Tender Archive

Tender Archive

Title for Search Tender Issue Start Date Tender Issue End Date
S.No. Title Issue Start Date Issue Last Date Submission Last Date Opening Date Opening Time Status View
1. A Annual repairs to camp quarters at Tirodi Mine and B Repairs to 6 units country tiled roof at south quarters at Tirodi Mine(MOIL/18-19/ET/227) 06-09-2018 04-10-2018 04-10-2018 04-10-2018 03:30 PM Active View
2. A Construction of siding office by the side of weight bridge at Gumgaon Mine. And B Providing and fixing of paving block at front side of recreation hall cun sports club at Gumgaon Mine(MOIL/18-19/ET/228) 06-09-2018 04-10-2018 04-10-2018 04-10-2018 03:30 PM Active View
3. Renovation of old B type quarter at Beldongri Mine(MOIL/18-19/ET/229) 06-09-2018 05-10-2018 05-10-2018 05-10-2018 03:30 PM Active View
4. Trench cutting in ore stack for sampling at Tirodi Mine(MOIL/18-19/ET/250) 06-09-2018 05-10-2018 05-10-2018 05-10-2018 03:30 PM Active View
5. Construction of childerns park at officers colony at Kandri Mine(MOIL/18-19/ET/231) 06-09-2018 05-10-2018 05-10-2018 05-10-2018 03:30 PM Active View
6. WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF PP MULTIFILAMENT FILTER CLOTH(PUR/MOIL/C-11/16/E-34/546-M Dt. 05-09-2018) 05-09-2018 26-09-2018 26-09-2018 26-09-2018 03:30 PM Active View
7. Underground development at 15th Level at Balaghat Mine(MOIL/18-19/ET/245) 05-09-2018 05-10-2018 05-10-2018 05-10-2018 03:30 PM Active View
8. Removal of waste rock and Manganiferous rock and handling the same by mechanized means from Pit No.6 at Sitapatore Mine(MOIL/18-19/ET/246) 05-09-2018 05-10-2018 05-10-2018 05-10-2018 03:30 PM Active View
9. Retaining wall for new installation of pump house and platform for delivery section at ABC North Section at Tirodi Mine.(TRD/CIVIL/2018-19/2322-A) 05-09-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
10. Providing of fencing to protected saplings at Tirodi Mine(TRD/CIVIL/2018-19/2322) 05-09-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
11. Construction of OCF Jig section at Balaghat Mine(MOIL/18-19/ET/221) 04-09-2018 28-09-2018 28-09-2018 28-09-2018 03:30 PM Active View
12. Transportation of underground tubs at Ch 10800 section of Ukwa Mine(16/Mining/UM/18-19/1170) 03-09-2018 17-09-2018 17-09-2018 17-09-2018 04:30 PM Active View
13. Construction of RCC Wall for trammel near 2nd Vertical Shaft at Munsar Mine.(CIVIL/MUN/18-19/82 Dated 01.09.2018) 03-09-2018 08-09-2018 08-09-2018 08-09-2018 04:30 PM Active View
14. Construction of RCC Platform for pouring Manganese Ore in Hopper of Mobile Crusher at Munsar Mine.( CIVIL/MUN/18-19/79 Dated 01.09.2018) 03-09-2018 08-09-2018 08-09-2018 08-09-2018 04:30 PM Active View
15. Purchase of 40KVA D.G.Set - 1 No.(1 Lot) (Only Through e-procurement)( WE-86 DT.30/08/2018 (MOIL/18-19/ET/249)) 30-08-2018 26-09-2018 26-09-2018 27-09-2018 03:30 PM Active View
16. Purchase of Corrective Surgery and Orthopaedic Appliances Unit - 6 Items (6 Lots) (Only Through e-procurement)( WE-85 DT.30/08/2018 (MOIL/18-19/ET/248)) 30-08-2018 16-10-2018 16-10-2018 17-10-2018 03:30 PM Active View
17. A Construction of compound wall all around Agent bunglow at Balaghat Mine and B Interior renovation works for type quarter allotted to DGM in front of Administrative building at Balaghat Mine(MOIL/18-19/ET/223) 29-08-2018 03-10-2018 03-10-2018 03-10-2018 03:30 PM Active View
18. A) Construction of new cement godown at Ukwa Mine and B) Shifting of vehicle parking shed at Ukwa Mine(MOIL/18-19/ET/224) 29-08-2018 03-10-2018 03-10-2018 03-10-2018 03:30 PM Active View
19. A Construction of cement concrete road and cement concrete drains in 48 52 colony at Chikla mine and B Construction of Toilet block in Mine work shop at Chikla mine(MOIL/18-19/ET/226) 29-08-2018 03-10-2018 03-10-2018 03-10-2018 03:30 PM Active View
20. laying of sewer Line(Civil/BGT/T.E./2017-18/3422) 29-08-2018 08-09-2018 08-09-2018 08-09-2018 04:30 PM Active View
21. Installation of Bio Toilet(Civil/BGT/T.E./2018-19/3419) 29-08-2018 08-09-2018 08-09-2018 08-09-2018 04:30 PM Active View
22. Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine(MOIL/18-19/ET/237) 28-08-2018 26-09-2018 26-09-2018 26-09-2018 03:30 PM Active View
23. TENDER ENQUIRY FOR PURCHASE OF MECHANICAL C CLASS ITEMS(TE/MOIL/FMP/MECH/18-19/163) 27-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
24. PURCHASE OF ANALYTICAL BALANCE FOR FERRO MANGANESE PLANT, BALAGHAT MINE(PUR/MOIL/C-3/48/E-33/513-M DT.27.08.2018) 27-08-2018 14-09-2018 14-09-2018 14-09-2018 03:30 PM Active View
25. Explosives and Accessories(PUR/MOIL/C-6/214/WE-55 (MOIL/18-19//ET/242)) 25-08-2018 19-09-2018 19-09-2018 21-09-2018 09:30 AM Active View
26. Maintenance and operation of water supply scheme at at MOIL BHAWAN, CMD Bunglow, CMS with A type quarters, West Court with Guest huose, Transit House and Bansivilla area Compound MOIL, Nagpur(MOIL/18-19/ET/218) 25-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
27. Equipping of 11KV Indoor substation at 5th level surface substation of Balaghat Mine(MOIL/18-19/ET/225) 24-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
28. Setting up 54.25 KWp capacity, grid connected, Solar Power Trees at Corporate office MOIL Bhawan, Nagpur(MOIL/18-19/ET/232) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
29. Maintenance and operation of water supply scheme at Ukwa Mine(MOIL/18-19/ET/217) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
30. Maintenance and operation of water supply scheme at Balaghat Mine(MOIL/18-19/ET/216) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
31. Maintenance of Garden at Balaghat Mine(MOIL/18-19/ET/219) 24-08-2018 24-09-2018 24-09-2018 24-09-2018 03:30 PM Active View
32. Procurement, installation and commissioning of Special Energy Meters(SEM) at Chikla, Kandri and Gumgaon Mine substation and respective substations of MSEDCL/MSPTCL(MOIL/18-19/ET/238) 24-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
33. Purchase of Sand for Sand Stowing Plant at Kandri, Munsar and Beldongri Mine(MOIL/18-19/ET/235) 24-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
34. Purchase of Sand for Sand Stowing Plant at Gumgaon Mine(MOIL/18-19/ET/236) 24-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
35. Fabrication of Miscellaneous items a. Leather piston Packing for Air Legs b.Leather Cap Lamp Belts c. Rexin First Aid Kit Bag(AGENT/BGT/MECH/MISC/18-19/591 dtd 19.08.2018) 23-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
36. Repairing of Track Components of Side Dump Loader no.6 in 11th Level Underground of Balaghat Mine( AGENT/BGT/MECH/SDL/18-19/616 Dtd 21.08.2018) 23-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
37. PURCHASE OF C CLASS ITEMS -MISCELLANEOUS ITEM FOR KANDRI MINE.(AGT-GR.III/KD/2018-19/1653) 22-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
38. Purchase of Reduction Gear Box-1 No.(1 Lot) for Man Winding Engine of Production Shaft at Balaghat Mine(M.P) (Only Through e-procurement)( WE-84 Dt.21/08/2018 (MOIL/18-19/ET/240)) 21-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
39. Hiring of services for mobile/skid mounted crushing and screening plant with VSI unit for processing dump reject ore/sand pebbles including excavation transportation of raw materials and transportation of product for sand stowing at Balaghat Mine(MOIL/18- 21-08-2018 19-09-2018 19-09-2018 19-09-2018 03:30 PM Active View
40. Blanket Rate Contract for one Year for supply of various types of Paints, Thinner etc( WE-78 DT.21.08.2018 (e-Tender no.MOIL/18-19/ET/241) 21-08-2018 18-09-2018 18-09-2018 19-09-2018 03:30 PM Active View
41. Concreting of X cut between Ch.24 to Ch.30 at 300 Level for stope preparation at Gumgaon Mine(MOIL/18-19/ET/213) 21-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
42. Making and Supply of stemming material Mud plug used for blasting at Gumgaon Mine(MOIL/18-19/ET/214) 21-08-2018 21-09-2018 21-09-2018 21-09-2018 03:30 PM Active View
43. Procurement of C class Items for Ferro Manganese Plant(FMP/TE/Elect/18-19/160) 21-08-2018 05-09-2018 05-09-2018 05-09-2018 03:30 PM Active View
44. PURCHASE OF FASTNERS,WIRE NAILS AND ROSE NAILS FOR BALAGHAT MINE(PUR/MOIL/BGT/FASTNER/18-19/607 dtd 20.08.2018) 21-08-2018 11-09-2018 11-09-2018 11-09-2018 04:30 PM Active View
45. PURCHASE OF C CLASS ITEMS GRINDING WHEEL COTTON WASTE and WHITE CHINDI, TORCH CELL, HACKSAW BLADE, NYLON ROPE, MANILA ROPE, TEFLON TAPE and EMERY TAPE FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1640) 21-08-2018 11-09-2018 11-09-2018 11-09-2018 03:30 PM Active View
46. Replacement of Buntons of Holmes Shaft at Balaghat Mine( BGT/MECH/PS/18-19/3358) 20-08-2018 28-08-2018 28-08-2018 28-08-2018 04:00 PM Active View
47. Agrico implements( PUR-MOIl-C-1-196-E-32 dt -20-08-2018) 20-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
48. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES (PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) 20-08-2018 19-09-2018 19-09-2018 19-09-2018 3:30 PM Active View
49. Repairing of Track Rollers Assembly of Side Dump Loader-3 Nos operating at Balaghat Mine(AGT/BGT/MECH/SDL/18-19/590 dtd 19.08.2018) 20-08-2018 04-09-2018 04-09-2018 04-09-2018 04:30 PM Active View
50. PURCHASE OF C CLASS ITEMS - PACKING MATERIAL FOR KANDRI MINE( AGT-GR.III/KD/2018-19/1623) 20-08-2018 11-09-2018 11-09-2018 11-09-2018 03:30 PM Active View
51. WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR HOLMAN CLIMAX AIR WINCHES(PUR/MOIL/C-5/27/E-31/493-M Dt. 20/08/2018) 20-08-2018 12-09-2018 12-09-2018 12-09-2018 03:30 PM Active View
52. EXTENSION OF RETAINING WALL FOR STABILITY OF LOOSE OVERBURDEN AT MOBILE CRUSHER AT MUNSAR MINE.(MUN/CIVIL/18-19/72 DT 17.08.2018) 18-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
53. Underground Development Horizontal and Vertical at 170 Level of Vertical section at Chikla Mine(MOIL/18-19/ET/211) 17-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
54. Removal of accumulated pebbles near sand stowing plants at Chikla Mine( MOIL/18-19/ET/212) 17-08-2018 17-09-2018 17-09-2018 17-09-2018 03:30 PM Active View
55. Transportation of manganese ore from Gumgaon mine siding to Kandri Mine siding(MOIL/18-19/ET/215) 17-08-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
56. Purchase of Tipper - 5 Nos for Various Mines (1 Lot) (Only Through e-procurement)( WE-71 DT.16/08/2018 (MOIL/18-19/ET/239)) 16-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
57. PURCHASE OF C CLASS ITEMS PIPE FITTING ACCESSORIES FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1562) 13-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
58. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF TENOVA DELKOR MAKE BUTTERFLY VALVE AND ACTUATOR(PUR/MOIL/C-11/129/E-29/481-M Dt. 13-08-2018) 13-08-2018 05-09-2018 05-09-2018 05-09-2018 03:30 PM Active View
59. RCC work at CH-1800 and CH-2665 in -470 Level and -270 Level of Chikla Mine(TE-14 Dt.13082018) 13-08-2018 20-08-2018 20-08-2018 20-08-2018 04:30 PM Active View
60. PURCHASE OF HIGH ENERGY EFFICIENT AXIAL FLOW FRP FAN - 2 SETS (1 SET CONTAINTS - 12 NOS.BLADES) (AS PER ANNEXURE A ENCLOSED).(PUR/MOIL/C-4/148/E-30/484-M Dt.09/08/2018) 10-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
61. Purchase of Electrically Operated Auxiliary Ventilation Fan for Various Mines - 7 Nos. (2 Lots) (Only Through e-procurement)(WE-82 Dt.09/08/2018 (MOIL/18-19/ET/210)) 09-08-2018 17-09-2018 17-09-2018 18-09-2018 03:30 PM Active View
62. Manual Removal of Sludge from S.K. Tank at I.M.B. Plant at Balaghat Mine(MOIL/18-19/ET/187) 09-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
63. Raking of Raw Materials and Preparation of Sand beds and associated works at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/186) 09-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
64. WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR KIRLOSKAR MAKE PUMP(PUR/MOIL/C-11/21/E-28/472-M Dt. 09-08-2018) 09-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
65. Purchase of Electrical HT/LT Cables (Assorted Size)( WE-56 DT.08.08.2018 (e-TenderNo.MOIL/18-19/ET-209)) 09-08-2018 11-09-2018 11-09-2018 12-09-2018 03:30 PM Active View
66. Overhauling of Pollution Control Unit with Material at Ferro Manganese Plant, Balaghat Mine(MOIL/18-19/ET/188) 09-08-2018 07-09-2018 07-09-2018 07-09-2018 03:30 PM Active View
67. SUPPLY OF JAW PLATES FOR SAYAJI MAKE CRUSHER 20 X 12(SDGM/CHIKLA/MECH/TE/2018-19, 08/08/2018) 08-08-2018 29-08-2018 29-08-2018 29-08-2018 03:30 PM Active View
68. Purchase of Head Gear Sheave Wheels, 3.6 Mtrs Dia. for Balaghat Mine - 2 Sets.(1 Lot) (Only Through e-procurement)( WE-81 Dt.08/08/2018 (MOIL/18-19/ET/208)) 08-08-2018 10-09-2018 10-09-2018 11-09-2018 03:30 PM Active View
69. Additional excavation in Mangeniferous rock between Ch.24 to Ch.30 at 300 Level at Gumgaon Mine(MOIL/18-19/ET/196) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
70. Underground development at 13.5th Level at Balaghat Mine(MOIL/18-19/ET/195) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
71. Underground development at 11th Level South Section at Balaghat Mine(MOIL/18-19/ET/199) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
72. PURCHASE OF C CLASS ITEMS - WIRE and ROSE NAILS AND FASTENERS FOR KANDRI MINE(AGT-GR.III/KD/2018-19/1486) 06-08-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
73. Handling of spillage ore and fines from various places of IMB plant at Dongri Buzurg Mine(MOIL/18-19/ET/197) 06-08-2018 06-09-2018 06-09-2018 06-09-2018 03:30 PM Active View
74. Purchase of Hose Fittings for Rock Drill and Air Leg Machines(WE-68 e-tender No.MOIL/18-19/ET-207, Dt.06.08.18) 06-08-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
75. Procurement of 33kV residual voltage transformer for capacitor bank..(fmp/elect/18-19/147) 04-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
76. Procurement of Industrial man cooler pedestal fan(fmp/elect/18-19/146) 04-08-2018 24-08-2018 24-08-2018 24-08-2018 04:30 PM Active View
77. SAPLING AT MINE DUMP AREA AT TIRODI MINE(TRD/CIVIL/2018-19/1065-A) 04-08-2018 11-08-2018 11-08-2018 11-08-2018 03:30 PM Active View
78. Purchase of Undercarriage assemblies for Sandvik Make DI-500 Drilling Machine and BEML Make Dozer BD-85 and BD-155.(WE-75 e-tender No.MOIL/18-19/ET-206, Dt.03.08.18) 03-08-2018 28-08-2018 28-08-2018 29-08-2018 03:30 PM Active View
79. Underground Concreting work at Chikla Mine(MOIL/18-19/ET/192) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
80. Pushing and unloading of tubs in underground and on surface at vertical shaft section at Ukwa Mine(MOIL/18-19/ET/193) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
81. Removal of waste rock and handling the same by mechanized means from South dump at Tirodi Mine(MOIL/18-19/ET/194) 03-08-2018 03-09-2018 03-09-2018 03-09-2018 03:30 PM Active View
82. PURCHASE OF MATHER AND PLATT MAKE BARE PUMP (WITHOUT MOTOR AND ACCESSORIES) - 1 NO. FOR IMB PLANT, BALAGHAT MINE (M.P), AS PER ANNEXURE - A ENCLOSED.(PUR/MOIL/C-4/78/E-6/459 -M DT.03/08/2018) 03-08-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
83. Purchase of Transformer - 14 Nos. (10 Lots) (Only Through e-procurement)(WE-72 DT.02/08/2018 (MOIL/18-19/ET/205)) 02-08-2018 03-09-2018 03-09-2018 04-09-2018 03:30 PM Active View
84. Purchase of Cable Bolting Machine for Various Mines - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-70 DT.01/08/2018 (MOIL/18-19/ET/203)) 01-08-2018 04-09-2018 04-09-2018 05-09-2018 03:30 PM Active View
85. Purchase of High Mast Lighting System for Various Mines - 13 Nos. (2 Lots)(WE-73 DT.01/08/2018 (MOIL/18-19/ET/204)) 01-08-2018 30-08-2018 30-08-2018 31-08-2018 03:30 PM Active View
86. Purchase of Steel Braided Rubber Hose(WE-69 e-tender No.MOIL/18-19/ET-202, Dt.01.08.18) 01-08-2018 06-09-2018 06-09-2018 07-09-2018 03:30 PM Active View
87. PURCHASE OF C CLASS MATERIALS FOR CHIKLA AND DONGRI BUZURG MINE(TE-12 DT.25072018) 31-07-2018 20-08-2018 20-08-2018 20-08-2018 04:30 PM Active View
88. Underground Horizontal Development at 270 Level of Vertical section at Chikla Mine( MOIL/18-19/ET/189) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
89. Pushing and unloading of ROM and rock tubs in underground and on surface at Gumgaon Mine(MOIL/18-19/ET/190) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
90. Washing Picking and collection of material from 6 No. dumps of Sitapatore Mine(MOIL/18-19/ET/191) 31-07-2018 31-08-2018 31-08-2018 31-08-2018 03:30 PM Active View
91. Annual repairs to camp quarters Munsar Mine and Construction of pitching of un-course rubble masonry for stability of siding plateform at Kandri Mine(MOIL/18-19/ET/165) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
92. Providing expoxy flooring for old and new workshop building of Balaghat Mine(MOIL/18-19/ET/167) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
93. Providing furniture and interial works for Marketing Department on first floor of MOIL Bhawan Nagpur(MOIL/18-19/ET/170) 30-07-2018 28-08-2018 28-08-2018 28-08-2018 03:30 PM Active View
94. Painting to plant structure of integrated Manganese Beneficiation Plant IMB of Balaghat Mine(MOIL/18-19/ET/166) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
95. Construction of sample room, weight bridge room, metal beam crush barrier along the WBM road at Beldongri Mine and construction of Electric meter room at old Satak mine(MOIL/18-19/ET/163) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
96. Drilling of bore hole with installation of pump at Dongri Buzurg Mine(MOIL/18-19/ET/161) 30-07-2018 27-08-2018 27-08-2018 27-08-2018 03:30 PM Active View
97. ADDITIONAL PILLAR OF RCC AT CHIKLA B SECTION OF CHIKLA MINE(TE-13 Dt.28072018) 28-07-2018 06-08-2018 06-08-2018 06-08-2018 04:30 PM Active View
98. Manpower towards plantation under Plantation Drive at Munsar Mine.(MUN/CIVIL/18-19/59 Date 27.08.2018) 28-07-2018 04-08-2018 04-08-2018 04-08-2018 04:30 PM Active View
99. Maintenance of Gardens at Ukwa Mine. (16/Civil/UM/18-19/878) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View
100. Maintenance and operation of water supply scheme at Ukwa Mine (16/Civil/UM/18-19/879) 26-07-2018 09-08-2018 09-08-2018 09-08-2018 4:30 PM Active View

Tenders More Information

Independent External Monitor

Finalised Tenders

MOU Between MOIL & TII

Integrity Pact

Contracts finalised on nomination basis


List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website)

View (2204) Year Tenders
View (2024) Year Tenders
View (2023) Year Tenders
View (2022) Year Tenders
View (2021) Year Tenders
View (2020) Year Tenders
View (2019) Year Tenders
View (2018) Year Tenders
View (2017) Year Tenders
View (2016) Year Tenders
View (2015) Year Tenders
View (2014) Year Tenders
View (2013) Year Tenders
View (2012) Year Tenders
View (24) Year Tenders
View Full Tender Archive
See all MOIL tender.