Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Development of approach road at Parsoda Mine.(PARSODA/CIVIL/NIT/19-20/109 DT 06.09.2019) | 06-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | View |
2. | GARDEN MAINTENANCE OF CHILDDREN PARK, MINE HOSPITAL, ADMINISTRATIVE BUILDING, MM BUNGALOW AT MUNSAR MINE(MUN/CIVIL/NIT/18-19/108 DT 06.09.2019) | 06-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | View |
3. | LAYING OF PAVER BLOCKS FOR COMMEN AREA BETWEEN A TYPE QTRS OF WAHITOLA NEAR OFFICERS COLONY AT MUNSAR MINE.(MUN/CIVIL/NIT/19-20/105 DT 06.09.2019) | 06-09-2019 | 14-09-2019 | 14-09-2019 | 14-09-2019 | 04:30 PM | Active | View |
4. | Recovery of Cleaned Ore from open cast ROM at Parsoda Mine(Agent JTGM/Mining/PS/NIT/19-20/106 Dt 06.09.19) | 06-09-2019 | 16-09-2019 | 16-09-2019 | 16-09-2019 | 04:30 PM | Active | View |
5. | Tub Wheel and Axle Assembly(PUR/MOIL/C-12/6/WE-55/ET/245) | 03-09-2019 | 25-09-2019 | 25-09-2019 | 26-09-2019 | 03:30 PM | Active | View |
6. | Purchase of DGMS approved LED based Miner Safely Cap Lamp Assembly Complete with all accessories and Metal Frame Charging Rack complete with Charger(WE56 DT.28.08.2019 (e-Tender no.MOIL/19-20/ET/244)) | 03-09-2019 | 25-09-2019 | 25-09-2019 | 26-09-2019 | 03:30 PM | Active | View |
7. | Reduction of Manganese Ore on Conversion basis for EMD Plant, Dongri Buzurg Mine(MOIL/19-20/ET/231) | 31-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | View |
8. | Picking and collection of Ferro grade and LGHS ore from Sidha Baba Mandir Dump at Tirodi Mine(MOIL/19-20/ET/241) | 30-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | View |
9. | Sampling of manganese ore for output production and dispatch railing for all the mines of MOIL Ltd(MOIL/19-20/ET/242) | 30-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | View |
10. | Providing Backup Internet Connectivity at Nagpur Office(MOIL/19-20/ET/240) | 30-08-2019 | 30-09-2019 | 30-09-2019 | 30-09-2019 | 03:30 PM | Active | View |
11. | Supply, installation, commissioning of OFC wired (Armored) LAN connectivity to Weigh Bridge, Mine Stores Magazine from Admin building at Ukwa Mine(BG/SYSTEM/NETWORK/2019-20/560) | 29-08-2019 | 09-09-2019 | 09-09-2019 | 09-09-2019 | 04:00 PM | Active | View |
12. | Transporting of one no. TATA Hitachi make excavator from Dongri Buzurg Mine to Tirodi Mine through Truck Trailer.(DB/MECH/19-20/ 231) | 29-08-2019 | 17-09-2019 | 17-09-2019 | 17-09-2019 | 04:30 PM | Active | View |
13. | TENDER DOCUMENTS FOR LAYING OF 3C X 120SQMM, 11KV XLPE CABLE FROM MAIN VERTICAL SHAFT SUBSTATION TO 3RD LEVEL UNDERGROUND FOR FEEDING POWER SUPPLY TO 3RD LEVEL UNDERGROUND SUBSTATION AT MUNSAR MINE(ELECT/MUN/ADGM/19-20/565) | 28-08-2019 | 06-09-2019 | 06-09-2019 | 06-09-2019 | 04:00 PM | Active | View |
14. | Drilling of holes for cable bolting and grouting operation at Kandri Mine(MOIL/19-20/ET/230) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:00 PM | Active | View |
15. | Removal of accumulated pebbles near sand stowing plants at Chikla Mine(MOIL/19-20/ET/228) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:30 PM | Active | View |
16. | Muffling for blasting at 5 No. and 6 No. pit at Sitapatore Mine(MOIL/19-20/ET/229) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:30 PM | Active | View |
17. | Cleaning of surplus underground ROM at Kandri Mine(MOIL/19-20/ET/227) | 28-08-2019 | 27-09-2019 | 27-09-2019 | 27-09-2019 | 03:30 PM | Active | View |
18. | Purchase of High Head Slurry Dewatering Pump for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement(WE-58(ET-243) DT.27.08.2019) | 27-08-2019 | 19-09-2019 | 19-09-2019 | 20-09-2019 | 03:30 PM | Active | View |
19. | Purchase of High Head Slurry Dewatering Pump for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots) (Only Through e-procurement(WE-58(ET-243) DT.27.08.2019) | 27-08-2019 | 24-09-2019 | 24-09-2019 | 25-09-2019 | 03:30 PM | Active | View |
20. | Supply of Welding Electrodes As per Annex C(T.E.No.PUR/DB/19-20/180) | 26-08-2019 | 25-09-2019 | 25-09-2019 | 25-09-2019 | 04:30 PM | Active | View |
21. | Secondary recovery of UKL -471 20 percent from F W dump from Ch.4300 to Ch.6800 at Ukwa Mine(MOIL/19-20/ET/225) | 26-08-2019 | 26-09-2019 | 26-09-2019 | 26-09-2019 | 03:30 PM | Active | View |
22. | Hiring of machinery for sub grade mineral reject from Underground handling from magazine area at Kandri Mine(MOIL/19-20/ET/224) | 26-08-2019 | 26-09-2019 | 26-09-2019 | 26-09-2019 | 03:30 PM | Active | View |
23. | Hiring of machinery for loading unloading and transportation of Hutch from Hutch settling pond and hutch drain at Balaghat Mine(MOIL/19-20/ET/226) | 26-08-2019 | 26-09-2019 | 26-09-2019 | 26-09-2019 | 03:30 PM | Active | View |
24. | Transportation of bottom ash from Adani power plant tiroda to Balaghat Mine(BGT/Minin/LT/2019-20/539 A) | 23-08-2019 | 02-09-2019 | 02-09-2019 | 02-09-2019 | 04:30 PM | Active | View |
25. | Renovation of IMB plant office and toilet at D.B. Mine(DB/C/HO/19-20/1704 Dt 20/08/2019) | 23-08-2019 | 10-09-2019 | 10-09-2019 | 10-09-2019 | 04:30 PM | Active | View |
26. | Renovation of old toilet of EMD plant office at Dongri Buzurg Mine.(DB/C/HO/19-20/1705 Dt 20/08/2019) | 23-08-2019 | 10-09-2019 | 10-09-2019 | 10-09-2019 | 04:30 PM | Active | View |
27. | Purchase of High quality Electrical Insulating Transformer Oil - 5880 Litres.(2 Lots.)(Only Through e-procurement)(WE-60(ET-232) DT.22/08/2019) | 22-08-2019 | 16-09-2019 | 16-09-2019 | 17-09-2019 | 03:30 PM | Active | View |
28. | PURCHASE OF FASTNERS WIRE NAIL AND ROSE NAILS(PUR/MOIL/BGT/FASTNER/19-20/536) | 22-08-2019 | 18-09-2019 | 18-09-2019 | 18-09-2019 | 04:30 PM | Active | View |
29. | PURCHASE OF G I PIPE FITTINGS(PUR/MOIL/BGT/PIPE FITTINGS/19-20/537) | 22-08-2019 | 18-09-2019 | 18-09-2019 | 18-09-2019 | 04:30 PM | Active | View |
30. | Providing and laying Hume pipe from sand stowing plant for collection of pebbles at lower level bench, Kandri Mine(MOIL/19-20/ET/215) | 22-08-2019 | 20-09-2019 | 20-09-2019 | 20-09-2019 | 03:30 PM | Active | View |
31. | Tea, Snacks and Lunch for Technical Programs to be conducted at Munsar Training Centre for the year 2019-20(MUN/Civil/NIT/2019-20/VTC/93 Date 10.08.2019) | 19-08-2019 | 21-08-2019 | 21-08-2019 | 21-08-2019 | 04:30 PM | Active | View |
32. | Removal of Spillage material accumulated in 16.5 level at Balaghat Min(Mining/LT/2019-20/64) | 12-08-2019 | 21-08-2019 | 21-08-2019 | 21-08-2019 | 04:30 PM | Active | View |
33. | Repairs to roof of camp quarters at Balaghat Mine(Civil/BGT/LT/2019-20/492) | 12-08-2019 | 26-08-2019 | 26-08-2019 | 26-08-2019 | 04:30 PM | Active | View |
34. | Retaining wall for Installation of new pump shed foundation for 170 150HP pump North section Tirodi(TRD/CIVIL/19-20/1103 DATED 03.08.2019) | 11-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
35. | Proposal of outsourcing of repairs and maintenace of auto electrical work.(TRD/Elect/19-20/1059 Date 01/08/2019) | 11-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
36. | Removal of garbage cleaning of septic tankDrain at Camp area at Tirodi Mine(TRD/CIVIL/19-20/1074A DATED 03.08.2019) | 11-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
37. | Major repairing of Terex Loader at Munsar Mine(A-III/MUN/19-20/1516) | 10-08-2019 | 19-08-2019 | 19-08-2019 | 19-08-2019 | 04:00 PM | Active | View |
38. | Procurement Of Float Gear Box With Motor For 400mm Conveyor Belt For Chikla Mine(TE-05 DT.10082019) | 10-08-2019 | 26-08-2019 | 26-08-2019 | 26-08-2019 | 04:30 PM | Active | View |
39. | Lowering of HT XLPE copper cable from Production shaft surface inset to 13.5Level at Balaghat Mine(BGT/ELECT/19-20/470) | 09-08-2019 | 26-08-2019 | 26-08-2019 | 26-08-2019 | 04:30 PM | Active | View |
40. | Water proofing to service magazine building at Balaghat Mine(Civil/BGT/LT/2019-20/2390) | 08-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 04:30 PM | Active | View |
41. | Repairing of Lead Cathodes Plates at EMD Plant Dongri Buzurg Mine(MOIL/EMD/DB/Jt.GM/2019-20/214) | 07-08-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 10;30 AM | Active | View |
42. | Purchase of Organic Waste Converter Machine Along with Shredder and Weiging Machines with Annual Maintenance Contact - 10 Nos.(2 Lots) (Only Through e-procurement)(WE-48(ET-222) DT.06/08/2019) | 06-08-2019 | 28-08-2019 | 28-08-2019 | 29-08-2019 | 03:30 PM | Active | View |
43. | Purchase of Special bearing Grease, Multipurpose usage, MOSIL Make BRB-100 or equivalent - 900 Kgs.(2 Lots) (Only Through e-procurement)(WE-54(ET-223) DT.06/08/2019) | 06-08-2019 | 28-08-2019 | 28-08-2019 | 29-08-2019 | 03:30 PM | Active | View |
44. | Purchase of D.G.Set in The Range of 1250KVA To 1500KVA, 11KV with Erection and Commissioning for Chikla Mine(M.S) - 1 No.(2 Lots) and D.G.Set Rated 1000KVA, 11 KV with Erection and Commissioning for Dongri Buzurg Mine(M.S) - 1 No.(2 Lots)(WE-47(ET-221) DT | 06-08-2019 | 03-09-2019 | 03-09-2019 | 04-09-2019 | 03:30 PM | Active | View |
45. | Confining the openings of B and C-Type Quarters of Officers Colony by providing MS grills, Munsar Mine.(Munsar/Civil/2019-20/82 Date 03.08.2019) | 05-08-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
46. | Construction of Shed for Jigging near Canteen Building at Munsar Mine.(Munsar/Civil/2019-20/79 Date 31.07.2019) | 05-08-2019 | 10-08-2019 | 10-08-2019 | 10-08-2019 | 04:30 PM | Active | View |
47. | Development of approach road to Parsoda Mine.(Parsoda/Civil/NIT/19-20/86 Date 03.08.2019) | 05-08-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
48. | Making and Supplying of stemming material mud plug used to Blasting /fragment in underground at various working level at Balaghat Mine(BGT/Mining/LT/2019-20/50) | 05-08-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
49. | Construction of New generator house at North 6 No section at Tirodi Mine( MOIL/19-20/ET/184) | 05-08-2019 | 23-08-2019 | 23-08-2019 | 23-08-2019 | 03:30 PM | Active | View |
50. | Procurement of HDPE Pipe 140 MM At Dongri Buzurg Mine.(PUR/DB/19-20/130) | 05-08-2019 | 20-08-2019 | 20-08-2019 | 20-08-2019 | 04:30 PM | Active | View |
51. | Installation of centralised control for compressed air distribution system by installation of motorised valves and control panel at Balaghat Mine(MOIL/19-20/ET/216) | 02-08-2019 | 02-09-2019 | 02-09-2019 | 02-09-2019 | 03:30 PM | Active | View |
52. | Request for Empanelment For Empanelment of Consultant/ Transaction Advisor For Due Diligence and advise on Transaction of Targets Assets( MOIL/RFE/CTA/2019-20) | 02-08-2019 | 06-09-2019 | 06-09-2019 | 07-09-2019 | 11:00 AM | Active | View |
53. | Loading and unloading of steel section and various materials with stacking at Dongri Buzurg Mine(MOIL/19-20/ET/211) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | View |
54. | Cleaning of excess ROM at Beldongri Mine(MOIL/19-20/ET/209) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | View |
55. | Picking and collection of material DBL-456 25 percent and DBL-563 20 percent Mn from contaminated low grade at Dongri Buzurg Mine North West side part-5(MOIL/19-20/ET/213) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | View |
56. | Providing unskilled manpower in C and S plant for housekeeping and smooth operation of C and S plant at Chikla Mine for the year 2019-20(MOIL/19-20/ET/210) | 02-08-2019 | 03-09-2019 | 03-09-2019 | 03-09-2019 | 03:30 PM | Active | View |
57. | Cleaning of surface drain and making of earthen bound for monsoon preparation at Tirodi Mine(TRD/CIVIL/19-20/957,Dateed 12/7/2019) | 01-08-2019 | 08-08-2019 | 08-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
58. | Purchase of G.B.Car, Capacity- 4 MT For Balaghat Mine(M.P) - 15 Nos. (1 Lot) (Only Through e-procurement)(WE-52(ET/219) DT.01/08/2019) | 01-08-2019 | 21-08-2019 | 21-08-2019 | 22-08-2019 | 03:30 PM | Active | View |
59. | Purchase of Cassette Type Air Conditioners 2 Ton - 4 Nos. (Lot No.1) for MOIL Gymnasium, West Court, Rajnagar, Nagpur and Cassette Type Air Conditioners 4 Ton - 4 Nos. (Lot No.2) for Auditorium of MOIL BHAWAN, Nagpur (M.S) (Only Through e-procuremen(WE-53 | 01-08-2019 | 11-09-2019 | 11-09-2019 | 12-09-2019 | 03:30 PM | Active | View |
60. | REWIRING OF MINE MANAGER BUNGALOW AT MUNSAR MINE(ELECT/MUN/ADGM/19-20/400) | 31-07-2019 | 09-08-2019 | 09-08-2019 | 09-08-2019 | 03:30 PM | Active | View |
61. | Tea, Snacks and Lunch for Technical Programs to be conducted at Munsar Training Centre for the year 2019-20(Mun/Per/NIT/19-20/VTC/74 Date 30.07.19) | 31-07-2019 | 10-08-2019 | 10-08-2019 | 10-08-2019 | 04:30 PM | Active | View |
62. | PURCHASE OF SPARES FOR 240 HP KIRLOSKAR PUMP AT BALAGHAT MINE FROM OEM / AUTHORIZED DEALER(PUR/MOIL/BGT/PUMP/19-20/439) | 31-07-2019 | 19-08-2019 | 19-08-2019 | 19-08-2019 | 04:30 PM | Active | View |
63. | Laying of New 6 inch delivery pipeline from 13.5 level to 10 level Vertical and replacement of existing 300 HP pipeline from 10 level to surface vertical( AGT/BGT/MECH/PIPE/19-20/440) | 31-07-2019 | 19-08-2019 | 19-08-2019 | 19-08-2019 | 04:30 PM | Active | View |
64. | Purchase of Water Softener plant for 3 TPH FBC boiler - 1 No.(1 Lot) at EMD Plant, Dongri Buzurg Mine(M.S)(Only Through e-procurement)(WE-50(ET/217) DT.31/07/2019) | 31-07-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 03:30 PM | Active | View |
65. | Purchase of Agitator Shaft Assembly with Agitator blades(AISI 316-H) for Leaching Vessel - 1 Set (1 Lot.) for EMD Plant, Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-51(ET/218) DT.31/07/2019) | 31-07-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 03:30 PM | Active | View |
66. | Transportation of sand from Kanki Ghat to Balaghat mine for the purpose of sand stowing in underground Balaghat Mine(MOIL/19-20/ET/205) | 31-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
67. | Outsourcing of Dry Density Separation Plant operation at Munsar Mine for the period of 9 (Nine) Months( MOIL/19-20/ET/161) | 31-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
68. | Outsourcing of Maintenance and repairs of HT and LT overhead lines at Chikla Mine(TE MOIL/CH/19-20/02) | 30-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
69. | Production of 25 percent Mn SM grade ore BGL-523 from Underground old sub grade mineral reject material at Balaghat Mine(MOIL/19-20/ET/206) | 30-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
70. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East side part-6(MOIL/19-20/ET/207) | 30-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
71. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East side part-5(MOIL/19-20/ET/208) | 30-07-2019 | 30-08-2019 | 30-08-2019 | 30-08-2019 | 03:30 PM | Active | View |
72. | STRUCTURAL AUDIT AND NON- DESTRUCTIVE TESTING(NDT) OF IMB PLANT STRUCTURE AT BALAGHAT MINE.(AGT/BGT/MECH/STRU/19-20/429) | 29-07-2019 | 13-08-2019 | 13-08-2019 | 13-08-2019 | 04:30 PM | Active | View |
73. | PROVIDING AND APPLYING NEOPRENE RUBBER LINNING TO 2 LAKHS LITERS CELL FEED TANK AT EMD PLANT DB MINE(MOIL/EMD/DB/SDGM/2019-20/190) | 27-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 10;30 AM | Active | View |
74. | Laying of lawn for prepration of Garden premises near Mine Entry premises at Balaghat Mine(Civil/BGT/LT/19-20/146) | 24-07-2019 | 05-08-2019 | 05-08-2019 | 05-08-2019 | 04:30 PM | Active | View |
75. | providing 6 mbps 1 is to 1 Internet Leased Line(ADGM/ Group-III/ SYS/NW/ 2019-20/363) | 23-07-2019 | 30-07-2019 | 30-07-2019 | 30-07-2019 | 03:30 PM | Active | View |
76. | Purchase of FRVE Header Bars for Anodes and Cathodes - 450 Nos.each (2 Lots) for EMD Plant, Dongri Buzurg Mine (M.S) (Only Through e-procurement)(WE-49(ET/212) DT.23/07/2019) | 23-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
77. | Purchase of PP Filter Press with Suitable Compressor, Reservoir and Piping etc.for EMD Plant, Dongri Buzurg Mine(M.S) - 1 No. (1 Lot) (Only Through e-procurement)(WE-24(ET/204) DT.23/07/2019) | 23-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
78. | Provision of 33 KV Outdoor Check Meter for 33 KV Line for Vertical Shaft (High Speed Shaft) at Gumgaon Mine(MOIL/19-20/ET/172) | 23-07-2019 | 23-08-2019 | 23-08-2019 | 23-08-2019 | 03:30 PM | Active | View |
79. | TENDER FOR REPLACEMENT OF 11KV CTs AND PTs EXISTING METER CUBICAL OF MUNSAR MINE(ELECT/MUN/ADGM/19-20/353) | 22-07-2019 | 31-07-2019 | 31-07-2019 | 31-07-2019 | 03:30 PM | Active | View |
80. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT WESTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-37 Dt.22072019) | 22-07-2019 | 06-08-2019 | 06-08-2019 | 06-08-2019 | 04:30 PM | Active | View |
81. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT WESTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-37 Dt.22072019) | 22-07-2019 | 06-08-2019 | 06-08-2019 | 06-08-2019 | 04:30 PM | Active | View |
82. | Hiring of Diesel Jeep for three months at Balaghat Mine(AGT/BGT/MECH/19-20/2087) | 20-07-2019 | 05-08-2019 | 05-08-2019 | 05-08-2019 | 04:30 PM | Active | View |
83. | ERW Steel Pipes(PUR/MOIL/C-1/197/WE-44/ET/203) | 19-07-2019 | 20-08-2019 | 20-08-2019 | 21-08-2019 | 03:30 PM | Active | View |
84. | Repairing of Stick and Bucket Pin Bore holes of TATA Hitachi Zx 450 Hydraulic Excavator no.1 and 2 Two Machines by line boring and bushing work.(DB/MECH/DRILL/19-20/108) | 18-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 04:30 PM | Active | View |
85. | Premium Greaves make Worm Gear box Model U800 Reduction Ratio 70 is to 1 Right Handling(MOIL/EMD/CH/ASDGM/2019-20/113) | 18-07-2019 | 30-07-2019 | 30-07-2019 | 31-07-2019 | 09:00 AM | Active | View |
86. | Purchase of D.G.Sets Rated 25 KVA - 3 Nos. and 7.5 KVA - 1 No.(4 Lots.) required for Various Mines (Only through e-procurement)(WE-46(ET/200) DT.18/07/2019) | 18-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
87. | G.I.Wire Netting and S.S.Screen Cloth(PUR/MOIL/C-1/203/WE-39/ET/201) | 18-07-2019 | 19-08-2019 | 19-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
88. | Purchase of SPRING STEEL SCREEN PANELS -15 items( WE-45 e-tender No.MOIL/19-20/ET-202, Dt.18.07.2019) | 18-07-2019 | 13-08-2019 | 13-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
89. | Repairing of 02 Nos. two number Track Chain Assembly of TATAHitachi Zx220 Hydraulic Excavator operating at Dongri Buzurg Mine.(DB/MECH/19-20/SDGM(MECH)/104) | 17-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 04:30 PM | Active | View |
90. | Repairing of Idler Assembly- 1 No. and Sprocket Assembly -2 Nos. of TATA Hitachi Zaxis 450 No.2 Hydraulic Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/105) | 17-07-2019 | 24-07-2019 | 24-07-2019 | 24-07-2019 | 09:00 AM | Active | View |
91. | Work of repair and maintenance contract for domestic electrical installation of residential and non-residential buildings at Gumgaon mine(MOIL/19-20/ET/165) | 17-07-2019 | 14-08-2019 | 14-08-2019 | 14-08-2019 | 03:30 PM | Active | View |
92. | PURCHASE OF STANDARDS FOR GBS (AAS)(PUR/MOIL/C-3/43/E-37/377-M DT.16.07.2019) | 16-07-2019 | 31-07-2019 | 31-07-2019 | 31-07-2019 | 03:30 PM | Active | View |
93. | Major repairing works for Terex Loader at Munsar Mine(A-III/MUN/2019-20/1259 Date 15.07.19) | 16-07-2019 | 29-07-2019 | 29-07-2019 | 29-07-2019 | 04:00 PM | Active | View |
94. | C.I.Gate, Foot and N R Valves(PUR/MOIL/C-1/202/WE-43/ET/199) | 16-07-2019 | 19-08-2019 | 19-08-2019 | 20-08-2019 | 03:30 PM | Active | View |
95. | PURCHASE OF SHOT FIRING CABLE(PUR/MOIL/C-3/30/E-36/349-M DT.16.07.2019) | 16-07-2019 | 16-08-2019 | 16-08-2019 | 16-08-2019 | 03:30 PM | Active | View |
96. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR FILLING SPREADING AT EASTERN SIDE OF -470 LEVEL AT CHIKLA MINE(TE-36 Dt.15072019) | 15-07-2019 | 22-07-2019 | 22-07-2019 | 22-07-2019 | 04:30 PM | Active | View |
97. | C.I.Ball Valves(PUR/MOIL/C-1/202/WE-37/ET/197) | 15-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
98. | Butterfly Valves(PUR/MOIL/C-1/202/WE-38/ET/198) | 15-07-2019 | 07-08-2019 | 07-08-2019 | 08-08-2019 | 03:30 PM | Active | View |
99. | Removingand Laying G.I. Pipe line in Weigh Bgidge to Well to IMB at Bgt Mine(Civil/BGT/LT/19-20/39) | 14-07-2019 | 26-07-2019 | 26-07-2019 | 26-07-2019 | 04:30 PM | Active | View |
100. | Sapling at North Mine Dump area at Tirodi Mine(TRD/CIVIL/19-20/751 DATED 19.06.2019) | 13-07-2019 | 23-07-2019 | 23-07-2019 | 23-07-2019 | 03:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |