Tender Archive
S.No. | Title | Issue Start Date | Issue Last Date | Submission Last Date | Opening Date | Opening Time | Status | View |
---|---|---|---|---|---|---|---|---|
1. | Supplying and installation of portable Toilet and Security Cabin for Parsoda Mine(PARSODA/CIVIL/19-20/40) | 19-06-2019 | 25-06-2019 | 25-06-2019 | 25-06-2019 | 04:30 PM | Active | View |
2. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR TRENCH CUTTING IN ORE STACKS AT CHIKLA MINE(TE-34 Dt.19062019) | 19-06-2019 | 26-06-2019 | 26-06-2019 | 26-06-2019 | 04:30 PM | Active | View |
3. | Repairing of Bucket of Tata Hitachi ZX450 no2 Hyd. excavator operating at Dongri Buzurg mine(DB/MECH/19-20/SDGM(MECH)/82) | 19-06-2019 | 27-06-2019 | 27-06-2019 | 27-06-2019 | 04:30 PM | Active | View |
4. | Repairing of Bucket Assemblies of Ck300 No.3 Hydraulic Excavator operating at Dongri Buzurg Mine.(DB/MECH/19-20/SDGM(MECH)/81) | 19-06-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
5. | G. I. Pipes of assorted sizes(PUR/MOIL/C-1/197/WE-11/ET/155 DT.19.06.2019) | 19-06-2019 | 15-07-2019 | 15-07-2019 | 16-07-2019 | 03:30 PM | Active | View |
6. | Design, Supply, Installation and Commissioning of Multi Stage Helical Reduction Gear Box, Gear Coupling and Thruster Brake by Reducing The Length of Main Drum Shaft of Holmes Shaft Cage Winder at Balaghat Mine(M.P)(4 Lots) (Only Through e-procurement(WE-1 | 18-06-2019 | 16-07-2019 | 16-07-2019 | 17-07-2019 | 03:30 PM | Active | View |
7. | HDPE PIPES,BENDS AND ENDS(PUR/MOIL/C-1/WE-12/ET-154) | 17-06-2019 | 10-07-2019 | 10-07-2019 | 11-07-2019 | 03:30 PM | Active | View |
8. | Providing and fixing heat guard for roof of 1500 KVA DG Shed at Munsar Mine(MUN/CIVIL/19-20/36 Date 29/05/2019) | 12-06-2019 | 18-06-2019 | 18-06-2019 | 18-06-2019 | 04:30 PM | Active | View |
9. | Providing ploythelene sheet to maglore tiled roofing to carry camp quarters and taurpaulin sheet over industrial shed at Balaghat Mine(CIVIL/BGT/LT/19-20/32 DATE 10.06.2019) | 11-06-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 04:30 PM | Active | View |
10. | Making RCC barricade wall from railway siding to ROB at Balaghat Mine(CIVI/BGT/LT/19-20/31 DATE 10.06.2019) | 11-06-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 04:30 PM | Active | View |
11. | Providing and fixing of CPVC pipe line with water tank for preventive measure of fire at Manegaon mine magazine at Balaghat Mine(CIVIL/BGT/LT/19-20/30 DATE 10.06.2019) | 11-06-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 04:30 PM | Active | View |
12. | RCC roof repair of camp quarters at Balaghat Mine(CIVI/BGT/LT/19-20/28 DATE 10.06.2019) | 11-06-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 04:30 PM | Active | View |
13. | Over hauling and drop test of pit Bottom Buffer at Holmes shaft cage winder at Balaghat Mine(AGT/BGT/MECH/WINDER/19-20/233) | 11-06-2019 | 27-06-2019 | 27-06-2019 | 27-06-2019 | 04:30 PM | Active | View |
14. | Lowering of HT XLPE copper conductor cable from production shaft surface to 13.5 level at Balaghat Mine(BGT/Elect/19-20/204) | 11-06-2019 | 05-07-2019 | 05-07-2019 | 05-07-2019 | 04:30 PM | Active | View |
15. | PROVIDING AND SUPPLYING OF 7.5KVA 3PHASE DG SET COMPLETE WITH ALL STANDARD ACCESSORIES(ELECT/MUN/ADGM/19-20/208) | 10-06-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
16. | Transportation of underground tubs at Ch 5000 section of Ukwa Mine( 16/Mining/UM/19-20/417) | 10-06-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 04:30 PM | Active | View |
17. | Purchase of restricted neutral earthing system for Chikla Mine (PUR/MOIL/CH/01) | 08-06-2019 | 15-06-2019 | 15-06-2019 | 15-06-2019 | 4:30 PM | Active | View |
18. | Collection of fines from different sorting areas at Munsar Mine (MUN/MINES/19-20/881 DT 07.06.2019) | 08-06-2019 | 15-06-2019 | 15-06-2019 | 15-06-2019 | 4:30 PM | Active | View |
19. | Purchase of restricted neutral earthing system for Chikla Mine (PUR/MOIL/CH/01) | 08-06-2019 | 15-06-2019 | 15-06-2019 | 15-06-2019 | 4:30 PM | Active | View |
20. | Major repairs/overhauling Ashok Leyland Engine AL 412TC2/1 of JCB-3 loader operating at Balaghat Mine(AGT/BGT/MECH/JCB/19-20/201) | 07-06-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 04:30 PM | Active | View |
21. | Repairing and servicing of Actuators of Butterfly Valve of I.M.B Plant at Balaghat Mine (AGT/BGT/MECH/IMB/19-20/202 ) | 07-06-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 4:30 PM | Active | View |
22. | Hiring of AC Sedan Etios Cars on monthly basis for MOIL Ltd Nagpur (MOIL/19-20/ET/109) | 06-06-2019 | 05-07-2019 | 05-07-2019 | 05-07-2019 | 3:30 PM | Active | View |
23. | RETILING AND ROOF REPAIR INCLUDING LAYING POLYTHENE SHEET OVER ROOF OF CAMP QUATER AT CHIKLA MINE (CH/CIVIL/19-20/825) | 05-06-2019 | 11-06-2019 | 11-06-2019 | 11-06-2019 | 4:30 PM | Active | View |
24. | Construction of storm water drain in front of Mine Office and along the boundary wall and road side at Sitapatore Mine. (MOIL/19-20/ET/107 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
25. | Drilling of Bore Equipped with pump, pipe and starter panel for drinking water at Parsoda Mine. (MOIL/19-20/ET/103) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
26. | Drilling of 3 No. of Bore along with starter panel and pump for drinking water at various locations at Kandri Mine. (MOIL/19-20/ET/104 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
27. | Construction of Canteen Building at Balaghat Mine. (MOIL/19-20/ET/102 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
28. | Construction of Exhaust fan house with EVASEE and boundary wall at Balaghat Mine. (MOIL/19-20/ET/101 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
29. | Annual repairs to camp quarters at Chikla Mine. (MOIL/19-20/ET/106 ) | 04-06-2019 | 08-07-2019 | 08-07-2019 | 08-07-2019 | 3:30 PM | Active | View |
30. | Construction of Water supply scheme at Gumgaon Mine (MOIL/19-20/ET/108 ) | 04-06-2019 | 08-07-2019 | 08-07-2019 | 08-07-2019 | 3:30 PM | Active | View |
31. | Supplying and installation of portable M.S. Office for Parsoda Mine (Parsoda/civil/19-20/29 dt 03.06.2019) | 04-06-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 4:30 PM | Active | View |
32. | Supplying and installation of portable Toilet and Security Cabin for Parsoda Mine (Parsoda/civil/19-20/30 dt 03.06.2019) | 04-06-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 4:30 PM | Active | View |
33. | Construction of RCC Retaining wall and floor for new installed bunker of crushing plant at Chikla Mine (MOIL/19-20/ET/105 ) | 04-06-2019 | 04-07-2019 | 04-07-2019 | 04-07-2019 | 3:30 PM | Active | View |
34. | Loading of crude ore into tipper manually from different working sections to jig section of Tirodi Mine (MOIL/19-20/ET/121) | 04-06-2019 | 03-07-2019 | 03-07-2019 | 03-07-2019 | 3:30 PM | Active | View |
35. | Transportation of sand from Kanhan River to near Guest House and sand stowing plant at Gumgaon Mine by mechanised means (MOIL/19-20/ET/120) | 04-06-2019 | 03-07-2019 | 03-07-2019 | 03-07-2019 | 3:30 PM | Active | View |
36. | Annual underground sand cleaning work at Balaghat Mine (MOIL/19-20/ET/122) | 04-06-2019 | 03-07-2019 | 03-07-2019 | 03-07-2019 | 3:30 PM | Active | View |
37. | PURCHASE OF APPLE 21.5 INCH IMAC (DESKTOP) WITH RETINA 4K DISPLAY 3.0GHZ 6-CORE 8TH-GENERATION INTEL CORE I5 PROCESSOR, 1TB ALONG WITH APPLE CARE PROTECTION PLAN FOR IMAC-ONLINE ENROLMENT AND MICROSOFT OFFICE MAC HOME STUDENT 2016 - 1 NO. (PUR/MOIL/C-4/13 | 04-06-2019 | 10-07-2019 | 10-07-2019 | 10-07-2019 | 3:30 PM | Active | View |
38. | Rejuvenate of well situated near siding by cleaning and deepening at Kandri mine. (Kan/Civil/NIT/19-20/687 dt 28.05.2019) | 01-06-2019 | 04-06-2019 | 04-06-2019 | 04-06-2019 | 4:30 PM | Active | View |
39. | Repairing and replacement of damaged domestic water pipeline including fitting of pump to service well for water distribution in chargaon colony at Munsar Mine (MUN/CIVIL/19-20/27 Date 29/05/2019) | 01-06-2019 | 08-06-2019 | 08-06-2019 | 08-06-2019 | 4:30 PM | Active | View |
40. | Repairing and replacement of damaged domestic water pipeline including fitting of pump to service well for water distribution in chargaon colony at Munsar Mine (MUN/CIVIL/19-20/27 Date 29/05/2019) | 01-06-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 4:30 PM | Active | View |
41. | Limited Tender for Computer and peripherals (Printers, UPSs and LAN) Maintenance Contract of Chikla Mine and Dongri Buzurg Mine.(TE/CH/SYSTEM/AMC/2019-20/60) | 30-05-2019 | 08-06-2019 | 08-06-2019 | 08-06-2019 | 04:30 PM | Active | View |
42. | TENDER DOCUMENT FOR REPLACEMENT OF IBR BED COIL TUBES 19 20(MOIL/EMD/CH/ASDGM/19-20/59) | 30-05-2019 | 11-06-2019 | 11-06-2019 | 12-06-2019 | 10:30 AM | Active | View |
43. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR GODREJ SULLAIR MAKE COMPRESSOR(PUR/MOIL/C-5/34/E-18/207-M Dt. 29/05/2019) | 29-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
44. | WEBSITE SINGLE-PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR VENTRA MAKE 4TON BATTERY OPERATED LOCOMOTIVE.(PUR/MOIL/C-5/44/E-19/208-M Dt. 29/05/2019) | 29-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
45. | Purchase of SULPHURIC ACID with Transportation - 275 MT(WE-21 e-tender No.MOIL/19-20/ET-128, Dt.29.05.2019) | 29-05-2019 | 20-06-2019 | 20-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
46. | Premium Greaves make Worm Gear box, Model U800 Reduction Ratio70is to1 Right Handling(MOIL/EMD/CH/ASDGM/19-20/56) | 29-05-2019 | 19-06-2019 | 19-06-2019 | 20-06-2019 | 10:30 AM | Active | View |
47. | Operation and Maintenance of Electrical works at Corporate Office, Nagpur for a period of one year(MOIL/19-20/ET/123) | 29-05-2019 | 28-06-2019 | 28-06-2019 | 28-06-2019 | 03:30 PM | Active | View |
48. | Inclusion of priming system in existing pumping automation system for operation and monitoring of underground pumps at Chikla Mine(MOIL/19-20/ET/124) | 29-05-2019 | 28-06-2019 | 28-06-2019 | 28-06-2019 | 03:30 PM | Active | View |
49. | Purchase of IRON ORE with Transportation - 3000 MT(WE-20 e-tender No.MOIL/19-20/ET-126, Dt.27.05.2019) | 27-05-2019 | 19-06-2019 | 19-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
50. | Purchse of TCT Drill Rods - 4 Items(WE-14 DT.27.05.2019 (e-Tenderno.MOIL/19-20/ET/127)) | 27-05-2019 | 26-06-2019 | 26-06-2019 | 27-06-2019 | 03:30 PM | Active | View |
51. | PURCHASE OF GEARED MOTOR FOR 14.5 LEVEL CONVEYOR BELT AT BALAGHAT MINE(PUR/MOIL/BGT/19-20/185) | 25-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 04:30 PM | Active | View |
52. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine East south side part-3(MOIL/19-20/ET/116) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
53. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South side part-1(MOIL/19-20/ET/117) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
54. | Picking and collection of low grade contaminated Ore DBL-563 from crushed ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South West part-1(MOIL/19-20/ET/118) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
55. | Picking and collection of low grade contaminated Ore DBL-563 from ROM processed through mobile crushing and screening plant at Dongri Buzurg Mine South side part-2(MOIL/19-20/ET/119) | 24-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 03:30 PM | Active | View |
56. | Purchase of PEARL COKE with Transportation - 7000 MT(WE-10 e-tender No.MOIL/19-20/ET-125, Dt.24.05.2019) | 24-05-2019 | 13-06-2019 | 13-06-2019 | 14-06-2019 | 03:30 PM | Active | View |
57. | Hiring of diesel Jeep for Balaghat Mine for a period of one year(MOIL/19-20/ET/36) | 24-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
58. | Cleaning of ROM recovered from Pit No.6 at Sitapatore Mine(MOIL/19-20/ET/97) | 24-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
59. | Strengthening of security for Railway Weigh Bridge at Balaghat Mine(MOIL/19-20/ET/99) | 24-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
60. | Shifting and Transport of pebbles accumulated due to Sand Stowing by old open plant at 234 MRL and dropping into the winze No. 2 of the level 193 MRL and Spreading at Beldongri Mine(MOIL/19-20/ET/98) | 24-05-2019 | 01-07-2019 | 01-07-2019 | 01-07-2019 | 03:30 PM | Active | View |
61. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR SCREENING OF SIDING DEBRIDGE TO PRODUCE 340MT ORE(Lumpy) AND 250 MT FINES AT CHIKLA MINE(TE-33 Dt.23052019) | 23-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
62. | Repairing work at quarter no C-2 Chikla type at Balaghat Mine(CIVIL/BGT/LT/19-20/21 DATE 22.05.2019) | 23-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 04:30 PM | Active | View |
63. | Repairing of existing drain of IMB plant at Balaghat Mine(CIVI/BGT/LT/19-20/22 DATE 22.05.2019) | 23-05-2019 | 03-06-2019 | 03-06-2019 | 03-06-2019 | 04:30 PM | Active | View |
64. | Providing, Supplying, Installation and Commissioning of heavy duty centrifugal pump with drive and operating valves at Chikla Mine(MOIL/19-20/ET/84) | 22-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
65. | Cleaning of accumulated silt from cross cut of different level at Balaghat Mine(MIN/BGT/19-2/LT/816 DATE 17.05.2019) | 21-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
66. | Transportation of sand from Kanki ghat to Balaghat Mine(Min/BGT/19-2/LT/841 DATE 20.05.2019) | 21-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 04:30 PM | Active | View |
67. | Additional excavation in Manganiferous rock for concreting of crosscut, manway and orepass etc. in underground at Munsar Mine(MOIL/19-20/ET/94) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
68. | Picking and collection of material to recover Ferro grade MS-3516 ore from sub-grade mineral reject through jigging at Munsar Mine(MOIL/19-20/ET/93) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
69. | Recovery of Ferro grade TD-4505 and SM grade TDL-439 and TDL-499 from South Magazine Dump at Tirodi Mine(MOIL/19-20/ET/95) | 21-05-2019 | 21-06-2019 | 21-06-2019 | 21-06-2019 | 03:30 PM | Active | View |
70. | WEBSITE PROPRIETARY TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF SPARES FOR DRY DENSITY SEPERATION PLANT AT MUNSAR MINE(PUR/MOIL/C-5/23/E-16/117-M Dt. 21-05-2019) | 21-05-2019 | 12-06-2019 | 12-06-2019 | 12-06-2019 | 03:30 PM | Active | View |
71. | Lifting of transformer and accessories from transformer floor to the ground and transporting to storage site in FMP, Balaghat(FMP/ELECT/19-20/55) | 20-05-2019 | 31-05-2019 | 31-05-2019 | 31-05-2019 | 04:30 PM | Active | View |
72. | PURCHASE OF ATLAS COPCO MAKE BBD 94W ROCK DRILL - 10 NOS. AND ALF 72D PUSHER LEGS - 10 NOS. FOR BALAGHAT MINE(M.P)(AS PER ANNEXURE - A ENCLOSED)(PUR/MOIL/C-4/115/E-17/178-M DT.20/05/2019) | 20-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
73. | Hiring of services of Design Engineering Firm for proposed new water supply scheme at Chikla Mine(MOIL/19-20/ET/72) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
74. | Maintenance, watch and ward of garden at various places at Munsar Mine.(MOIL/19-20/ET/65) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
75. | 1 Providing and fixing concertina coil fencing at 160L n 250L 2 Providing and fixing concertina coil fencing from Siding to Chikla B and 3 Construction of boundary wall in precast, prestressed column and panels along peripherial area of 2nd Ve(MOIL/19-20/ | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
76. | Construction of GSR of 2.00 lakh liter capacity for second vertical shaft near Gadhaghat at Chikla Mine(MOIL/19-20/ET/70) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
77. | Cleaning of surplus contaminated ROM to recover Ferro grade and LGHS ore at Vertical Shaft at Chikla Mine(MOIL/19-20/ET/91) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
78. | Cleaning of surplus contaminated ROM at Chikla B section of Chikla Mine(MOIL/19-20/ET/90) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
79. | Construction of Cement concrete plateform beside existing CC plateform at Kandri Mine.(MOIL/19-20/ET/62) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
80. | Providing and laying pipe line from service reservoir of guest house upto second level sand stowing plant at Balaghat Mine(MOIL/19-20/ET/66) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
81. | Concreting of shaft cross-cut at -450 L using Precast Slabs at Kandri Mine(MOIL/19-20/ET/92) | 20-05-2019 | 20-06-2019 | 20-06-2019 | 20-06-2019 | 03:30 PM | Active | View |
82. | Construction of DAV Public school at village Munsar Distt Nagpur, under CSR(MOIL/19-20/ET/100) | 20-05-2019 | 24-06-2019 | 24-06-2019 | 24-06-2019 | 03:30 PM | Active | View |
83. | Repairing of Bucket Assembly TATA Hitachi 450-1 Hyd Excavator operating at Dongri Buzurg Mine(DB/MECH/19-20/SDGM(MECH)/52) | 18-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 04:30 PM | Active | View |
84. | WEBSITE TENDER ENQUIRY IN TWO BID SYSTEM FOR PURCHASE OF STAINLESS STEEL BALL VALVES(PUR/MOIL/C-11/14/E-12/114-M Dt. 17-05-2019) | 17-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
85. | Removal of waste rock and Manganiferous rock from Pit No.5 and handling the same by mechanized means at Sitapatore Sukli Mine(MOIL/19-20/ET/86) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
86. | Purchase of sand required for Underground concreting work at Ukwa Mine(MOIL/19-20/ET/87) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
87. | Transportation of underground tubs at Ch.5000 section of Ukwa Mine(MOIL/19-20/ET/89) | 17-05-2019 | 17-06-2019 | 17-06-2019 | 17-06-2019 | 03:30 PM | Active | View |
88. | Pushing and unloading of ROM and rock tubs in underground at Munsar Mine(MOIL/19-20/ET/88) | 17-05-2019 | 19-06-2019 | 19-06-2019 | 19-06-2019 | 03:30 PM | Active | View |
89. | WEBSITE TENDER ENQUIRY IN SINGLE BID SYSTEM FOR PURCHASE OF NON RETURN VALVES, GATE VALVES AND BUTTERFLY VALVES.(PUR/MOIL/C-11/148/E-13/116-M Dt. 17-05-2019) | 17-05-2019 | 07-06-2019 | 07-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
90. | Purchase of Traction Battery Chargers for Various Mines - 10 Nos. (5 Lots) (Only Through e-procurement)(WE-19(ET/115) DT.17/05/2019) | 17-05-2019 | 13-06-2019 | 13-06-2019 | 14-06-2019 | 03:30 PM | Active | View |
91. | Fabrication of wooden and Iron Clamps for lowering of 120 Sqmm XLPE copper cable from Production shaft surface inset to 13.5L Underground at Balaghat Mine(BGT/TE/Elect/19-20/123) | 16-05-2019 | 04-06-2019 | 04-06-2019 | 04-06-2019 | 04:30 PM | Active | View |
92. | Purchase of Hand Held Electro-Hydraulic Drill Machine for Underground Mining Application at Various Mines - 6 Nos.(4 Lots) with Operation and Maintenance Spares (Only Through e-procurement)(WE-7(ET/113) DT.16/05/2019) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
93. | Transporting one no. TATA Hitachi make Excavator (Tata from Tirodi Mine to Dongri Buzurg Mine through Truck Trailer.( DB/MECH/19-20/SDGM(MECH)/ 51) | 16-05-2019 | 21-05-2019 | 21-05-2019 | 21-05-2019 | 04:30 PM | Active | View |
94. | Designing and printing of Annual Report 2018-19 Deluxe Version in English, Hindi and Marathi, Shareholder version and Abridged Version in English, Translation of text from English to Hindi and Marathi and handling charges(MOIL/19-20/ET/83) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 06-06-2019 | 03:30 PM | Active | View |
95. | Purchase of Ventilation Fan Complete for various Mines - 3 Sets.(2 Lots) (Only Through e-procurement)(WE-9(ET/114) DT.16/05/2019) | 16-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
96. | Purchase of Dry Type Transformers for Various Mines - 6 Nos.(4 Lots) (Only Through e-procurement)(WE-8(ET/112) DT.15/05/2019) | 15-05-2019 | 06-06-2019 | 06-06-2019 | 07-06-2019 | 03:30 PM | Active | View |
97. | PURCHASE OF TRIMBLE MAKE (S-6 MODEL) TOTAL STATION BATTERY.(PUR/MOIL/C-13/19/E-15/151-M DT.14.05.2019) | 15-05-2019 | 10-06-2019 | 10-06-2019 | 10-06-2019 | 03:30 PM | Active | View |
98. | Purchase of High Speed Diesel (HSD)(PUR/MOIL/C-2/163/E-14/142-M DT.14/05/2019) | 14-05-2019 | 29-05-2019 | 29-05-2019 | 29-05-2019 | 03:30 PM | Active | View |
99. | Purchase of Motorised Rotary Tub Tippler for Gumgaon Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-16 (ET/110) DT.14/05/2019) | 14-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
100. | Purchase of Double Deck Circular Motion Vibratory Screen for Munsar Mine(M.S) - 1 Set. (1 Lot) (Only Through e-procurement)(WE-17 (ET/111) DT.14/05/2019) | 14-05-2019 | 03-06-2019 | 03-06-2019 | 04-06-2019 | 03:30 PM | Active | View |
Tenders More Information |
---|
Details of Purchase Order issued by MATERIALS DEPARTMENT valuing Rs.30.00 Lakhs & Above List of Empaneled Advocates (Advertisement dated 29/06/2023 published on CPP portal and MOIL Website) |
View (2025) Year Tenders |
View (2024) Year Tenders |
View (2023) Year Tenders |
View (2022) Year Tenders |
View (2021) Year Tenders |
View (2020) Year Tenders |
View (2019) Year Tenders |
View (2018) Year Tenders |
View (2017) Year Tenders |
View (2016) Year Tenders |
View (2015) Year Tenders |
View (2014) Year Tenders |
View (2013) Year Tenders |
View (2012) Year Tenders |
View (205) Year Tenders |
View (24) Year Tenders |
View Full Tender Archive |
See all MOIL tender. |