIVI/BGT/LT/AGT/21-22/246 DT.20.05.2021) 25-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active View
44. Laying of New 6 inch and 4 inch GI Pipeline for discharging Underground water and Supplying Compressed air from 13.5th level to 15th level at Second Outlet shaft of Balaghat Mine(AGT/BGT/MECH/WINDER/21-22/249) 24-05-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active View
45. Laying of G.I. pipeline with pumps from 3 lakh lit capacity Ground storage reservoir to Ferrow Manganese Plant at Balaghat Mine(MOIL/21-22/ET/29) 24-05-2021 23-06-2021 23-06-2021 23-06-2021 03:30 PM Active View
46. Providing and fixing profile sheet on roof of Boiler House at EMD plant at Dongri Buzurg Mine(MOIL/21-22/ET/31) 24-05-2021 23-06-2021 23-06-2021 23-06-2021 03:30 PM Active View
47. Manpower to assistance pumping operation in CH95 at Ukwa Mine(UK/TE/MECH/21-22/17270/309) 24-05-2021 08-06-2021 08-06-2021 08-06-2021 04:30 PM Active View
48. providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Beldongri Mine(ADGM/Group-III/SYS/NW /2021-22/252) 24-05-2021 01-06-2021 01-06-2021 01-06-2021 04:00 PM Active View
49. Construction of cremation shed at village Gurha Beldaran, Tahsil Hiranagar, Dist Kathua, UT of Jammu and Kashmir, under CSR(MOIL/21-22/ET/26) 24-05-2021 23-06-2021 23-06-2021 23-06-2021 03:30 PM Active View
50. Slab Water Proofing Works for New Medical Administrative Building of Kandri Mine.(KAN/CIVIL/NIT/21-22/533 DT 21.05.2021) 22-05-2021 04-06-2021 04-06-2021 04-06-2021 04:30 PM Active View
51. Handling and Despatch of ore for Tirodi Mine(MOIL/21-22/ET/33) 22-05-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active View
52. Handling and Despatch of ore for Balaghat Mine(MOIL/21-22/ET/32) 22-05-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active View
53. Handling and Despatch of ore for Sitapatore Mine(MOIL/21-22/ET/34) 22-05-2021 21-06-2021 21-06-2021 21-06-2021 03:30 PM Active View
54. Cleaning of Storm water drain in surface and underground sump under monsoon preparatory work at Kandri Mine(KAN/CIVIL/NIT/21-22/521 DT 19.05.2021) 21-05-2021 28-05-2021 28-05-2021 28-05-2021 04:30 PM Active View
55. False ceiling work of Transformer, Electric panel and Electrical store rooms of IMB Plant, Moil Ltd BGT mine(AGT/BGT/IMB PLANT/21-22/233) 21-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active View
56. Removal of Spillage from the bottom of Conveyor belt structure and Bottom of the shaft at 15.5th Level Loading station Holmes Shaft.(AGT/BGT/MECH/WINDER/21-22/248) 21-05-2021 07-06-2021 07-06-2021 07-06-2021 04:30 PM Active View
57. Cleaning of Surface Drains as monsoon preparatory work at Chikla Mine(CIVIL/CH/T.E./21-22/638) 20-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active View
58. REAIRING OF TRACK COMPONENTS OF SIDE DUMP LOADERS MACHINE AT MUNSAR MINE.(Agent and DGM (Mines)/GrpIII/2021-22/214) 19-05-2021 07-06-2021 07-06-2021 07-06-2021 04:30 PM Active View
59. Loading of Slag at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/19) 19-05-2021 18-06-2021 18-06-2021 18-06-2021 03:30 PM Active View
60. Breaking of Slag and Other Associated Works at Ferro Manganese Plant, Balaghat Mine(MOIL/21-22/ET/18) 19-05-2021 18-06-2021 18-06-2021 18-06-2021 03:30 PM Active View
61. OUTSOURCING METER READING, PREPARATION OF ELECTRICITY RECOVERY LIST AND PROCESSING OF LOCAL DOCUMENMTATION OF ELECTRICAL DEPARTMENT FOR THE PERIOD 6 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/223) 18-05-2021 25-05-2021 25-05-2021 25-05-2021 03:30 PM Active View
62. WEB SITE TENDER ENQUIRY FOR PIPELINE FITTING OF 200 MM, WITH CLAMPS BY LOWERING AND COMPLETE INSTALLED WITH FLANGES WELDING AND COMPLETE PAINTING OF PIPELINE AT MUNSAR MINE.(MUN/ENGG/TENDER/20-21/213) 17-05-2021 07-06-2021 07-06-2021 07-06-2021 04:30 PM Active View
63. SELECTION OF ANNUAL REPORT CONSULTING SERVICE PROVIDER FOR MOIL LIMITED FOR THE FINANCIAL YEAR 2020-21(MOIL/21-22/ET/41) 17-05-2021 31-05-2021 31-05-2021 31-05-2021 03:30 PM Active View
64. Repair and construction of front Compound Wall of Mine Managers Bungalow at Gumgaon Mine.(Agent/GUM/Civil/NIT/21-22/228 14/05/2021) 15-05-2021 22-05-2021 22-05-2021 22-05-2021 04:30 PM Active View
65. Hiring of Machinery for loading unloading transportation of waste from Chitawer section to Nagara Plant at Section Ukwa Mine(AGT/Min/UK/LT/21-22/192) 15-05-2021 21-05-2021 21-05-2021 21-05-2021 04:30 PM Active View
66. Supplying and Installation of Portable Toilet for deployed ladies workers in BDC/OCF Section at Gumgaon Mine.(GUM/Civil/NIT/21-22/217 13.05.2021) 14-05-2021 31-05-2021 31-05-2021 31-05-2021 04:30 PM Active View
67. CAPLAMP MAINTENANCE, DISTRIBUTION AND COLLECTION FROM 18MAY 2021ONWARDS FOR 118 DAYS AT MANSAR MINE(ELECT/MUN/ADGM/21-22/157, Dated 03.05.2021) 12-05-2021 15-05-2021 15-05-2021 15-05-2021 05:00 PM Active View
68. Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-50/17-M DT.10/05/2021) 11-05-2021 24-05-2021 24-05-2021 24-05-2021 03:30 PM Active View
69. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR MATHER AND PLATT MAKE PUMP MODEL PUMP 10/12BLF, 132 KW.(PUR/MOIL/C-5/28/E- 48/ 14 -M Dt. 11/05/2021) 11-05-2021 02-06-2021 02-06-2021 02-06-2021 03:30 PM Active View
70. WEBSITE SINGLE/PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPARATION PLANT(PUR/MOIL/C-5/23/E- 46/ 12 -M Dt. 07/05/2021) 07-05-2021 31-05-2021 31-05-2021 31-05-2021 03:30 PM Active View
71. Structural Design consultancy for construction of screening plant for Pebble handling at Sand stowing Plant(Jt.GM/CH/MECH/TE/2021-22/192) 06-05-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active View
72. Purchase and Installation of Digital Water Flow Meters with telemetry system for Munsar Mine(MS/GEO/NIT/2021-22/141 Date 02.05.2021) 03-05-2021 17-05-2021 17-05-2021 17-05-2021 04:30 PM Active View
73. Purchase and Installation of Digital Water Flow Meters with telemetry system for Parsoda Mine(PS/GEO/NIT/2021-22/142 Date 02.05.2021) 03-05-2021 17-05-2021 17-05-2021 17-05-2021 04:30 PM Active View
74. Procurement of Hydraulic Power Pack and Hydraulic Cylinders for Pit Bottom Buffer of production shaft at Balaghat Mine.(PUR/MOIL/BGT/WINDER/21-22/141) 03-05-2021 18-05-2021 18-05-2021 18-05-2021 04:30 PM Active View
75. Dismantling, shifting and reassembling of 20Nos. of Joplin jig assembly from old site to New OCF Shed constructed along the Ferro Plant of Balaghat Mine.(AGT/BGT/MECH/OCF/21-22/139) 01-05-2021 17-05-2021 17-05-2021 17-05-2021 04:30 PM Active View
76. Regular cleaning/ unblocking of main bunker ore flow in IMB Plant at Dongri Buzurg Mine.(DB/MECH/21-22/JGM(MECH)/164) 01-05-2021 04-05-2021 04-05-2021 04-05-2021 04:30 PM Active View
77. OUTSOURCING FOR MONITORING AND OPERATION OF 33KV SUBSTATION FOR 2 MONTHS AT BALAGHAT MINE(BGT/TE/ELECT/AJGM/21-22/124) 28-04-2021 01-05-2021 01-05-2021 01-05-2021 03:30 PM Active View
78. Erection of 11KV Overhead Line from Mine Pit Substation to Aggregate Crusher Plant.(DB/ELECT/21-22/163) 28-04-2021 06-05-2021 06-05-2021 06-05-2021 04:30 PM Active View
79. Replacement of IBR Riser Tubes of FBC Boiler at EMD Plant, Dongri Buzurg Mine(MOIL/EMD/DB/AJGM/2021-22/159) 27-04-2021 03-05-2021 03-05-2021 03-05-2021 04:30 PM Active View
80. Empanelment of Consultant Advisor for Identification of Domestic and Overseas assets for partial or total acquisition(MOIL/21-22/ET/20) 27-04-2021 27-05-2021 27-05-2021 27-05-2021 03:30 PM Active View
81. Washing Picking and collection of Ferro grade and SM grade ore TD-4505 TDL-439 TDL-499 and TDL-469 from South side A dump at Tirodi Mine(MOIL/21-22/ET/24) 26-04-2021 26-05-2021 26-05-2021 26-05-2021 03:30 PM Active View
82. Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/21-22/ET/25) 26-04-2021 26-05-2021 26-05-2021 26-05-2021 03:30 PM Active View
83. Underground exploratory drivage at -130 Level of Munsar Mine(MOIL/21-22/ET/23) 26-04-2021 26-05-2021 26-05-2021 26-05-2021 03:30 PM Active View
84. Cleaning and collection waste from septic tanks, chambers in camp colony at Kandri Mine(KD/PER/NIT/2021-22/214) 24-04-2021 05-05-2021 05-05-2021 05-05-2021 04:30 PM Active View
85. Cleaning and collection of Garbage and cleaning of Drains at Kandri Mine(KD/PER/NIT/2021-22/218) 24-04-2021 05-05-2021 05-05-2021 05-05-2021 04:30 PM Active View
86. Cleaning maintenance and up keeping of Rest House at Kandri Mine(KD/PER/NIT/2021-22/216) 24-04-2021 05-05-2021 05-05-2021 05-05-2021 04:30 PM Active View
87. Hiring of Machinery for loading(AGT/Min/UK/LT/21-22/94) 21-04-2021 01-05-2021 01-05-2021 01-05-2021 04:30 PM Active View
88. Development cutting and levelling of Hill rock portion for consrtuction of WTP ESR for construction of new water supply schme at Ukwa Mine(Civil/UK/LT/21-22/153 Date- 19.04.2021) 21-04-2021 01-05-2021 01-05-2021 01-05-2021 04:30 PM Active View
89. Handling and Despatch of ore from Tirodi and Sitapatore Mines for the period of two month(MOIL/21-22/ET/22) 20-04-2021 30-04-2021 30-04-2021 30-04-2021 03:30 PM Active View
90. Removal of burnt LT and HT panel and shifting it to the required location.(AGT/BGT/IMB PLANT/21-22/60) 19-04-2021 27-04-2021 27-04-2021 27-04-2021 04:30 PM Active View
91. labor assistant for material shifting during replacement of heavy assembly or repairing work in underground machineries like SDL, LHD, battery locomotive and Jumbo machines deployed in underground at Balaghat Mine(AGENT/BGT/MECH/WS/21-22/90) 19-04-2021 27-04-2021 27-04-2021 27-04-2021 04:30 PM Active View
92. Operation of vibrating screen to screen sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/12) 19-04-2021 19-05-2021 19-05-2021 19-05-2021 03:30 PM Active View
93. Drilling 57 mm dia. drill holes for installing cable bolt in Manganiferous rock at 11 Level 12 Level and 13 Levels of underground at Balaghat Mine(MOIL/21-22/ET/13) 19-04-2021 19-05-2021 19-05-2021 19-05-2021 03:30 PM Active View
94. Removal of spillage from the bottom of production shaft at 15th Level and bottom of Holmes shaft at 16.5th Level at Balaghat Mine(MOIL/21-22/ET/14) 19-04-2021 19-05-2021 19-05-2021 19-05-2021 03:30 PM Active View
95. Picking and collection of 20 percent Mn. SM Grade Ore BGL-564 from sub grade mineral reject of Underground ROM at Balaghat Mine(MOIL/21-22/ET/15) 19-04-2021 21-05-2021 21-05-2021 21-05-2021 03:30 PM Active View
96. Repairing of three row concertina coil fencing and lease boundary on Manegaon magazine side at Balaghat mine(CIVI/BGT/LT/AGT/21-22/72 DATE 15.04.2021) 16-04-2021 26-04-2021 26-04-2021 26-04-2021 04:30 PM Active View
97. Providing and supplying of black gitti for underground concreating at Balaghat Mine(MIN/BGT/AGT/LT/21-22/73 DATE 15.04.2021) 16-04-2021 26-04-2021 26-04-2021 26-04-2021 04:30 PM Active View
98. Underground Development at 13.5th Level South section at Balaghat Mine(MOIL/21-22/ET/10) 15-04-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active View
99. Underground Development at -370 Level and -470 Level of Vertical Section at Chikla Mine(MOIL/21-22/ET/9) 15-04-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active View
100. Extra excavation and RCC for sub-station at -450 Level and loco battery charging station at -450 Level and -550 Level of Kandri Mine(MOIL/21-22/ET/11) 15-04-2021 12-05-2021 12-05-2021 12-05-2021 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.