Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Hiring of machinery for sub grade mineral reject of UG ROM handling from Magazine area at Kandri Mine(MOIL/20-21/ET/35) | 19-05-2020 | 18-06-2020 | 18-06-2020 | 18-06-2020 | 03:30 PM | Active | View |
2. | Transportation of bottom ash from Adani Power Plant, Tiroda to Ukwa Mine of M S MOIL Ltd. for stowing purpose(MOIL/19-20/ET/34) | 19-05-2020 | 18-06-2020 | 18-06-2020 | 18-06-2020 | 03:30 PM | Active | View |
3. | Retiling and Reroofing of Camp Quarters as Monsoon Preparatory Works at Kandri Mine.(Kan/Civil/NIT/2020-21/219 Date 17.05.2020) | 18-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
4. | Cleaning of Storm Water Drain of Surface and Underground Sump at Kandri Mine.(Kan/Civil/NIT/2020-21/320 Date 17.05.2020) | 18-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
5. | Hiring of Consultant for Estimation Drawings including working drawings and structural design for centralized store building with storage sheds yards and peripheral boundary wall at Balaghat Mine.(Civil/BGT/T E/2020-21/340) | 18-05-2020 | 01-06-2020 | 01-06-2020 | 01-06-2020 | 04:30 PM | Active | View |
6. | Hiring of structural Consultant services for Construction of foundation work for installation of new gear box and motor for Cage winder of Home shaft at Balaghat Mine(Civil/BGT/T E/2020-21/338) | 18-05-2020 | 01-06-2020 | 01-06-2020 | 01-06-2020 | 04:30 PM | Active | View |
7. | WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR RE-TILLING ROOF REPAIR INCLUDING LAYING OF POLYTHENE COVER OF CAMP QUARTER AT CHIKLA MINE.(TE-CH/CIVIL/20-21/210) | 18-05-2020 | 25-05-2020 | 25-05-2020 | 25-05-2020 | 03:30 PM | Active | View |
8. | WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -170 LEVEL AT CHIKLA MINE(TE-03 Dt.18052020) | 18-05-2020 | 28-05-2020 | 28-05-2020 | 28-05-2020 | 04:30 PM | Active | View |
9. | Renovation of Production Shaft by replacing Buntons at Balaghat Mine(MOIL/20-21/ET/23) | 18-05-2020 | 25-06-2020 | 25-06-2020 | 25-06-2020 | 03:30 PM | Active | View |
10. | Fencing of Electrical Switchyard beside existing Compressor House at Munsar Mine.(MUN/CIVIL/NIT/19-20/19 DT.16.05.2020) | 16-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
11. | Maintenance and Upkeeping of ETP at EMD Plant,Dongri Mine 2020(MOIL/EMD/CH/Jt.GM/20-21/134) | 15-05-2020 | 26-05-2020 | 26-05-2020 | 26-05-2020 | 11:00 AM | Active | View |
12. | Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) | 15-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
13. | Vertical development at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/32) | 15-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
14. | Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) | 15-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
15. | Picking and Collection of Ferro Grade 34 percent Mn. Lump Ore KD-4543 and 30 percent Mn. Lump ore KDL-435 from sub grade mineral reject of underground ROM at Kandri Mine(MOIL/20-21/ET/39) | 15-05-2020 | 22-05-2020 | 22-05-2020 | 22-05-2020 | 03:30 PM | Active | View |
16. | Removal of waste rock and handling the same by mechanized means in the F W benches between Ch. 20 to 50 at Dongri Buzurg Mine(MOIL/20-21/ET/30) | 15-05-2020 | 02-07-2020 | 02-07-2020 | 02-07-2020 | 03:30 PM | Active | View |
17. | Vertical development at 1850 Level at Ukwa Mine(MOIL/20-21/ET/33) | 15-05-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 03:30 PM | Active | View |
18. | REPAIRIRNG OF MATHER and PLATT AT 250HP CENTRIFUGAL PUMP NO 1 SR N 81237467/30/1 OPEARTING AT DONGRI BUZURG MINE(DB/MECH/Workshop/20-21/110) | 12-05-2020 | 05-06-2020 | 05-06-2020 | 05-06-2020 | 04:30 PM | Active | View |
19. | Procurement of Drill Pipe 89 mm for Di500 Drill Machine at DongriBuzurg mine(PUR/DB/20-21/109) | 12-05-2020 | 09-06-2020 | 09-06-2020 | 09-06-2020 | 04:30 PM | Active | View |
20. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) | 11-05-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 03:30 PM | Active | View |
21. | Engaging Housekeeping Agency for cleaning of MOIL Bhawan, CMD Bungalow, CMS premises etc(MOIL/20-21/ET/22) | 11-05-2020 | 11-06-2020 | 11-06-2020 | 11-06-2020 | 03:30 PM | Active | View |
22. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SAYAJI JAW CRUSHER(PUR/MOIL/C-5/30/E-02/38-M Dt. 11/05/2020) | 11-05-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
23. | Replacement of sheave wheel 1 No at Kandri Mine(A-III/KAN/20-21/228) | 08-05-2020 | 23-05-2020 | 23-05-2020 | 23-05-2020 | 04:30 PM | Active | View |
24. | PURCHASE OF COLD VULCANIZING SOLUTION AND HARDNER FOR JOINTING OF CONVEYOR BELTS AT BALAGHAT MINE(PUR/MOIL/BGT/IMB/20-21/78 dated 07.05.2020) | 08-05-2020 | 26-05-2020 | 26-05-2020 | 26-05-2020 | 04:30 PM | Active | View |
25. | Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine(AGT/BGT/MECH/JIG/20-21/256) | 07-05-2020 | 15-05-2020 | 15-05-2020 | 15-05-2020 | 04:30 PM | Active | View |
26. | Construction of Shed over Sand Stowing Plant near DSU at Munsar Mine(Mun/Civil/NIT/2020-21/12 Date 06.05.2020) | 06-05-2020 | 16-05-2020 | 16-05-2020 | 16-05-2020 | 04:30 PM | Active | View |
27. | Providing Designing Fabrication Installation and commissioning of motorized gate for mine workshop at Chikla mine(TE-22 DT.02042020) | 06-05-2020 | 20-05-2020 | 20-05-2020 | 20-05-2020 | 04:30 PM | Active | View |
28. | Purchase of Undercarriage assemblies for HEMM.(MOIL/20-21/ET-31 dt.06.05.2020) | 06-05-2020 | 11-06-2020 | 11-06-2020 | 12-06-2020 | 03:30 PM | Active | View |
29. | Purchase of CEMENT-824 MT(MOIL/20-21/ET-41 dt.06.05.2020) | 06-05-2020 | 08-06-2020 | 08-06-2020 | 09-06-2020 | 03:30 PM | Active | View |
30. | PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED, PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-1/35 -M DT.06/05/2020) | 06-05-2020 | 12-06-2020 | 12-06-2020 | 12-06-2020 | 03:30 PM | Active | View |
31. | Design, Manufacturing and Supply of 200 mm Butterfly valve Assy. without actuator for APIC Jig as per OEM Dimension along with material for I.M.B. plant.(AGT/BGT/MECH/IMB/20-21/71 Dated 04.05.2020) | 05-05-2020 | 05-06-2020 | 05-06-2020 | 05-06-2020 | 04:30 PM | Active | View |
32. | Laying of Paver Blocks from CC Road upto Administrative Building Entrance at Kandri Mine.(KAN/Civil/NIT/2020-21/214 Date 02.05.2020) | 04-05-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 PM | Active | View |
33. | Procurement of Telephone Exchange 200 lines for Balaghat Mine(BGT/ELECT/20-21/204) | 02-05-2020 | 01-06-2020 | 01-06-2020 | 01-06-2020 | 04:30 PM | Active | View |
34. | Laying of Paver block for approach pathway and allied civil works for sewage treatment plant at Munsar Mine(MUN/CIVIL/NIT/20-21/08 DT.02.05.2020) | 02-05-2020 | 16-05-2020 | 16-05-2020 | 16-05-2020 | 04:30 PM | Active | View |
35. | Repairing of civil work for 6th level substation premises at Balaghat Mine(Civil/BGT/TE/2020-21/42) | 01-05-2020 | 12-05-2020 | 12-05-2020 | 12-05-2020 | 04:30 PM | Active | View |
36. | Procurement of 650Metres of 4CX50SQMM aluminum Armoured Cable for Dongri Buzurg Mine(DB/ELECT/20-21/88) | 30-04-2020 | 26-05-2020 | 26-05-2020 | 26-05-2020 | 04:30 PM | Active | View |
37. | Purchase of Aluminum and Copper Lugs and DC Glands for Dongri Buzurg Mine.(DB/ELECT/20-21/89) | 30-04-2020 | 26-05-2020 | 26-05-2020 | 26-05-2020 | 04:30 PM | Active | View |
38. | Purchase of Hydraulic Rock Breaker Attachment for Excavator at Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-130(ET-19) DT.30/04/2020) | 30-04-2020 | 26-05-2020 | 26-05-2020 | 27-05-2020 | 03:30 PM | Active | View |
39. | Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) | 30-04-2020 | 20-05-2020 | 20-05-2020 | 21-05-2020 | 03:30 PM | Active | View |
40. | Purchase of Jaw Crusher, Size 750 X 375 mm for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-2(ET-20) DT.30/04/2020) | 30-04-2020 | 28-05-2020 | 28-05-2020 | 29-05-2020 | 03:30 PM | Active | View |
41. | Purchase of Triple Deck Vibratory Screen for Chikla Mine- 1 No.(1 Lot.) (Only Through e-procurement)(WE-3(ET-21) DT.30/04/2020) | 30-04-2020 | 01-06-2020 | 01-06-2020 | 02-06-2020 | 03:30 PM | Active | View |
42. | Purchase of Ammonium Nitrate-Prilled-119 MT(WE-128 DT.29.04.2020 (e-Tender no.MOIL/20-21/ET/18) | 29-04-2020 | 21-05-2020 | 21-05-2020 | 22-05-2020 | 03:30 PM | Active | View |
43. | Maintenance and Watering of Plantation at Kandri Mine(KAN/Civil/NIT/2020-21/160 Date 21.04.2020) | 28-04-2020 | 04-05-2020 | 04-05-2020 | 04-05-2020 | 04:30 PM | Active | View |
44. | Repairing rubber lining of MSRL Electrolytic Cell Tanks of EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/7) | 27-04-2020 | 27-05-2020 | 27-05-2020 | 27-05-2020 | 03:30 PM | Active | View |
45. | Recovery of Reduced Ore and EMD Powder and Washing of Bottom EMD at EMD Plant, Dongri Buzurg Mine(MOIL/20-21/ET/6) | 27-04-2020 | 27-05-2020 | 27-05-2020 | 27-05-2020 | 03:30 PM | Active | View |
46. | Removal of waste rock from the dump at 265 MRL near Jawahar Shaft of Chikla mine(TE-23 DT.09042020) | 27-04-2020 | 04-05-2020 | 04-05-2020 | 04-05-2020 | 04:30 PM | Active | View |
47. | Procurement of Electrical C class material for Balaghat Mine(BGT/ELECT/2020-21/31) | 25-04-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 PM | Active | View |
48. | Renovation of old floor Tiles with water supply and sanitary fittings work for Guest room bath of MM bunglow at Balaghat Mine(Civil/BGT/LT/2020-21/10) | 22-04-2020 | 12-05-2020 | 12-05-2020 | 12-05-2020 | 04:30 PM | Active | View |
49. | Monsoon preparatory work for cleaning of surface drain in industrial premises at Balaghat Mine.(Civil/BGT/LT/2020-2021/14) | 22-04-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 PM | Active | View |
50. | Providing PVC Polythene Sheets to Mangalore Tiled Roofing to Camp Quarters and tarpaulin sheets over industrial structures including various miscellaneous repair works and retiling at Balaghat Mine.(Civil/BGT/LT/2020-21/16) | 22-04-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 PM | Active | View |
51. | RCC roof repair of camp quarters at Balaghat Mine.(Civil/BGT/LT/2020-21/18) | 22-04-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 PM | Active | View |
52. | Components of Cage Suspension Gear(PUR/MOIL/C-12/12/WE-01/ET/17) | 22-04-2020 | 05-05-2020 | 05-05-2020 | 06-05-2020 | 03:30 PM | Active | View |
53. | Purchase of Spares for Flameproof Make Miners Cap Lamps(KD/Elect/TE/20-21/119, Dtd - 20.04.2020) | 21-04-2020 | 01-06-2020 | 01-06-2020 | 10-06-2020 | 04:30 PM | Active | View |
54. | WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND CONCRETING WORK OF MANWAY AT STOPE NO 2365 AT -270L OF CHIKLA MINE(TE-02 Dt.19042020) | 20-04-2020 | 28-04-2020 | 28-04-2020 | 28-04-2020 | 03:30 pm | Active | View |
55. | Maintenance and Upkeeping of ETP at EMD PLANT Dongri Buzurg Mine 2020 (MOIL/EMD/CH/Jt.GM/20-21/35) | 20-04-2020 | 05-05-2020 | 05-05-2020 | 05-05-2020 | 11:00 am | Active | View |
56. | Repairing of Multi Stage Centrifugal Pump 150HP of 4th Level with material.(Mech/KD/19-20/4045) | 20-04-2020 | 11-05-2020 | 11-05-2020 | 11-05-2020 | 04:30 pm | Active | View |
57. | WEBSITE TENDER ENQUIRY IN ONE BID SYSTEM FOR UNDERGROUND FILLING SPREADING AT -270L AT CHIKLA MINE(TE-01 Dt.19042020) | 20-04-2020 | 28-04-2020 | 28-04-2020 | 28-04-2020 | 03:30 pm | Active | View |
58. | Comprehensive Annual Maintenance Contract (CAMC) of 127 Nos. of Air-Conditioners of MOIL Ltd Nagpur(MOIL/20-21/ET/5) | 20-04-2020 | 18-05-2020 | 18-05-2020 | 18-05-2020 | 03:30 pm | Active | View |
59. | Purchase of Spares for Exide Make Miners Cap Lamps(KD/Elect/TE/20-21/118, Dtd - 20.04.2020) | 20-04-2020 | 01-07-2020 | 01-07-2020 | 01-07-2020 | 04:30 pm | Active | View |
60. | Shifting and Transport of pebbles accumulated due to Sand Stowing by old open plant at 234 MRL and dropping into the winze No. 2 of the level 193 MRL and Spreading at Beldongri Mine(MOIL/20-21/ET/9) | 15-04-2020 | 13-05-2020 | 13-05-2020 | 13-05-2020 | 03:30 pm | Active | View |
61. | Hiring of equipment for removal of sub grade mineral reject of Underground ROM to recover SM Grade at Balaghat Mine(MOIL/20-21/ET/10) | 15-04-2020 | 13-05-2020 | 13-05-2020 | 13-05-2020 | 03:30 pm | Active | View |
62. | Cleaning of surplus underground ROM at Munsar Mine(MOIL/20-21/ET/11) | 15-04-2020 | 13-05-2020 | 13-05-2020 | 13-05-2020 | 03:30 pm | Active | View |
63. | Underground development work at -550 Level at Kandri Mine(MOIL/20-21/ET/12) | 15-04-2020 | 13-05-2020 | 13-05-2020 | 13-05-2020 | 03:30 pm | Active | View |
64. | Trench cutting in ore stack for sampling at Dongri Buzurg Mine(MOIL/20-21/ET/16) | 15-04-2020 | 29-04-2020 | 29-04-2020 | 29-04-2020 | 03:30 pm | Active | View |
65. | Making of stemming material Mug Plug used for blasting at Kandri Mine(MOIL/20-21/ET/14) | 15-04-2020 | 15-05-2020 | 15-05-2020 | 15-05-2020 | 03:30 pm | Active | View |
66. | Trench cutting in ore stack at Kandri Mine(MOIL/20-21/ET/15) | 15-04-2020 | 15-05-2020 | 15-05-2020 | 15-05-2020 | 03:30 pm | Active | View |
67. | Transportation of bottom ash from Adani Power Plant Tiroda to Balaghat Mine of M s MOIL Ltd. for stowing purpose(MOIL/20-21/ET/13) | 15-04-2020 | 09-06-2020 | 09-06-2020 | 09-06-2020 | 03:30 pm | Active | View |
68. | Comprehensive Annual Maintenance Contract of Computers and Peripherals(MOIL20-21ET4) | 13-04-2020 | 12-05-2020 | 12-05-2020 | 12-05-2020 | 03:30 pm | Active | View |
69. | Comprehensive Annual Maintenance Contract of Computers and Peripherals(MOIL/20-21/ET/4) | 13-04-2020 | 12-05-2020 | 12-05-2020 | 12-05-2020 | 03:30 pm | Active | View |
70. | Removal of waste rock from the dump at 265 MRL near Jawahar Shaft of Chikla mine(TE-23 DT.09042020) | 09-04-2020 | 23-04-2020 | 23-04-2020 | 23-04-2020 | 04:00 PM | Active | View |
71. | REPAIRING OF COMPLETE RHS SIDE TRACK CHAIN OF TATA 450 HYD EXCV. TIRODI MINE(TRD/MECH/HO/20/520/1251 DT 02.3.20) | 18-03-2020 | 25-03-2020 | 25-03-2020 | 25-03-2020 | 03:30 PM | Active | View |
72. | Dismantling, shifting and reassembling of 20 Nos of Joplin jig assembly from old site to new shed constructed along the ferro plant of balaghat Mine.(AGT/BGT/MECH/JIG/19-20/1317) | 18-03-2020 | 31-03-2020 | 31-03-2020 | 31-03-2020 | 04:30 PM | Active | View |
73. | Purchase of VIBRATORY CUP MILL - 1 No., HARDENED STEEL - 1 No. and TUNGSTEN CARBIDE LINED BOWL - 1 No.(3 Lots.) (Only Through e-procurement)(WE-127(ET-433) DT.17.03.2020) | 17-03-2020 | 07-04-2020 | 07-04-2020 | 08-04-2020 | 03:30 PM | Active | View |
74. | Providing 6 mbps 1 is to 1 Internet Leased Line at Beldongri Mine(ADGM/GrpIII/SYS/NW/19-20/1353) | 16-03-2020 | 23-03-2020 | 23-03-2020 | 23-03-2020 | 04:30 PM | Active | View |
75. | Major Over Hauling Repairing of Mather and Platt Make MultiStage Centrifugal Pump 150HP of 4th Level with material(A-III/KAN/19-20/4045) | 14-03-2020 | 31-03-2020 | 31-03-2020 | 31-03-2020 | 04:30 PM | Active | View |
76. | Repair and rewinding of three submersible pumps of Balaghat Mine-15 HP , 35 HP , 40 HP(BGT/ELECT/19-20/1286) | 13-03-2020 | 03-04-2020 | 03-04-2020 | 03-04-2020 | 04:30 PM | Active | View |
77. | Purchase of Various Types of Copper-Aluminium Bus Bar, etc. For EMD PLANT, DONGRI BUZURG MINE.(MOIL/19-20/ET-432 dt.12.03.2020) | 12-03-2020 | 07-04-2020 | 07-04-2020 | 08-04-2020 | 03:30 PM | Active | View |
78. | Filling and spreading work at 13.5th level (North) section Balaghat Mine(Mining /BGT/LT/19-20/1290) | 12-03-2020 | 24-03-2020 | 24-03-2020 | 24-03-2020 | 04:30 PM | Active | View |
79. | Outsourcing of Operation and Maintenance contract of Excavator-2 Nos, Dumpers-8 Nos, and Dozer-1 No at Dongri Buzurg Mine for the Period of Two Years.(MOIL/19-20/ET/423) | 11-03-2020 | 13-04-2020 | 13-04-2020 | 13-04-2020 | 03:30 PM | Active | View |
80. | Cleaning and Screening of 30 percent Mn KDL435 from sub grade mineral reject from UG at Kandri Mine(KD/MINING/NIT/19-20/4074 dt. 08/03/2020) | 09-03-2020 | 16-03-2020 | 16-03-2020 | 16-03-2020 | 04:30 PM | Active | View |
81. | Excavation in manganiferous rock from Ch.2850 to Ch.2050 at -30 Level underground at Munsar Mine(MOIL/19-20/ET/384) | 09-03-2020 | 09-04-2020 | 09-04-2020 | 09-04-2020 | 03:30 PM | Active | View |
82. | Installation and Commissioning of new metering equipment required after enhancement of contract demand for industrial connection of EMD Plant, Dongri Buzurg(MOIL/19-20/ET/422) | 09-03-2020 | 09-04-2020 | 09-04-2020 | 09-04-2020 | 03:30 PM | Active | View |
83. | Cleaning of sanitary pipe line drain chambers and removal of garbage from MOIL premises at Nagpur(MOIL/19-20/ET/418) | 07-03-2020 | 07-04-2020 | 07-04-2020 | 07-04-2020 | 03:30 PM | Active | View |
84. | Providing and laying 3 inch HDPE pipe line from recently drilled bore upto GSR constructed for 200 A Type residential quarters colony water supply at Kandri Mine.(MOIL/19-20/ET/417) | 07-03-2020 | 07-04-2020 | 07-04-2020 | 07-04-2020 | 03:30 PM | Active | View |
85. | Construction of residential quarters Type C 1 block 4 quarters and type D one block at Beldongri Mine(MOIL/19-20/ET/420) | 07-03-2020 | 07-04-2020 | 07-04-2020 | 07-04-2020 | 03:30 PM | Active | View |
86. | Construction of personal toilets at Village Tighai Distt Nagpur under CSR(MOIL/19-20/ET/421) | 07-03-2020 | 07-04-2020 | 07-04-2020 | 07-04-2020 | 03:30 PM | Active | View |
87. | Maintenance of gardens at Kandri Mine(MOIL/19-20/ET/419) | 07-03-2020 | 07-04-2020 | 07-04-2020 | 07-04-2020 | 03:30 PM | Active | View |
88. | PURCHASE OF BARE CENTRIFUGAL PUMP (MAKE- MAXFLOW PUMPS INDIA PVT.LIMITED AND PUMP MODEL - 149HPB7R) - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/78/E-67/1050-M DT.07.03.2020) | 07-03-2020 | 30-03-2020 | 30-03-2020 | 30-03-2020 | 03:30 PM | Active | View |
89. | Purchase of Steel Wire Ropes(WE-58 DT.05.03.2020(e-Tender No.MOIL/19-20/ET/431) | 05-03-2020 | 30-03-2020 | 30-03-2020 | 31-03-2020 | 03:30 PM | Active | View |
90. | Collection of garbage and dump into barren /abundant land at Balaghat Mine(Civil/BGT/LT/2019-20/1257) | 04-03-2020 | 16-03-2020 | 16-03-2020 | 16-03-2020 | 04:30 PM | Active | View |
91. | Drilling of 2Nos borehole with PVC casing near Slime pond and near F.M. Plant at Balaghat Mine(Civil/BGT/T E/2019-20/1255) | 04-03-2020 | 16-03-2020 | 16-03-2020 | 16-03-2020 | 04:30 PM | Active | View |
92. | Procurement of Conveyor Belt Spares for IMB Plant at Dongri Buzurg Mine(PUR/DB/19-20/ 1016) | 04-03-2020 | 18-03-2020 | 18-03-2020 | 18-03-2020 | 04:30 PM | Active | View |
93. | AMC for repairs and rewiring of Electrical Installations at Balaghat Mine(MOIL/19-20/ET/416) | 04-03-2020 | 03-04-2020 | 03-04-2020 | 03-04-2020 | 03:30 PM | Active | View |
94. | Repairing of Turbocharger Assy of QSK19 Engine of BH60M Dumper operating at Dongri Buzurg Mine(DB/MECH/Dumper/19-20/1014) | 03-03-2020 | 13-03-2020 | 13-03-2020 | 13-03-2020 | 04:30 PM | Active | View |
95. | TENDER DOCUMENTS FOR SUPPLYING OF DGMS APPROVED, FLAME PROOFGATE END BOX COMPLETE WITH ALL ACCESSORIES FOR MUNSAR MINE.(ELECT/MUN/ADGM/19-20/1270) | 03-03-2020 | 10-03-2020 | 10-03-2020 | 10-03-2020 | 03:30 PM | Active | View |
96. | Procurement of 1 no. electrically operated Mono block pump for Dongri Buzurg Mine( PUR/DB/19-20/ 1015) | 03-03-2020 | 18-03-2020 | 18-03-2020 | 18-03-2020 | 04:30 PM | Active | View |
97. | Purchase of Gravel Black Gitti for underground concreting work at Ukwa Mine(MOIL/19-20/ET/415) | 03-03-2020 | 03-04-2020 | 03-04-2020 | 03-04-2020 | 03:30 PM | Active | View |
98. | Picking and collection of UKL-448 25 percent from F W Old sub grade mineralised area from Ch. 8600 to Ch.12000 at Ukwa Mine( MOIL/19-20/ET/414) | 03-03-2020 | 03-04-2020 | 03-04-2020 | 03-04-2020 | 03:30 PM | Active | View |
99. | Underground development at -370 Level of Vertical Section at Chikla Mine( MOIL/19-20/ET/412) | 03-03-2020 | 03-04-2020 | 03-04-2020 | 03-04-2020 | 03:30 PM | Active | View |
100. | Underground development for winze -150 Level to -250 Level at Kandri Mine(MOIL/19-20/ET/413) | 03-03-2020 | 03-04-2020 | 03-04-2020 | 03-04-2020 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |