Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Laying of New 6 inch delivery pipeline from 13.5 level to 10 level Vertical and replacement of existing 300 HP pipeline from 10 level to surface vertical( AGT/BGT/MECH/PIPE/19-20/440) | 31-07-2019 | 19-08-2019 | 19-08-2019 | 19-08-2019 | 04:30 PM | Active | View |
2. | Purchase of Water Softener plant for 3 TPH FBC boiler - 1 No.(1 Lot) at EMD Plant, Dongri Buzurg Mine(M.S)(Only Through e-procurement)(WE-50(ET/217) DT.31/07/2019) | 31-07-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 03:30 PM | Active | View |
3. | Purchase of Agitator Shaft Assembly with Agitator blades(AISI 316-H) for Leaching Vessel - 1 Set (1 Lot.) for EMD Plant, Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-51(ET/218) DT.31/07/2019) | 31-07-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 03:30 PM | Active | View |
4. | Transportation of sand from Kanki Ghat to Balaghat mine for the purpose of sand stowing in underground Balaghat Mine(MOIL/19-20/ET/205) | 31-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
5. | Outsourcing of Dry Density Separation Plant operation at Munsar Mine for the period of 9 (Nine) Months( MOIL/19-20/ET/161) | 31-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
6. | Outsourcing of Maintenance and repairs of HT and LT overhead lines at Chikla Mine(TE MOIL/CH/19-20/02) | 30-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
7. | Production of 25 percent Mn SM grade ore BGL-523 from Underground old sub grade mineral reject material at Balaghat Mine(MOIL/19-20/ET/206) | 30-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
8. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East side part-6(MOIL/19-20/ET/207) | 30-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
9. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East side part-5(MOIL/19-20/ET/208) | 30-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
10. | STRUCTURAL AUDIT AND NON- DESTRUCTIVE TESTING(NDT) OF IMB PLANT STRUCTURE AT BALAGHAT MINE.(AGT/BGT/MECH/STRU/19-20/429) | 29-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
11. | PROVIDING AND APPLYING NEOPRENE RUBBER LINNING TO 2 LAKHS LITERS CELL FEED TANK AT EMD PLANT DB MINE(MOIL/EMD/DB/SDGM/2019-20/190) | 27-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 10;30 AM | Active | View |
12. | Laying of lawn for prepration of Garden premises near Mine Entry premises at Balaghat Mine(Civil/BGT/LT/19-20/146) | 24-07-2019 | 05-08-2019 | 05-08-2019 | 05-08-2019 | 04:30 PM | Active | View |
13. | providing 6 mbps 1 is to 1 Internet Leased Line(ADGM/ Group-III/ SYS/NW/ 2019-20/363) | 23-07-2019 | 30-07-2019 | 30-07-2019 | 30-07-2019 | 03:30 PM | Active | View |
14. | Purchase of FRVE Header Bars for Anodes and Cathodes - 450 Nos.each (2 Lots) for EMD Plant, Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-49(ET/212) DT.23/07/2019) | 23-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
15. | Purchase of PP Filter Press with Suitable Compressor, Reservoir and Piping etc.for EMD Plant, Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-24(ET/204) DT.23/07/2019) | 23-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
16. | Provision of 33 KV Outdoor Check Meter for 33 KV Line for Vertical Shaft (High Speed Shaft) at Gumgaon Mine(MOIL/19-20/ET/172) | 23-07-2019 | 23-08-2019 | 23-08-2019 | 23-08-2019 | 03:30 PM | Active | View |
17. | TENDER FOR REPLACEMENT OF 11KV CTs AND PTs EXISTING METER CUBICAL OF MUNSAR MINE(ELECT/MUN/ADGM/19-20/353) | 22-07-2019 | 31-07-2019 | 31-07-2019 | 31-07-2019 | 03:30 PM | Active | View |
18. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT WESTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-37 Dt.22072019) | 22-07-2019 | 06-08-2019 | 06-08-2019 | 06-08-2019 | 04:30 PM | Active | View |
19. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT WESTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-37 Dt.22072019) | 22-07-2019 | 06-08-2019 | 06-08-2019 | 06-08-2019 | 04:30 PM | Active | View |
20. | Hiring of Diesel Jeep for three months at Balaghat Mine(AGT/BGT/MECH/19-20/2087) | 20-07-2019 | 05-08-2019 | 05-08-2019 | 05-08-2019 | 04:30 PM | Active | View |
21. | ERW Steel Pipes(PUR/MOIL/C-1/197/WE-44/ET/203) | 19-07-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 03:30 PM | Active | View |
22. | Repairing of Stick and Bucket Pin Bore holes of TATA Hitachi Zx 450 Hydraulic Excavator no.1 and 2 Two Machines by line boring and bushing work.(DB/MECH/DRILL/19-20/108) | 18-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 04:30 PM | Active | View |
23. | Premium Greaves make Worm Gear box Model U800 Reduction Ratio 70 is to 1 Right Handling(MOIL/EMD/CH/ASDGM/2019-20/113) | 18-07-2019 | 30-07-2019 | 30-07-2019 | 31-07-2019 | 09:00 AM | Active | View |
24. | Purchase of D.G.Sets Rated 25 KVA - 3 Nos. and 7.5 KVA - 1 No.(4 Lots.) required for Various Mines (Only through e-procurement)(WE-46(ET/200) DT.18/07/2019) | 18-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
25. | G.I.Wire Netting and S.S.Screen Cloth(PUR/MOIL/C-1/203/WE-39/ET/201) | 18-07-2019 | 19-08-2019 | 19-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
26. | Purchase of SPRING STEEL SCREEN PANELS -15 items( WE-45 e-tender No.MOIL/19-20/ET-202, Dt.18.07.2019) | 18-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
27. | Repairing of 02 Nos. two number Track Chain Assembly of TATAHitachi Zx220 Hydraulic Excavator operating at Dongri Buzurg Mine.(DB/MECH/19-20/SDGM(MECH)/104) | 17-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 04:30 PM | Active | View |
28. | Repairing of Idler Assembly- 1 No. and Sprocket Assembly -2 Nos. of TATA Hitachi Zaxis 450 No.2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/105) | 17-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 09:00 AM | Active | View |
29. | Work of repair and maintenance contract for domestic electrical installation of residential and non-residential buildings at Gumgaon mine(MOIL/19-20/ET/165) | 17-07-2019 | 14-08-2019 | 14-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
30. | PURCHASE OF STANDARDS FOR GBS (AAS)(PUR/MOIL/C-3/43/E-37/377-M DT.16.07.2019) | 16-07-2019 | 31-07-2019 | 31-07-2019 | 31-07-2019 | 03:30 PM | Active | View |
31. | Major repairing works for Terex Loader at Munsar Mine(A-III/MUN/2019-20/1259 Date 15.07.19) | 16-07-2019 | 29-07-2019 | 29-07-2019 | 29-07-2019 | 04:00 PM | Active | View |
32. | C.I.Gate, Foot and N R Valves(PUR/MOIL/C-1/202/WE-43/ET/199) | 16-07-2019 | 19-08-2019 | 19-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
33. | PURCHASE OF SHOT FIRING CABLE(PUR/MOIL/C-3/30/E-36/349-M DT.16.07.2019) | 16-07-2019 | 16-08-2019 | 16-08-2019 | 16-08-2019 | 03:30 PM | Active | View |
34. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT EASTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-36 Dt.15072019) | 15-07-2019 | 22-07-2019 | 22-07-2019 | 22-07-2019 | 04:30 PM | Active | View |
35. | C.I.Ball Valves(PUR/MOIL/C-1/202/WE-37/ET/197) | 15-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
36. | Butterfly Valves(PUR/MOIL/C-1/202/WE-38/ET/198) | 15-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
37. | Removingand Laying G.I. Pipe line in Weigh Bgidge to Well to IMB at Bgt Mine(Civil/BGT/LT/19-20/39) | 14-07-2019 | 26-07-2019 | 26-07-2019 | 26-07-2019 | 04:30 PM | Active | View |
38. | Sapling at North Mine Dump area at Tirodi Mine(TRD/CIVIL/19-20/751 DATED 19.06.2019) | 13-07-2019 | 23-07-2019 | 23-07-2019 | 23-07-2019 | 03:30 PM | Active | View |
39. | PROVIDING OF FENCING TO PROTECT SAPLING AT TIRODI MINE(TRD/CIVIL/19-20/750,DATED 18.06.2019) | 13-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 03:30 PM | Active | View |
40. | Protection work for Foundation of production shaft at Balaghat Mine( CIVI/BGT/LT/19-20/45 DATE 12.07.2019) | 13-07-2019 | 26-07-2019 | 26-07-2019 | 26-07-2019 | 04:30 PM | Active | View |
41. | Collection of garbage and dump into barren/abundant land at Balaghat Mine(Civil/BGT/LT/19-20/41) | 13-07-2019 | 26-07-2019 | 26-07-2019 | 26-07-2019 | 04:30 PM | Active | View |
42. | Repairing of Track Components of Side Dump Loader no.8 in 10th Level Underground of Balaghat Mine( AGT/BGT/MECH/SDL/19-20/341) | 13-07-2019 | 30-07-2019 | 30-07-2019 | 30-07-2019 | 04:30 PM | Active | View |
43. | Purchase of Class Items for Ferro Manganese Plant for year 19-20(TE/MOIL/FMP/MECH/19-20/113) | 13-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
44. | Tramline Accessories(PUR/MOIL/C-12/5/WE-42/ET/195) | 12-07-2019 | 06-08-2019 | 06-08-2019 | 07-08-2019 | 03:30 PM | Active | View |
45. | Purchase of Vehicle Batteries(WE-36 DT.11.07.2019 (e-Tenderno.MOIL/19-20/ET/194)) | 12-07-2019 | 08-08-2019 | 08-08-2019 | 09-08-2019 | 03:30 PM | Active | View |
46. | Purchase of Rubber Air Hoses(WE-41 DT.12.07.2019 (e-Tenderno.MOIL/19-20/ET/196)) | 12-07-2019 | 08-08-2019 | 08-08-2019 | 09-08-2019 | 03:30 PM | Active | View |
47. | Replacement of Guide Rail of Vertical Shaft at Chikla Mine(MOIL/19-20/ET/189) | 12-07-2019 | 12-08-2019 | 12-08-2019 | 12-08-2019 | 03:30 PM | Active | View |
48. | Extra excavation in manganiferrous rocks at stope no. Ch. 2275 to Ch. 2335 and Ch. 2455 to Ch. 2485 from -270 Level to -170 Level and hoisting of tubs from -270 Level to surface bunker through 2nd vertical shaft at Chikla Mine(MOIL/19-20/ET/177) | 12-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 03:30 PM | Active | View |
49. | Trench cutting in ore stacks at Chikla Mine(MOIL/19-20/ET/176) | 12-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 03:30 PM | Active | View |
50. | Secondary recovery of UKL -471 20 percent from F W dump from Ch.9000 to Ch.12000 at Ukwa Mine(MOIL/19-20/ET/183) | 12-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 03:30 PM | Active | View |
51. | PURCHASE OF STEEL WIRE ROPE -12 MM (USHA MARTIN MAKE) FOR FERRO MANGANESE PLANT, BALAGHAT MINE(PUR/MOIL/C-3/23/E-35/348-M DT.12.07.2019) | 12-07-2019 | 16-08-2019 | 16-08-2019 | 16-08-2019 | 03:30 PM | Active | View |
52. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 360MT ORE(Lumpy) AND 190MT FINES AT CHIKLA MINE(TE-35 Dt.11072019) | 11-07-2019 | 18-07-2019 | 18-07-2019 | 18-07-2019 | 04:30 PM | Active | View |
53. | PVC PIPES - 12 mm AND 20 mm( PUR/MOIL/C-1/196/WE-40/ET/192) | 11-07-2019 | 01-08-2019 | 01-08-2019 | 02-08-2019 | 03:30 PM | Active | View |
54. | IRON PAN AND ORE CLEANING HAMMER(PUR/MOIL/C-1/196/WE-33/ET/191) | 11-07-2019 | 01-08-2019 | 01-08-2019 | 02-08-2019 | 03:30 PM | Active | View |
55. | Purchase of Man Winding Steel Wire Ropes( WE-15 DT.11.07.2019 (e-Tenderno.MOIL/19-20/ET/193) | 11-07-2019 | 06-08-2019 | 06-08-2019 | 07-08-2019 | 03:30 PM | Active | View |
56. | Providing and fixing of heatguard i.e. cool roof for 1500 kVA DG Set Shed of Munsar Mine.(MUN/Civil/NIT/LT/2019-20/65 Date 09.07.2019) | 10-07-2019 | 16-07-2019 | 16-07-2019 | 16-07-2019 | 04:30 PM | Active | View |
57. | Purchase of Sand for Sand Stowing at Gumgaon Mine(MOIL/19-20/ET/182) | 09-07-2019 | 15-07-2019 | 15-07-2019 | 15-07-2019 | 03:30 PM | Active | View |
58. | Providing 6 mbps 1 is to 1 Internet Leased Line (ILL) at Gumgaon Mine(ASDGM /Group-III/SYS/NW/2019-20 / 310) | 09-07-2019 | 20-07-2019 | 20-07-2019 | 20-07-2019 | 03:30 PM | Active | View |
59. | Construction of water collection tank and additional civil works for Rest Shelter of Parsoda Mine(PS/Civil/2019-20/60 Date 08.07.2019) | 09-07-2019 | 16-07-2019 | 16-07-2019 | 16-07-2019 | 04:30 PM | Active | View |
60. | Pushing and unloading of ROM and Rock Tubs in Underground at Munsar Mine(Agent Sr DGM/Mining/MUN/LT/19-20/62 Date 09.07.19) | 09-07-2019 | 19-07-2019 | 19-07-2019 | 19-07-2019 | 04:30 PM | Active | View |
61. | Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/19-20/ET/174) | 09-07-2019 | 09-08-2019 | 09-08-2019 | 09-08-2019 | 03:30 PM | Active | View |
62. | Recovery of SM Grade and Ferro Grade ore from North Dump at Tirodi mine(MOIL/19-20/ET/175) | 09-07-2019 | 09-08-2019 | 09-08-2019 | 09-08-2019 | 03:30 PM | Active | View |
63. | Construction of stone masonry wall at lease boundry and stone masonry retaining wall along waste dumps at Dongri Buzurg mine.(MOIL/19-20/ET/167) | 09-07-2019 | 08-08-2019 | 08-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
64. | Construction of Community hall in village Gobarwahi, Dist Bhandara under CSR.(MOIL/19-20/ET/168) | 09-07-2019 | 08-08-2019 | 08-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
65. | Construction of Cement Concrete wall for Railway siding plateform and gantry at Dongri Buzurg Mine(MOIL/19-20/ET/166) | 09-07-2019 | 08-08-2019 | 08-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
66. | Construction of cement concrete road along with side drain and Construction of of conpound wall at Primary and medium Govt. school at Bagholi, Dist Balaghat Under CSR.(MOIL/19-20/ET/169) | 09-07-2019 | 08-08-2019 | 08-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
67. | Safety Gumboots(PUR/MOIL/C-1/187/WE-22/ET/190) | 09-07-2019 | 16-08-2019 | 16-08-2019 | 17-08-2019 | 11:30 AM | Active | View |
68. | Hiring of Equipment for removal of soil without drilling and Blasting at Parsoda Mine.( Agent Sr DGM/Mining/PAR/LT/19-20/57 Date 05.07.19) | 08-07-2019 | 13-07-2019 | 13-07-2019 | 13-07-2019 | 04:30 PM | Active | View |
69. | Purchase of Zirconium Coil - 15 Nos.(1 Lot) for EMD Plant, Dongri Buzurg Mine(M.S)(Only Through e-procurement)(WE-26(ET/187) DT.08/07/2019) | 08-07-2019 | 29-07-2019 | 29-07-2019 | 30-07-2019 | 03:30 PM | Active | View |
70. | Purchase of Lead Cathode Plates - 450 Nos.(1 Lot) for EMD Plant, Dongri Buzurg Mine(M.S) (Only Through e-procurement)( WE-25(ET/188) DT.08/07/2019) | 08-07-2019 | 05-08-2019 | 05-08-2019 | 06-08-2019 | 03:30 PM | Active | View |
71. | Purchase of Lead Cathode Plates - 450 Nos.(1 Lot) for EMD Plant, Dongri Buzurg Mine(M.S) (Only Through e-procurement)( WE-25(ET/188) DT.08/07/2019) | 08-07-2019 | 05-08-2019 | 05-08-2019 | 06-08-2019 | 03:30 PM | Active | View |
72. | Transportation of manganese ore BL-4528 from Beldongri to Munsar Mine siding(MOIL/19-20/ET/173) | 06-07-2019 | 12-07-2019 | 12-07-2019 | 12-07-2019 | 03:30 PM | Active | View |
73. | Purchase of Grinding Wheels(WE-34 DT.06.07.2019 (e-Tenderno.MOIL/19-20/ET/179)) | 06-07-2019 | 29-07-2019 | 29-07-2019 | 30-07-2019 | 03:30 PM | Active | View |
74. | Purchase of Titanium Anode Plates - 450 Nos.(1 Lot) for EMD Plant, Dongri Buzurg Mine(M.S) (Only Through e-procurement)(WE-23(ET/181) DT.06/07/2019) | 06-07-2019 | 29-07-2019 | 29-07-2019 | 30-07-2019 | 03:30 PM | Active | View |
75. | purchase of M.S. Welding Electrodes(WE-35 DT.06.07.2019 (e-Tenderno.MOIL/19-20/ET/180)) | 06-07-2019 | 01-08-2019 | 01-08-2019 | 02-08-2019 | 03:30 PM | Active | View |
76. | Engaging an Agency to conduct selection process to recruit various posts of MOIL Limited(MOIL/19-20/ET/171) | 06-07-2019 | 06-08-2019 | 06-08-2019 | 06-08-2019 | 03:30 PM | Active | View |
77. | Engaging an Agency to conduct selection process to recruit various posts of MOIL Limited(MOIL/19-20/ET/171) | 06-07-2019 | 06-08-2019 | 06-08-2019 | 06-08-2019 | 03:30 PM | Active | View |
78. | Purchase of Pneumatic Tyre, Tube, Flaps and Solid Tyres(WE-13 DT.05.07.2019 (e-Tenderno.MOIL/19-20/ET/178)) | 05-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
79. | Removal of spillage from the bottom of conveyor belt of 151/2 Level Loading station Holmes Shaft of Balaghat Mine(BGT/Mech/19-20/316) | 04-07-2019 | 15-07-2019 | 15-07-2019 | 15-07-2019 | 5:00 PM | Active | View |
80. | Replacement of liner plates of the transfer chute, bunker and repair of transfer chute/bunker at various location of I.M.B Plant Balaghat Mine(AGT/BGT/MECH/IMB/19-20/1717) | 04-07-2019 | 16-07-2019 | 16-07-2019 | 16-07-2019 | 04:30 PM | Active | View |
81. | PURCHASE OF CLT754 TRANSMISSION ASSEMBLY FOR BEML MAKE BH35-2 DUMPER OPERATING AT DONGRI BUZURG MINE(M.S)(AS PER ANNEXURE - A ENCLOSED).(PUR/MOIL/C-4/270/E-32/333-M DT.04/07/2019) | 04-07-2019 | 26-07-2019 | 26-07-2019 | 26-07-2019 | 03:30 PM | Active | View |
82. | Flooring Works for Camp Quarters of Chargaon Colony, Munsar Mine.(MUN/Civil/NIT/2019-20/51 Date 02.07.2019) | 03-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
83. | Construction of Guide Wall on either side of Culvert near Mine Hospital Building at Munsar Mine.(MUN/Civil/NIT/2019-20/52 Date 02.07.2019) | 03-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
84. | Laying of Paver Blocks for common area of 20A-Type Quarters of Wahitola near Officers Colony at Munsar Mine.(MUN/Civil/NIT/2019-20/55 Date 02.07.2019) | 03-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
85. | Construction of RCC Guide Wall along the hillock side at Dry Separation Unit, Munsar Mine.(MUN/Civil/NIT/2019-20/56 Date 02.07.2019) | 03-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
86. | DUST MASK, EAR PLUGS, EAR MUFF - 3 ITEMS(PUR/MOIL/C-1/190/WE-30/ET/164) | 03-07-2019 | 23-07-2019 | 23-07-2019 | 24-07-2019 | 03:30 PM | Active | View |
87. | Safety Goggles(PUR/MOIL/C-1/190/WE-31/ET/170) | 03-07-2019 | 29-07-2019 | 29-07-2019 | 30-07-2019 | 03:30 PM | Active | View |
88. | Sampling and Analysis of respirable Dust in All Mines EMD Plant of Dongri Buzurg Mine and Ferro Man Sampling and Analysis of respirable Dust in All Mines EMD Plant of Dongri Buzurg Mine and Ferro Manganese Plant of Balaghat Mine by Personal Dust Samplerga | 03-07-2019 | 02-08-2019 | 02-08-2019 | 02-08-2019 | 03:30 PM | Active | View |
89. | PURCHASE OF KIRLOSKAR MAKE SPENT SOLUTION PUMP - 3 NOS.FOR EMD PLANT, DONGRI BUZURG MINE(M.S)(AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/78/E-30/321-M DT.01/07/2019) | 02-07-2019 | 22-07-2019 | 22-07-2019 | 22-07-2019 | 03:30 PM | Active | View |
90. | Cotton Hand Gloves(PUR/MOIL/C-1/190/E-31) | 02-07-2019 | 23-07-2019 | 23-07-2019 | 23-07-2019 | 03:30 PM | Active | View |
91. | Hessian Cloth(PUR/MOIL/C-1/231/WE-32/ET/163) | 02-07-2019 | 25-07-2019 | 25-07-2019 | 26-07-2019 | 03:30 PM | Active | View |
92. | Removal of accumulated pebbles near sand stowing plants at Balaghat Mine(MOIL/19-20/ET/160) | 02-07-2019 | 01-08-2019 | 01-08-2019 | 01-08-2019 | 03:30 PM | Active | View |
93. | Drilling of 57 mm dia drill holes for installing cable bolts in manganeferous rock at 11th L, 12th L and 13.5th L at Balaghat Mine(MOIL/19-20/ET/152) | 02-07-2019 | 01-08-2019 | 01-08-2019 | 01-08-2019 | 03:30 PM | Active | View |
94. | Ore Tolley breaking work at Chikla Mine(MOIL/19-20/ET/159) | 02-07-2019 | 01-08-2019 | 01-08-2019 | 01-08-2019 | 03:30 PM | Active | View |
95. | Purchase of Sand for Munsar, Kandri and Beldongri Mine(MOIL/19-20/ET/158) | 01-07-2019 | 08-07-2019 | 08-07-2019 | 08-07-2019 | 03:30 PM | Active | View |
96. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Ukwa Mine(BGT/SYSTEM/AMC/2019-20/307 Dated) | 01-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
97. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2019-20/304 30.06.2019) | 01-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 03:30 PM | Active | View |
98. | Comprehensive Annual Maintenance Contract (CAMC) of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2019-20/305 30.06.2019) | 01-07-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:00 PM | Active | View |
99. | PURCHASE OF MONOBLOCK WATER PUMP - 2 NOS.FOR EMD PLANT, DONGRI BUZUR MINE(M.S (AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/78/E-28/318-M DT.01/07/2019) | 01-07-2019 | 22-07-2019 | 22-07-2019 | 22-07-2019 | 03:30 PM | Active | View |
100. | PURCHASE OF HDPE PIPE WELDING MACHINE - 1 NO.FOR EMD PLANT, DONGRI BUZUR MINE(M.S)(AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/234/E-29/319-M DT.01/07/2019) | 01-07-2019 | 22-07-2019 | 22-07-2019 | 22-07-2019 | 03:30 PM | Active | View |
Tenders More Information |
---|
Contracts finalised on nomination basis Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |