Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | FABRICATION OF STEEL ORE PASSES FOR BALAGHAT MINE(AGENT/BGT/MECH/20-21/1362) | 01-08-2020 | 26-08-2020 | 26-08-2020 | 26-08-2020 | 04:30 PM | Active | View |
2. | Design, Manufacture and supply plumber block for pinion Shaft of Production shaft winder at Balaghat Mine.(AGENT/BGT/MECH/20-21/1361) | 01-08-2020 | 26-08-2020 | 26-08-2020 | 26-08-2020 | 04:30 PM | Active | View |
3. | Under ground filling and spreading of waste rock at 13.5th level North section at Balaghat Mine(MIN/BGT/AGT/LT/20-21/469 dt 29.07.2020) | 31-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 04:30 PM | Active | View |
4. | Supply of empty cement bags for muffle blasting at Tirodi Mine.(403 Dated 15.07.2020) | 31-07-2020 | 05-08-2020 | 05-08-2020 | 05-08-2020 | 03:30 PM | Active | View |
5. | Cleaning of Sump at 1650 L Underground at Ukwa Mine(AGT/Civil/UK/LT/20-21/443 Date 28.07.2020) | 30-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 04:30 PM | Active | View |
6. | CLEANING OF DRAIN(AGT/Civil/UK/LT/20-21/442 Date 28.07.2020) | 30-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 04:30 PM | Active | View |
7. | Installation of retaining wall from steel section for new dump screen installed near new Joplin Jig section at Balaghat Mine(AGENT/BGT/MECH/20-21/ 451) | 29-07-2020 | 18-08-2020 | 18-08-2020 | 18-08-2020 | 04:30 PM | Active | View |
8. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES.(PUR/MOIL/C-5/46/E-12/174-M Dt. 29/07/2020) | 29-07-2020 | 19-08-2020 | 19-08-2020 | 19-08-2020 | 03:30 PM | Active | View |
9. | PURCHASE OF PEOPLELINK EXTENSION MICROPHONE(PUR/MOIL/C-4/138/E-13/176-M DT.28.07.2020) | 28-07-2020 | 14-08-2020 | 14-08-2020 | 14-08-2020 | 03:30 PM | Active | View |
10. | Tender For 10 Mbps Wired Wireless Internet Broadband Line 1 1 at Ukwa Mine(BG/SYSTEM/Network/2020-21/433) | 23-07-2020 | 07-08-2020 | 07-08-2020 | 07-08-2020 | 03:30 PM | Active | View |
11. | Maintenance, Distribution and Collection of Cap Lamps at Kandri Mine through outsourcing for the period of one year(MOIL/20-21/ET/74) | 23-07-2020 | 24-08-2020 | 24-08-2020 | 24-08-2020 | 03:30 PM | Active | View |
12. | WEBSITE SNGLE TENDER ENQUIRY IN TWO BID SYSTEM TO ENTER INTO BLANKET RATE CONTRACT FOR TWO YEARS-2020-22- FOR PURCHASE OF HOLMAN-ROCKWELL MAKE SPARES FOR ROCK DRILL AN AIR LEG MACHINES- HOLMAN AND ROCKEWELL ONLY.(PUR/MOIL/C-5/16/E-08/169-M Dt. 23/07/2020) | 23-07-2020 | 05-08-2020 | 05-08-2020 | 05-08-2020 | 03:30 PM | Active | View |
13. | Purchase of Strata Monitoring Instrument MPBX for Chikla Mine(TE-04 DT.21072020) | 21-07-2020 | 11-08-2020 | 11-08-2020 | 11-08-2020 | 04:30 PM | Active | View |
14. | PURCHASE OF SPARES FOR SIGNALLING SYSTEM OF 150HP WINDER FOR KANDRI MINE(PUR/KD/ELECT/20-21/) | 21-07-2020 | 28-07-2020 | 28-07-2020 | 28-07-2020 | 04:30 PM | Active | View |
15. | OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DUMPERS AND TIPPERS ONLY REGISTERED CONTRACTORS WHO DOING THIS TYPE OF SIMILAR WORK SINCE ATLEAST FROM LAST YEAR(MOIL/HO/MECH/2020/56 DT 23.05.2020) | 20-07-2020 | 25-07-2020 | 25-07-2020 | 25-07-2020 | 03:30 PM | Active | View |
16. | Designing and printing of Annual Report 2019-20 (Deluxe Version in English, Hindi and Marathi)(MOIL/20-21/ET/99) | 20-07-2020 | 10-08-2020 | 10-08-2020 | 10-08-2020 | 03:30 PM | Active | View |
17. | OUTSOURCING OF GENERAL MAINTENANCE AND REGULAR CHECKUP OF DOZER AND EXCAVATOR(MOIL/HO/MECH/2020/57 DT. 23.05.2020) | 19-07-2020 | 25-07-2020 | 25-07-2020 | 25-07-2020 | 03:30 PM | Active | View |
18. | Scanning and Digitization of Company Records(MOIL/20-21/ET/102) | 18-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
19. | Development of Vendor Invoice Tracking System(MOIL/20-21/ET/100) | 18-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
20. | Maintenance and operation of water supply scheme at Dongri Buzurg Mine(MOIL/20-21/ET/89) | 17-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
21. | Construction of RCC sump and laying of pipe line for supply of water to new A type quarters and Medical Administrative building at MOIL Nagpur(MOIL/20-21/ET/103) | 17-07-2020 | 17-08-2020 | 17-08-2020 | 17-08-2020 | 03:30 PM | Active | View |
22. | Ultrasonic and Magnetic Particle NDT Testing of CSG Components of all winders at Balaghat mine(AGENT/BGT/MECH/NDT/20-21/395) | 16-07-2020 | 05-08-2020 | 05-08-2020 | 05-08-2020 | 04:30 PM | Active | View |
23. | Maintenance repair of HT/LT overhead lines for the three months at Balaghat Mine(BGT/ELECT/20-21/376) | 14-07-2020 | 31-07-2020 | 31-07-2020 | 31-07-2020 | 04:30 PM | Active | View |
24. | Repairing of Bucket assembly 5.6 Cu M -- 4 Nos of TATAHitachi 1200-3 Hydraulic Excavator of DB Mine.(DB/MECH/20-21/JGM(MECH)/321) | 14-07-2020 | 21-07-2020 | 21-07-2020 | 21-07-2020 | 04:30 PM | Active | View |
25. | Replacement of 6mm thick liner plates at 14.5th Level loading station of Production shaft at Balaghat Mine(AGT/BGT/MECH/WINDER/20-21/374) | 13-07-2020 | 04-08-2020 | 04-08-2020 | 04-08-2020 | 04:30 PM | Active | View |
26. | Replacement of liner plates of the transfer chute, bunker and repair of transfer chute/bunker at various location at IMB plant of Balaghat Mine(AGENT/BGT/MECH/IMBP/20-21/ 371) | 11-07-2020 | 28-07-2020 | 28-07-2020 | 28-07-2020 | 04:30 PM | Active | View |
27. | Construction of Drain around Service Winze beside I st Vertical Shaft at Munsar Mine(MUN/CIVIL/NIT/20-21/51 DT 08.07.2020) | 10-07-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 04:30 PM | Active | View |
28. | Purchase of Steel Cages - 5 Nos.(2 LOTS.) (Only Through e-procurement)(WE-25(ET-88) DT.10/07/2020) | 10-07-2020 | 03-08-2020 | 03-08-2020 | 04-08-2020 | 03:30 PM | Active | View |
29. | Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Tirodi and Sitapatore Mine(BGT/SYSTEM/AMC/2020-21/354) | 07-07-2020 | 17-07-2020 | 17-07-2020 | 17-07-2020 | 03:30 PM | Active | View |
30. | Purchase of PEARL COKE with Transportation - 6900 MT(MOIL/20-21/ET-87 dt.06.07.2020) | 06-07-2020 | 05-08-2020 | 05-08-2020 | 06-08-2020 | 03:30 PM | Active | View |
31. | Repairing kachha road at North and South Section mine road at Tirodi Mine.(TRD/CIVIL/2020-21/528 Dated 21.06.2020) | 04-07-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
32. | Retaining wall for installation of pump shed and foundation for 170HP pump150HP pump north C section at Tirodi Mine.(TRD/CIVIL/2020-21/481 Dated 19.06.2020) | 04-07-2020 | 09-07-2020 | 09-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
33. | New installation of pump foundation and retaining wall for 170HP, 150HP north section at Tirodi Mine.(TRD/CIVIL/2020-21/467 Dated 11.06.2020) | 04-07-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
34. | Cleaning of septic tank with vacuum cleaning machine at camp/colony area at Tirodi Mine.(TRD/CIVIL/2020-21/527 Dated 21.06.2020) | 04-07-2020 | 08-07-2020 | 08-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
35. | Expression of Interest (EoI) for Setting up X- Ray based sorting system(PUR-MOIL-X RAY OCS/ET-85) | 01-07-2020 | 29-09-2020 | 29-09-2020 | 29-09-2020 | 03:30 PM | Active | View |
36. | Purchase of Flexible Trailing Copper Conductor Cable(WE-21 DT.01.07.2020 (e-Tender no.MOIL/20-21/ET/86)) | 01-07-2020 | 29-07-2020 | 29-07-2020 | 30-07-2020 | 03:30 PM | Active | View |
37. | BLANKET RATE CONTRACT FOR TWO YEARS FOR SUPPLY OF SIEMENS MAKE SWITCHGEARS PRODUCTS(PUR/MOIL/C-3/13/E-06/80-M DT.29.06.2020) | 01-07-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
38. | Loading transportation and unloading of manganese ore ROM at Beldongri Mine(Bel/Min/20-21/600 Dated 28.06.2020) | 30-06-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
39. | Tnder inviting in single bid system for Construction of switch and NGR panel room and 11KV cable teach at Chikla mine.(TE/CH/CIVIL/20-21/309) | 30-06-2020 | 09-07-2020 | 09-07-2020 | 09-07-2020 | 03:30 PM | Active | View |
40. | Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Balaghat Mine(BGT/SYSTEM/AMC/2020-21/315) | 29-06-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
41. | Comprehensive Annual Maintenance Contract CAMC of Computers, Printers, UPSs installed at Ukwa Mine(BGT/SYSTEM/AMC/2020-21/317) | 29-06-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 03:30 PM | Active | View |
42. | Cleaning of Underground Sumps and Underground Level Drains under Monsoon Preparatory Works at Munsar Mine(ADGM/Mining/LT/2020-21/46 Date 26.06.2020) | 27-06-2020 | 06-07-2020 | 06-07-2020 | 06-07-2020 | 04:30 PM | Active | View |
43. | Tender inviting in single bid system for Providing Water by Tanker in Residential Colonies at Chikla mine.(TE-CIVIL20-21-280) | 27-06-2020 | 11-07-2020 | 11-07-2020 | 11-07-2020 | 04:00 PM | Active | View |
44. | Cleaning of surface drains and making of earthen bunds for North and south section for Monsoon preparatory works at Tirodi Mine.(TRD/CIVIL/2020-21/524 Dated 20/06/2020) | 26-06-2020 | 30-06-2020 | 30-06-2020 | 01-07-2020 | 03:30 PM | Active | View |
45. | Repairing of Track Components of Side Dump Loader no.9 in 12th Level Underground of Balaghat Mine(AGT/BGT/MECH/SDL/20-21/291) | 26-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 04:30 PM | Active | View |
46. | Tender for Laying of 6 inch and 4 inch GI pipe line for compressed air in underground at balaghat mine(AGT/BGT/MECH/PIPE/20-21/290) | 26-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 04:30 PM | Active | View |
47. | Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/20-21/289) | 25-06-2020 | 06-07-2020 | 06-07-2020 | 06-07-2020 | 04:30 PM | Active | View |
48. | Purchase of Pneumatic Stopper with Telescopic Air Leg for various Mines - 2 Lots.(Only Through e-procurement)(WE-14(ET-84) DT.25/06/2020) | 25-06-2020 | 15-07-2020 | 15-07-2020 | 16-07-2020 | 03:30 PM | Active | View |
49. | Removal of waste rock from the dump at 265 MRL near Jawahar Shaft at Chikla Mine.(TE/CHIKLA/MECH/2020-21/94) | 24-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
50. | Operation Maintenance, watch and ward of Solid Waste Management Plant at Munsar Mine(MUN/CIVIL/AGT/NIT/20-21/44 DT.24.06.2020) | 24-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 04:30 PM | Active | View |
51. | Purchase of Compressed Oxygen Gas and Dissolved Acetylene Gas Cylinders(MOIL/20-21/ET-83 dt.24.06.2020) | 24-06-2020 | 16-07-2020 | 16-07-2020 | 17-07-2020 | 03:30 PM | Active | View |
52. | Purchase of Cable Bolting Machines for Various Mines - 6 Nos.(1 Lot) (Only Through e-procurement)(WE-18(ET-81) DT.24/06/2020) | 24-06-2020 | 20-07-2020 | 20-07-2020 | 21-07-2020 | 03:30 PM | Active | View |
53. | Purchase of Pneumatic Rock Drill Machines and Pusher Leg for various Mines (4 Lots.) (Only Through e-procurement)(WE-19(ET-82) DT.24/06/2020) | 24-06-2020 | 16-07-2020 | 16-07-2020 | 17-07-2020 | 03:30 PM | Active | View |
54. | Annual Underground Sand cleaning work at Balaghat Mine(MOIL/20-21/ET/70) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
55. | Hiring of machinery for loading, unloading and transportation of Hutch from Hutch settling pond and hutch drain at Ukwa Mine(MOIL/20-21/ET/69) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
56. | Loading and unloading of steel section and various material with stacking at NOS Kandri Mine(MOIL/20-21/ET/71) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
57. | Handling of Manganese Ore in to Trucks for dispatch by Manual and Mechanized means at Ukwa Mine(MOIL/20-21/ET/68) | 19-06-2020 | 20-07-2020 | 20-07-2020 | 20-07-2020 | 03:30 PM | Active | View |
58. | PURCHASE OF HT PANELS VARIOUS TYPES - 7 LOTS (only through e-procurement)(WE-22(ET-78) DT.18/06/2020) | 18-06-2020 | 13-07-2020 | 13-07-2020 | 14-07-2020 | 03:30 PM | Active | View |
59. | e Procurement of HDPE Pipes, Bends and Pipe Ends(PUR/MOIL/C-1/199/WE-05/ET/80) | 18-06-2020 | 14-07-2020 | 14-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
60. | Providing Installation and testing of Piston type Accumulator with fittings in 150 HP winder(A-III/KAN/20-21/382) | 17-06-2020 | 30-06-2020 | 30-06-2020 | 01-07-2020 | 04:30 PM | Active | View |
61. | Purchase of Smart Parking System at MOIL BHAWAN, Nagpur(M.S) - 1 Set.(1 Lot) (Only Through e-procurement)(WE-23(ET-77) DT.17/06/2020) | 17-06-2020 | 07-07-2020 | 07-07-2020 | 08-07-2020 | 03:30 PM | Active | View |
62. | Picking and collection of SM Grade SPL 463 and SPL 481 from various dumps of Sitapatore Mine(MOIL/20-21/ET/67) | 16-06-2020 | 16-07-2020 | 16-07-2020 | 16-07-2020 | 03:30 PM | Active | View |
63. | Production of 25 percent Mn. SM Grade ore BGL-523 from U/G old sub grade mineral reject material at Balaghat Mine(MOIL/20-21/ET/66) | 16-06-2020 | 22-07-2020 | 22-07-2020 | 22-07-2020 | 03:30 PM | Active | View |
64. | Picking and collection of manganiferous rock from surface bed reject area at Parsoda Mine(MOIL/20-21/ET/65) | 16-06-2020 | 16-07-2020 | 16-07-2020 | 16-07-2020 | 03:30 PM | Active | View |
65. | Repairing of Bucket Assy 5.6 cum 4 nos of TATAHitachi 1200 NO.3 Hyd Excavator operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/236) | 15-06-2020 | 23-06-2020 | 23-06-2020 | 23-06-2020 | 04:30 PM | Active | View |
66. | Procurement of 1 no. Elecrically Operated Mono- block pump for IMB Plant at Dongri Buzurg mine(PUR/DB/20-21/ 277) | 15-06-2020 | 10-07-2020 | 10-07-2020 | 10-07-2020 | 04:30 PM | Active | View |
67. | Terrace water proofing to RCC slab of old B type quarters 05 blocks at Chikla Mine(MOIL/20-21/ET/47) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
68. | Maintenance and Operation of Sewage Treatment Plant at Munsar Mine.(MOIL/20-21/ET/50) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
69. | Providing and fixing heat guard (Cool roof) for work shop building of Munsar Mine.(MOIL/20-21/ET/51) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
70. | Construction of Security watch tower (2 nos) for surveillance and strengtheing of internal security at Kandri Mine(MOIL/20-21/ET/52) | 15-06-2020 | 31-07-2020 | 31-07-2020 | 31-07-2020 | 03:30 PM | Active | View |
71. | Operation of pumps for drinking water supply at Wahitola, Kaichi and Chargaon camp at Munsar Mine(MOIL/20-21/ET/48) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
72. | Concreting of x-cut between Ch.34 to Ch.42 at -300 Level for stope preparation at Gumgaon Mine(MOIL/20-21/ET/63) | 15-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
73. | Additional excavation in manganiferous rock between Ch.37 to Ch.42 at -300 Level at Gumgaon Mine(MOIL/20-21/ET/64) | 15-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
74. | Underground development at 9th Level and 8th Level North at Balaghat Mine(MOIL/20-21/ET/61) | 15-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
75. | Additional excavation in Mangeniferous rock at 1750 Level and 1650 Level at Ukwa Mine(MOIL/20-21/ET/62) | 15-06-2020 | 15-07-2020 | 15-07-2020 | 15-07-2020 | 03:30 PM | Active | View |
76. | Maintenance and Operation of Solid waste Management plant at Munsar Mine.(MOIL/20-21/ET/49) | 15-06-2020 | 27-07-2020 | 27-07-2020 | 27-07-2020 | 03:30 PM | Active | View |
77. | Construction of New Administrative building including compound wall and vehical parking shed at Kandri Mine(MOIL/20-21/ET/53) | 15-06-2020 | 31-07-2020 | 31-07-2020 | 31-07-2020 | 03:30 PM | Active | View |
78. | Repairing of RCC roof of Laboure and staff quarters of Gudma Camp colony ,prem Nagar(AGT/Civil/UK/LT/20-21/224) | 13-06-2020 | 20-06-2020 | 20-06-2020 | 20-06-2020 | 04:30 PM | Active | View |
79. | TRANSPORTATION OF 538 MT OF BOTTOM FLY ASH FROM ADANI POWER PLANT, TIRORA TO CHIKLA MINE FOR UNDERGROUND BACKFILLING WORKS.(TE-04 Dt.13062020) | 13-06-2020 | 25-06-2020 | 25-06-2020 | 25-06-2020 | 04:00 PM | Active | View |
80. | Dewatering of Satak open pit during rainy season(Bel/Mech/NIT/2020/445 Dated 10.06.2020) | 12-06-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
81. | Operation of pump at Beldongri Mine during Monsoon(Bel/Mech/NIT/2020/444 Dated 10.06.2020) | 12-06-2020 | 22-06-2020 | 22-06-2020 | 22-06-2020 | 03:30 PM | Active | View |
82. | TWO BID SYSTEM FOR PURCHASE OF Failsafe Electro Hydraulic Thruster Brake suitable for 250HP motor FOR KANDRI MINE.(PUR/MOIL/GR.III/KD/2020-21/335) | 12-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 04:30 PM | Active | View |
83. | Extension of existing coal shed at EMD plant premises at Dongri Buzurg mine(DB/Civil/20-21/220 Date 01/06/2020) | 11-06-2020 | 20-06-2020 | 20-06-2020 | 20-06-2020 | 04:30 PM | Active | View |
84. | Deployment of 02 Nos Sweepers for Miscellaneous cleaning works at Ukwa Mine(AGT/CIVIL/UK/LT/20-21/187) | 11-06-2020 | 20-06-2020 | 20-06-2020 | 22-06-2020 | 04:30 PM | Active | View |
85. | Providing and fixing aluminium sliding windows at Mine Office at Dongri Buzurg Mine.(DB/Civil/20-21/381 Date 29/05/2020) | 11-06-2020 | 19-06-2020 | 19-06-2020 | 19-06-2020 | 04:30 PM | Active | View |
86. | Replacement of old damaged steel doors with new steel doors at Dongri Buzurg Mine(DB/Civil/20-21/219 Date 01/06/2020) | 11-06-2020 | 23-06-2020 | 23-06-2020 | 23-06-2020 | 04:30 PM | Active | View |
87. | ELECTRIC WINCH FOR PULLING OF TUB FROM ORE DISCHARGE CHUTE UPTO CAGES AT -330L UNDERGROUND AT MUNSAR MINE(ADGM (Mines)/Grp-III/2020-21/344) | 09-06-2020 | 24-06-2020 | 24-06-2020 | 24-06-2020 | 03:30 PM | Active | View |
88. | Proposal for outsourcing manpower for daily electrical maintenance work at Tirodi Mine.(TRD/EL./20-21/7400004572/373 Dated 05.06.2020) | 08-06-2020 | 30-06-2020 | 30-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
89. | Engine Overhauling of L and T Loader 9020 Sr No AD0055 operating at Dongri Buzurg Mine.(DB/MECH/20-21/JGM(MECH)/235) | 08-06-2020 | 16-06-2020 | 16-06-2020 | 16-06-2020 | 04:30 PM | Active | View |
90. | TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA AND 500KVA, 11KV/433V TRANSFORMERS OF MUNSAR MINE(ELECT/MUN/ADGM/20-21/334) | 08-06-2020 | 17-06-2020 | 17-06-2020 | 17-06-2020 | 03:30 PM | Active | View |
91. | DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/MECH/B-HOLE/20-21/199) | 06-06-2020 | 17-06-2020 | 17-06-2020 | 17-06-2020 | 04:30 PM | Active | View |
92. | Grass thatching of Bunglow No. 01 (Mine Manager Bunglow) at Tirodi Mine.(TRD/CIVIL/20-21/361) | 06-06-2020 | 10-06-2020 | 10-06-2020 | 11-06-2020 | 05:30 PM | Active | View |
93. | Proposal for errection of new L.T. Line at Sitapatore Mine.(TRD/EL./20-21/7400004314/374 Dated 05.06.20) | 06-06-2020 | 27-06-2020 | 27-06-2020 | 27-06-2020 | 03:30 PM | Active | View |
94. | Purchase of FRP TRANSLUCENT ROOF SHEET-400 Nos(MOIL/20-21/ET-60 dt.05.06.2020) | 05-06-2020 | 29-06-2020 | 29-06-2020 | 30-06-2020 | 03:30 PM | Active | View |
95. | Construction of foundation for Chimney for 1500 KVA DG Set at Second vertical Shaft at Chikla mine.(CH/Civil/2020-21/316 date 01.06.2020) | 04-06-2020 | 13-06-2020 | 13-06-2020 | 13-06-2020 | 03:30 PM | Active | View |
96. | PURCHASE OF VIBRATING FEEDER COMPLETE WITH DRIVE, MAKE-ENESTEE ENGINEERING LTD., MODEL-E-VF-1016-001- 1 NO. FOR BALAGHAT MINE (M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/239/E-3/35-M DT.03/06/2020) | 04-06-2020 | 24-06-2020 | 24-06-2020 | 24-06-2020 | 03:30 PM | Active | View |
97. | PURCHASE OF WHEEL AND EXCEL ASSEMBLY WITH GEARBOX COMPLETE WITHOUT MOTOR - 1 SET, MAKE- M/S OVIS EQUIPMENT PVT.LTD., HYDERABAD, MODEL- 4 TON BATTERY OPERATED LOCOMOTIVE (SR.NO.603 AND 582) OPERATING AT BALAGHAT MINE(M.P) (AS PER ANNEXURE A ENCLOSED)(PUR/MOIL/C-4/4/E-4/36-M DT.03/06/2020) | 04-06-2020 | 24-06-2020 | 24-06-2020 | 24-06-2020 | 03:30 PM | Active | View |
98. | DRILLING OF BORE HOLE 110 MM DIAMETER FROM 8TH TO 11 LEVEL FOR LAYING OF ELECTRICAL POWER CABLE AT PRODUCTION SHAFT IN UNDERGROUND AT BALAGHAT MINE(AGENT/BGT/B-HOLE/20-21/188) | 04-06-2020 | 15-06-2020 | 15-06-2020 | 15-06-2020 | 04:30 PM | Active | View |
99. | Providing and installation of Effluent Treatment Plant in work shop area at Chikla Mine.(CH/Civil/2020-21/211 date 16.05.2020) | 03-06-2020 | 10-06-2020 | 10-06-2020 | 10-06-2020 | 03:30 PM | Active | View |
100. | purchase of Pneumatically Operated Double Diaphragm Pumps for Various Mines - 10 Nos. (2 Lots)(WE-13(ET-57) DT.01/06/2020) | 02-06-2020 | 24-06-2020 | 24-06-2020 | 25-06-2020 | 03:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.5.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |