1. Purchase of Crawler mounted, Diesel Engine operated Dozer with Operation and maintenance spares for Dongri Buzurg Mine(M.S) - 1 No. (2 Lots) (Only Through e-procurement)(WE-113(ET-405) DT.10/02/2020) 10-02-2020 11-03-2020 11-03-2020 12-03-2020 03:30 PM Active View
2. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine Western Hill from Ch.8 to Ch.18(MOIL/19-20/ET/396) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
3. Operation of vibrating screen to screen sub grade mineral reject of underground ROM at Balaghat Mine(MOIL/19-20/ET/399) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
4. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East Side Part-6(MOIL/19-20/ET/397) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
5. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East Side Part-4(MOIL/19-20/ET/398) 06-02-2020 06-03-2020 06-03-2020 06-03-2020 03:30 PM Active View
6. Accidental repairing of Bolero jeep bearing registration no. MP50C4489 of Balaghat Mine(AGT/BGT/MECH/ MG/19-20/1137) 05-02-2020 17-02-2020 17-02-2020 17-02-2020 04:30 PM Active View
7. Operation of industrial pumping operation in UG levels at Kandri mine(A-III/KAN/19-20/3594) 05-02-2020 12-02-2020 12-02-2020 12-02-2020 04:30 PM Active View
8. Purchase of VHF Walkie Talkie Handset Model XiR P3688 for Dongri buzurg Mine(DB/ELECT/19-20/871) 05-02-2020 27-02-2020 27-02-2020 27-02-2020 04:30 PM Active View
9. Installation of vibrating screen, conveyor belt system and feed hopper at Balaghat Mine.(BGT/MECH/IMB/19-20/1141) 05-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
10. Fabrication and Installation of Flap Door type arrangement in Holmes Shaft Skip compartment at 12L, below 11.5th LS.(BGT/MECH/WINDER/19-20/1116) 05-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
11. Fabrication of Miscellaneous Items for Balaghat Mine(BGT/MECH/MISC ITEM/19-20/1140) 05-02-2020 25-02-2020 25-02-2020 25-02-2020 04:30 PM Active View
12. Pushing and unloading of ROM and rock tubs at surface at Chikla Mine(MOIL/19-20/ET/393) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
13. Transportation of underground and surface tubs at Kandri Mine(MOIL/19-20/ET/394) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
14. Cleaning of surplus underground ROM at Munsar Mine(MOIL/19-20/ET/395) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
15. Picking and collection of low grade Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East Side Part-5(MOIL/19-20/ET/400) 05-02-2020 05-03-2020 05-03-2020 05-03-2020 03:30 PM Active View
16. Renovation of Safety temple near Adm. Office at Balaghat Mine( Civil/BGT/T E/2019-20/1132) 04-02-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
17. Repairing of civil work for various location of camp premises at Balaghat Mine(Civil/BGT/T E/2019-20/1125) 04-02-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
18. Drilling of bore hole of 110mm dia from 13.5th level to 16.5 th level at Holmes Shaft and 12th level to 13.5th level at Production shaft in underground of Balaghat Mine.(AGT/BGT/MECH/UG/19-20/1115) 04-02-2020 20-02-2020 20-02-2020 20-02-2020 04:30 PM Active View
19. Purchase of Air Blowers (2 Stage Evaporative Cooling System) for MOIL BHAWAN, Nagpur - 6 Nos.(6 Lots.) (Only Through e-procurement)(WE-117(ET-402) DT.03/02/2020) 03-02-2020 25-02-2020 25-02-2020 26-02-2020 03:30 PM Active View
20. Concrete for U/G at Ore drive at 1950 Level at10800 section at Ukwa Mine(AGT/Min/UK/LT/19-20/1117) 03-02-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
21. Purchase of Gym Equipments and other essential items at Gymnasium, West Court, Nagpur - 15 Lots.(Only Through e-procurement)(WE-119(ET-403) DT.03/02/2020) 03-02-2020 24-02-2020 24-02-2020 25-02-2020 03:30 PM Active View
22. CLEANING OF SEPTIC TANK AND DRAIN AT CAMP AREA AT TIRODI MINE.(TRD/CIVIL/19-20/5307 Dated 08.01.2020) 01-02-2020 07-02-2020 07-02-2020 07-02-2020 03:30 PM Active View
23. Purchase of Explosive and accessories(WE-110 dt.31.01.2020 (e-Tenderno.MOIL/19-20/ET/401) 01-02-2020 19-02-2020 19-02-2020 20-02-2020 03:30 PM Active View
24. REPAIRING OF TRACK CHAIN LEFT SIDE OF TATA 450 HY. EXCAVATOR TIRODI MINE.(TRD/MECH/HO/2020/471 DT-02/01/2020) 01-02-2020 12-02-2020 12-02-2020 12-02-2020 03:30 PM Active View
25. Outsourcing of Electrically Operated Skid Mounted Crushing and Screening Plant Operation at Munsar Mine(MOIL/19-20/ET/279) 29-01-2020 28-02-2020 28-02-2020 28-02-2020 03:30 PM Active View
26. Providing and Laying 90mm HDPE Pipe pipe from chargaon Colony Main Entrance Upto recently constructed GSR under water supply scheme at Munsar Mine( MUN/CIVIL/NIT/19-20/185 DT.25.01.2020) 27-01-2020 04-02-2020 04-02-2020 04-02-2020 04:30 PM Active View
27. Providing, Installation and fixing pumps and extending of HDPE Pipe upto KL Pit Munsar Mine(MUN/CIVIL/NIT/19-20/186 DT.25.01.2020) 27-01-2020 04-02-2020 04-02-2020 04-02-2020 04:30 PM Active View
28. Purchase of G.I. Core Boxes(WE-118 DT.27.01.2020 e-Tender no.MOIL/19-20/ET/390) 27-01-2020 10-02-2020 10-02-2020 11-02-2020 03:30 PM Active View
29. Outsourcing of Industrial Pumping Operation at Underground levels and Opencast at Kandri Mine(MOIL/19-20/ET/381) 25-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
30. Hydraulic Pressure and Ultrasonic testing of air pressure vessel installed for supply of compressed air in Underground and of various tippers and machines at Balaghat Mine.(AGT/BGT/MECH/NDT-PV/19-20/1065) 24-01-2020 10-02-2020 10-02-2020 10-02-2020 04:30 PM Active View
31. Providing main and check meters with metering equipment at 15.2 MW and 4.8 MW Wind Energy Farms, Ratedi and Nagda Hills, Dewas(MP) respectively(MOIL/19-20/ET/382) 24-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
32. Replacement of Buntons, Manway platforms and ladders of second outlet shaft at Balaghat Mine.(AGT/BGT/MECH/19-20/1087) 23-01-2020 12-02-2020 12-02-2020 12-02-2020 04:30 PM Active View
33. Laying of 6 inch and 2 inch GI Pipe line from GSR tank near rest house to old north section sand plant for sand stowing operation at Balaghat Mine(AGT/BGT/MECH/PIPE/19-20/1086) 23-01-2020 12-02-2020 12-02-2020 12-02-2020 04:30 PM Active View
34. Construction of structural and RCC foundation for leaching unit in EMD plant of Dongri Buzurg Mine(MOIL/19-20/ET/385) 23-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
35. Providing and fixing of UPVC HIGH PRESSURE THEADED pipes 8 inch (200mm) diameter of 270 MTR for sand stowing plant at Balagaht Mine.(MOIL/19-20/ET/383) 23-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
36. Construction of boundary wall in precast, prestressed column and panels along lease boundry in Balapur and Syndicate camp and siding area and providing fixing concertina coil fencing in three layers at Dongri Buzurg Mine(MOIL/19-20/ET/386) 23-01-2020 27-02-2020 27-02-2020 27-02-2020 03:30 PM Active View
37. Providing and supplying of Desk and Benches size 42inch by 15 inches by 30 inches with self for RNT school Ukwa (Civil/UK/TE/2019-20/1072) 20-01-2020 03-02-2020 03-02-2020 03-02-2020 4:30 PM Active View
38. Providing and supplying of Desk and Benches size 42inch by 15 inches by 30 inches with self for RNT school Balaghat (Civil/BGT/TE/CSR/2019-20/1069) 20-01-2020 03-02-2020 03-02-2020 03-02-2020 4:30 PM Active View
39. Exploratory core drilling on PL areas of Chikla and Satak village over an area of 99.36Ha and 46.90Ha (MOIL/19-20/ET/357) 20-01-2020 20-02-2020 20-02-2020 20-02-2020 3:30 PM Active View
40. Maintenance of gardens at Balaghat mine. (MOIL/19-20/ET/366) 18-01-2020 17-02-2020 17-02-2020 17-02-2020 3:30 PM Active View
41. WEBSITE PROPRIETARY TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF SPARES FOR MEEKA MAKE EOT CRANE (PUR/MOIL/C-11/24/E-63/914-M Dt. 18-01-2020) 18-01-2020 10-02-2020 10-02-2020 10-02-2020 3:30 PM Active View
42. Construction of new water supply scheme at Ukwa Mine. (MOIL/19-20/ET/367) 18-01-2020 20-02-2020 20-02-2020 20-02-2020 3:30 PM Active View
43. Cleaning and Screening of SM Grade small 34 Percent Mn. KDL 4543 from Sub Grade Mineral reject from Underground at Kandri Mine(Kan/Mining/NIT/19-20/3485 Date 17.01.2020) 17-01-2020 24-01-2020 24-01-2020 24-01-2020 04:30 PM Active View
44. Extra excavation in Manganiferous rocks at 4th Level of 2nd Vertical Shaft Section at Chikla Mine(MOIL/19-20/ET/378) 17-01-2020 24-01-2020 24-01-2020 24-01-2020 03:30 PM Active View
45. Proposal for repairing of bucket of K450 Hyd Excavator of Tirodi Mine(TRD/MECH/HO/19-20/423 DT-06/01/2020) 17-01-2020 30-01-2020 30-01-2020 01-02-2020 11:00 AM Active View
46. PURCHASE OF CS WHEEL ASSEMBLY WITH COVER FOR 4 MT GB CAR IN UNDERGROUND AT BALAGHAT MINE(PUR/MOIL/BGT/GB CAR/19-20/1050) 17-01-2020 05-02-2020 05-02-2020 05-02-2020 04:30 PM Active View
47. Purchase of IGBT Based Active Harmonic Filter With Capacitor Banks for Various Mines - 8 Sets (8 Lots) (Only Through e-procurement)(WE-112 (ET-389) DT.16/01/2020) 17-01-2020 06-02-2020 06-02-2020 07-02-2020 03:30 PM Active View
48. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR ANUVIN MAKE PUMP(PUR/MOIL/C-11/21/E-62/908-M Dt.16-01-2020) 17-01-2020 07-02-2020 07-02-2020 07-02-2020 03:30 PM Active View
49. Maintenance, Distribution and Collection of Cap Lamps at Gumgaon Mine through Outsourcing for the Period of One year(MOIL/19-20/ET/380) 17-01-2020 17-02-2020 17-02-2020 17-02-2020 03:30 PM Active View
50. Removal of spillage from the bottom of production shaft and inset of 15th Level at Balaghat Mine(MOIL/19-20/ET/387) 17-01-2020 17-02-2020 17-02-2020 17-02-2020 03:30 PM Active View
51. Muffling for blasting at 6A 6B and 6C section of North Tirodi Mine(MOIL/19-20/ET/379) 17-01-2020 17-02-2020 17-02-2020 17-02-2020 03:30 PM Active View
52. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-61/900-M Dt. 15-01-2020) 15-01-2020 07-02-2020 07-02-2020 07-02-2020 03:30 PM Active View
53. Repairing of Track Roller of TataHitachi 450 Sr.No. 2 Hydraulic Excavator of Dongri Buzurg Mine (10 Nos.).(DB/MECH/19-20/JGM(MECH)/732) 15-01-2020 30-01-2020 30-01-2020 30-01-2020 04:30 PM Active View
54. e Procurement of CONVEYOR BELT(MOIL/19-20/ET/388) 15-01-2020 17-02-2020 17-02-2020 18-02-2020 03:30 PM Active View
55. Providing 6 mbps 1 is to 1 Internet Leased Line at Kandri Mine(ADGM/Grp-III/SYS/NW/19-20/1017) 13-01-2020 20-01-2020 20-01-2020 20-01-2020 04:30 PM Active View
56. FIBER GLASS REINFORCED PLASTIC BLADE 1 SET FOR 40 HP VENTILATION FAN(PUR/MOIL/Bel/2019-20/2492 Date 06/01/2020) 10-01-2020 22-01-2020 22-01-2020 22-01-2020 04:30 PM Active View
57. Purchase of Hydraulic Crawler DTH Drill Machine - 1 No.alongwith Comprehensive Operation and Maintenance for the Period of 6 Year for Dongri Buzurg Mine(M.S) (7 Lots) (Only Through e-procurement)( WE-98(ET-377) DT.10/01/2020) 10-01-2020 25-02-2020 25-02-2020 26-02-2020 03:30 PM Active View
58. Purchase of M.S. LANCING PIPE-24 MT(MOIL/19-20/ET-376 dt.09.01.2020) 09-01-2020 30-01-2020 30-01-2020 31-01-2020 03:30 PM Active View
59. Installation, commissioning and Testing of CCTV System with Camera at cage winder to view inside / outside of cage with 6 Months recording capacity(KD/Elect/TE/19-20/ 3347, 07.01.2020) 07-01-2020 28-01-2020 28-01-2020 28-01-2020 04:30 PM Active View
60. PROCUREMENT OF GEAR BOX FOR 500MM CONVEYOR BELT FOR CHIKLA MINE(TE-13 DT.04122019) 06-01-2020 11-01-2020 11-01-2020 11-01-2020 04:30 PM Active View
61. TENDER DOCUMENTS FOR PROVIDING SUPPLYING OF RESTRICTED NEUTRAL SYSTEM FOR 1000KVA, 11KV/433V TRANSFORMER FOR 2ND VERTICAL SHAFT SUBSTATION OF MUNSAR MINE(ELECT/MUNADGM/19-20/955) 06-01-2020 11-01-2020 11-01-2020 11-01-2020 03:30 PM Active View
62. Purchase of POLYPROPYLENE JUMBO BAG CARRYING CAPACITY 1.0 MT-13650 NOS.(MOIL/19-20/ET-375 dt.06.01.2020) 06-01-2020 28-01-2020 28-01-2020 29-01-2020 03:30 PM Active View
63. Purchase of Drilling Accessories for DI-500 Drilling Machine-3 Items(MOIL/19-20/ET-373 dt.04.01.2020) 04-01-2020 28-01-2020 28-01-2020 29-01-2020 03:30 PM Active View
64. Procurement of Standby Winder Control System for Vertical Shaft Winder of Beldongri Mine(MOIL/19-20/ET/353) 04-01-2020 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View
65. Purchase of Load Haul Dump Machine for Gumgaon Mine(M.S) with Operation and Maintenance Spares - 1 No.(2 Lots) (Only Through e-procurement)(WE-101(ET-374) DT.04/01/2020) 04-01-2020 03-02-2020 03-02-2020 04-02-2020 03:30 PM Active View
66. Purchase of CERAMIC PACKING ROPE(MOIL/19-20/ET-372 dt.03.01.2020) 03-01-2020 28-01-2020 28-01-2020 29-01-2020 03:30 PM Active View
67. Supply of electrodes(T.E.NO. PUR/DB/2019-20/ 745 DT- 31-12-2019) 03-01-2020 30-01-2020 30-01-2020 30-01-2020 04:30 PM Active View
68. Washing Picking and collection of material from subgrade mineral rejects yard of Sitapatore Mine(MOIL/19-20/ET/363) 03-01-2020 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View
69. Picking and collection of material from Hirapur Dump at Tirodi Mine(MOIL/19-20/ET/362) 03-01-2020 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View
70. Procurement of Black Gitti for underground concreting work at Kandri Mine(MOIL/19-20/ET/364) 03-01-2020 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View
71. Hiring of EXCAVATOR FOR CLEANING OF FINES POND NAGARA PLANT AT UKWA MINE(AGT/MIN/UK/LT/19-20/797) 02-01-2020 20-01-2020 20-01-2020 20-01-2020 04:30 PM Active View
72. Repairing of Track Roller of Dozer BD155 No. 2 operating of Dongri Buzurg Mine (6 Numbers).(DB/MECH/19-20/JGM(MECH)/731) 02-01-2020 30-01-2020 30-01-2020 30-01-2020 04:30 PM Active View
73. Purchase of Laptop (Touch Screen) - 1 No.(1 Lot) (Only Through e-procurement)(WE-106(ET-371) DT.01/01/2020) 01-01-2020 21-01-2020 21-01-2020 22-01-2020 03:30 PM Active View
74. Hydrogeological investigation at the location of Proposed ventilation shaft at Gumgaon Mine of MOIL to estimate quantity of water inflow in shaft and its control measures during construction of shaft.(MOIL/19-20/ET/368) 01-01-2020 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View
75. Purchase of HYDRATED LIME POWDER - 90 MT(MOIL-19-20-ET-370 Dt.31.12.2019) 31-12-2019 21-01-2020 21-01-2020 22-01-2020 03:30 PM Active View
76. Cleaning and Screening of SM Grade small 30.50 percent Mn. KDL-545 and Lump Grade 25 percent KDL-446 from Sub Grade Mineral reject of Underground at Kandri Mine(MOIL/19-20/ET/359) 31-12-2019 31-01-2020 31-01-2020 31-01-2020 03:30 PM Active View
77. Relining and Repairing of 6 Nos. of Electrolytic Cell Tanks of EMD Plant at Dongri Buzurg Mine(MOIL/19-20/ET/330) 31-12-2019 31-01-2020 31-01-2020 31-01-2020 03:30 PM Active View
78. Picking and collection of UKL-448 25 percent and UKL-471 20 percent from Ch. 8600 to Ch. 10000 from F W old sub grade mineralized area of Ukwa Mine(MOIL/19-20/ET/361) 31-12-2019 31-01-2020 31-01-2020 31-01-2020 03:30 PM Active View
79. Recovery of cleaned ore from surface bed reject area at Parsoda Mine(MOIL/19-20/ET/358) 31-12-2019 31-01-2020 31-01-2020 31-01-2020 03:30 PM Active View
80. Loading of Slag into trucks at Ferro Manganese Plant, Balaghat Mine(MOIL/19-20/ET/339) 31-12-2019 31-01-2020 31-01-2020 31-01-2020 03:30 PM Active View
81. Underground Filling Spreading at -270 L and -370 Level at Chikla Mine(MOIL/19-20/ET/356) 31-12-2019 30-01-2020 30-01-2020 30-01-2020 03:30 PM Active View
82. Additional excavation in Magniferrous rock between Ch. 10800 to Ch.11800 at 1950 Level at Ukwa Mine(MOIL/19-20/ET/355) 31-12-2019 30-01-2020 30-01-2020 30-01-2020 03:30 PM Active View
83. Underground development at 12th Level South Section at Balaghat Mine(MOIL/19-20/ET/354) 31-12-2019 30-01-2020 30-01-2020 30-01-2020 03:30 PM Active View
84. Shifting making of foundation for Installation of old bunker and screen near OCF Dump at Balaghat Mine(Civil/BGT/T E/2019-20/953) 30-12-2019 10-01-2020 10-01-2020 10-01-2020 04:30 PM Active View
85. Procurement of Electro Hydraulic Thruster Brake Assembly for 550H.P Production shaft at Balaghat Mine.(PUR/MOIL/BGT/WINDER/19-20/965) 30-12-2019 21-01-2020 21-01-2020 21-01-2020 04:30 PM Active View
86. Purchase of HIGH DENSITY POLY ETHYLENE HDPE WOOVEN SACKS-30150 NOS(MOIL-19-20-ET-369 Dt.30.12.2019) 30-12-2019 21-01-2020 21-01-2020 22-01-2020 03:30 PM Active View
87. Breaking of Slag and other associated works at Ferro Manganese Plant at Balaghat Mine( MOIL/19-20/ET/338) 30-12-2019 30-01-2020 30-01-2020 30-01-2020 03:30 PM Active View
88. Providing and fixing of Barbed Wire Fencing around open pit near main entrance of Parsoda Mine from safety perspective(MUN/Civil/NIT/2019-20/176 Date 27.12.2019) 28-12-2019 03-01-2020 03-01-2020 03-01-2020 04:30 PM Active View
89. Confinement of Double Pole Structure behind new Electrical Substation Building of 2nd Vertical Shaft including allied civil works at Munsar Mine(MUN/Civil/NIT/2019-20/177 Date 27.12.2019) 28-12-2019 03-01-2020 03-01-2020 03-01-2020 04:30 PM Active View
90. Providing and laying of heavy duty Paver Blocks on either sides of Railway Track at Main Entrance Gate of Munsar Mine(MUN/Civil/NIT/2019-20/173 Date 27.12.2019) 28-12-2019 03-01-2020 03-01-2020 03-01-2020 04:30 PM Active View
91. PURCHASE OF C CLASS ITEMS PACKING MATERIALS, GRINDING WHEEL, COTTON CHINDI and WASTE, TORCH CELL, HACKSAW BLADE, NYLON ROPE, MANILA ROPE, TEFLON TAPE and EMERY FOR KANDRI MINE(AGT-GR.III/KD/2019-20/ 3200) 28-12-2019 17-01-2020 17-01-2020 17-01-2020 04:30 PM Active View
92. Construction of cement concrete plateform infront of siding office and extension of Railway siding plateform at Dongri Budurg Mine.(MOIL/19-20/ET/342) 27-12-2019 03-02-2020 03-02-2020 03-02-2020 03:30 PM Active View
93. Annual Requirement of general electrical spares C Class Items for EMD Plant(EMD/DB/ELECT/19-20/711) 26-12-2019 22-01-2020 22-01-2020 22-01-2020 04:30 PM Active View
94. Annual Rate Contract for supply of Cement Capsules - 564800 Nos.( WE-105 DT.24.12.2019 (e-Tenderno.MOIL/19-20/ET/365) 25-12-2019 14-01-2020 14-01-2020 15-01-2020 03:30 PM Active View
95. PURCHASE OF C CLASS ITEMS MISCELLANEOUS TOOLS and ITEM FOR KANDRI MINE(AGT-GR.III/KD/2019-20/3188) 24-12-2019 17-01-2020 17-01-2020 17-01-2020 04:30 PM Active View
96. PURCHASE OF C CLASS ITEMS WIRE and ROSE NAILS AND FASTENERS FOR KANDRI MINE(MOIL/AGT-GR.III/KD/19-20/3189) 24-12-2019 17-01-2020 17-01-2020 17-01-2020 04:30 PM Active View
97. PURCHASE OF C CLASS ITEMS PIPE FITTING ACCESSORIES FOR KANDRI MINE(AGT-GR.III/KD/2019-20/3187) 24-12-2019 17-01-2020 17-01-2020 17-01-2020 04:30 PM Active View
98. Monitoring and operation of 33KV Substation at Balaghat Mine through outsourcing for the period of One Year(MOIL/19-20/ET/337) 23-12-2019 23-01-2020 23-01-2020 23-01-2020 03:30 PM Active View
99. Maintenance, Distribution and Collection of Cap Lamps at Balaghat Mine through Outsourcing for the period of One Year(MOIL/19-20/ET/336) 23-12-2019 23-01-2020 23-01-2020 23-01-2020 03:30 PM Active View
100. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR 3 TON AND 4 TON BATTERY-DIESEL LOCO FROM OVIS EQUIPMENTS PVT. LTD., HYDERABAD(PUR/MOIL/C-5/27/E-59/841-M Dt. 23/12/2019) 23-12-2019 15-01-2020 15-01-2020 15-01-2020 03:30 PM Active View

Tenders More Information

Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2025) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (205) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.