Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | ENTERING BLANKET RATE CONTRACT FOR SUPPLY OF ESAB MAKE WELDING ACCESSORIES AND INDUSTRIAL GAS EQUIPMENTS(PUR/MOIL/C-3/16/E-20/248-M dt.29.09.2020) | 29-09-2020 | 16-10-2020 | 16-10-2020 | 16-10-2020 | 03:30 PM | Active | View |
2. | Purchase of Undercarriage Assembly for Tata Hitachi Excavator EX 1200V(MOIL/20-21/ET-160 dt.29.09.2020) | 29-09-2020 | 27-10-2020 | 27-10-2020 | 28-10-2020 | 03:30 PM | Active | View |
3. | Hiring of equipment for removal of soil without drilling and blasting at Parsoda Mine(MOIL/20-21/ET/150) | 29-09-2020 | 29-10-2020 | 29-10-2020 | 29-10-2020 | 03:30 PM | Active | View |
4. | PURCHASE OF ASHOK LEYLAND DIESEL ENGINE SUITABLE FOR L AND T 9O2O LOADER OPERATING AT DONGRI BUZURG MINE (MS) (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/139/E- 22/251-M) | 29-09-2020 | 11-11-2020 | 11-11-2020 | 11-11-2020 | 03:30 PM | Active | View |
5. | Pushing of Tubs in underground at Chikla Mine(MOIL/20-21/ET/147) | 28-09-2020 | 28-10-2020 | 28-10-2020 | 28-10-2020 | 03:30 PM | Active | View |
6. | Pushing of ROM/rock tubs and maintenance of tubs at various places at Munsar Mine(MOIL/20-21/ET/148) | 28-09-2020 | 28-10-2020 | 28-10-2020 | 28-10-2020 | 03:30 PM | Active | View |
7. | Concreting 8th 9th 10th 11th 12th and 13.5th Level at Balaghat Mine(MOIL/20-21/ET/149) | 28-09-2020 | 09-11-2020 | 09-11-2020 | 09-11-2020 | 03:30 PM | Active | View |
8. | Purchase of of TCT Drill Rods(WE-33 DT.23.09.2020(e-Tender no.MOIL/20-21/ET/158)) | 25-09-2020 | 20-10-2020 | 20-10-2020 | 21-10-2020 | 03:30 PM | Active | View |
9. | Purchase of Man Winding Steel Wire Ropes (Assorted Size) for various Mines(WE-34 DT.25.09.2020(e-Tender no.MOIL/20-21/ET/159)) | 25-09-2020 | 22-10-2020 | 22-10-2020 | 23-10-2020 | 03:30 PM | Active | View |
10. | Purchase of Man Winding Steel Wire Ropes (Assorted Size) for various Mines(WE-34 DT.25.09.2020(e-Tender no.MOIL/20-21/ET/159) | 25-09-2020 | 16-11-2020 | 16-11-2020 | 17-11-2020 | 03:30 PM | Active | View |
11. | Extension of Gantry Wall with OCF Shed in Nagara Plant at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/667) | 23-09-2020 | 29-09-2020 | 29-09-2020 | 29-09-2020 | 04:30 PM | Active | View |
12. | Purchase of LT Panels Various Types - 25 Lots. (Only Through e-procurement)(WE-29 DT.22/09/2020 (MOIL/20-21/ET/155)) | 23-09-2020 | 19-10-2020 | 19-10-2020 | 20-10-2020 | 03:30 PM | Active | View |
13. | Preparation of Ecological Impact Assessment for river sand mining along with Conservation and Management Plan over an area sand mining lease(MOIL/20-21/ET/125) | 23-09-2020 | 22-10-2020 | 22-10-2020 | 22-10-2020 | 03:30 PM | Active | View |
14. | Winzing from 12th Level to 13.5th Level at Balaghat Mine(MOIL/20-21/ET/144) | 23-09-2020 | 23-10-2020 | 23-10-2020 | 23-10-2020 | 03:30 PM | Active | View |
15. | Underground Development at 16.5th Level at Balaghat Mine(MOIL/20-21/ET/145) | 23-09-2020 | 23-10-2020 | 23-10-2020 | 23-10-2020 | 03:30 PM | Active | View |
16. | Purchase of Electrical HT/LT Cables (Assorted Sizes)(WE-32 DT.23.09.2020(e-Tenderno. MOIL/20-21/ET/156)) | 23-09-2020 | 20-10-2020 | 20-10-2020 | 21-10-2020 | 03:30 PM | Active | View |
17. | Underground Development at 1650 Level at Ukwa Mine(MOIL/20-21/ET/146) | 23-09-2020 | 23-10-2020 | 23-10-2020 | 23-10-2020 | 03:30 PM | Active | View |
18. | Purchase of Multi Polymer Linked Polyethylene Peroxide Pipes and Accessories for Dongri Buzurg Mine(M.S) - 6 Lots.(Only Through e-procurement)(WE-36 DT.23/09/2020 (MOIL/20-21/ET/157)) | 23-09-2020 | 02-11-2020 | 02-11-2020 | 03-11-2020 | 03:30 PM | Active | View |
19. | Procurement of 55Nos 2V 100AH lead acid batteries for Balaghat Mine(Bgt/Elect/2020-21/652) | 22-09-2020 | 15-10-2020 | 15-10-2020 | 15-10-2020 | 04:30 PM | Active | View |
20. | Work of outsourcing meter reading, preparation of deduction list and processing of local tenders of Electrical Department.(BGT/ELECT/20-21/617) | 22-09-2020 | 15-10-2020 | 15-10-2020 | 15-10-2020 | 04:30 PM | Active | View |
21. | Cleaning of Spilled ore near the Feed Conveyor Belt and Change over system Near Zero level of Production shaft of Balaghat Mine.(AGT/BGT/MECH/WINDER/20-21/665) | 22-09-2020 | 06-10-2020 | 06-10-2020 | 06-10-2020 | 04:30 PM | Active | View |
22. | Cleaning of Spilled Ore Near the Flap door of Holmes shaft Skip winder Compartment and 50MT Bunker area at surface of Balaghat Mine.(AGT/BGT/MECH/WINDER/20-21/666) | 22-09-2020 | 06-10-2020 | 06-10-2020 | 06-10-2020 | 04:30 PM | Active | View |
23. | Transportation of waste rock from vertical shaft area dump to Sports complex near administrative building at Chikla Mine(CIVIL/CH/T.E./20-21/836) | 22-09-2020 | 10-10-2020 | 10-10-2020 | 10-10-2020 | 04:30 PM | Active | View |
24. | Cleaning and Screening of Ferro Gr KD-4543 34 percent Mn and SM Gr KDL-435 30 percent Mn KDL-545 30.5 percent Mn and KDL-446 25 percent from Sub Grade Mineral rejects from Underground at Kandri Mine(MOIL/20-21/ET/142) | 22-09-2020 | 22-10-2020 | 22-10-2020 | 22-10-2020 | 03:30 PM | Active | View |
25. | Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at 2nd vertical shaft at Chikla mine(MOIL/20-21/ET/141) | 22-09-2020 | 22-10-2020 | 22-10-2020 | 22-10-2020 | 03:30 PM | Active | View |
26. | Additional excavation in Manganiferous rock at 370 L of IInd Vertical Shaft at Chikla Mine(MOIL/20-21/ET/143) | 22-09-2020 | 22-10-2020 | 22-10-2020 | 22-10-2020 | 03:30 PM | Active | View |
27. | Purchase of Spares for Flameproof make LED Miners Cap lamps As per Schedule(KD/Elect/TE/20-21/2717) | 21-09-2020 | 10-10-2020 | 10-10-2020 | 10-10-2020 | 04:30 PM | Active | View |
28. | Dismentalling and shifting and reassembly of joplin jig at Balaghat mine(AGT/BGT/MECH/JIG/20-21/661) | 21-09-2020 | 06-10-2020 | 06-10-2020 | 06-10-2020 | 04:30 PM | Active | View |
29. | Procurement of Ceiling Fans 1200MM for residential Camp, Dongri Buzurg Mine(DB/ELECT/20-21/832) | 21-09-2020 | 06-10-2020 | 06-10-2020 | 06-10-2020 | 04:30 PM | Active | View |
30. | Washing Picking and collection of material from rejected dump West side of D Dump at Tirodi Mine(MOIL/20-21/ET/132) | 21-09-2020 | 21-10-2020 | 21-10-2020 | 21-10-2020 | 03:30 PM | Active | View |
31. | Recovery of Ferro grade TD 4505 and SM grade Ore TDL 439 and TDL 499 from North D Dump at Tirodi Mine(MOIL/20-21/ET/131) | 21-09-2020 | 21-10-2020 | 21-10-2020 | 21-10-2020 | 03:30 PM | Active | View |
32. | Recovery of Ferro Grade TD 4505 and SM Grade TDL 439 and TDL 499 from South of Magazine Dump at Tirodi Mine(MOIL/20-21/ET/133) | 21-09-2020 | 21-10-2020 | 21-10-2020 | 21-10-2020 | 03:30 PM | Active | View |
33. | Repair and rewinding of submersible pumps of Balaghat Mine.(BGT/ELECT/20-21/651) | 21-09-2020 | 05-10-2020 | 05-10-2020 | 05-10-2020 | 04:30 PM | Active | View |
34. | Purchase of Rock Mechanics Instruments for 7 Underground Mines of MOIL - 16 Lots.(Only Through e-procurement)(WE-20 DT.21/09/2020 (MOIL/20-21/ET/154)) | 21-09-2020 | 14-10-2020 | 14-10-2020 | 15-10-2020 | 03:30 PM | Active | View |
35. | PURCHASE OF C CLASS PIPE FITTINGS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-5 DT.19092020) | 19-09-2020 | 12-10-2020 | 12-10-2020 | 12-10-2020 | 04:30 PM | Active | View |
36. | PURCHASE OF C CLASS FASTENERS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-7 DT.19092020) | 19-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
37. | PURCHASE OF C CLASS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-8 DT.19092020) | 19-09-2020 | 14-10-2020 | 14-10-2020 | 14-10-2020 | 04:30 PM | Active | View |
38. | Supply of Blind Spot and Rear Vision Mirrors for Dumpers Operating at D.B Mine(PUR/DB/20-21/818) | 18-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
39. | Removal of waste rock and magniferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/20-21/ET/129) | 18-09-2020 | 19-10-2020 | 19-10-2020 | 19-10-2020 | 03:30 PM | Active | View |
40. | Making of stemming material Mug Plug used for blasting at Ukwa Mine(MOIL/20-21/ET/130) | 18-09-2020 | 19-10-2020 | 19-10-2020 | 19-10-2020 | 03:30 PM | Active | View |
41. | PURCHASE OF C CLASS ITEMS WIRE AND ROSE NAILS AND FASTENERS FOR KANDRI MINE(MOIL/AGT-GR.III/KD/20-21/ 1025) | 18-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
42. | PURCHASE OF C CLASS ITEMS PIPE FITTING ACCESSORIES FOR KANDRI MINE(MOIL/AGT-GR.III/KD/20-21/1026) | 18-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
43. | PURCHASE OF C CLASS ITEMS PACKING MATERIALS ,GRINDING WHEEL ,COTTON CHINDI and WASTE , TORCH CELL, HACKSAW BLADE, NYLON ROPE, MANILA ROPE, TEFLON TAPE and EMERY FOR KANDRI MINE(MOIL/AGT-GR.III/KD/20-21/1027) | 18-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
44. | PURCHASE OF C CLASS ITEMS MISCELLANEOUS TOOLS AND ITEM FOR KANDRI MINE(MOIL/AGT-GR.III/KD/20-21/1028) | 18-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
45. | Removal of waste rock and handling the same by mechanized means from Canteen dump South dump at Tirodi Mine(MOIL/20-21/ET/128) | 18-09-2020 | 19-10-2020 | 19-10-2020 | 19-10-2020 | 03:30 PM | Active | View |
46. | Repairing of Boom Cylinder of Tata Zaxis 450 No1 Hydraulic Excavator of Dongri Buzurg Mine(DB/MECH/20-21/JGM(MECH)/ 814) | 17-09-2020 | 07-10-2020 | 07-10-2020 | 07-10-2020 | 04:30 PM | Active | View |
47. | CLEANING OF WORKSHOP AND WORKSHOP PREMISES AT DONGRI BUZURG MINE(DB/MECH/19-20/MECH/805) | 17-09-2020 | 13-10-2020 | 13-10-2020 | 13-10-2020 | 04:30 PM | Active | View |
48. | Appointment and services of Qualified Co-ordinating Agencies (QCAs) for Solar and Wind Energy Farms of MOIL Limited(MOIL/20-21/ET/121) | 17-09-2020 | 01-10-2020 | 01-10-2020 | 16-10-2020 | 03:30 PM | Active | View |
49. | Providing and fixing of 7.5 hp submercible pump at tawezari and awalazar pump house for water supply schme at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/637 DT. 13.09.2020) | 16-09-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 04:30 PM | Active | View |
50. | RCC roof repair water proofing work of camp quarters at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/638 DT. 13.09.2020) | 16-09-2020 | 28-09-2020 | 28-09-2020 | 28-09-2020 | 04:30 PM | Active | View |
51. | Providing and fixing of 50 hp submercible pump at Bhatera pump house for water supply scheme at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/636 DT. 13.09.2020) | 16-09-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 04:30 PM | Active | View |
52. | Collection of garbage and dump into barren area at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/640 DT. 13.09.2020) | 16-09-2020 | 25-09-2020 | 25-09-2020 | 25-09-2020 | 04:30 PM | Active | View |
53. | Site development work for Ferro managanese plant material stacking yard at Balaghat Mine(CIVI/BGT/LT/AGT/20-21/636 DT. 13.09.2020) | 16-09-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 04:30 PM | Active | View |
54. | Shifting Siddh Baba temple from existing valley portion to Dump at Dongri Buzurg Mine(DB/Civil/20-21/1397 Date 13/09/2020) | 16-09-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 04:30 PM | Active | View |
55. | Additional Sanction for Maintenance of Water Supply Scheme at Ukwa Mine(Civil/UK/LT/20-21/1075 Date- 14.09.2020) | 16-09-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 04:30 PM | Active | View |
56. | Providing 6 mbps 1 is to 1 Internet Leased Line at Munsar Mine(ADGM/Grp-III/SYS/NW/20-21/1019) | 16-09-2020 | 22-09-2020 | 22-09-2020 | 22-09-2020 | 03:30 PM | Active | View |
57. | Outsourcing of Finger Operators in Underground loading stations at Balaghat Mine for the period of one years (12 Months)(MOIL/20-21/ET/122) | 15-09-2020 | 14-10-2020 | 14-10-2020 | 14-10-2020 | 03:30 PM | Active | View |
58. | WEBSITE SINGLE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SAP USER LICENSES FOR SAP DIGITAL COMPLIANCE SERVICES - E-INVOICING - FOR 3 YEARS, MAKE SAP MS SAP INDIA PVT.LTD., FOR SYSTEM DEPARTMENT, MOIL LTD., NAGPUR-440 013(PUR/MOIL/C-4/305/E-19/218 -M) | 15-09-2020 | 22-09-2020 | 22-09-2020 | 22-09-2020 | 03:30 PM | Active | View |
59. | Painting and miscellaneous works at premises near Durga Stage Bhuvaneshwari and Rantoli area at Dongri Buzurg Mine(DB/Civil/20-21/803 Date 10/09/2020) | 12-09-2020 | 19-09-2020 | 19-09-2020 | 19-09-2020 | 04:30 PM | Active | View |
60. | Loading Transportation and Unloading of Manganese ore ROM at Beldongri Mine(Bel/Min/NIT/20-21/1234) | 11-09-2020 | 17-09-2020 | 17-09-2020 | 17-09-2020 | 04:30 PM | Active | View |
61. | Laying of Paver Block infront of Old B and C-Type Quarters in Wahitola Officers Colony at Munsar Mine.(Mun/Civil/NIT/2020-21/119 Date 08.09.2020) | 11-09-2020 | 19-09-2020 | 19-09-2020 | 19-09-2020 | 04:30 PM | Active | View |
62. | Purchase of Hard Disk for HPE 3PAR Storage(PUR/MOIL/C-4/138/E-17/216-M DT.11/09/2020) | 11-09-2020 | 28-09-2020 | 28-09-2020 | 28-09-2020 | 03:30 PM | Active | View |
63. | Annual Blanket Rate Contract for supply of various all types and sizes of Bearings, Sleeves with Nuts, C.I. Pedestals Etc.(WE-39 DT.11.09.2020(e-Tender no.MOIL/20-21/ET/139) | 11-09-2020 | 05-10-2020 | 05-10-2020 | 06-10-2020 | 03:30 PM | Active | View |
64. | Laying of Paver Blocks infront of ESR, Sump and Water Filtration Plant Unit including fencing the entire premises at Munsar Mine(Mun/Civil/NIT/2020-21/113 Date 06.09.2020) | 11-09-2020 | 16-09-2020 | 16-09-2020 | 16-09-2020 | 04:30 PM | Active | View |
65. | Regrooving of Sheave wheel pulley North and South side Diameter 2050mm To accommodate 19mm FLC at 250 MRL at Beldongri Mine(BL/MECH/20-21/1256) | 10-09-2020 | 22-09-2020 | 22-09-2020 | 22-09-2020 | 4:30 pm | Active | View |
66. | Repairs to gantry for U/G development waste rock disposal near BDC at Kandri Mine(KAN/CIVIL/NIT/20-21/2536 DT 08.09.2020) | 09-09-2020 | 16-09-2020 | 16-09-2020 | 16-09-2020 | 04:30 PM | Active | View |
67. | Operation of Pumps for Drinking water supply in camp area and officer colony at Kandri Mine(KAN/CIVIL/NIT/20-21/2537 DT 08.09.2020) | 09-09-2020 | 16-09-2020 | 16-09-2020 | 16-09-2020 | 04:30 PM | Active | View |
68. | Backup Internet Connectivity at Tirodi, Chikla and Dongri Buzurg Mine(MOIL/20-21/ET/124) | 08-09-2020 | 09-10-2020 | 09-10-2020 | 09-10-2020 | 03:30 PM | Active | View |
69. | Exploration of dump at 43.353 Hac. lease area of sitapatore mine(TRD/CIVIL/20-21/SP/601 DT-04-09-2020) | 05-09-2020 | 11-09-2020 | 11-09-2020 | 11-09-2020 | 03:30 PM | Active | View |
70. | REPARING OF LEAD CATHODES PLATES, AT EMD PLANT DONGRI BUZURGMINE-2020(MOIL/EMD/CH/AJGM/20-21/760) | 05-09-2020 | 19-09-2020 | 19-09-2020 | 19-09-2020 | 11:00 AM | Active | View |
71. | Fabrication of Butterfly Diaphragm along with the Spline Shaft of Air Pulsating Jig of IMB Plant of Balaghat Mine(AGT/BGT/MECH/IMB/20-21/600) | 05-09-2020 | 28-09-2020 | 28-09-2020 | 28-09-2020 | 04:30 PM | Active | View |
72. | Recasting of 3 nos of contact clamp(FMP/ELECT/20-21/126) | 04-09-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 05:00 PM | Active | View |
73. | Purchase of 2 Nos. of submersible pumps suitable for 4 inch/6 inch borehole for drinking water supply at Balaghat Mine(PUR/MOIL/BGT/PUMP/20-21/597) | 04-09-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 04:30 PM | Active | View |
74. | Major overhauling of 75 H.P. Maxflow make Multistage pump and 220 HP Mather and Platt make Multistage pumps by pattern making, Casting, Machining , Balancing and Repairing with spares at Balaghat Mine(AGT/BGT/MECH/PUMP/20-21/598) | 04-09-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 04:30 PM | Active | View |
75. | Procurement of 1.67 kW Unbalance Motors for Balaghat Mine(Bgt/Elect/2020-21/588) | 03-09-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 04:30 PM | Active | View |
76. | Providing separate metering unit for 4.8 MW WTG unit at Nagda Hill Dist. Dewas (MP)(MOIL/20-21/ET/120) | 03-09-2020 | 17-09-2020 | 17-09-2020 | 17-09-2020 | 03:30 PM | Active | View |
77. | PURCHASE OF MISCELANEOUS ITEMS, WELDING ACCESSORIES , EMERY TAPE, WHITE CHINDI, GRINDING WHEEL ETC FOR GR-I BALAGHAT MINE(PUR/MOIL/BGT/C CLASS/20-21/582) | 01-09-2020 | 22-09-2020 | 22-09-2020 | 22-09-2020 | 04:30 PM | Active | View |
78. | PURCHASE OF PIPE FITTING, MANILAROPE, NYLONROPE , PACKING ETC FOR GR-I BALAGHAT MINE(PUR/MOIL/BGT/C CLASS/20-21/581) | 01-09-2020 | 22-09-2020 | 22-09-2020 | 22-09-2020 | 04:30 PM | Active | View |
79. | Relining and Repairing of 6 Nos of Electrolytic Cell Tanks of EMD Plant at Dongri Buzurg Mine(MOIL/20-21/ET/123) | 01-09-2020 | 01-10-2020 | 01-10-2020 | 01-10-2020 | 03:30 PM | Active | View |
80. | PROPOSAL FOR DIESEL AND LUBRICANT FILLING IN HEMM AT MINE SITE OF TIRODI MINE .(SIX MONTHS)(MOIL/HO/MECH/GEN/2020/136 DATED 16.07.2020) | 31-08-2020 | 10-09-2020 | 10-09-2020 | 12-09-2020 | 03:30 PM | Active | View |
81. | PROPOSAL FOR OUTSOURCING OF PUMP OPERATION INSTALLED AT PIT BOTTOM AT SITAPATORE MINE(DEWATERING WORK OF MINE WATER FOR FIVE MONTHS)(MOIL/HO/MECH/GEN/2020/138 DATED 17.07.2020) | 31-08-2020 | 10-09-2020 | 10-09-2020 | 12-09-2020 | 03:30 PM | Active | View |
82. | Maintenance of gardens at various places ta Chikla Mine(MOIL/20-21/ET/117) | 31-08-2020 | 30-09-2020 | 30-09-2020 | 30-09-2020 | 03:30 PM | Active | View |
83. | Fabrication of Manway Orepass for Chikla Mine(TE-06 DT.31082020) | 31-08-2020 | 07-09-2020 | 07-09-2020 | 07-09-2020 | 03:30 PM | Active | View |
84. | Construction of Boundary wall along the lease boundary along with allied works at Balaghat Mine(MOIL/20-21/ET/118) | 31-08-2020 | 05-10-2020 | 05-10-2020 | 05-10-2020 | 03:30 PM | Active | View |
85. | Operation and Maintenance of Electric Air Compressor at Chikla Mine for the period of one year (12 Months)(MOIL/20-21/ET/76) | 31-08-2020 | 30-09-2020 | 30-09-2020 | 30-09-2020 | 03:30 PM | Active | View |
86. | Outsourcing of Operation and General Maintenance of Crushing and Screening Plant at Chikla Mine for the period of one year (12 Months)(MOIL/20-21/ET/75) | 31-08-2020 | 30-10-2020 | 30-10-2020 | 30-10-2020 | 03:30 PM | Active | View |
87. | Cleaning of septic tank with vacuum cleaning machine at Sitasaongi upper camp area at Chikla Mine(CIVIL/CH/T.E./20-21/594) | 25-08-2020 | 02-09-2020 | 02-09-2020 | 02-09-2020 | 04:30 PM | Active | View |
88. | Operation, Maintenance, Watch and Ward of Solid Waste Management Plant at Munsar Mine.(Munsar/Civil/NIT/2020-21/91 Date 22.08.2020) | 24-08-2020 | 29-08-2020 | 29-08-2020 | 29-08-2020 | 04:30 PM | Active | View |
89. | Purchase of Mechanical C Class Items for Ferro Manganese Plant, Balaghat Mine for the year 2020-21(TE/MOIL/FMP/MECH/20-21/116) | 24-08-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 04:30 PM | Active | View |
90. | Loading and unloading of steel section, cement bags and other materials with stacking at Balaghat Mine store(MOIL/20-21/ET/115) | 24-08-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 03:30 PM | Active | View |
91. | Purchase of plus 10 mm to -20 mm Black Gitti for underground concreting at Chikla Mine(MOIL/20-21/ET/112) | 24-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
92. | Handling of ore tolleys at Chikla Mine(MOIL/20-21/ET/113) | 24-08-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 03:30 PM | Active | View |
93. | Trench cutting in ore stacks for sampling at Munsar Mine(MOIL/20-21/ET/114) | 24-08-2020 | 28-09-2020 | 28-09-2020 | 28-09-2020 | 03:30 PM | Active | View |
94. | Removal of accumulated pebbles near sand stowing plants at Balaghat Mine(MOIL/20-21/ET/116) | 24-08-2020 | 24-09-2020 | 24-09-2020 | 24-09-2020 | 03:30 PM | Active | View |
95. | LOADING UNLOADING AT DONGRI BUZURG MINE STORE.(DB/AGT/Store/20-21/545) | 22-08-2020 | 02-09-2020 | 02-09-2020 | 02-09-2020 | 04:30 PM | Active | View |
96. | Applications for empanelment of firms for conducting Transaction Auditing for three years extendable to five years. | 21-08-2020 | 10-09-2020 | 10-09-2020 | 10-09-2020 | 02:00 PM | Active | View |
97. | Underground development at 13.5th Level North Section at Balaghat Mine(MOIL/20-21/ET/109) | 21-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
98. | Additional excavation in Manganiferous rock between Ch.1920 to Ch. 1980 at -470 L at Chikla Mine(MOIL/20-21/ET/110) | 21-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
99. | Additional excavation in Manganiferous rock at -70 L and plus 160 L of Chikla B section at Chikla Mine(MOIL/20-21/ET/111) | 21-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
100. | e-Procurement of PVC PIPES (12 mm and 20 mm)(PUR/MOIL/C-1/196/WE-38/ET/127) | 20-08-2020 | 10-09-2020 | 10-09-2020 | 11-09-2020 | 03:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |