Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Applications for empanelment of firms for conducting Transaction Auditing for three years extendable to five years. | 21-08-2020 | 10-09-2020 | 10-09-2020 | 10-09-2020 | 02:00 PM | Active | View |
2. | Underground development at 13.5th Level North Section at Balaghat Mine(MOIL/20-21/ET/109) | 21-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
3. | Additional excavation in Manganiferous rock between Ch.1920 to Ch. 1980 at -470 L at Chikla Mine(MOIL/20-21/ET/110) | 21-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
4. | Additional excavation in Manganiferous rock at -70 L and plus 160 L of Chikla B section at Chikla Mine(MOIL/20-21/ET/111) | 21-08-2020 | 21-09-2020 | 21-09-2020 | 21-09-2020 | 03:30 PM | Active | View |
5. | e-Procurement of PVC PIPES (12 mm and 20 mm)(PUR/MOIL/C-1/196/WE-38/ET/127) | 20-08-2020 | 10-09-2020 | 10-09-2020 | 11-09-2020 | 03:30 PM | Active | View |
6. | Erection and commissioning of MS base foundation and shade work for stand by winder control panel at Beldongri mine(Civil/Bel/2020-21/1078) | 19-08-2020 | 29-08-2020 | 29-08-2020 | 29-08-2020 | 03:30 PM | Active | View |
7. | Supply of Brake Liners of Parking Brake Assy for BH60M Dumpers Operating at Dongri Buzurg mine.(PUR/DB/20-21/553) | 18-08-2020 | 07-09-2020 | 07-09-2020 | 07-09-2020 | 04:30 PM | Active | View |
8. | Repairing of Track Rollers Assembly of Side Dump Loader 2 Nos. operating at Balaghat Mine(AGT/BGT/MECH/SDL/20-21/531) | 18-08-2020 | 08-09-2020 | 08-09-2020 | 08-09-2020 | 04:30 PM | Active | View |
9. | Picking and collection of UKL-448 25 percent and UKL-471 20 percent from Ch.10000 to Ch.12500 from F W old sub grade mineralized area of Ukwa Mine(MOIL/20-21/ET/108) | 18-08-2020 | 18-09-2020 | 18-09-2020 | 18-09-2020 | 03:30 PM | Active | View |
10. | Removal of waste rock and handling the same by mechanized means from North Dump at Tirodi Mine(MOIL/20-21/ET/107) | 18-08-2020 | 18-09-2020 | 18-09-2020 | 18-09-2020 | 03:30 PM | Active | View |
11. | Removal of waste rock with drilling and blasting and handling the same by mechanized means at Pit No 6-C and Pit No 9 at Tirodi Mine(MOIL/20-21/ET/106) | 18-08-2020 | 18-09-2020 | 18-09-2020 | 18-09-2020 | 03:30 PM | Active | View |
12. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR SANDVIK ASIA PVT. LTD MAKE, JUMBO DRILLING MACHINE OPERATING AT BALAGHAT MINE.(PUR/MOIL/C-5/23/E-11/173-M Dt. 18/08/2020) | 18-08-2020 | 07-09-2020 | 07-09-2020 | 07-09-2020 | 03:30 PM | Active | View |
13. | Purchase of Fasteners High Tension Bolts, Mild Steel Bolts, Wire Nails, Rose Nails, Teflon Tape ,M seal, Araldite , Holdite etc. for Gr-I Balaghat Mine(PUR/MOIL/BGT/C CLASS/20-21/534) | 17-08-2020 | 08-09-2020 | 08-09-2020 | 08-09-2020 | 04:30 PM | Active | View |
14. | PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE- ENESTEE ENGINEERING LIMITED, MODEL- E-VF-1016-001 - 1 NO. FOR BALAGHAT MINE(MP) (AS PER ANNEXURE A ENCLOSED).(PUR/MOIL/C-4/239/E-15/193-M DT.17/08/2020) | 17-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
15. | Procurement and Installation of CCTV Surveillance System at EMD Plant, MOIL Limited, Dongri Buzurg Mine(DB/ELECT/20-21/556) | 14-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 04:30 PM | Active | View |
16. | Purchase of WATER BONDED PLUGGING MASS- 5 MT(MOIL/20-21/ET-126 dt.14.08.2020) | 14-08-2020 | 08-09-2020 | 08-09-2020 | 09-09-2020 | 03:30 PM | Active | View |
17. | Providing,supplying,installation of neutral grounding resistance and monitoring relay on 11/3.3kV transformer at Balaghat Mine(BGT/ELECT/20-21/523) | 13-08-2020 | 03-09-2020 | 03-09-2020 | 03-09-2020 | 04:30 PM | Active | View |
18. | providing, supplying and installation of heat shrinkable indoor End termination kits on the 120 sq mm copper XLPE cable.(BGT/ELECT/2020-21/524) | 13-08-2020 | 03-09-2020 | 03-09-2020 | 03-09-2020 | 04:30 PM | Active | View |
19. | Amenities material to be provided to SISF At Balaghat, Ukwa, and Tirodi Mines MOIL Limited(PUR/PERS/BGT/AGT/518 date 10.08.2020) | 12-08-2020 | 31-08-2020 | 31-08-2020 | 31-08-2020 | 04:30 PM | Active | View |
20. | Daily fuel (High Speed Diesel) filling in HEMMs at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/542) | 11-08-2020 | 20-08-2020 | 20-08-2020 | 20-08-2020 | 04:30 PM | Active | View |
21. | Security of Mine hospital at Balaghat(PERS/BGT/LT/20-21/511 date 10.08.2020) | 11-08-2020 | 20-08-2020 | 20-08-2020 | 20-08-2020 | 04:30 PM | Active | View |
22. | Construction of Community hall at Puri (Odisha) under CSR(MOIL/20-21/ET/119) | 11-08-2020 | 10-09-2020 | 10-09-2020 | 10-09-2020 | 03:30 PM | Active | View |
23. | Tender inviting in single bid system for Proposal for fabrication and installation of Steel Platform and associated works near 2nd Vert)ical Shaft at Chikla mine.(PUR/MOIL/CH/MECH/20-21/06) | 10-08-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
24. | REPAIRING OF RHS TRACK CHAIN ASSY OF TATAHITACHI 450-1 HYDRAULIC EXCVATOR OF DONGRI BUZURG MINE.(DB/MECH/20-21/JGM(MECH)/525) | 06-08-2020 | 14-08-2020 | 14-08-2020 | 14-08-2020 | 04:30 PM | Active | View |
25. | Waterproofing to RCC slab of old B-Type and C-Type Quarters at Dongri Buzurg Mine.(DB/Civil/20-21/526 Date 04/08/2020) | 06-08-2020 | 14-08-2020 | 14-08-2020 | 14-08-2020 | 04:30 PM | Active | View |
26. | Maintenance and operation of pumps for drinking water supply in camp area at Kandri Mine(MOIL/20-21/ET/92) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
27. | Construction of Community hall at village Chakdehi Distt Mandla (MP) under CSR(MOIL/20-21/ET/105) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
28. | Construction of additional floor at Saraswati Mandir an educational institute for Deaf-Mute Childerns at Nagpur under CSR(MOIL/20-21/ET/104) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
29. | Construction of new water supply scheme at Chikla Mine(MOIL/20-21/ET/93) | 05-08-2020 | 09-09-2020 | 09-09-2020 | 09-09-2020 | 03:30 PM | Active | View |
30. | Maintenance of gardens at Administrative Building and Mine Managers Bungalow at Beldongri Mine(MOIL/20-21/ET/98) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
31. | Maintenance, watch and ward of various gardens at Munsar Mine(MOIL/20-21/ET/97) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
32. | Const of cubical room and HT panel room and certralized CCTV room near Mine store at Chikla Mine(MOIL/20-21/ET/96) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
33. | Construction of CC platform and Industrial shed near dry separation unit at Munsar Mine(MOIL/20-21/ET/95) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
34. | Annual repairs to camp quarters at Kandri Mine.(MOIL/20-21/ET/94) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
35. | Construction Switch room and NGR panel room and 11 kv cable trench of Chikla Mine(MOIL/20-21/ET/91) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
36. | ET 90 for Operation and minor maintenance of water supply scheme at MOIL Bhawan CMD Bungalow CMS with A type quarters and West court with guest house Transit house and Bansivilla compound area MOI Nagpur(MOIL/20-21/ET/90) | 05-08-2020 | 04-09-2020 | 04-09-2020 | 04-09-2020 | 03:30 PM | Active | View |
37. | BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF LARSEN AND TOUBRO MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/E-05/79-M DT.04.08.2020) | 04-08-2020 | 24-08-2020 | 24-08-2020 | 24-08-2020 | 03:30 PM | Active | View |
38. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ATLAS COPCO MAKE ROCK BREAKER MODEL MB -1500.(PUR/MOIL/C-5/70/E-09/168-M Dt. 04/08/2020) | 04-08-2020 | 26-08-2020 | 26-08-2020 | 26-08-2020 | 03:30 PM | Active | View |
39. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR IR MAKE AIR COMPRESSOR MODEL IN-15-7 AND DYER IR24R, D144 INA FOR IMB PLANT BALAGHAT MINE(PUR/MOIL/C-5/65/E-10/169-M Dt. 04/08/2020) | 04-08-2020 | 26-08-2020 | 26-08-2020 | 26-08-2020 | 03:30 PM | Active | View |
40. | Complete survey, Estimation of 3D Subsidence parameter and 3D Numerical Modelling of Subsidence parameters at Chikla Mine of MOIL over an area of 150.650 Ha with survey certification by MoEF recommended Instititions(MOIL/20-21/ET/72) | 03-08-2020 | 19-08-2020 | 19-08-2020 | 19-08-2020 | 03:30 PM | Active | View |
41. | FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/20-21/1362) | 01-08-2020 | 26-08-2020 | 26-08-2020 | 26-08-2020 | 04:30 PM | Active | View |
42. | Design, Manufacture and supply plumber block for pinion Shaft of Production shaft winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/1361) | 01-08-2020 | 26-08-2020 | 26-08-2020 | 26-08-2020 | 04:30 PM | Active | View |
43. | Under ground filling and spreading of waste rock at 13.5th level North section at Balaghat Mine(MIN/BGT/AGT/LT/20-21/469 dt 29.07.2020) | 31-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 04:30 PM | Active | View |
44. | Supply of empty cement bags for muffle blasting at Tirodi Mine.(403 Dated 15.07.2020) | 31-07-2020 | 05-08-2020 | 05-08-2020 | 05-08-2020 | 03:30 PM | Active | View |
45. | Cleaning of Sump at 1650 L Underground at Ukwa Mine(AGT/Civil/UK/LT/20-21/443 Date 28.07.2020) | 30-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 04:30 PM | Active | View |
46. | CLEANING OF DRAIN(AGT/Civil/UK/LT/20-21/442 Date 28.07.2020) | 30-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 04:30 PM | Active | View |
47. | Installation of retaining wall from steel section for new dump screen installed near new Joplin Jig section at Balaghat Mine(AGENT/BGT/MECH/20-21/ 451) | 29-07-2020 | 18-08-2020 | 18-08-2020 | 18-08-2020 | 04:30 PM | Active | View |
48. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES.(PUR/MOIL/C-5/46/E-12/174-M Dt. 29/07/2020) | 29-07-2020 | 19-08-2020 | 19-08-2020 | 19-08-2020 | 03:30 PM | Active | View |
49. | PURCHASE OF PEOPLELINK EXTENSION MICROPHONE(PUR/MOIL/C-4/138/E-13/176-M DT.28.07.2020) | 28-07-2020 | 14-08-2020 | 14-08-2020 | 14-08-2020 | 03:30 PM | Active | View |
50. | Tender For 10 Mbps Wired Wireless Internet Broadband Line 1 1 at Ukwa Mine(BG/SYSTEM/Network/2020-21/433) | 23-07-2020 | 07-08-2020 | 07-08-2020 | 07-08-2020 | 03:30 PM | Active | View |
51. | Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine through outsourcing for the period of one year(MOIL/20-21/ET/74) | 23-07-2020 | 24-08-2020 | 24-08-2020 | 24-08-2020 | 03:30 PM | Active | View |
52. | WEBSITE SNGLE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS-2020-22- FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AN AIR LEG MACHINES- HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-08/169-M Dt. 23/07/2020) | 23-07-2020 | 05-08-2020 | 05-08-2020 | 05-08-2020 | 03:30 PM | Active | View |
53. | Purchase of Strata Monitoring Instrument MPBX for Chikla Mine(TE-04 DT.21072020) | 21-07-2020 | 11-08-2020 | 11-08-2020 | 11-08-2020 | 04:30 PM | Active | View |
54. | PURCHASE OF SPARES FOR SIGNALLING SYSTEM OF 150HP WINDER FOR KANDRI MINE(PUR/KD/ELECT/20-21/) | 21-07-2020 | 28-07-2020 | 28-07-2020 | 28-07-2020 | 04:30 PM | Active | View |
55. | OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DUMPERS AND TIPPERS ONLY REGISTERED CONTRACTORS WHO DOING THIS TYPE OF SIMILAR WORK SINCE ATLEAST FROM LAST YEAR(MOIL/HO/MECH/2020/56 DT 23.05.2020) | 20-07-2020 | 25-07-2020 | 25-07-2020 | 25-07-2020 | 03:30 PM | Active | View |
56. | Designing and printing of Annual Report 2019-20 (Deluxe Version in English, Hindi and Marathi)(MOIL/20-21/ET/99) | 20-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 03:30 PM | Active | View |
57. | OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DOZER AND EXCAVATOR(MOIL/HO/MECH/2020/57 DT. 23.05.2020) | 19-07-2020 | 25-07-2020 | 25-07-2020 | 25-07-2020 | 03:30 PM | Active | View |
58. | Scanning and Digitization of Company Records(MOIL/20-21/ET/102) | 18-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
59. | Development of Vendor Invoice Tracking System(MOIL/20-21/ET/100) | 18-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
60. | Maintenance and operation of water supply scheme at Dongri Buzurg Mine(MOIL/20-21/ET/89) | 17-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
61. | Construction of RCC sump and laying of pipe line for supply of water to new A type quarters and Medical Administrative building at MOIL Nagpur(MOIL/20-21/ET/103) | 17-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
62. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all winders at Balaghat mine(AGENT/BGT/MECH/NDT/20-21/395) | 16-07-2020 | 05-08-2020 | 05-08-2020 | 05-08-2020 | 04:30 PM | Active | View |
63. | Maintenance repair of HT/LT overhead lines for the three months at Balaghat Mine(BGT/ELECT/20-21/376) | 14-07-2020 | 31-07-2020 | 31-07-2020 | 31-07-2020 | 04:30 PM | Active | View |
64. | Repairing of Bucket assembly 5.6 Cu M -- 4 Nos of TATAHitachi 1200-3 Hydraulic Excavator of DB Mine.(DB/MECH/20-21/JGM(MECH)/321) | 14-07-2020 | 21-07-2020 | 21-07-2020 | 21-07-2020 | 04:30 PM | Active | View |
65. | Replacement of 6mm thick liner plates at 14.5th Level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WINDER/20-21/374) | 13-07-2020 | 04-08-2020 | 04-08-2020 | 04-08-2020 | 04:30 PM | Active | View |
66. | Replacement of liner plates of the transfer chute, bunker and repair of transfer chute/bunker at various location at IMB plant of Balaghat Mine(AGENT/BGT/MECH/IMBP/20-21/ 371) | 11-07-2020 | 28-07-2020 | 28-07-2020 | 28-07-2020 | 04:30 PM | Active | View |
67. | Construction of Drain around Service Winze beside I st Vertical Shaft at Munsar Mine(MUN/CIVIL/NIT/20-21/51 DT 08.07.2020) | 10-07-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 04:30 PM | Active | View |
68. | Purchase of Steel Cages - 5 Nos.(2 LOTS.) (Only Through e-procurement)(WE-25(ET-88) DT.10/07/2020) | 10-07-2020 | 03-08-2020 | 03-08-2020 | 04-08-2020 | 03:30 PM | Active | View |
69. | Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2020-21/354) | 07-07-2020 | 17-07-2020 | 17-07-2020 | 17-07-2020 | 03:30 PM | Active | View |
70. | Purchase of PEARL COKE with Transportation - 6900 MT(MOIL/20-21/ET-87 dt.06.07.2020) | 06-07-2020 | 05-08-2020 | 05-08-2020 | 06-08-2020 | 03:30 PM | Active | View |
71. | Repairing kachha road at North and South Section mine road at Tirodi Mine.(TRD/CIVIL/2020-21/528 Dated 21.06.2020) | 04-07-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
72. | Retaining wall for installation of pump shed and foundation for 170HP pump150HP pump north C section at Tirodi Mine.(TRD/CIVIL/2020-21/481 Dated 19.06.2020) | 04-07-2020 | 09-07-2020 | 09-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
73. | New installation of pump foundation and retaining wall for 170HP, 150HP north section at Tirodi Mine.(TRD/CIVIL/2020-21/467 Dated 11.06.2020) | 04-07-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
74. | Cleaning of septic tank with vacuum cleaning machine at camp/colony area at Tirodi Mine.(TRD/CIVIL/2020-21/527 Dated 21.06.2020) | 04-07-2020 | 08-07-2020 | 08-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
75. | Expression of Interest (EoI) for Setting up X- Ray based sorting system(PUR-MOIL-X RAY OCS/ET-85) | 01-07-2020 | 29-09-2020 | 29-09-2020 | 29-09-2020 | 03:30 PM | Active | View |
76. | Purchase of Flexible Trailing Copper Conductor Cable(WE-21 DT.01.07.2020 (e-Tender no.MOIL/20-21/ET/86)) | 01-07-2020 | 29-07-2020 | 29-07-2020 | 30-07-2020 | 03:30 PM | Active | View |
77. | BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF SIEMENS MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/C-3/13/E-06/80-M DT.29.06.2020) | 01-07-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
78. | Loading transportation and unloading of manganese ore ROM at Beldongri Mine(Bel/Min/20-21/600 Dated 28.06.2020) | 30-06-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
79. | Tnder inviting in single bid system for Construction of switch and NGR panel room and 11KV cable teach at Chikla mine.(TE/CH/CIVIL/20-21/309) | 30-06-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
80. | Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2020-21/315) | 29-06-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
81. | Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Ukwa Mine(BGT/SYSTEM/AMC/2020-21/317) | 29-06-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
82. | Cleaning of Underground Sumps and Underground Level Drains under Monsoon Preparatory Works at Munsar Mine(ADGM/Mining/LT/2020-21/46 Date 26.06.2020) | 27-06-2020 | 06-07-2020 | 06-07-2020 | 06-07-2020 | 04:30 PM | Active | View |
83. | Tender inviting in single bid system for Providing Water by Tanker in Residential Colonies at Chikla mine.(TE-CIVIL20-21-280) | 27-06-2020 | 11-07-2020 | 11-07-2020 | 11-07-2020 | 04:00 PM | Active | View |
84. | Cleaning of surface drains and making of earthen bunds for North and south section for Monsoon preparatory works at Tirodi Mine.(TRD/CIVIL/2020-21/524 Dated 20/06/2020) | 26-06-2020 | 30-06-2020 | 30-06-2020 | 01-07-2020 | 03:30 PM | Active | View |
85. | Repairing of Track Components of Side Dump Loader no.9 in 12th Level Underground of Balaghat Mine(AGT/BGT/MECH/SDL/20-21/291) | 26-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 04:30 PM | Active | View |
86. | Tender for Laying of 6 inch and 4 inch GI pipe line for compressed air in underground at balaghat mine(AGT/BGT/MECH/PIPE/20-21/290) | 26-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 04:30 PM | Active | View |
87. | Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/20-21/289) | 25-06-2020 | 06-07-2020 | 06-07-2020 | 06-07-2020 | 04:30 PM | Active | View |
88. | Purchase of Pneumatic Stopper with Telescopic Air Leg for various Mines - 2 Lots.(Only Through e-procurement)(WE-14(ET-84) DT.25/06/2020) | 25-06-2020 | 15-07-2020 | 15-07-2020 | 16-07-2020 | 03:30 PM | Active | View |
89. | Removal of waste rock from the dump at 265 MRL near Jawahar Shaft at Chikla Mine.(TE/CHIKLA/MECH/2020-21/94) | 24-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
90. | Operation Maintenance, watch and ward of Solid Waste Management Plant at Munsar Mine(MUN/CIVIL/AGT/NIT/20-21/44 DT.24.06.2020) | 24-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 04:30 PM | Active | View |
91. | Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/20-21/ET-83 dt.24.06.2020) | 24-06-2020 | 16-07-2020 | 16-07-2020 | 17-07-2020 | 03:30 PM | Active | View |
92. | Purchase of Cable Bolting Machines for Various Mines - 6 Nos.(1 Lot) (Only Through e-procurement)(WE-18(ET-81) DT.24/06/2020) | 24-06-2020 | 20-07-2020 | 20-07-2020 | 21-07-2020 | 03:30 PM | Active | View |
93. | Purchase of Pneumatic Rock Drill Machines and Pusher Leg for various Mines (4 Lots.) (Only Through e-procurement)(WE-19(ET-82) DT.24/06/2020) | 24-06-2020 | 16-07-2020 | 16-07-2020 | 17-07-2020 | 03:30 PM | Active | View |
94. | Annual Underground Sand cleaning work at Balaghat Mine(MOIL/20-21/ET/70) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
95. | Hiring of machinery for loading, unloading and transportation of Hutch from Hutch settling pond and hutch drain at Ukwa Mine(MOIL/20-21/ET/69) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
96. | Loading and unloading of steel section and various material with stacking at NOS Kandri Mine(MOIL/20-21/ET/71) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
97. | Handling of Manganese Ore in to Trucks for dispatch by Manual and Mechanized means at Ukwa Mine(MOIL/20-21/ET/68) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
98. | PURCHASE OF HT PANELS VARIOUS TYPES - 7 LOTS (only through e-procurement)(WE-22(ET-78) DT.18/06/2020) | 18-06-2020 | 13-07-2020 | 13-07-2020 | 14-07-2020 | 03:30 PM | Active | View |
99. | e Procurement of HDPE Pipes, Bends and Pipe Ends(PUR/MOIL/C-1/199/WE-05/ET/80) | 18-06-2020 | 14-07-2020 | 14-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
100. | Providing Installation and testing of Piston type Accumulator with fittings in 150 HP winder(A-III/KAN/20-21/382) | 17-06-2020 | 30-06-2020 | 30-06-2020 | 01-07-2020 | 04:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |